81_FR_89691 81 FR 89453 - Eugene Water and Electric Board; Notice of Settlement Agreement and Soliciting Comments

81 FR 89453 - Eugene Water and Electric Board; Notice of Settlement Agreement and Soliciting Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 238 (December 12, 2016)

Page Range89453-89454
FR Document2016-29620

Federal Register, Volume 81 Issue 238 (Monday, December 12, 2016)
[Federal Register Volume 81, Number 238 (Monday, December 12, 2016)]
[Notices]
[Pages 89453-89454]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29620]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2242-078]


Eugene Water and Electric Board; Notice of Settlement Agreement 
and Soliciting Comments

    Take notice that the following settlement agreement has been filed 
with the Commission and is available for public inspection.
    a. Type of Application: Settlement agreement (amending settlement 
agreement filed October 23, 2008).
    b. Project No.: 2242-078.
    c. Date filed: November 30, 2016.
    d. Applicant: Eugene Water and Electric Board.
    e. Name of Project: Carmen-Smith Hydroelectric Project.
    f. Location: On the McKenzie River in Lane and Linn counties, near 
the town of McKenzie Bridge, Oregon. The project occupies approximately 
560 acres of the Willamette National Forest.
    g. Filed Pursuant to: Rule 602 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.602.
    h. Applicant Contact: Frank Lawson, General Manager, Eugene Water 
and Electric Board, 500 East 4th Avenue, P.O. Box 10148, Eugene, Oregon 
97440-2148; (541) 685-7000.
    i. FERC Contact: Dianne Rodman; (202) 502-6077 or 
[email protected].
    j. Deadline for Filing Comments: January 2, 2017. Reply comments 
due January 17, 2017.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-2242-078.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments

[[Page 89454]]

or documents with the Commission relating to the merits of an issue 
that may affect the responsibilities of a particular resource agency, 
they must also serve a copy of the document on that resource agency.
    k. Eugene Water and Electric Board (EWEB) filed the settlement 
agreement on behalf of itself and the National Marine Fisheries 
Service, U.S. Fish and Wildlife Service, Forest Service, Oregon 
Department of Environmental Quality, Oregon Department of Fish and 
Wildlife, Oregon Parks and Recreation Department, Confederated Tribes 
of the Grand Ronde Community of Oregon, Confederated Tribes of Siletz 
Indians of Oregon, Confederated Tribes of the Warm Springs Reservation 
of Oregon, McKenzie Flyfishers, Rocky Mountain Elk Foundation, Inc., 
and Trout Unlimited. The purpose of the settlement agreement is to 
resolve among the signatories all issues associated with issuance of a 
new license for the project regarding water quality, instream flows, 
fish passage and habitat, wildlife, recreation, aesthetics, and 
cultural resources. EWEB requests that the Commission accept and 
incorporate into any new license for the project the protection, 
mitigation, and enhancement measures stated in the amended settlement 
agreement.
    l. A copy of the settlement agreement is available for review at 
the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: December 2, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-29620 Filed 12-9-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices                                             89453

                                                  presented the analysis in Section 5 and                 proposed avoidance and minimization                   DEPARTMENT OF ENERGY
                                                  Appendix K of the Final EIS.                            measures identified in the EIS.
                                                     EPA also commented that the Final                                                                          Federal Energy Regulatory
                                                  EIS could have been ‘‘improved with a                   Basis for Decision                                    Commission
                                                  discussion of the environmental effects                   DOE’s decision to grant this                        [Project No. 2242–078]
                                                  that would be avoided through potential                 Presidential permit is based on
                                                  reductions in the need to operate power                                                                       Eugene Water and Electric Board;
                                                                                                          consideration of environmental impacts,
                                                  plants with significant cooling water                                                                         Notice of Settlement Agreement and
                                                                                                          impacts on the reliability of the U.S.
                                                  needs.’’ DOE notes that such a                                                                                Soliciting Comments
                                                                                                          electric power supply system under
                                                  discussion might be beneficial but
                                                                                                          normal and contingency conditions, and                   Take notice that the following
                                                  would be premised on substantial
                                                                                                          the favorable recommendations of the                  settlement agreement has been filed
                                                  uncertainty.
                                                     In regard to environmental justice,                  U.S. Departments of State and Defense                 with the Commission and is available
                                                  EPA acknowledged that analysis in the                   (which were provided, respectively, in                for public inspection.
                                                  Final EIS identifies low-income                         July and August of 2015).                                a. Type of Application: Settlement
                                                  populations and minority populations at                   DOE determined that the proposed                    agreement (amending settlement
                                                  the census tract level but commented                    international electric transmission line              agreement filed October 23, 2008).
                                                  that it ‘‘does not differentiate between                would not have an adverse impact on                      b. Project No.: 2242–078.
                                                  the overland and lake segments.’’ EPA                   the reliability of the U.S. electric power               c. Date filed: November 30, 2016.
                                                  further commented that, ‘‘This is                       supply system. In reaching this                          d. Applicant: Eugene Water and
                                                  significant in that populations likely to               determination, DOE reviewed the                       Electric Board.
                                                  be affected by the project will be in the               System Impact Study produced by the                      e. Name of Project: Carmen-Smith
                                                  overland section, and the proximity of                  Independent System Operator New                       Hydroelectric Project.
                                                  the project to those populations would                  England Inc. (ISO–NE) in October 2016                    f. Location: On the McKenzie River in
                                                  be useful to examine.’’ DOE notes that                  and a November 1, 2016, letter from                   Lane and Linn counties, near the town
                                                  its analysis did include potential                      ISO–NE. Based on the information                      of McKenzie Bridge, Oregon. The
                                                  impacts to low-income populations and                   available, DOE staff has determined that              project occupies approximately 560
                                                  minority populations in communities                     the 1000 MW of incremental north-to-                  acres of the Willamette National Forest.
                                                  throughout the potentially affected area.               south transfer, which represents south-                  g. Filed Pursuant to: Rule 602 of the
                                                     EPA also recommended that DOE and                                                                          Commission’s Rules of Practice and
                                                                                                          bound transmission service requests
                                                  TDI–NE conduct public outreach during                                                                         Procedure, 18 CFR 385.602.
                                                                                                          from Quebec to the United States, will
                                                  the construction phase of the project to                                                                         h. Applicant Contact: Frank Lawson,
                                                                                                          not have a negative impact on the
                                                  keep environmental justice populations                                                                        General Manager, Eugene Water and
                                                                                                          reliability of the United States electric
                                                  informed about the project’s progress                                                                         Electric Board, 500 East 4th Avenue,
                                                                                                          grid if operated consistent with both
                                                  and potential impacts, even those                                                                             P.O. Box 10148, Eugene, Oregon 97440–
                                                                                                          ISO-New England and North American
                                                  anticipated to be minor in nature. DOE                                                                        2148; (541) 685–7000.
                                                                                                          Electric Reliability Corporation policies                i. FERC Contact: Dianne Rodman;
                                                  notes that in addition to the four public               and standards, terms and conditions of
                                                  meetings held during DOE’s NEPA                                                                               (202) 502–6077 or dianne.rodman@
                                                                                                          the Presidential Permit and other                     ferc.gov.
                                                  process, TDI–NE conducted
                                                                                                          regulatory and statutory requirements.                   j. Deadline for Filing Comments:
                                                  comprehensive outreach throughout the
                                                                                                          Neither DOE nor ISO–NE has studied a                  January 2, 2017. Reply comments due
                                                  development of the project using town
                                                                                                          south-to-north transfer, so the permit                January 17, 2017.
                                                  offices, Front Porch Forums, and
                                                                                                          does not authorize such a transfer.                      The Commission strongly encourages
                                                  targeted letters to landowners in the
                                                  vicinity of the project route to                        Mitigation                                            electronic filing. Please file comments
                                                  communicate project information. TDI–                                                                         using the Commission’s eFiling system
                                                  NE conducted six local open house                          All practicable means to avoid or                  at http://www.ferc.gov/docs-filing/
                                                  meetings in several communities along                   minimize environmental harm from the                  efiling.asp. Commenters can submit
                                                  the project route. TDI–NE plans to                      alternative selected have been, or will               brief comments up to 6,000 characters,
                                                  continue to use these forums to                         be, adopted. TDI–NE’s proposed                        without prior registration, using the
                                                  communicate with local citizens along                   measures to avoid and minimize                        eComment system at http://
                                                  the project route.                                      adverse impacts are described in the                  www.ferc.gov/docs-filing/
                                                     The construction phase of the NECPL                  EIS, the BA, and the PA. TDI–NE will                  ecomment.asp. You must include your
                                                  project including stipulations,                         be responsible for implementing these                 name and contact information at the end
                                                  mitigation measures, and public                         avoidance and minimization measures.                  of your comments. For assistance,
                                                  outreach efforts, would be under the                    Additional measures will be required as               please contact FERC Online Support at
                                                  jurisdiction of the USACE, VT–ANR,                      a result of ongoing consultations (e.g.,              FERCOnlineSupport@ferc.gov, (866)
                                                  VTrans, the VT Public Service Board,                    regarding Clean Water Act Section 404,                208–3676 (toll free), or (202) 502–8659
                                                  and the Towns of Alburgh, Benson and                    the Cultural Resources Management                     (TTY). In lieu of electronic filing, please
                                                  Ludlow.                                                 Plan) between TDI–NE and state and                    send a paper copy to: Secretary, Federal
                                                                                                          federal agencies as part of approval and              Energy Regulatory Commission, 888
                                                  Decision                                                permitting processes.                                 First Street NE., Washington, DC 20426.
                                                     DOE has decided to issue Presidential                                                                      The first page of any filing should
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                            Issued in Washington, DC, on December 5,
                                                  Permit PP–400 to authorize TDI–NE to                                                                          include docket number P–2242–078.
                                                                                                          2016.
                                                  construct, operate, maintain, and                                                                                The Commission’s Rules of Practice
                                                  connect a 1,000-MW HVDC                                 Meghan Conklin,                                       require all intervenors filing documents
                                                  transmission line across the U.S./                      Deputy Assistant Secretary, Office of                 with the Commission to serve a copy of
                                                  Canada international border. The permit                 Electricity Delivery and Energy Reliability.          that document on each person on the
                                                  will include a condition requiring TDI–                 [FR Doc. 2016–29700 Filed 12–9–16; 8:45 am]           official service list for the project.
                                                  NE to implement the Applicant-                          BILLING CODE 6450–01–P                                Further, if an intervenor files comments


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016   Jkt 241001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1


                                                  89454                        Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices

                                                  or documents with the Commission                              esubscription.asp to be notified via                ‘‘eFiling’’ link at http://www.ferc.gov.
                                                  relating to the merits of an issue that                       email of new filings and issuances                  Persons unable to file electronically
                                                  may affect the responsibilities of a                          related to this or other pending projects.          should submit an original and 5 copies
                                                  particular resource agency, they must                         For assistance, contact FERC Online                 of the protest or intervention to the
                                                  also serve a copy of the document on                          Support.                                            Federal Energy Regulatory Commission,
                                                  that resource agency.                                           Dated: December 2, 2016.                          888 First Street NE., Washington, DC
                                                     k. Eugene Water and Electric Board                                                                             20426.
                                                                                                                Kimberly D. Bose,
                                                  (EWEB) filed the settlement agreement                                                                                This filing is accessible on-line at
                                                  on behalf of itself and the National                          Secretary.
                                                                                                                [FR Doc. 2016–29620 Filed 12–9–16; 8:45 am]
                                                                                                                                                                    http://www.ferc.gov, using the
                                                  Marine Fisheries Service, U.S. Fish and                                                                           ‘‘eLibrary’’ link and is available for
                                                  Wildlife Service, Forest Service, Oregon                      BILLING CODE 6717–01–P
                                                                                                                                                                    review in the Commission’s Public
                                                  Department of Environmental Quality,                                                                              Reference Room in Washington, DC.
                                                  Oregon Department of Fish and                                                                                     There is an ‘‘eSubscription’’ link on the
                                                  Wildlife, Oregon Parks and Recreation                         DEPARTMENT OF ENERGY
                                                                                                                                                                    Web site that enables subscribers to
                                                  Department, Confederated Tribes of the                                                                            receive email notification when a
                                                  Grand Ronde Community of Oregon,                              Federal Energy Regulatory
                                                                                                                Commission                                          document is added to a subscribed
                                                  Confederated Tribes of Siletz Indians of                                                                          docket(s). For assistance with any FERC
                                                  Oregon, Confederated Tribes of the                            [Docket Nos. TS17–1–000]                            Online service, please email
                                                  Warm Springs Reservation of Oregon,                                                                               FERCOnlineSupport@ferc.gov, or call
                                                  McKenzie Flyfishers, Rocky Mountain                           Northern California Power Agency;                   (866) 208–3676 (toll free). For TTY, call
                                                  Elk Foundation, Inc., and Trout                               Notice of Filing                                    (202) 502–8659.
                                                  Unlimited. The purpose of the
                                                  settlement agreement is to resolve                               Take notice that on November 29,                    Comment Date: 5:00 p.m. Eastern
                                                  among the signatories all issues                              2016, Northern California Power Agency              Time on December 20, 2016.
                                                  associated with issuance of a new                             filed a notice of potential change in                 Dated: December 6, 2016.
                                                  license for the project regarding water                       material facts and a request for                    Kimberly D. Bose,
                                                  quality, instream flows, fish passage and                     continued waiver of the Standards of
                                                                                                                                                                    Secretary.
                                                  habitat, wildlife, recreation, aesthetics,                    Conduct.
                                                                                                                                                                    [FR Doc. 2016–29699 Filed 12–9–16; 8:45 am]
                                                  and cultural resources. EWEB requests                            Any person desiring to intervene or to
                                                                                                                                                                    BILLING CODE 6717–01–P
                                                  that the Commission accept and                                protest this filing must file in
                                                  incorporate into any new license for the                      accordance with Rules 211 and 214 of
                                                  project the protection, mitigation, and                       the Commission’s Rules of Practice and
                                                                                                                                                                    DEPARTMENT OF ENERGY
                                                  enhancement measures stated in the                            Procedure (18 CFR 385.211, 385.214).
                                                  amended settlement agreement.                                 Protests will be considered by the                  Federal Energy Regulatory
                                                     l. A copy of the settlement agreement                      Commission in determining the                       Commission
                                                  is available for review at the                                appropriate action to be taken, but will
                                                  Commission in the Public Reference                            not serve to make protestants parties to
                                                                                                                                                                    [Project Nos. 1855–049, 1892–029, 1904–
                                                  Room or may be viewed on the                                  the proceeding. Any person wishing to
                                                                                                                                                                    077, 2077–106, 2323–214]
                                                  Commission’s Web site at http://                              become a party must file a notice of
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.                     intervention or motion to intervene, as             TransCanada Hydro Northeast Inc.; TC
                                                  Enter the docket number excluding the                         appropriate. Such notices, motions, or              Hydro Inc.; Notice of Application for
                                                  last three digits in the docket number                        protests must be filed on or before the             Transfer of Licenses and Soliciting
                                                  field to access the document. For                             comment date. On or before the                      Comments and Motions To Intervene
                                                  assistance, contact FERC Online                               comment date, it is not necessary to
                                                  Support. A copy is also available for                         serve motions to intervene or protests                 On November 18, 2016, the above
                                                  inspection and reproduction at the                            on persons other than the Applicant.                mentioned transferor and TC Hydro Inc.
                                                  address in item h above.                                         The Commission encourages                        (transferee) filed an application for
                                                     You may also register online at http://                    electronic submission of protests and               transfer of licenses for the following
                                                  www.ferc.gov/docs-filing/                                     interventions in lieu of paper using the            projects.

                                                   Project No.                 Project name                                                                    Location

                                                  P–1855–049       Bellows Falls Project ................       Connecticut River, Cheshire and Sullivan counties, NH and Windham and Windsor counties,
                                                                                                                  VT.
                                                  P–1892–029       Wilder Project ...........................   Connecticut River, Windsor and Orange counties, VT and Grafton County, NH.
                                                  P–1904–077       Vernon Project ..........................    Connecticut River, Grafton County, NH and Caledonia County, VT.
                                                  P–2077–106       Mile Falls Hydroelectric Project             Connecticut River, Grafton County, NH and Caledonia County, VT.
                                                  P–2323–214       Deerfield River Project ..............       Windham and Bennington, counties, VT and Franklin and Berkshire counties, MA.



                                                     The transferor and transferee seek                         Westborough, MA 01581, Phone: 508–                     Deadline for filing comments and
                                                  Commission approval to transfer the                           599–1434, Email: erin_odea@                         motions to intervene: 30 days from the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  licenses for the above mentioned                              transcanada.com. And John A.                        issuance date of this notice, by the
                                                  projects from the transferor to the                           Whittaker, IV, Winston & Strawn LLP,                Commission. The Commission strongly
                                                  transferee.                                                   and 1700 K Street NW., Washington, DC               encourages electronic filing. Please file
                                                     Applicant Contacts: For Transferor                         20006–3817, Phone: 202–282–5766,                    motions to intervene and comments
                                                  and Transferee: Ms. Erin A. O’Dea, Legal                      Email: jwhittaker@winston.com.                      using the Commission’s eFiling system
                                                  Counsel, TransCanada U.S. Northeast,                            FERC Contact: Patricia W. Gillis, (202)           at http://www.ferc.gov/docs-filing/
                                                  110 Turnpike Road, Suite 300,                                 502–8735.                                           efiling.asp. Commenters can submit


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016     Jkt 241001    PO 00000    Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1



Document Created: 2018-02-14 09:05:51
Document Modified: 2018-02-14 09:05:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 89453 