The U.S. Nuclear Regulatory Commission (NRC) is providing public notice of the termination of Source Materials License No. STB- 401. The NRC has terminated the license of the decommissioned Mallinckrodt facility in St. Louis, Missouri and has approved the site for unrestricted release.

Federal Register, Volume 81 Issue 32 (Thursday, February 18, 2016)
[Federal Register Volume 81, Number 32 (Thursday, February 18, 2016)]
[Notices]
[Pages 8256-8258]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-03419]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. No. 40-6563; NRC-2016-0032]


Mallinckrodt, LLC

AGENCY: Nuclear Regulatory Commission.

ACTION: License termination; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is providing 
public notice of the termination of Source Materials License No. STB-
401. The NRC has terminated the license of the decommissioned 
Mallinckrodt facility in St. Louis, Missouri and has approved the site 
for unrestricted release.

DATES: Notice of termination of Source Materials License No. STB-401 
issued on February 18, 2016.

ADDRESSES: Please refer to Docket ID NRC-2016-0032 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0032. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if that document 
is available in ADAMS) is provided the first time that a document is 
referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

[[Page 8257]]


FOR FURTHER INFORMATION CONTACT: Karen Pinkston, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington DC 20555-0001; telephone: 301-415-3650, email: 
[email protected].

SUPPLEMENTARY INFORMATION: The NRC has terminated License No. STB-401, 
held by Mallinckrodt LLC (Mallinckrodt), for a site in St. Louis, 
Missouri and has approved the site for unrestricted release.
    In 1961, Mallinckrodt received License No. STB-401 to extract 
columbium and tantalum from natural ores and tin slags. In July 1993, 
the NRC amended Mallinckrodt's license to a possession only license for 
the purpose of decommissioning and license termination. The 
contamination at the site was due to licensed activities consisted of 
natural uranium, natural thorium, and their associated progeny. The 
Mallinckrodt site is a 43 acre site subdivided into ten areas called 
Plants. The former Columbium-Tantalum (C-T) process areas included 21 
support buildings on approximately 4.2 acres, primarily located within 
Plant 5, but also in portions of Plants 1, 3, 6, 7, and 8.
    In addition to the C-T activities conducted under License No. STB-
401, the Mallinckrodt site was previously used for Manhattan Engineer 
District/Atomic Energy Commission (MED/AEC) activities. The U.S. Army 
Corps of Engineers (USACE) is responsible for remediating these 
portions of the site under the Formerly Utilized Sites Remedial Action 
Program (FUSRAP).
    Mallinckrodt decommissioned the C-T project areas of the site in 
two phases. In Phase I, Mallinckrodt decommissioned the buildings and 
equipment to the extent necessary to meet the NRC's guidelines for 
unrestricted release in Sec.  20.1402 of title 10 of the Code of 
Federal Regulations (10 CFR). Phase I of the decommissioning project 
was completed in February 2007 (ADAMS Accession No. ML070530675).
    Following Phase I decommissioning, the C-T areas remaining for 
remediation were limited to the soil, pavement, and sewers in Plant 5, 
as well as portions of Plant 6 and 7. Mallinckrodt's Phase II 
Decommissioning Plan (DP) (ADAMS Accession Nos. ML083150652 and 
ML101620140) described Mallinckrodt's plan for decommissioning the 
remainder of the C-T project areas to meet the criteria for 
unrestricted release, though the remediation of portions of Plants 6 
and 7 was not included in the DP and was addressed separately, as is 
described below. The NRC approved Mallinckrodt's Phase II DP on July 1, 
2010 (ADAMS Accession No. ML091960063).
    Plants 6 and 7 contained residual contamination from both licensed 
activities and MED/AEC activities. The MED/AEC activities in Plants 6 
and 7 resulted in contamination in buildings and soil in these plants. 
Additionally, in Plant 6, approximately 300 cubic yards of unreacted 
ore (URO) generated as part of the C-T process was buried in 10 
trenches in 1972 and 1973. Plant 7 contained sewers, a grit chamber, 
and two wastewater neutralization basins that were used to support C-T 
operations.
    Mallinckrodt and the USACE entered into two agreements to delineate 
remediation responsibilities in Plants 6 and 7. Mallinckrodt's 
responsibilities included the removal of the buried URO in Plant 6 and 
the removal of the grit chamber in Plant 7. On February 9, 2015, USACE 
provided Mallinckrodt with a letter acknowledging that Mallinckrodt had 
completed the removal of the URO and grit chambers and stating that the 
USACE was proceeding with remediation of these areas under FUSRAP 
(ADAMS Accession No. ML15090A705).
    Mallinckrodt's Phase II DP requested that the NRC terminate its 
license in accordance with 10 CFR 20.1402 without accounting for MED/
AEC contamination in demonstrating compliance with the dose limits in 
Sec.  20.1402. In its approval of the Phase II DP, the NRC exempted the 
MED/AEC material from consideration in demonstrating compliance with 
license termination requirements (ADAMS Accession No. ML091960087). The 
basis for granting the exemption was: (1) Mallinckrodt will meet 25 
mrem/year unrestricted release criteria for C-T process areas; and (2) 
unlicensed MED/AEC material is being remediated to the NRC's 
unrestricted release standards of 25 mrem/year by USACE. The dose from 
the residual radioactivity at the site is primarily from the direct 
radiation pathway, therefore the NRC concluded that an individual would 
not simultaneously receive a dose from both areas. The staff, 
therefore, concluded that it is reasonable to terminate License STB-401 
after Mallinckrodt completes decommissioning activities in the C-T 
process areas and demonstrates that the C-T process areas at the site 
meet the NRC's unrestricted release criteria.
    This finding is based in part on USACE's commitment to remediate 
the site under FUSRAP. At the time, Mallinckrodt and USACE had reached 
an agreement regarding delineation of responsibility for remediating 
Plant 6, but had not yet agreed on the delineation of responsibility 
for Plant 7. Therefore, the exemption was conditioned on Mallinckrodt 
and USACE reaching a delineation agreement for Plant 7 before 
decommissioning was complete. Mallinckrodt and USACE entered into a 
delineation agreement for Plant 7 on October 31, 2014 (cover letter 
available at ADAMS Accession No. ML15041A076).
    Mallinckrodt performed remediation of the C-T project areas based 
on their Phase II DP, conducted a Final Status Survey (FSS) and 
provided the NRC with a Final Status Survey Report (FSSR) documenting 
the residual radioactivity remaining on site for which Mallinckrodt was 
responsible (ADAMS Accession No. ML14177A180). Mallinckrodt 
subsequently provided additional information in response to the NRC's 
requests for additional information (ADAMS Accession Nos. ML14339A278, 
ML15177A051, and ML15334A417). On February 12, 2015, Mallinckrodt 
submitted a license amendment application requesting the use of the 
dose assessment approach, as well as the derived concentration 
guideline level (DCGL) approach (ADAMS Accession No. ML15063A404). The 
NRC approved this license amendment request on February 4, 2016 (ADAMS 
Accession No. ML15286A174).
    The NRC has now completed its review of the FSSR and associated 
documents according to NUREG-1757, ``Consolidated Decommissioning 
Guidance,'' and guidance in the Multi-Agency Radiation Survey and Site 
Investigation Manual (MARSSIM) (NUREG 1575). The NRC staff has 
concluded that the FSS design and data collected were adequate to 
characterize the residual radioactivity in the portions of the 
Mallinckrodt site where NRC regulated activities took place. The NRC 
staff also concluded that the data analysis and dose assessments 
performed are appropriate and that the projected dose from residual 
radioactivity in these areas is less than the 25 mrem/year dose 
criterion in 10 CFR 20.1402. For these reasons, the NRC staff has 
determined that Mallinckrodt has demonstrated that the site will meets 
the radiological criteria for license termination described in 10 CFR 
part 20 subpart E and the exemption granted by the NRC in its approval 
of the Phase II DP. Therefore, Source Materials License No. STB-401 has 
been terminated.

    Dated at Rockville, Maryland, this 9th day of February 2016.


[[Page 8258]]


    For the Nuclear Regulatory Commission.
Michael A. Norato,
Chief, Materials Decommissioning Branch Division of Decommissioning, 
Uranium Recovery, and Waste Programs, Office of Nuclear Material Safety 
and Safeguards.
[FR Doc. 2016-03419 Filed 2-17-16; 8:45 am]
BILLING CODE 7590-01-P



                                                  8256                        Federal Register / Vol. 81, No. 32 / Thursday, February 18, 2016 / Notices

                                                  electronic copy of each presentation                    Tuesday, March 1, 2016—8:30 a.m.                        Dated: February 4, 2016.
                                                  should be emailed to the DFO one day                    Until 2:00 p.m.                                       Mark L. Banks,
                                                  before the meeting. If an electronic copy                                                                     Chief, Technical Support Branch, Advisory
                                                  cannot be provided within this                             The Subcommittee will discuss the                  Committee on Reactor Safeguards.
                                                  timeframe, presenters should provide                    progress of the NRC staff’s Level 3                   [FR Doc. 2016–03369 Filed 2–17–16; 8:45 am]
                                                  the DFO with a CD containing each                       Probabilistic Risk Assessment (PRA)                   BILLING CODE 7590–01–P
                                                  presentation at least thirty minutes                    Project. The Subcommittee will hear
                                                  before the meeting. Electronic                          presentations by and hold discussions
                                                  recordings will be permitted only                       with the NRC staff and other interested               NUCLEAR REGULATORY
                                                  during those portions of the meeting                    persons regarding this matter. The                    COMMISSION
                                                  that are open to the public. Detailed                   Subcommittee will gather information,
                                                                                                                                                                [Docket No. No. 40–6563; NRC–2016–0032]
                                                  procedures for the conduct of and                       analyze relevant issues and facts, and
                                                  participation in ACRS meetings were                     formulate proposed positions and                      Mallinckrodt, LLC
                                                  published in the Federal Register on                    actions, as appropriate, for deliberation
                                                  October 21, 2015 (80 FR 63846).                         by the Full Committee.                                AGENCY:  Nuclear Regulatory
                                                     Detailed meeting agendas and meeting                                                                       Commission.
                                                                                                             Members of the public desiring to
                                                  transcripts are available on the NRC                                                                          ACTION: License termination; issuance.
                                                                                                          provide oral statements and/or written
                                                  Web site at http://www.nrc.gov/reading-                 comments should notify the Designated                 SUMMARY:    The U.S. Nuclear Regulatory
                                                  rm/doc-collections/acrs. Information                    Federal Official (DFO), John Lai                      Commission (NRC) is providing public
                                                  regarding topics to be discussed,                       (Telephone 301–415–5197 or Email:                     notice of the termination of Source
                                                  changes to the agenda, whether the                      John.Lai@nrc.gov) five days prior to the              Materials License No. STB–401. The
                                                  meeting has been canceled or                            meeting, if possible, so that appropriate             NRC has terminated the license of the
                                                  rescheduled, and the time allotted to                   arrangements can be made. Thirty-five                 decommissioned Mallinckrodt facility
                                                  present oral statements can be obtained                 hard copies of each presentation or                   in St. Louis, Missouri and has approved
                                                  from the Web site cited above or by                     handout should be provided to the DFO                 the site for unrestricted release.
                                                  contacting the identified DFO.                          thirty minutes before the meeting. In                 DATES: Notice of termination of Source
                                                  Moreover, in view of the possibility that               addition, one electronic copy of each                 Materials License No. STB–401 issued
                                                  the schedule for ACRS meetings may be                   presentation should be emailed to the                 on February 18, 2016.
                                                  adjusted by the Chairman as necessary                   DFO one day before the meeting. If an                 ADDRESSES: Please refer to Docket ID
                                                  to facilitate the conduct of the meeting,               electronic copy cannot be provided
                                                  persons planning to attend should check                                                                       NRC–2016–0032 when contacting the
                                                                                                          within this timeframe, presenters                     NRC about the availability of
                                                  with these references if such                           should provide the DFO with a CD                      information regarding this document.
                                                  rescheduling would result in a major                    containing each presentation at least                 You may obtain publicly-available
                                                  inconvenience.                                          thirty minutes before the meeting.                    information related to this document
                                                     If attending this meeting, please enter              Electronic recordings will be permitted               using any of the following methods:
                                                  through the One White Flint North                       only during those portions of the                        • Federal Rulemaking Web site: Go to
                                                  building, 11555 Rockville Pike,                         meeting that are open to the public.                  http://www.regulations.gov and search
                                                  Rockville, MD. After registering with                   Detailed procedures for the conduct of                for Docket ID NRC–2016–0032. Address
                                                  security, please contact Mr. Theron                     and participation in ACRS meetings                    questions about NRC dockets to Carol
                                                  Brown (Telephone 240–888–9835) to be                    were published in the Federal Register                Gallagher; telephone: 301–415–3463;
                                                  escorted to the meeting room.                           on October 1, 2015 (80 FR 63846).                     email: Carol.Gallagher@nrc.gov. For
                                                    Dated: February 4, 2016.                                                                                    technical questions, contact the
                                                                                                             Detailed meeting agendas and meeting
                                                  Mark L. Banks,                                          transcripts are available on the NRC                  individual listed in the FOR FURTHER
                                                  Chief, Technical Support Branch, Advisory                                                                     INFORMATION CONTACT section of this
                                                                                                          Web site at http://www.nrc.gov/reading-
                                                  Committee on Reactor Safeguards.                        rm/doc-collections/acrs. Information                  document.
                                                  [FR Doc. 2016–03371 Filed 2–17–16; 8:45 am]                                                                      • NRC’s Agencywide Documents
                                                                                                          regarding topics to be discussed,
                                                                                                                                                                Access and Management System
                                                  BILLING CODE 7590–01–P                                  changes to the agenda, whether the
                                                                                                                                                                (ADAMS): You may obtain publicly-
                                                                                                          meeting has been canceled or
                                                                                                                                                                available documents online in the
                                                                                                          rescheduled, and the time allotted to
                                                  NUCLEAR REGULATORY                                                                                            ADAMS Public Documents collection at
                                                                                                          present oral statements can be obtained
                                                  COMMISSION                                                                                                    http://www.nrc.gov/reading-rm/
                                                                                                          from the Web site cited above or by
                                                                                                                                                                adams.html. To begin the search, select
                                                  Advisory Committee on Reactor                           contacting the identified DFO.
                                                                                                                                                                ‘‘ADAMS Public Documents’’ and then
                                                  Safeguards (ACRS); Meeting of the                       Moreover, in view of the possibility that             select ‘‘Begin Web-based ADAMS
                                                  ACRS Subcommittee on Reliability and                    the schedule for ACRS meetings may be                 Search.’’ For problems with ADAMS,
                                                  PRA                                                     adjusted by the Chairman as necessary                 please contact the NRC’s Public
                                                                                                          to facilitate the conduct of the meeting,             Document Room (PDR) reference staff at
                                                  Notice of Meeting                                       persons planning to attend should check               1–800–397–4209, 301–415–4737, or by
                                                     The ACRS Subcommittee on                             with these references if such                         email to pdr.resource@nrc.gov. The
                                                  Reliability and PRA will hold a meeting                 rescheduling would result in a major                  ADAMS accession number for each
                                                                                                          inconvenience.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  on March 1, 2016, Room T–2B1, 11545                                                                           document referenced (if that document
                                                  Rockville Pike, Rockville, Maryland.                       If attending this meeting, please enter            is available in ADAMS) is provided the
                                                     The meeting will be open to public                   through the One White Flint North                     first time that a document is referenced.
                                                  attendance with the exception of                        building, 11555 Rockville Pike,                          • NRC’s PDR: You may examine and
                                                  portions that may be closed to protect                  Rockville, Maryland. After registering                purchase copies of public documents at
                                                  information that is proprietary pursuant                with security, please contact Mr. Theron              the NRC’s PDR, Room O1–F21, One
                                                  to 5 U.S.C. 552b(c)(4). The agenda for                  Brown (Telephone 240–888–9835) to be                  White Flint North, 11555 Rockville
                                                  the subject meeting shall be as follows:                escorted to the meeting room.                         Pike, Rockville, Maryland 20852.


                                             VerDate Sep<11>2014   19:03 Feb 17, 2016   Jkt 238001   PO 00000   Frm 00084   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1


                                                                              Federal Register / Vol. 81, No. 32 / Thursday, February 18, 2016 / Notices                                              8257

                                                  FOR FURTHER INFORMATION CONTACT:                        described below. The NRC approved                     responsibility for remediating Plant 6,
                                                  Karen Pinkston, Office of Nuclear                       Mallinckrodt’s Phase II DP on July 1,                 but had not yet agreed on the
                                                  Material Safety and Safeguards, U.S.                    2010 (ADAMS Accession No.                             delineation of responsibility for Plant 7.
                                                  Nuclear Regulatory Commission,                          ML091960063).                                         Therefore, the exemption was
                                                  Washington DC 20555–0001; telephone:                       Plants 6 and 7 contained residual                  conditioned on Mallinckrodt and
                                                  301–415–3650, email: Karen.Pinkston@                    contamination from both licensed                      USACE reaching a delineation
                                                  nrc.gov.                                                activities and MED/AEC activities. The                agreement for Plant 7 before
                                                                                                          MED/AEC activities in Plants 6 and 7                  decommissioning was complete.
                                                  SUPPLEMENTARY INFORMATION:      The NRC
                                                                                                          resulted in contamination in buildings                Mallinckrodt and USACE entered into a
                                                  has terminated License No. STB–401,
                                                                                                          and soil in these plants. Additionally, in            delineation agreement for Plant 7 on
                                                  held by Mallinckrodt LLC
                                                                                                          Plant 6, approximately 300 cubic yards                October 31, 2014 (cover letter available
                                                  (Mallinckrodt), for a site in St. Louis,
                                                                                                          of unreacted ore (URO) generated as part              at ADAMS Accession No.
                                                  Missouri and has approved the site for                  of the C–T process was buried in 10
                                                  unrestricted release.                                                                                         ML15041A076).
                                                                                                          trenches in 1972 and 1973. Plant 7                       Mallinckrodt performed remediation
                                                     In 1961, Mallinckrodt received
                                                                                                          contained sewers, a grit chamber, and                 of the C–T project areas based on their
                                                  License No. STB–401 to extract
                                                                                                          two wastewater neutralization basins                  Phase II DP, conducted a Final Status
                                                  columbium and tantalum from natural                     that were used to support C–T
                                                  ores and tin slags. In July 1993, the NRC                                                                     Survey (FSS) and provided the NRC
                                                                                                          operations.                                           with a Final Status Survey Report
                                                  amended Mallinckrodt’s license to a                        Mallinckrodt and the USACE entered
                                                  possession only license for the purpose                                                                       (FSSR) documenting the residual
                                                                                                          into two agreements to delineate                      radioactivity remaining on site for
                                                  of decommissioning and license                          remediation responsibilities in Plants 6
                                                  termination. The contamination at the                                                                         which Mallinckrodt was responsible
                                                                                                          and 7. Mallinckrodt’s responsibilities                (ADAMS Accession No. ML14177A180).
                                                  site was due to licensed activities                     included the removal of the buried URO
                                                  consisted of natural uranium, natural                                                                         Mallinckrodt subsequently provided
                                                                                                          in Plant 6 and the removal of the grit                additional information in response to
                                                  thorium, and their associated progeny.                  chamber in Plant 7. On February 9,
                                                  The Mallinckrodt site is a 43 acre site                                                                       the NRC’s requests for additional
                                                                                                          2015, USACE provided Mallinckrodt                     information (ADAMS Accession Nos.
                                                  subdivided into ten areas called Plants.                with a letter acknowledging that
                                                  The former Columbium-Tantalum (C–T)                                                                           ML14339A278, ML15177A051, and
                                                                                                          Mallinckrodt had completed the                        ML15334A417). On February 12, 2015,
                                                  process areas included 21 support                       removal of the URO and grit chambers
                                                  buildings on approximately 4.2 acres,                                                                         Mallinckrodt submitted a license
                                                                                                          and stating that the USACE was                        amendment application requesting the
                                                  primarily located within Plant 5, but                   proceeding with remediation of these
                                                  also in portions of Plants 1, 3, 6, 7, and                                                                    use of the dose assessment approach, as
                                                                                                          areas under FUSRAP (ADAMS                             well as the derived concentration
                                                  8.                                                      Accession No. ML15090A705).
                                                     In addition to the C–T activities                                                                          guideline level (DCGL) approach
                                                                                                             Mallinckrodt’s Phase II DP requested
                                                  conducted under License No. STB–401,                                                                          (ADAMS Accession No. ML15063A404).
                                                                                                          that the NRC terminate its license in
                                                  the Mallinckrodt site was previously                    accordance with 10 CFR 20.1402                        The NRC approved this license
                                                  used for Manhattan Engineer District/                   without accounting for MED/AEC                        amendment request on February 4, 2016
                                                  Atomic Energy Commission (MED/AEC)                      contamination in demonstrating                        (ADAMS Accession No. ML15286A174).
                                                  activities. The U.S. Army Corps of                      compliance with the dose limits in                       The NRC has now completed its
                                                  Engineers (USACE) is responsible for                    § 20.1402. In its approval of the Phase               review of the FSSR and associated
                                                  remediating these portions of the site                  II DP, the NRC exempted the MED/AEC                   documents according to NUREG–1757,
                                                  under the Formerly Utilized Sites                       material from consideration in                        ‘‘Consolidated Decommissioning
                                                  Remedial Action Program (FUSRAP).                       demonstrating compliance with license                 Guidance,’’ and guidance in the Multi-
                                                     Mallinckrodt decommissioned the                      termination requirements (ADAMS                       Agency Radiation Survey and Site
                                                  C–T project areas of the site in two                    Accession No. ML091960087). The basis                 Investigation Manual (MARSSIM)
                                                  phases. In Phase I, Mallinckrodt                        for granting the exemption was: (1)                   (NUREG 1575). The NRC staff has
                                                  decommissioned the buildings and                        Mallinckrodt will meet 25 mrem/year                   concluded that the FSS design and data
                                                  equipment to the extent necessary to                    unrestricted release criteria for C–T                 collected were adequate to characterize
                                                  meet the NRC’s guidelines for                           process areas; and (2) unlicensed MED/                the residual radioactivity in the portions
                                                  unrestricted release in § 20.1402 of title              AEC material is being remediated to the               of the Mallinckrodt site where NRC
                                                  10 of the Code of Federal Regulations                   NRC’s unrestricted release standards of               regulated activities took place. The NRC
                                                  (10 CFR). Phase I of the                                25 mrem/year by USACE. The dose from                  staff also concluded that the data
                                                  decommissioning project was                             the residual radioactivity at the site is             analysis and dose assessments
                                                  completed in February 2007 (ADAMS                       primarily from the direct radiation                   performed are appropriate and that the
                                                  Accession No. ML070530675).                             pathway, therefore the NRC concluded                  projected dose from residual
                                                     Following Phase I decommissioning,                   that an individual would not                          radioactivity in these areas is less than
                                                  the C–T areas remaining for remediation                 simultaneously receive a dose from both               the 25 mrem/year dose criterion in 10
                                                  were limited to the soil, pavement, and                 areas. The staff, therefore, concluded                CFR 20.1402. For these reasons, the
                                                  sewers in Plant 5, as well as portions of               that it is reasonable to terminate License            NRC staff has determined that
                                                  Plant 6 and 7. Mallinckrodt’s Phase II                  STB–401 after Mallinckrodt completes                  Mallinckrodt has demonstrated that the
                                                  Decommissioning Plan (DP) (ADAMS                        decommissioning activities in the C–T                 site will meets the radiological criteria
                                                                                                                                                                for license termination described in 10
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Accession Nos. ML083150652 and                          process areas and demonstrates that the
                                                  ML101620140) described Mallinckrodt’s                   C–T process areas at the site meet the                CFR part 20 subpart E and the
                                                  plan for decommissioning the                            NRC’s unrestricted release criteria.                  exemption granted by the NRC in its
                                                  remainder of the C–T project areas to                      This finding is based in part on                   approval of the Phase II DP. Therefore,
                                                  meet the criteria for unrestricted release,             USACE’s commitment to remediate the                   Source Materials License No. STB–401
                                                  though the remediation of portions of                   site under FUSRAP. At the time,                       has been terminated.
                                                  Plants 6 and 7 was not included in the                  Mallinckrodt and USACE had reached                      Dated at Rockville, Maryland, this 9th day
                                                  DP and was addressed separately, as is                  an agreement regarding delineation of                 of February 2016.



                                             VerDate Sep<11>2014   19:03 Feb 17, 2016   Jkt 238001   PO 00000   Frm 00085   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1


                                                  8258                        Federal Register / Vol. 81, No. 32 / Thursday, February 18, 2016 / Notices

                                                    For the Nuclear Regulatory Commission.                introductory argument, and the NRC                    Document Room please see http://www.
                                                  Michael A. Norato,                                      Staff and the Licensee shall each have                nrc.gov/reading-rm/pdr.html.
                                                  Chief, Materials Decommissioning Branch                 10 minutes as well. The Petitioner may                  It is so ordered.
                                                  Division of Decommissioning, Uranium                    reserve up to 5 minutes of its allotted                 Rockville, Maryland February 10, 2016.
                                                  Recovery, and Waste Programs, Office of                 time for rebuttal. No other rebuttal will               For The Atomic Safety and Licensing
                                                  Nuclear Material Safety and Safeguards.                 be permitted.                                         Board.
                                                  [FR Doc. 2016–03419 Filed 2–17–16; 8:45 am]               In general, the participants should not             Ronald M. Spritzer,
                                                  BILLING CODE 7590–01–P                                  repeat arguments already presented in                 Chairman, Administrative Judge.
                                                                                                          their written filings, but should focus on            [FR Doc. 2016–03372 Filed 2–17–16; 8:45 am]
                                                                                                          responding to the Board’s questions.
                                                  NUCLEAR REGULATORY                                      The argument is not an evidentiary
                                                                                                                                                                BILLING CODE 7590–01–P
                                                  COMMISSION                                              hearing, and the participants therefore
                                                  [Docket Nos. 52–025 and 52–026; ASLBP                   should not attempt to introduce                       NUCLEAR REGULATORY
                                                  No. 16–944–01–LA–BD01]                                  evidence during the argument. The                     COMMISSION
                                                                                                          participants should advise the Board
                                                  Atomic Safety and Licensing Board;                      and the other participants no later than              [Docket Nos. 50–309, and 72–1015; NRC–
                                                  Before Administrative Judges: Ronald                    March 8, 2016 if they plan to refer to                2016–0028]
                                                  M. Spritzer, Chairman; Nicholas G.                      any type of visual aid during the
                                                  Trikouros; Dr. James F. Jackson; in                                                                           Independent Spent Fuel Storage
                                                                                                          argument. No material that is not
                                                  the Matter of Southern Nuclear                                                                                Installation, Maine Yankee Atomic
                                                                                                          already cited in the record before the
                                                  Operating Company, Inc.; (Vogtle                                                                              Power Company
                                                                                                          Board should be used as a visual aid.
                                                  Electric Generating Plant, Units 3 and                                                                        AGENCY:  Nuclear Regulatory
                                                  4)                                                      Public Attendance
                                                                                                                                                                Commission.
                                                  February 10, 2016.
                                                                                                             The public is welcome to attend the                ACTION: Exemption; issuance.
                                                                                                          argument, but space is limited within
                                                  Order                                                   the courtroom. Additionally, only the                 SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                          parties’ designated representatives will              Commission (NRC) is issuing an
                                                  (Scheduling Oral Argument)
                                                                                                          be permitted to participate in the                    exemption in response to a September 1,
                                                    Before the Board is a petition to                     argument. Neither signs nor any manner                2015, request from Maine Yankee
                                                  intervene and request for a hearing, filed              of demonstration will be permitted in                 Atomic Power Company, (MYAPC or
                                                  by Blue Ridge Environmental Defense                     the courtroom. Those people wishing to                licensee) from the requirement to
                                                  League and its chapter Concerned                        attend the oral argument in person                    comply with the terms, conditions, and
                                                  Citizens of Shell Bluff (collectively                   should contact the Board’s law clerk,                 specifications regarding the method of
                                                  Petitioner).1 Oral argument on                          Cooper Strickland, at 301–415–5880 or                 compliance defined in Amendment 5 of
                                                  contention admissibility will be held on                Cooper.Strickland@nrc.gov, no later                   the NAC International (NAC)-UMS
                                                  Tuesday, March 15, 2016, beginning at                   than Wednesday, March 9, 2016 to                      System Certificate of Compliance (CoC)
                                                  10:00 a.m. EDT. This argument will take                 provide their names for security                      No. 1015, Appendix A ‘‘Technical
                                                  place at the U.S. Bankruptcy Court,                     purposes. All persons participating in                Specifications for NAC–UMS System’’,
                                                  Federal Justice Center, Plaza Building,                 person must present a valid photo ID                  Technical Specifications (TS) A.5.4
                                                  600 James Brown Boulevard (formerly                     and should arrive at least fifteen                    ‘‘Surveillance After an Off-Normal,
                                                  9th Street), Augusta, GA 30901.                         minutes early so as to allow sufficient               Accident, or Natural Phenomena Event’’
                                                  Instructions                                            time to pass through security screening.              at the Maine Yankee (MY) Independent
                                                                                                          Furthermore, cell phones are not                      Spent Fuel Storage Installation (ISFSI).
                                                     On or before Friday, March 11, 2016,                 permitted in the Federal Justice Center.              The exemption request seeks a
                                                  the Petitioner, the Licensee, and the                                                                         modification of TS A.5.4 inspection
                                                  NRC Staff must each provide the names                   Transcript Availability                               requirements for the inlet and outlet
                                                  of their representatives by email to the                   Sometime after March 15, 2016, a                   vents following off-normal, accident,
                                                  Board and the service list. Only                        transcript of the oral argument will be               and natural phenomena events.
                                                  designated representatives will be                      available for public inspection                       ADDRESSES: Please refer to Docket ID
                                                  permitted to present oral argument.                     electronically on the NRC’s Electronic                NRC–2016–0028 when contacting the
                                                  Each counsel or other representative for                Hearing Docket (EHD). EHD is                          NRC about the availability of
                                                  each participant in this proceeding who                 accessible from the NRC Web site at                   information regarding this document.
                                                  has not already done so must file and                   https://adams.nrc.gov/ehd. For                        You may obtain publicly-available
                                                  serve a notice of appearance on or                      additional information regarding the                  information related to this document
                                                  before March 11, 2016, containing all of                EHD please see http://www.nrc.gov/                    using any of the following methods:
                                                  the information required by 10 CFR                      about-nrc/regulatory/adjudicatory.                       • Federal Rulemaking Web site: Go to
                                                  § 2.314(b).                                             html#ehd. Persons who do not have                     http://www.regulations.gov and search
                                                     The primary purpose of this oral                     access to the internet or who encounter               for Docket ID NRC–2016–0028. Address
                                                  argument is for the Board to ask                        problems in accessing the documents                   questions about NRC dockets to Carol
                                                  questions and receive answers                           located on the NRC’s Web site may                     Gallagher; telephone: 301–415–3463;
                                                  concerning contention admissibility
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          contact the NRC Public Document Room                  email: Carol.Gallagher@nrc.gov. For
                                                  issues presented by the pleadings. As to                reference staff by email to pdr@nrc.gov               technical questions, contact the
                                                  each contention, the Petitioner shall                   or by telephone at (800) 397–4209 or                  individual listed in the FOR FURTHER
                                                  have 15 minutes to present an                           (301) 415–4737. Reference staff are                   INFORMATION CONTACT section of this
                                                    1 Amended Petition for Leave to Intervene and
                                                                                                          available Monday through Friday                       document.
                                                  Request for Hearing by the Blue Ridge
                                                                                                          between 8:00 a.m. and 4:00 p.m. ET,                      • NRC’s Agencywide Documents
                                                  Environmental Defense League and its Chapter            except federal holidays. For additional               Access and Management System
                                                  Concerned Citizens of Shell Bluff (Dec. 23, 2015).      information regarding the NRC Public                  (ADAMS): You may obtain publicly


                                             VerDate Sep<11>2014   19:03 Feb 17, 2016   Jkt 238001   PO 00000   Frm 00086   Fmt 4703   Sfmt 4703   E:\FR\FM\18FEN1.SGM   18FEN1



Document Created: 2016-02-18 07:46:35
Document Modified: 2016-02-18 07:46:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionLicense termination; issuance.
DatesNotice of termination of Source Materials License No. STB-401 issued on February 18, 2016.
ContactKaren Pinkston, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-3650, email: [email protected]