81_FR_86938 81 FR 86707 - WBI Energy Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Valley Expansion Project and Request for Comments on Environmental Issues

81 FR 86707 - WBI Energy Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Valley Expansion Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 231 (December 1, 2016)

Page Range86707-86709
FR Document2016-28850

Federal Register, Volume 81 Issue 231 (Thursday, December 1, 2016)
[Federal Register Volume 81, Number 231 (Thursday, December 1, 2016)]
[Notices]
[Pages 86707-86709]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-28850]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF16-10-000]


WBI Energy Transmission, Inc.; Notice of Intent To Prepare an 
Environmental Assessment for the Planned Valley Expansion Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Valley Expansion Project 
involving construction and operation of facilities by WBI Energy 
Transmission, Inc. (WBI Energy) between Mapleton, North Dakota and 
Felton, Minnesota. The Commission will use this EA in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before December 23, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on October 17, 2016, you will need to file those 
comments in Docket No. PF16-10-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(PF16-10-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Planned Project

    WBI Energy plans to construct 38 miles of new bidirectional 16-
inch-diameter pipeline between Mapleton, North Dakota and Felton, 
Minnesota. Additionally, WBI Energy would construct a new 2,600-
horsepower electric-driven compressor station in Clay County, 
Minnesota, a metering station, farm taps, valve settings, and ancillary 
facilities. Finally, WBI Energy would increase the maximum allowable 
operating pressure on a portion of its Line Section 24. According to 
WBI Energy, the project would provide an additional 40 million cubic 
feet per day of firm transportation on its system.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the project would affect a total of about 530 acres 
of land, including the pipeline construction right-of-way, additional 
temporary workspace, staging areas, temporary and permanent access 
roads, and aboveground facilities. The total acreage required for 
operation of the project is approximately 235 acres, including the new 
permanent pipeline easement, permanent access roads, and permanent 
aboveground facilities' footprint.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to

[[Page 86708]]

focus the analysis in the EA on the important environmental issues. By 
this notice, the Commission requests public comments on the scope of 
the issues to address in the EA. We will consider all filed comments 
during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA, we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     water resources, fisheries, and wetlands;
     vegetation and wildlife;
     endangered and threatened species;
     cultural resources;
     socioeconomics;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before 
the FERC receives an application. As part of our pre-filing review, we 
have begun to contact some federal and state agencies to discuss their 
involvement in the scoping process and the preparation of the EA.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before we make our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this project to formally cooperate with us in the 
preparation of the EA.\3\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Offices (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPOs as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Currently Identified Environmental Issues

    We have already identified several issues that we think deserve 
attention based on a preliminary review of the planned facilities and 
the environmental information provided by WBI Energy. This preliminary 
list of issues may change based on your comments and our analysis, but 
currently includes:
     Drain tiles;
     deep topsoil and poor quality subsoils (salinity/sodium or 
lime);
     prime farm land;
     federally listed species, including the whooping crane, 
gray wolf, Dakota skipper, northern long-eared bat, western prairie 
fringed orchid, and the powershiek skipperling;
     cultural resources; and
     crossing methods of the Rush River, Red River of the 
North, and the Buffalo River.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. This list also includes all affected landowners (as defined 
in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the planned project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    Once WBI Energy files its application with the Commission, you may 
want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Motions to intervene are more fully described at 
http://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions 
for becoming an intervenor are in the ``Document-less Intervention 
Guide'' under the ``e-filing'' link on the Commission's Web site. 
Please note that the Commission will not accept requests for intervenor 
status at this time. You must wait until the Commission receives a 
formal application for the project.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., PF16-
10). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact

[[Page 86709]]

(202) 502-8659. The eLibrary link also provides access to the texts of 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    In addition, the Commission offers a free service called 
eSubscription, which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: November 23, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-28850 Filed 11-30-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 81, No. 231 / Thursday, December 1, 2016 / Notices                                                    86707

                                                  19831 has been transferred to 169                         If you sent comments on this project                a comment on a particular project,
                                                  Sunapee Street, LLC. The project is                     to the Commission before the opening of               please select ‘‘Comment on a Filing’’ as
                                                  located on the Sugar River in Sullivan                  this docket on October 17, 2016, you                  the filing type; or
                                                  County, New Hampshire. The transfer of                  will need to file those comments in                     (3) You can file a paper copy of your
                                                  an exemption does not require                           Docket No. PF16–10–000 to ensure they                 comments by mailing them to the
                                                  Commission approval.                                    are considered as part of this                        following address. Be sure to reference
                                                    2. 169 Sunapee Street, LLC is now the                 proceeding.                                           the project docket number (PF16–10–
                                                  exemptee of the Sugar River 1 Project                     This notice is being sent to the                    000) with your submission: Kimberly D.
                                                  No. 3320. All correspondence should be                  Commission’s current environmental                    Bose, Secretary, Federal Energy
                                                  forwarded to: Mr. Ronald K. DeCola,                     mailing list for this project. State and              Regulatory Commission, 888 First Street
                                                  Manager, 169 Sunapee Street, LLC, 300                   local government representatives should               NE., Room 1A, Washington, DC 20426.
                                                  River Road, Suite 110, Manchester, NH                   notify their constituents of this planned
                                                  03104, Phone: 603–289–2738, Email:                      project and encourage them to comment                 Summary of the Planned Project
                                                  rkd01@aol.com.                                          on their areas of concern.                              WBI Energy plans to construct 38
                                                    Dated: November 23, 2016.                               If you are a landowner receiving this               miles of new bidirectional 16-inch-
                                                                                                          notice, a pipeline company                            diameter pipeline between Mapleton,
                                                  Kimberly D. Bose,
                                                                                                          representative may contact you about                  North Dakota and Felton, Minnesota.
                                                  Secretary.
                                                                                                          the acquisition of an easement to                     Additionally, WBI Energy would
                                                  [FR Doc. 2016–28848 Filed 11–30–16; 8:45 am]            construct, operate, and maintain the                  construct a new 2,600-horsepower
                                                  BILLING CODE 6717–01–P                                  planned facilities. The company would                 electric-driven compressor station in
                                                                                                          seek to negotiate a mutually acceptable               Clay County, Minnesota, a metering
                                                                                                          agreement. However, if the Commission                 station, farm taps, valve settings, and
                                                  DEPARTMENT OF ENERGY                                    approves the project, that approval                   ancillary facilities. Finally, WBI Energy
                                                  Federal Energy Regulatory                               conveys with it the right of eminent                  would increase the maximum allowable
                                                  Commission                                              domain. Therefore, if easement                        operating pressure on a portion of its
                                                                                                          negotiations fail to produce an                       Line Section 24. According to WBI
                                                  [Docket No. PF16–10–000]                                agreement, the pipeline company could                 Energy, the project would provide an
                                                                                                          initiate condemnation proceedings                     additional 40 million cubic feet per day
                                                  WBI Energy Transmission, Inc.; Notice                   where compensation would be                           of firm transportation on its system.
                                                  of Intent To Prepare an Environmental                   determined in accordance with state                     The general location of the project
                                                  Assessment for the Planned Valley                       law.                                                  facilities is shown in appendix 1.1
                                                  Expansion Project and Request for                         A fact sheet prepared by the FERC
                                                  Comments on Environmental Issues                        entitled ‘‘An Interstate Natural Gas                  Land Requirements for Construction
                                                     The staff of the Federal Energy                      Facility On My Land? What Do I Need                      Construction of the project would
                                                  Regulatory Commission (FERC or                          To Know?’’ is available for viewing on                affect a total of about 530 acres of land,
                                                  Commission) will prepare an                             the FERC Web site (www.ferc.gov). This                including the pipeline construction
                                                  environmental assessment (EA) that will                 fact sheet addresses a number of                      right-of-way, additional temporary
                                                  discuss the environmental impacts of                    typically asked questions, including the              workspace, staging areas, temporary and
                                                  the Valley Expansion Project involving                  use of eminent domain and how to                      permanent access roads, and
                                                  construction and operation of facilities                participate in the Commission’s                       aboveground facilities. The total acreage
                                                  by WBI Energy Transmission, Inc. (WBI                   proceedings.                                          required for operation of the project is
                                                  Energy) between Mapleton, North                                                                               approximately 235 acres, including the
                                                                                                          Public Participation
                                                  Dakota and Felton, Minnesota. The                                                                             new permanent pipeline easement,
                                                  Commission will use this EA in its                        For your convenience, there are three               permanent access roads, and permanent
                                                  decision-making process to determine                    methods you can use to submit your                    aboveground facilities’ footprint.
                                                  whether the project is in the public                    comments to the Commission. The
                                                                                                          Commission encourages electronic filing               The EA Process
                                                  convenience and necessity.
                                                     This notice announces the opening of                 of comments and has expert staff                        The National Environmental Policy
                                                  the scoping process the Commission                      available to assist you at (202) 502–8258             Act (NEPA) requires the Commission to
                                                  will use to gather input from the public                or efiling@ferc.gov. Please carefully                 take into account the environmental
                                                  and interested agencies on the project.                 follow these instructions so that your                impacts that could result from an action
                                                  You can make a difference by providing                  comments are properly recorded.                       whenever it considers the issuance of a
                                                  us with your specific comments or                          (1) You can file your comments                     Certificate of Public Convenience and
                                                  concerns about the project. Your                        electronically using the eComment                     Necessity. NEPA also requires us 2 to
                                                  comments should focus on the potential                  feature on the Commission’s Web site                  discover and address concerns the
                                                  environmental effects, reasonable                       (www.ferc.gov) under the link to                      public may have about proposals. This
                                                  alternatives, and measures to avoid or                  Documents and Filings. This is an easy                process is referred to as scoping. The
                                                  lessen environmental impacts. Your                      method for submitting brief, text-only                main goal of the scoping process is to
                                                  input will help the Commission staff                    comments on a project;
                                                  determine what issues they need to                         (2) You can file your comments                       1 The appendices referenced in this notice will

                                                  evaluate in the EA. To ensure that your                 electronically by using the eFiling                   not appear in the Federal Register. Copies of the
                                                                                                          feature on the Commission’s Web site                  appendices were sent to all those receiving this
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  comments are timely and properly                                                                              notice in the mail and are available at www.ferc.gov
                                                  recorded, please send your comments so                  (www.ferc.gov) under the link to                      using the link called ‘‘eLibrary’’ or from the
                                                  that the Commission receives them in                    Documents and Filings. With eFiling,                  Commission’s Public Reference Room, 888 First
                                                  Washington, DC on or before December                    you can provide comments in a variety                 Street NE., Washington, DC 20426, or call (202)
                                                                                                          of formats by attaching them as a file                502–8371. For instructions on connecting to
                                                  23, 2016.                                                                                                     eLibrary, refer to the last page of this notice.
                                                                                                          with your submission. New eFiling                       2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
                                                    1 23 FERC ¶ 62,008, Notice of Exemption from          users must first create an account by                 environmental staff of the Commission’s Office of
                                                  Licensing (1983).                                       clicking on ‘‘eRegister.’’ If you are filing          Energy Projects.



                                             VerDate Sep<11>2014   15:02 Nov 30, 2016   Jkt 241001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                  86708                       Federal Register / Vol. 81, No. 231 / Thursday, December 1, 2016 / Notices

                                                  focus the analysis in the EA on the                      agency status should follow the                           agencies; elected officials; Native
                                                  important environmental issues. By this                  instructions for filing comments                          American Tribes; other interested
                                                  notice, the Commission requests public                   provided under the Public Participation                   parties; and local libraries and
                                                  comments on the scope of the issues to                   section of this notice.                                   newspapers. This list also includes all
                                                  address in the EA. We will consider all                                                                            affected landowners (as defined in the
                                                                                                           Consultations Under Section 106 of the                    Commission’s regulations) who are
                                                  filed comments during the preparation
                                                                                                           National Historic Preservation Act                        potential right-of-way grantors, whose
                                                  of the EA.
                                                     In the EA, we will discuss impacts                       In accordance with the Advisory                        property may be used temporarily for
                                                  that could occur as a result of the                      Council on Historic Preservation’s                        project purposes, or who own homes
                                                  construction and operation of the                        implementing regulations for section                      within certain distances of aboveground
                                                  planned project under these general                      106 of the National Historic                              facilities, and anyone who submits
                                                  headings:                                                Preservation Act, we are using this                       comments on the project. We will
                                                     • Geology and soils;                                  notice to initiate consultation with the                  update the environmental mailing list as
                                                     • water resources, fisheries, and                     applicable State Historic Preservation                    the analysis proceeds to ensure that we
                                                  wetlands;                                                Offices (SHPO), and to solicit their                      send the information related to this
                                                     • vegetation and wildlife;                            views and those of other government                       environmental review to all individuals,
                                                     • endangered and threatened species;                  agencies, interested Indian tribes, and                   organizations, and government entities
                                                     • cultural resources;                                 the public on the project’s potential                     interested in and/or potentially affected
                                                     • socioeconomics;                                     effects on historic properties.4 We will                  by the planned project.
                                                     • land use;                                           define the project-specific Area of                          If we publish and distribute the EA,
                                                     • air quality and noise;                              Potential Effects (APE) in consultation                   copies will be sent to the environmental
                                                     • public safety; and                                  with the SHPOs as the project develops.                   mailing list for public review and
                                                     • cumulative impacts.                                 On natural gas facility projects, the APE                 comment. If you would prefer to receive
                                                     We will also evaluate possible                        at a minimum encompasses all areas                        a paper copy of the document instead of
                                                  alternatives to the planned project or                   subject to ground disturbance (examples                   the CD version or would like to remove
                                                  portions of the project, and make                        include construction right-of-way,                        your name from the mailing list, please
                                                  recommendations on how to lessen or                      contractor/pipe storage yards,                            return the attached Information Request
                                                  avoid impacts on the various resource                    compressor stations, and access roads).                   (appendix 2).
                                                  areas.                                                   Our EA for this project will document                     Becoming an Intervenor
                                                     Although no formal application has                    our findings on the impacts on historic
                                                  been filed, we have already initiated our                properties and summarize the status of                       Once WBI Energy files its application
                                                  NEPA review under the Commission’s                       consultations under section 106.                          with the Commission, you may want to
                                                  pre-filing process. The purpose of the                                                                             become an ‘‘intervenor’’ which is an
                                                                                                           Currently Identified Environmental                        official party to the Commission’s
                                                  pre-filing process is to encourage early
                                                                                                           Issues                                                    proceeding. Intervenors play a more
                                                  involvement of interested stakeholders
                                                                                                              We have already identified several                     formal role in the process and are able
                                                  and to identify and resolve issues before
                                                                                                           issues that we think deserve attention                    to file briefs, appear at hearings, and be
                                                  the FERC receives an application. As
                                                                                                           based on a preliminary review of the                      heard by the courts if they choose to
                                                  part of our pre-filing review, we have
                                                                                                           planned facilities and the                                appeal the Commission’s final ruling.
                                                  begun to contact some federal and state
                                                                                                           environmental information provided by                     An intervenor formally participates in
                                                  agencies to discuss their involvement in
                                                                                                           WBI Energy. This preliminary list of                      the proceeding by filing a request to
                                                  the scoping process and the preparation
                                                                                                           issues may change based on your                           intervene. Motions to intervene are
                                                  of the EA.
                                                                                                           comments and our analysis, but                            more fully described at http://
                                                     The EA will present our independent
                                                                                                           currently includes:                                       www.ferc.gov/resources/guides/how-to/
                                                  analysis of the issues. The EA will be
                                                                                                              • Drain tiles;                                         intervene.asp. Instructions for becoming
                                                  available in the public record through
                                                                                                              • deep topsoil and poor quality                        an intervenor are in the ‘‘Document-less
                                                  eLibrary. Depending on the comments
                                                                                                           subsoils (salinity/sodium or lime);                       Intervention Guide’’ under the ‘‘e-filing’’
                                                  received during the scoping process, we
                                                                                                              • prime farm land;                                     link on the Commission’s Web site.
                                                  may also publish and distribute the EA
                                                  to the public for an allotted comment                       • federally listed species, including                  Please note that the Commission will
                                                                                                           the whooping crane, gray wolf, Dakota                     not accept requests for intervenor status
                                                  period. We will consider all comments
                                                                                                           skipper, northern long-eared bat,                         at this time. You must wait until the
                                                  on the EA before we make our
                                                                                                           western prairie fringed orchid, and the                   Commission receives a formal
                                                  recommendations to the Commission.
                                                                                                           powershiek skipperling;                                   application for the project.
                                                  To ensure we have the opportunity to
                                                  consider and address your comments,                         • cultural resources; and                              Additional Information
                                                  please carefully follow the instructions                    • crossing methods of the Rush River,
                                                                                                           Red River of the North, and the Buffalo                      Additional information about the
                                                  in the Public Participation section,                                                                               project is available from the
                                                  beginning on page 2.                                     River.
                                                                                                                                                                     Commission’s Office of External Affairs,
                                                     With this notice, we are asking                       Environmental Mailing List                                at (866) 208–FERC, or on the FERC Web
                                                  agencies with jurisdiction by law and/                                                                             site (www.ferc.gov) using the eLibrary
                                                  or special expertise with respect to the                   The environmental mailing list
                                                                                                           includes federal, state, and local                        link. Click on the eLibrary link, click on
                                                  environmental issues related to this                                                                               ‘‘General Search’’ and enter the docket
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  project to formally cooperate with us in                 government representatives and
                                                                                                                                                                     number, excluding the last three digits
                                                  the preparation of the EA.3 Agencies                       4 The Advisory Council on Historic Preservation         in the Docket Number field (i.e., PF16–
                                                  that would like to request cooperating                   regulations are at Title 36, Code of Federal              10). Be sure you have selected an
                                                                                                           Regulations, Part 800. Those regulations define           appropriate date range. For assistance,
                                                    3 The Council on Environmental Quality                 historic properties as any prehistoric or historic
                                                  regulations addressing cooperating agency                district, site, building, structure, or object included
                                                                                                                                                                     please contact FERC Online Support at
                                                  responsibilities are at Title 40, Code of Federal        in or eligible for inclusion in the National Register     FercOnlineSupport@ferc.gov or toll free
                                                  Regulations, Part 1501.6.                                of Historic Places.                                       at (866) 208–3676, or for TTY, contact


                                             VerDate Sep<11>2014    15:02 Nov 30, 2016   Jkt 241001   PO 00000   Frm 00020   Fmt 4703    Sfmt 4703   E:\FR\FM\01DEN1.SGM    01DEN1


                                                                             Federal Register / Vol. 81, No. 231 / Thursday, December 1, 2016 / Notices                                          86709

                                                  (202) 502–8659. The eLibrary link also                  Administrative Pricing Policy & Tariff                DEPARTMENT OF ENERGY
                                                  provides access to the texts of formal                  Clarification to be effective 2/1/2017.
                                                  documents issued by the Commission,                       Filed Date: 11/23/16.                               Federal Energy Regulatory
                                                  such as orders, notices, and                                                                                  Commission
                                                                                                            Accession Number: 20161123–5185.
                                                  rulemakings.
                                                     In addition, the Commission offers a                   Comments Due: 5 p.m. ET 12/14/16.                   [Docket Nos. EL17–24–000; QF83–205–009]
                                                  free service called eSubscription, which                  Docket Numbers: ER17–416–000.
                                                  allows you to keep track of all formal                                                                        Clear Lake Cogeneration Limited
                                                  issuances and submittals in specific                      Applicants: California Independent
                                                                                                          System Operator Corporation.                          Partnership; Notice of Petition for
                                                  dockets. This can reduce the amount of                                                                        Temporary Waiver
                                                  time you spend researching proceedings                    Description: § 205(d) Rate Filing:
                                                  by automatically providing you with                     2016–11–22 PMin Re-Rate Consistency                      Take notice that on November 22,
                                                  notification of these filings, document                 Amendment to be effective 2/1/2017.                   2016, pursuant to sections 292.205(c)
                                                  summaries, and direct links to the                        Filed Date: 11/25/16.                               and 385.207 of the Federal Energy
                                                  documents. Go to www.ferc.gov/docs-                       Accession Number: 20161125–5003.                    Regulatory Commission’s (Commission)
                                                  filing/esubscription.asp.                                                                                     Rules of Practice and Procedure, 18 CFR
                                                     Finally, public meetings or site visits                Comments Due: 5 p.m. ET 12/16/16.
                                                                                                                                                                292.205(c) and 385.207 (2016), Clear
                                                  will be posted on the Commission’s                        Docket Numbers: ER17–417–000.                       Lake Cogeneration Limited Partnership
                                                  calendar located at www.ferc.gov/                         Applicants: Avista Corporation.                     filed a Petition for Temporary Waiver of
                                                  EventCalendar/EventsList.aspx along                                                                           Operating and Efficiency Standards for
                                                  with other related information.                           Description: Notice of Cancellation of
                                                                                                          Rate Schedule No. 105 of Avista                       Qualifying Cogeneration Facility, for
                                                    Dated: November 23, 2016.                             Corporation.                                          calendar years 2016 and 2017, all as
                                                  Kimberly D. Bose,                                                                                             more fully explained in the petition.
                                                                                                            Filed Date: 11/23/16.
                                                  Secretary.                                                                                                       Any person desiring to intervene or to
                                                                                                            Accession Number: 20161123–5196.
                                                  [FR Doc. 2016–28850 Filed 11–30–16; 8:45 am]                                                                  protest this filing must file in
                                                  BILLING CODE 6717–01–P                                    Comments Due: 5 p.m. ET 12/14/16.                   accordance with Rules 211 and 214 of
                                                                                                            Take notice that the Commission                     the Commission’s Rules of Practice and
                                                                                                          received the following qualifying                     Procedure (18 CFR 385.211, 385.214).
                                                  DEPARTMENT OF ENERGY                                    facility filings:                                     Protests will be considered by the
                                                                                                                                                                Commission in determining the
                                                  Federal Energy Regulatory                                 Docket Numbers: QF17–312–000.
                                                                                                                                                                appropriate action to be taken, but will
                                                  Commission                                                Applicants: Brigham Young                           not serve to make protestants parties to
                                                                                                          University.                                           the proceeding. Any person wishing to
                                                  Combined Notice of Filings #1
                                                                                                            Description: Form 556 of Brigham                    become a party must file a notice of
                                                     Take notice that the Commission                      Young University [Provo].                             intervention or motion to intervene, as
                                                  received the following electric rate                      Filed Date: 11/22/16.                               appropriate. Such notices, motions, or
                                                  filings:                                                                                                      protests must be filed on or before the
                                                                                                            Accession Number: 20161122–5143.
                                                     Docket Numbers: ER15–1861–000.                                                                             comment date. Anyone filing a motion
                                                     Applicants: Tucson Electric Power                      Comments Due: None Applicable.                      to intervene or protest must serve a copy
                                                  Company.                                                   The filings are accessible in the                  of that document on the Petitioner.
                                                     Description: Report Filing: Refund                   Commission’s eLibrary system by                          The Commission encourages
                                                  Report to be effective N/A.                             clicking on the links or querying the                 electronic submission of protests and
                                                     Filed Date: 11/23/16.                                docket number.                                        interventions in lieu of paper using the
                                                     Accession Number: 20161123–5137.
                                                                                                             Any person desiring to intervene or                ‘‘eFiling’’ link at http://www.ferc.gov.
                                                     Comments Due: 5 p.m. ET 12/14/16.
                                                                                                          protest in any of the above proceedings               Persons unable to file electronically
                                                     Docket Numbers: ER15–1862–000.                       must file in accordance with Rules 211                should submit an original and 5 copies
                                                     Applicants: Tucson Electric Power                    and 214 of the Commission’s                           of the protest or intervention to the
                                                  Company.                                                Regulations (18 CFR 385.211 and                       Federal Energy Regulatory Commission,
                                                     Description: Report Filing: Refund                   385.214) on or before 5:00 p.m. Eastern               888 First Street NE., Washington, DC
                                                  Report to be effective N/A.                             time on the specified comment date.                   20426.
                                                     Filed Date: 11/23/16.                                Protests may be considered, but
                                                     Accession Number: 20161123–5141.                                                                              This filing is accessible on-line at
                                                                                                          intervention is necessary to become a
                                                     Comments Due: 5 p.m. ET 12/14/16.                                                                          http://www.ferc.gov, using the
                                                                                                          party to the proceeding.
                                                     Docket Numbers: ER17–414–000.                                                                              ‘‘eLibrary’’ link and is available for
                                                                                                             eFiling is encouraged. More detailed               review in the Commission’s Public
                                                     Applicants: Avista Corporation.                      information relating to filing
                                                     Description: Tariff Cancellation:                                                                          Reference Room in Washington, DC.
                                                                                                          requirements, interventions, protests,                There is an ‘‘eSubscription’’ link on the
                                                  Avista Corp Cancellation of Various                     service, and qualifying facilities filings
                                                  Rate Schedules to be effective 11/25/                                                                         Web site that enables subscribers to
                                                                                                          can be found at: http://www.ferc.gov/                 receive email notification when a
                                                  2016.                                                   docs-filing/efiling/filing-req.pdf. For
                                                     Filed Date: 11/23/16.                                                                                      document is added to a subscribed
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          other information, call (866) 208–3676                docket(s). For assistance with any FERC
                                                     Accession Number: 20161123–5175.
                                                                                                          (toll free). For TTY, call (202) 502–8659.            Online service, please email
                                                     Comments Due: 5 p.m. ET 12/14/16.
                                                     Docket Numbers: ER17–415–000.                          Dated: November 25, 2016.                           FERCOnlineSupport@ferc.gov, or call
                                                     Applicants: California Independent                   Nathaniel J. Davis, Sr.,                              (866) 208–3676 (toll free). For TTY, call
                                                  System Operator Corporation.                            Deputy Secretary.                                     (202) 502–8659.
                                                     Description: § 205(d) Rate Filing:                   [FR Doc. 2016–28836 Filed 11–30–16; 8:45 am]             Comment Date: 5:00 p.m. Eastern
                                                  2016–11–23 Amdt—Implement                               BILLING CODE 6717–01–P                                Time on December 13, 2016.


                                             VerDate Sep<11>2014   15:02 Nov 30, 2016   Jkt 241001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1



Document Created: 2018-02-14 09:00:33
Document Modified: 2018-02-14 09:00:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 86707 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR