DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 222 (November 17, 2016)

Page Range81090-81091
FR Document2016-27618

Federal Register, Volume 81 Issue 222 (Thursday, November 17, 2016)
[Federal Register Volume 81, Number 222 (Thursday, November 17, 2016)]
[Notices]
[Pages 81090-81091]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-27618]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 2593-031; 2823-020]


Algonquin Power (Beaver Falls), LLC; Notice of Scoping Meetings 
and Environmental Site Review and Soliciting Scoping Comments

    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection:
    a. Type of Application: Subsequent Licenses.
    b. Project Nos.: 2593-031 and 2823-020.
    c. Date filed: December 30, 2015.
    d. Applicant: Algonquin Power (Beaver Falls), LLC.
    e. Name of Project: Upper Beaver Falls Hydroelectric Project and 
Lower Beaver Falls Hydroelectric Project.
    f. Location: On the Beaver River in Lewis County, New York. The 
projects are not located on federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Robert A. Gates, Executive Vice President, 
Eagle Creek Renewable Energy, 116 N. State Street, P.O. Box 167, 
Neshkoro, WI 54960-0167; (973) 998-8403; [email protected].
    i. FERC Contact: Andy Bernick, (202) 502-8660 or 
[email protected].
    j. Deadline for filing scoping comments: January 12, 2017.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket numbers P-2593-031 and P-2823-020.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. These applications are not ready for environmental analysis at 
this time.
    l. The existing project works are as follows:
    The Upper Beaver Falls Project consists of: (1) A 328-foot-long, 
25-foot-high concrete gravity dam with an uncontrolled overflow 
spillway; (2) a 48-acre reservoir with a storage capacity of 800 acre-
feet at elevation 799.4 feet North American Vertical Datum of 1988 
(NAVD 88); (3) a 17-foot-high, 26.5-foot-wide, 27.5-foot-long intake 
structure with a steel trash rack with 2 5/8-inch clear spacing; (4) a 
90-foot-long, 16-foot-wide, 8-foot-high concrete penstock; (5) a 
powerhouse containing one turbine-generator with a nameplate rating of 
1,500 kilowatts (kW); (6) a tailrace excavated in the riverbed; (7) a 
2,120-foot-long, 2.4-kilovolt (kV) overhead and underground 
transmission line connecting to an existing substation; and (8) other 
appurtenances. The project generates about 8,685 megawatt-hours (MWh) 
annually.
    The Lower Beaver Falls Hydroelectric Project consists of: (1) A 
400-foot-long concrete gravity dam with a maximum height of 14 feet, 
including: (i) A 240-foot-long non-overflow section containing an 8-
foot-wide spillway topped with flashboards ranging from 6 to 8 inches 
in height and (ii) a 160-foot-long overflow section with an ice sluice 
opening; (2) a 4-acre reservoir with a storage capacity of 27.9 acre-
feet at a normal elevation of 769.6 feet NAVD 88; (3) an intake 
structure with a steel trash rack with 1 3/4-inch clear spacing, 
integral with a powerhouse containing two 500-kW turbine and generator 
units; (4) a tailrace; (5) a 505-foot-long, 2.4-kV transmission line 
connected to the Upper Beaver Falls powerhouse; and (6) appurtenant 
facilities. The project generates about 5,617 MWh annually.
    The Lower Beaver Falls Project is located approximately 600 feet 
downstream of the Upper Beaver Falls Project. The dams and existing 
project facilities for both projects are owned by the applicant. The 
applicant proposes

[[Page 81091]]

no new project facilities or operational changes, but proposes that 
both projects be combined under a single license.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Scoping Process: The Commission intends to prepare an 
environmental assessment (EA) on the projects in accordance with the 
National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable 
alternatives to the proposed action.

Scoping Meetings

    FERC staff will conduct one agency scoping meeting and one public 
meeting. The agency scoping meeting will focus on resource agency and 
non-governmental organization (NGO) concerns, while the public scoping 
meeting is primarily for public input. All interested individuals, 
organizations, and agencies are invited to attend one or both of the 
meetings, and to assist the staff in identifying the scope of the 
environmental issues that should be analyzed in the EA. The times and 
locations of these meetings are as follows:

Agency Scoping Meeting

    Date: Tuesday, December 13, 2016.
    Time: 9:00 a.m.
    Place: Croghan Volunteer Fire Department.
    Address: 6860 Fire Hall Street, Croghan, New York.

Public Scoping Meeting

    Date: Tuesday, December 13, 2016.
    Time: 7:00 p.m.
    Place: Croghan Volunteer Fire Department.
    Address: 6860 Fire Hall Street, Croghan, New York.
    Copies of the Scoping Document (SD1) outlining the subject areas to 
be addressed in the EA were distributed to the parties on the 
Commission's mailing list. Copies of the SD1 will be available at the 
scoping meeting or may be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link (see item m above).

Environmental Site Review

    The Applicant and FERC staff will conduct a project Environmental 
Site Review beginning at 1:00 p.m. on December 13, 2016. All interested 
individuals, organizations, and agencies are invited to attend. All 
participants should meet at the Upper Beaver Falls Project facility, 
located at 9692 New York State Route 126, Castorland, New York. All 
participants are responsible for their own transportation to the site 
and during the site visit. Anyone with questions about the 
Environmental Site Review should contact Mr. Jeff Kirch, Northern New 
York Regional Operator for Algonquin Power (Beaver Falls) LLC, at 315-
783-5854 or [email protected].

Objectives

    At the scoping meetings, the staff will: (1) Summarize the 
environmental issues tentatively identified for analysis in the EA; (2) 
solicit from the meeting participants all available information, 
especially quantifiable data, on the resources at issue; (3) encourage 
statements from experts and the public on issues that should be 
analyzed in the EA, including viewpoints in opposition to, or in 
support of, the staff's preliminary views; (4) determine the resource 
issues to be addressed in the EA; and (5) identify those issues that 
require a detailed analysis, as well as those issues that do not 
require a detailed analysis.

Procedures

    The meetings are recorded by a stenographer and become part of the 
formal record of the Commission proceeding on the projects.
    Individuals, organizations, and agencies with environmental 
expertise and concerns are encouraged to attend the meeting and to 
assist the staff in defining and clarifying the issues to be addressed 
in the EA.

    Dated: November 9, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-27618 Filed 11-16-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    81090                     Federal Register / Vol. 81, No. 222 / Thursday, November 17, 2016 / Notices

                                                       c. Date Filed: October 3, 2016.                      related to this or other pending projects.            First Street NE., Washington, DC 20426.
                                                       d. Submitted By: Shell Energy North                  For assistance, contact FERC Online                   The first page of any filing should
                                                    America (US), L.P.                                      Support.                                              include docket numbers P–2593–031
                                                       e. Name of Project: Hydro Battery                                                                          and P–2823–020.
                                                                                                              Dated: November 9, 2016.
                                                    Pearl Hill Project.                                                                                              The Commission’s Rules of Practice
                                                       f. Location: On the Columbia River                   Kimberly D. Bose,
                                                                                                                                                                  and Procedure require all interveners
                                                    and Rufus Woods Lake, near Bridgeport,                  Secretary.                                            filing documents with the Commission
                                                    Douglas County, Washington. The                         [FR Doc. 2016–27619 Filed 11–16–16; 8:45 am]          to serve a copy of that document on
                                                    project would be located on state lands                 BILLING CODE 6717–01–P                                each person on the official service list
                                                    and the lower reservoir and power                                                                             for the project. Further, if an intervener
                                                    generation and pumping equipment                                                                              files comments or documents with the
                                                    would be located on Rufus Woods Lake,                   DEPARTMENT OF ENERGY                                  Commission relating to the merits of an
                                                    a reservoir operated by the Army Corps                                                                        issue that may affect the responsibilities
                                                    of Engineers.                                           Federal Energy Regulatory
                                                                                                                                                                  of a particular resource agency, they
                                                       g. Filed Pursuant to: 18 CFR 5.3 of the              Commission
                                                                                                                                                                  must also serve a copy of the document
                                                    Commission’s regulations.                               [Project Nos. 2593–031; 2823–020]                     on that resource agency.
                                                       h. Potential Applicant Contact: Mr.                                                                           k. These applications are not ready for
                                                    Brian Johansen, Vice President Power                    Algonquin Power (Beaver Falls), LLC;                  environmental analysis at this time.
                                                    Trading West, Shell Energy North                        Notice of Scoping Meetings and                           l. The existing project works are as
                                                    America (US), L.P., 601 W. 1st Ave.,                    Environmental Site Review and                         follows:
                                                    Suite 1700, Spokane, Washington                         Soliciting Scoping Comments                              The Upper Beaver Falls Project
                                                    99201; phone: (509) 688–6000.                                                                                 consists of: (1) A 328-foot-long, 25-foot-
                                                       i. FERC Contact: Ryan Hansen at (202)                   Take notice that the following                     high concrete gravity dam with an
                                                    502–8074; or email at ryan.hansen@                      hydroelectric applications have been                  uncontrolled overflow spillway; (2) a
                                                    ferc.gov.                                               filed with the Commission and are                     48-acre reservoir with a storage capacity
                                                       j. Shell Energy North America (US),                  available for public inspection:                      of 800 acre-feet at elevation 799.4 feet
                                                    L.P. (Shell Energy) filed its request to                   a. Type of Application: Subsequent                 North American Vertical Datum of 1988
                                                    use the Traditional Licensing Process on                Licenses.                                             (NAVD 88); (3) a 17-foot-high, 26.5-foot-
                                                    October 3, 2016. Shell Energy provided                     b. Project Nos.: 2593–031 and 2823–                wide, 27.5-foot-long intake structure
                                                    public notice of its request on October                 020.                                                  with a steel trash rack with 2 5/8-inch
                                                    13, 2016. In a letter dated November 9,                    c. Date filed: December 30, 2015.                  clear spacing; (4) a 90-foot-long, 16-foot-
                                                    2016, the Director of the Division of                      d. Applicant: Algonquin Power                      wide, 8-foot-high concrete penstock; (5)
                                                    Hydropower Licensing approved Shell                     (Beaver Falls), LLC.                                  a powerhouse containing one turbine-
                                                    Energy’s request to use the Traditional                    e. Name of Project: Upper Beaver                   generator with a nameplate rating of
                                                    Licensing Process.                                      Falls Hydroelectric Project and Lower                 1,500 kilowatts (kW); (6) a tailrace
                                                       k. With this notice, we are designating              Beaver Falls Hydroelectric Project.                   excavated in the riverbed; (7) a 2,120-
                                                    Shell Energy as the Commission’s non-                      f. Location: On the Beaver River in                foot-long, 2.4-kilovolt (kV) overhead and
                                                    federal representative for carrying out                 Lewis County, New York. The projects                  underground transmission line
                                                    informal consultation pursuant to                       are not located on federal lands.                     connecting to an existing substation;
                                                    section 7 of the Endangered Species Act                    g. Filed Pursuant to: Federal Power                and (8) other appurtenances. The project
                                                    and section 305(b) of the Magnuson-                     Act 16 U.S.C. 791(a)–825(r).                          generates about 8,685 megawatt-hours
                                                    Stevens Fishery Conservation and                           h. Applicant Contact: Robert A. Gates,             (MWh) annually.
                                                    Management Act; and consultation                        Executive Vice President, Eagle Creek                    The Lower Beaver Falls Hydroelectric
                                                    pursuant to section 106 of the National                 Renewable Energy, 116 N. State Street,                Project consists of: (1) A 400-foot-long
                                                    Historic Preservation Act.                              P.O. Box 167, Neshkoro, WI 54960–                     concrete gravity dam with a maximum
                                                       l. Shell Energy filed a Pre-Application              0167; (973) 998–8403; bob.gates@                      height of 14 feet, including: (i) A 240-
                                                    Document (PAD; including a proposed                     eaglecreekre.com.                                     foot-long non-overflow section
                                                    process plan and schedule) with the                        i. FERC Contact: Andy Bernick, (202)               containing an 8-foot-wide spillway
                                                    Commission, pursuant to 18 CFR 5.6 of                   502–8660 or andrew.bernick@ferc.gov.                  topped with flashboards ranging from 6
                                                    the Commission’s regulations.                              j. Deadline for filing scoping                     to 8 inches in height and (ii) a 160-foot-
                                                       m. A copy of the PAD is available for                comments: January 12, 2017.                           long overflow section with an ice sluice
                                                    review at the Commission in the Public                     The Commission strongly encourages                 opening; (2) a 4-acre reservoir with a
                                                    Reference Room or may be viewed on                      electronic filing. Please file scoping                storage capacity of 27.9 acre-feet at a
                                                    the Commission’s Web site (http://                      comments using the Commission’s                       normal elevation of 769.6 feet NAVD 88;
                                                    www.ferc.gov), using the ‘‘eLibrary’’                   eFiling system at http://www.ferc.gov/                (3) an intake structure with a steel trash
                                                    link. Enter the docket number,                          docs-filing/efiling.asp. Commenters can               rack with 1 3/4-inch clear spacing,
                                                    excluding the last three digits in the                  submit brief comments up to 6,000                     integral with a powerhouse containing
                                                    docket number field to access the                       characters, without prior registration,               two 500-kW turbine and generator units;
                                                    document. For assistance, contact FERC                  using the eComment system at http://                  (4) a tailrace; (5) a 505-foot-long, 2.4-kV
                                                    Online Support at                                       www.ferc.gov/docs-filing/                             transmission line connected to the
                                                    FERCONlineSupport@ferc.gov, (866)                       ecomment.asp. You must include your                   Upper Beaver Falls powerhouse; and (6)
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    208–3676 (toll free), or (202) 502–8659                 name and contact information at the end               appurtenant facilities. The project
                                                    (TTY). A copy is also available for                     of your comments. For assistance,                     generates about 5,617 MWh annually.
                                                    inspection and reproduction at the                      please contact FERC Online Support at                    The Lower Beaver Falls Project is
                                                    address in paragraph h.                                 FERCOnlineSupport@ferc.gov, (866)                     located approximately 600 feet
                                                       n. Register online at http://                        208–3676 (toll free), or (202) 502–8659               downstream of the Upper Beaver Falls
                                                    www.ferc.gov/docs-filing/                               (TTY). In lieu of electronic filing, please           Project. The dams and existing project
                                                    esubscription.asp to be notified via                    send a paper copy to: Secretary, Federal              facilities for both projects are owned by
                                                    email of new filing and issuances                       Energy Regulatory Commission, 888                     the applicant. The applicant proposes


                                               VerDate Sep<11>2014   21:24 Nov 16, 2016   Jkt 241001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\17NON1.SGM   17NON1


                                                                              Federal Register / Vol. 81, No. 222 / Thursday, November 17, 2016 / Notices                                                     81091

                                                    no new project facilities or operational                at the scoping meeting or may be                      DEPARTMENT OF ENERGY
                                                    changes, but proposes that both projects                viewed on the web at http://
                                                    be combined under a single license.                     www.ferc.gov using the ‘‘eLibrary’’ link              Federal Energy Regulatory
                                                       m. A copy of the application is                      (see item m above).                                   Commission
                                                    available for review at the Commission                                                                        [Docket No. CP16–472–000]
                                                    in the Public Reference Room or may be                  Environmental Site Review
                                                    viewed on the Commission’s Web site at                                                                        Northern Natural Gas Company; Notice
                                                                                                               The Applicant and FERC staff will
                                                    http://www.ferc.gov using the                                                                                 of Availability of the Environmental
                                                                                                            conduct a project Environmental Site
                                                    ‘‘eLibrary’’ link. Enter the docket                                                                           Assessment for the Proposed Northern
                                                                                                            Review beginning at 1:00 p.m. on
                                                    number excluding the last three digits in                                                                     Lights 2017 Expansion Project
                                                    the docket number field to access the                   December 13, 2016. All interested
                                                    document. For assistance, contact FERC                  individuals, organizations, and agencies                The staff of the Federal Energy
                                                    Online Support. A copy is also available                are invited to attend. All participants               Regulatory Commission (FERC or
                                                    for inspection and reproduction at the                  should meet at the Upper Beaver Falls                 Commission) has prepared an
                                                    address in item h above.                                Project facility, located at 9692 New                 environmental assessment (EA) for the
                                                       You may also register online at http://              York State Route 126, Castorland, New                 Northern Lights 2017 Expansion Project,
                                                    www.ferc.gov/docs-filing/                               York. All participants are responsible                proposed by Northern Natural Gas
                                                    esubscription.asp to be notified via                    for their own transportation to the site              Company (Northern) in the above-
                                                    email of new filings and issuances                      and during the site visit. Anyone with                referenced docket. Northern requests
                                                    related to this or other pending projects.              questions about the Environmental Site                authorization to construct, operate, and
                                                    For assistance, contact FERC Online                     Review should contact Mr. Jeff Kirch,                 maintain new natural gas facilities in
                                                    Support.                                                Northern New York Regional Operator                   Sherburne, Isanti, and Rice counties,
                                                       n. Scoping Process: The Commission                   for Algonquin Power (Beaver Falls) LLC,               Minnesota, to provide for approximately
                                                    intends to prepare an environmental                     at 315–783–5854 or Jeffrey.kirch@                     76,000 dekatherms per day to serve
                                                    assessment (EA) on the projects in                      eaglecreekre.com.                                     increased markets for industrial,
                                                    accordance with the National                                                                                  commercial, and residential uses.
                                                    Environmental Policy Act. The EA will                   Objectives                                              The EA assesses the potential
                                                    consider both site-specific and                                                                               environmental effects of the
                                                                                                              At the scoping meetings, the staff will:            construction and operation of the
                                                    cumulative environmental impacts and
                                                    reasonable alternatives to the proposed                 (1) Summarize the environmental issues                Northern Lights 2017 Expansion Project
                                                    action.                                                 tentatively identified for analysis in the            in accordance with the requirements of
                                                                                                            EA; (2) solicit from the meeting                      the National Environmental Policy Act.
                                                    Scoping Meetings                                        participants all available information,               The FERC staff concludes that approval
                                                      FERC staff will conduct one agency                    especially quantifiable data, on the                  of the proposed project, with
                                                    scoping meeting and one public                          resources at issue; (3) encourage                     appropriate mitigating measures, would
                                                    meeting. The agency scoping meeting                     statements from experts and the public                not constitute a major federal action
                                                    will focus on resource agency and non-                  on issues that should be analyzed in the              significantly affecting the quality of the
                                                    governmental organization (NGO)                         EA, including viewpoints in opposition                human environment.
                                                    concerns, while the public scoping                      to, or in support of, the staff’s                       The Northern Lights 2017 Expansion
                                                    meeting is primarily for public input.                  preliminary views; (4) determine the                  Project includes the following facilities:
                                                    All interested individuals,                             resource issues to be addressed in the                  • Approximately 2 miles of 8-inch-
                                                    organizations, and agencies are invited                 EA; and (5) identify those issues that                diameter pipeline loop 1 in Sherburne
                                                    to attend one or both of the meetings,                  require a detailed analysis, as well as               County;
                                                    and to assist the staff in identifying the              those issues that do not require a                      • approximately 2.8 miles of 12-inch-
                                                    scope of the environmental issues that                  detailed analysis.                                    diameter pipeline loop in Isanti County;
                                                    should be analyzed in the EA. The times                                                                       and
                                                    and locations of these meetings are as                  Procedures                                              • an additional 15,900-horsepower
                                                    follows:                                                                                                      compression unit at Northern’s existing
                                                                                                              The meetings are recorded by a                      Faribault Compressor Station in Rice
                                                    Agency Scoping Meeting                                  stenographer and become part of the                   County.
                                                      Date: Tuesday, December 13, 2016.                     formal record of the Commission                         The FERC staff mailed copies of the
                                                      Time: 9:00 a.m.                                       proceeding on the projects.                           EA to federal, state, and local
                                                      Place: Croghan Volunteer Fire                           Individuals, organizations, and                     government representatives and
                                                    Department.                                             agencies with environmental expertise                 agencies; elected officials;
                                                      Address: 6860 Fire Hall Street,                       and concerns are encouraged to attend                 environmental and public interest
                                                    Croghan, New York.                                      the meeting and to assist the staff in                groups; Native American tribes;
                                                    Public Scoping Meeting                                  defining and clarifying the issues to be              potentially affected landowners and
                                                                                                            addressed in the EA.                                  other interested individuals and groups;
                                                       Date: Tuesday, December 13, 2016.                                                                          and newspapers and libraries in the
                                                       Time: 7:00 p.m.                                        Dated: November 9, 2016.                            project area. In addition, the EA is
                                                       Place: Croghan Volunteer Fire
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Kimberly D. Bose,                                     available for public viewing on the
                                                    Department.                                                                                                   FERC’s Web site (www.ferc.gov) using
                                                                                                            Secretary.
                                                       Address: 6860 Fire Hall Street,                                                                            the eLibrary link. A limited number of
                                                                                                            [FR Doc. 2016–27618 Filed 11–16–16; 8:45 am]
                                                    Croghan, New York.                                                                                            copies of the EA are available for
                                                       Copies of the Scoping Document                       BILLING CODE 6717–01–P
                                                                                                                                                                  distribution and public inspection at:
                                                    (SD1) outlining the subject areas to be
                                                    addressed in the EA were distributed to                                                                         1 A pipeline ‘‘loop’’ is a segment of pipe installed
                                                    the parties on the Commission’s mailing                                                                       adjacent to an existing pipeline and connected to
                                                    list. Copies of the SD1 will be available                                                                     the existing pipeline at both ends.



                                               VerDate Sep<11>2014   21:24 Nov 16, 2016   Jkt 241001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\17NON1.SGM   17NON1



Document Created: 2016-11-17 02:59:30
Document Modified: 2016-11-17 02:59:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesTuesday, December 13, 2016.
FR Citation81 FR 81090 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR