81_FR_89808 81 FR 89570 - Notice of Buy America Waiver for Replacement Parts on Diesel Multiple Unit Rail Vehicles

81 FR 89570 - Notice of Buy America Waiver for Replacement Parts on Diesel Multiple Unit Rail Vehicles

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 81, Issue 238 (December 12, 2016)

Page Range89570-89571
FR Document2016-29707

The Federal Transit Administration (FTA) received a request from the North County Transit District (NCTD) in California for a Buy America non-availability waiver for the procurement of replacement parts for Diesel Multiple Unit (DMU) rail vehicles. The 12 DMU rail vehicles were manufactured by Siemens as a part of their Desiro series and were placed in revenue service in 2008. Mid-life maintenance and replacement overhauls of vehicle parts are now required in order to ensure safe and continuous transit service. The FTA hereby waives its Buy America requirements, finding that the materials for which the waiver is requested are not produced in the United States in sufficient and reasonably available quantities and of satisfactory quality. This waiver is limited to the purchase of the replacement parts by NCTD over several phases from 2018 through 2026.

Federal Register, Volume 81 Issue 238 (Monday, December 12, 2016)
[Federal Register Volume 81, Number 238 (Monday, December 12, 2016)]
[Notices]
[Pages 89570-89571]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29707]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

[Docket No. FTA-2016-0036]


Notice of Buy America Waiver for Replacement Parts on Diesel 
Multiple Unit Rail Vehicles

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice of Buy America waiver.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) received a request 
from the North County Transit District (NCTD) in California for a Buy 
America non-availability waiver for the procurement of replacement 
parts for Diesel Multiple Unit (DMU) rail vehicles. The 12 DMU rail 
vehicles were manufactured by Siemens as a part of their Desiro series 
and were placed in revenue service in 2008. Mid-life maintenance and 
replacement overhauls of vehicle parts are now required in order to 
ensure safe and continuous transit service. The FTA hereby waives its 
Buy America requirements, finding that the materials for which the 
waiver is requested are not produced in the United States in sufficient 
and reasonably available quantities and of satisfactory quality. This 
waiver is limited to the purchase of the replacement parts by NCTD over 
several phases from 2018 through 2026.

DATES: The waiver is effective immediately.

FOR FURTHER INFORMATION CONTACT: Cecelia Comito, Assistant Chief 
Counsel, at (202) 366-2217 or [email protected].

SUPPLEMENTARY INFORMATION: The purpose of this notice is to announce 
that FTA has granted a Buy America non-availability waiver for the 
NCTD's purchase of replacement parts on their Siemens-manufactured 
Desiro series DMU rail vehicles, including, but not limited to, Power 
Pack Assembly, Power Truck Assembly, Jakobs Truck Assembly, 
Transmission, Primary Suspension, Secondary Suspension, Power Wheelset 
Assembly, Power Truck Brake Rotors, Jakobs Truck Brake Rotors, Power 
Truck Wheels, Jakobs Truck Wheels, A/C Compressors, Carbody Brake 
Components, Automatic Train Couplers, and HVAC Roof Mounted Units (the 
``Replacement Parts'') pursuant to 49 U.S.C. 5323(j)(2)(B) and 49 CFR 
661.7(c).
    With certain exceptions, FTA's Buy America requirements prevent FTA 
from obligating an amount that may be appropriated to carry out its 
program for a project unless ``the steel, iron, and manufactured goods 
used in the project are produced in the United States.'' 49 U.S.C. 
5323(j)(1). A manufactured product is considered produced in the United 
States if: (1) All of the manufacturing processes for the product take 
place in the United States; and (2) all of the components of the 
product are of U.S. origin. A component is considered of U.S. origin if 
it is manufactured in the United States, regardless of the origin of 
its subcomponents. 49 CFR 661.5(d). If, however, FTA determines that 
``the steel, iron, and goods produced in the

[[Page 89571]]

United States are not produced in a sufficient and reasonably available 
amount or are not of a satisfactory quality,'' then FTA may issue a 
non-availability waiver. 49 U.S.C. 5323(j)(2)(B); 49 CFR 661.7(c). ``It 
will be presumed that the conditions exist to grant this non-
availability waiver if no responsive and responsible bid is received 
offering an item produced in the United States.'' 49 CFR 661.7(c)(1).
    NCTD provides transit service to the entire North San Diego County, 
serving more than 12 million riders annually. In 2003, NCTD requested 
and received from FTA a non-availability Buy America waiver for the 
procurement of 12 DMU vehicles for use on NCTD's Sprinter line, with 15 
light rail stations between the cities of Escondido and Oceanside. NCTD 
purchased the 12 DMU vehicles in 2004 and placed the vehicles into 
revenue service in 2008 on NCTD's Sprinter line. The useful life of the 
vehicles is 25 years.
    According to NCTD, the Replacements Parts for the DMU vehicles are 
nearing the end of their useful service lives and showing signs of wear 
and fatigue. Without periodic capital equipment replacement and/or 
rebuild, the likelihood of mechanical downtime increases significantly, 
equating to prolonged service outages for riders. In March 2013, NCTD 
removed the Sprinter service from revenue service for more than two 
months due to premature wear of one of the three braking systems and 
unavailability of domestic replacement parts. NCTD intends to replace 
the components over several phases during the coming years, from 2018 
through 2026. The last phase is anticipated to be procured over a 
subsequent seven-year period. Any non-availability waiver granted would 
be effective for all phases of these projects and will expire upon 
completion of these projects.
    As a part of its search for domestic Replacement Parts, NCTD issued 
a Request for Information (RFI) on November 12, 2013 to maintenance and 
engineering communities to determine if any firms existed that could 
either supply Buy America compliant parts and components, or reverse 
engineer the parts and components utilizing plans and specifications 
provided. More than 300 vendors received the RFI; 19 downloaded the 
RFI. One vendor responded that ``with proper specifications, drawings, 
and samples, we may be able to design and supply Buy America Compliant, 
OE equivalent, air bellows, primary suspension, and passenger 
bellows.'' However, the original equipment manufacturer (``OEM'') would 
not provide the requested proprietary information. NCTD undertook three 
additional procurements for the Replacement Parts. Three responses were 
received; none could certify to Buy America compliance.
    NCTD's 12 vehicles are the only Siemens Sprinter vehicles in the 
United States. Additionally, since these vehicles were specifically 
designed to meet California Public Utilities Commission rail safety 
requirements, Sprinter is the only vehicle of its kind internationally. 
NCTD's multiple procurement efforts have demonstrated that there are no 
suppliers willing to invest in infrastructure to manufacture parts that 
are suitable only for NCTD's 12 vehicles.
    Under 49 U.S.C. 5323(j)(6), FTA cannot deny an application for a 
waiver based on non-availability unless FTA can certify that (i) the 
steel, iron, or manufactured good (the ``item'') is produced in the 
United States in a sufficient and reasonably available amount; and (ii) 
the item produced in the United States is of a satisfactory quality. 
Additionally, FTA must provide a list of known manufacturers in the 
United States from which the item can be obtained. FTA is not aware of 
any manufacturers who produce the Replacement Parts in the United 
States.
    The 12 DMUs purchased by NCTD were granted a waiver from Buy 
America, and Replacement Parts are necessary for mid-life maintenance 
of the rail vehicles. Due to its unsuccessful efforts to identify 
domestic manufacturers, NCTD seeks a non-availability waiver of the Buy 
America requirements for the various Replacement Parts. FTA published a 
notice in the Federal Register announcing the Buy America waiver 
request (Docket No. FTA-2016-0036) and sought comments from all 
interested parties, including potential vendors and suppliers. The 
comment period closed on November 14, 2016, and no comments were 
received.
    Therefore, based on the information provided in support of NCTD's 
request for a Buy America waiver and the lack of any comments, FTA 
hereby waives its Buy America requirements for the procurement of the 
various Replacement Parts on the grounds that the manufactured product 
is not available in the U.S. This waiver is limited to the purchase of 
replacement parts for the 12 DMUs which will be acquired for the 
replacement of the components over several phases from 2018 through 
2026. The waiver is effective for all phases of these projects.

Ellen Partridge,
Chief Counsel.
[FR Doc. 2016-29707 Filed 12-9-16; 8:45 am]
 BILLING CODE P



                                                  89570                      Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices

                                                  ‘‘Notice of Final Federal Agency Actions                Department of Transportation Act of                   from the North County Transit District
                                                  on Proposed Highway in Washington’’                     1966 [49 U.S.C. 303].                                 (NCTD) in California for a Buy America
                                                  in the Federal Register at 76 FR 55459                    4. Wildlife: Endangered Species Act                 non-availability waiver for the
                                                  for the SR 520, I–5 to Medina: Bridge                   [16 U.S.C. 1531–1544]; Section 7 of the               procurement of replacement parts for
                                                  Replacement and HOV Project. Notice is                  Endangered Species Act [16 U.S.C.                     Diesel Multiple Unit (DMU) rail
                                                  hereby given that, subsequent to the                    1536]; Anadromous Fish Conservation                   vehicles. The 12 DMU rail vehicles were
                                                  earlier FHWA notice, FHWA has taken                     Act [16 U.S.C. 757(a-757(g)); Fish and                manufactured by Siemens as a part of
                                                  final agency actions within the meaning                 Wildlife Coordination Act [16 U.S.C.                  their Desiro series and were placed in
                                                  of 23 U.S.C. 139(l)(1) by issuing a NEPA                661–667(d)]; Magnuson-Stevens Fishery                 revenue service in 2008. Mid-life
                                                  re-evaluation for the SR 520 SR 520, I–                 Conservation and Management Act of                    maintenance and replacement overhauls
                                                  5 to Medina: Bridge Replacement and                     1976, as amended [16 U.S.C. 1801 et                   of vehicle parts are now required in
                                                  HOV Project: West Approach Bridge                       seq.].                                                order to ensure safe and continuous
                                                  South and Montlake Lid Design                             5. Historic and Cultural Resources:                 transit service. The FTA hereby waives
                                                  (hereafter ‘‘re-evaluation’’). The                      Section 106 of the National Historic                  its Buy America requirements, finding
                                                  action(s) by FHWA and the laws under                    Preservation Act of 1966, as amended                  that the materials for which the waiver
                                                  which such actions were taken, are                      [16 U.S.C. 470(f) et seq.]; Archaeological            is requested are not produced in the
                                                  described in the re-evaluation and the                  and Historic Preservation Act [16 U.S.C.              United States in sufficient and
                                                  associated agency records. That                         469–469(c)]; Native American Grave                    reasonably available quantities and of
                                                  information is available by contacting                  Protection and Repatriation Act (25                   satisfactory quality. This waiver is
                                                  FHWA at the addresses provided above.                   U.S.C. 3001–3013).                                    limited to the purchase of the
                                                     The project proposed to improve                        6. Wetlands and Water Resources:                    replacement parts by NCTD over several
                                                  safety and mobility for people and                      Section 7 of the Endangered Species Act               phases from 2018 through 2026.
                                                  goods across Lake Washington by                         [16 U.S.C. 1536]; Clean Water Act,                    DATES: The waiver is effective
                                                  replacing the SR 520 Portage Bay and                    (Section 319 [33 U.S.C. 329]); Safe                   immediately.
                                                  Evergreen Point bridges and improve                     Drinking Water Act [42 U.S.C. 300(f)–
                                                                                                                                                                FOR FURTHER INFORMATION CONTACT:
                                                  existing roadway between Interstate 5                   300(j)(6)].
                                                                                                            7. Navigation: Rivers and Harbors Act               Cecelia Comito, Assistant Chief
                                                  (I–5) in Seattle and Evergreen Point
                                                                                                          of 1899 [33 U.S.C. 403]; General Bridge               Counsel, at (202) 366–2217 or
                                                  Road in Medina spanning 5.2 miles. The
                                                                                                          Act of 1946 [33 U.S.C. 9 and 11].                     cecelia.comito@dot.gov.
                                                  Final Environmental Impact Statement
                                                  (EIS) for the project was published in                    8. Executive Orders: E.O. 11990                     SUPPLEMENTARY INFORMATION: The
                                                  January 2011 and the Record of Decision                 Protection of Wetlands; E.O. 11988                    purpose of this notice is to announce
                                                  (ROD) was issued in August 2011.                        Floodplain Management; E.O. 12898                     that FTA has granted a Buy America
                                                     Since issuance of the FHWA ROD, the                  Federal Actions to Address                            non-availability waiver for the NCTD’s
                                                  design has been refined for the West                    Environmental Justice in Minority                     purchase of replacement parts on their
                                                  Approach Bridge South, Montlake Lid,                    Populations and Low Income                            Siemens-manufactured Desiro series
                                                  and other project elements in the                       Populations; E.O. 11593 Protection and                DMU rail vehicles, including, but not
                                                  Montlake Interchange Area including                     Enhancement of Cultural Resources;                    limited to, Power Pack Assembly, Power
                                                  changes to the path connections,                        E.O. 13007 Indian Sacred Sites; E.O.                  Truck Assembly, Jakobs Truck
                                                  changes to stormwater facilities, and                   13287 Preserve America; E.O. 13175                    Assembly, Transmission, Primary
                                                  changes to the design of the intersection               Consultation and Coordination with                    Suspension, Secondary Suspension,
                                                  at 24th Avenue East and East Lake                       Indian Tribal Governments; E.O. 11514                 Power Wheelset Assembly, Power Truck
                                                  Washington Boulevard. The re-                           Protection and Enhancement of                         Brake Rotors, Jakobs Truck Brake
                                                  evaluation considering these                            Environmental Quality; E.O. 13112                     Rotors, Power Truck Wheels, Jakobs
                                                  refinements was prepared in October                     Invasive Species.                                     Truck Wheels, A/C Compressors,
                                                  2016. It identifies and documents                         Authority: 23 U.S.C. 139(l)(1), as amended
                                                                                                                                                                Carbody Brake Components, Automatic
                                                  potential effects associated with these                 by Moving Ahead for Progress in the 21st              Train Couplers, and HVAC Roof
                                                  refinements. This notice only applies to                Century Act, (Pub. L. 112–141, 126 Stat. 405).        Mounted Units (the ‘‘Replacement
                                                  the re-evaluation.                                                                                            Parts’’) pursuant to 49 U.S.C.
                                                                                                          Frederick A. Judd IV,                                 5323(j)(2)(B) and 49 CFR 661.7(c).
                                                     Information about the re-evaluation
                                                  and associated records are available                    FHWA Acting Assistant Division                           With certain exceptions, FTA’s Buy
                                                                                                          Administrator, Olympia, WA.                           America requirements prevent FTA
                                                  from FHWA and WSDOT at the
                                                                                                          [FR Doc. 2016–29675 Filed 12–9–16; 8:45 am]           from obligating an amount that may be
                                                  addresses provided above and can be
                                                  found at: https://www.wsdot.wa.gov/                     BILLING CODE 4910–RY–P                                appropriated to carry out its program for
                                                  Projects/SR520Bridge/Library/                                                                                 a project unless ‘‘the steel, iron, and
                                                  I5Medina.htm. This notice applies to all                                                                      manufactured goods used in the project
                                                                                                          DEPARTMENT OF TRANSPORTATION                          are produced in the United States.’’ 49
                                                  Federal agency decisions related to the
                                                  re-evaluation as of the issuance date of                                                                      U.S.C. 5323(j)(1). A manufactured
                                                                                                          Federal Transit Administration
                                                  this notice and all laws under which                                                                          product is considered produced in the
                                                  such actions were taken, including but                  [Docket No. FTA–2016–0036]                            United States if: (1) All of the
                                                  not limited to:                                                                                               manufacturing processes for the product
                                                     1. General: National Environmental                   Notice of Buy America Waiver for                      take place in the United States; and (2)
                                                                                                          Replacement Parts on Diesel Multiple                  all of the components of the product are
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Policy Act (NEPA) [42 U.S.C. 4321–
                                                  4347]; Federal-Aid Highway Act [23                      Unit Rail Vehicles                                    of U.S. origin. A component is
                                                  U.S.C. 109].                                            AGENCY:    Federal Transit Administration,            considered of U.S. origin if it is
                                                     2. Air: Clean Air Act, as amended [42                DOT.                                                  manufactured in the United States,
                                                  U.S.C. 7401–7671(q)].                                   ACTION:   Notice of Buy America waiver.               regardless of the origin of its
                                                     3. Land: Section 6(f) of the Land and                                                                      subcomponents. 49 CFR 661.5(d). If,
                                                  Water Conservation Fund Act of 1965                     SUMMARY: The Federal Transit                          however, FTA determines that ‘‘the
                                                  [16 U.S.C. 4601]; Section 4(f) of the                   Administration (FTA) received a request               steel, iron, and goods produced in the


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016   Jkt 241001   PO 00000   Frm 00146   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1


                                                                             Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices                                                  89571

                                                  United States are not produced in a                     requested proprietary information.                    The waiver is effective for all phases of
                                                  sufficient and reasonably available                     NCTD undertook three additional                       these projects.
                                                  amount or are not of a satisfactory                     procurements for the Replacement Parts.               Ellen Partridge,
                                                  quality,’’ then FTA may issue a non-                    Three responses were received; none                   Chief Counsel.
                                                  availability waiver. 49 U.S.C.                          could certify to Buy America
                                                  5323(j)(2)(B); 49 CFR 661.7(c). ‘‘It will                                                                     [FR Doc. 2016–29707 Filed 12–9–16; 8:45 am]
                                                                                                          compliance.
                                                  be presumed that the conditions exist to                                                                      BILLING CODE P

                                                  grant this non-availability waiver if no                   NCTD’s 12 vehicles are the only
                                                  responsive and responsible bid is                       Siemens Sprinter vehicles in the United
                                                  received offering an item produced in                   States. Additionally, since these                     DEPARTMENT OF TRANSPORTATION
                                                  the United States.’’ 49 CFR 661.7(c)(1).                vehicles were specifically designed to
                                                                                                          meet California Public Utilities                      Federal Transit Administration
                                                     NCTD provides transit service to the
                                                  entire North San Diego County, serving                  Commission rail safety requirements,                  [Docket No. FTA–2016–0038]
                                                  more than 12 million riders annually. In                Sprinter is the only vehicle of its kind
                                                  2003, NCTD requested and received                       internationally. NCTD’s multiple                      Notice of Buy America Waiver for
                                                  from FTA a non-availability Buy                         procurement efforts have demonstrated                 Radio Consoles
                                                  America waiver for the procurement of                   that there are no suppliers willing to                AGENCY:    Federal Transit Administration,
                                                  12 DMU vehicles for use on NCTD’s                       invest in infrastructure to manufacture               DOT.
                                                  Sprinter line, with 15 light rail stations              parts that are suitable only for NCTD’s               ACTION:   Notice of Buy America waiver.
                                                  between the cities of Escondido and                     12 vehicles.
                                                  Oceanside. NCTD purchased the 12                                                                              SUMMARY:    In response to Greater Dayton
                                                                                                             Under 49 U.S.C. 5323(j)(6), FTA
                                                  DMU vehicles in 2004 and placed the                                                                           Regional Transit Authority’s (GDRTA)
                                                  vehicles into revenue service in 2008 on                cannot deny an application for a waiver
                                                                                                                                                                request for a Buy America non-
                                                  NCTD’s Sprinter line. The useful life of                based on non-availability unless FTA                  availability waiver for the procurement
                                                  the vehicles is 25 years.                               can certify that (i) the steel, iron, or              of radio consoles, which would be a part
                                                     According to NCTD, the                               manufactured good (the ‘‘item’’) is                   of GDRTA’s new communication system
                                                  Replacements Parts for the DMU                          produced in the United States in a                    (‘‘radio consoles’’), the Federal Transit
                                                  vehicles are nearing the end of their                   sufficient and reasonably available                   Administration (FTA) hereby waives its
                                                  useful service lives and showing signs                  amount; and (ii) the item produced in                 Buy America requirements, finding that
                                                  of wear and fatigue. Without periodic                   the United States is of a satisfactory                the materials for which the waiver is
                                                  capital equipment replacement and/or                    quality. Additionally, FTA must provide               requested are not produced in the
                                                  rebuild, the likelihood of mechanical                   a list of known manufacturers in the                  United States in sufficient and
                                                  downtime increases significantly,                       United States from which the item can                 reasonably available quantities and of
                                                  equating to prolonged service outages                   be obtained. FTA is not aware of any                  satisfactory quality. This waiver is
                                                  for riders. In March 2013, NCTD                         manufacturers who produce the                         limited to a single procurement by
                                                  removed the Sprinter service from                       Replacement Parts in the United States.               GDRTA for the radio consoles.
                                                  revenue service for more than two                                                                             DATES: This waiver is effective
                                                                                                             The 12 DMUs purchased by NCTD
                                                  months due to premature wear of one of                                                                        immediately.
                                                  the three braking systems and                           were granted a waiver from Buy
                                                  unavailability of domestic replacement                  America, and Replacement Parts are                    FOR FURTHER INFORMATION CONTACT:
                                                  parts. NCTD intends to replace the                      necessary for mid-life maintenance of                 Cecelia Comito, FTA Assistant Chief
                                                  components over several phases during                   the rail vehicles. Due to its unsuccessful            Counsel, at (202) 366–2217 or
                                                  the coming years, from 2018 through                     efforts to identify domestic                          cecelia.comito@dot.gov.
                                                  2026. The last phase is anticipated to be               manufacturers, NCTD seeks a non-                      SUPPLEMENTARY INFORMATION: The
                                                  procured over a subsequent seven-year                   availability waiver of the Buy America                purpose of this notice is to announce
                                                  period. Any non-availability waiver                     requirements for the various                          that FTA has granted a Buy America
                                                  granted would be effective for all phases               Replacement Parts. FTA published a                    non-availability waiver for GDRTA for
                                                  of these projects and will expire upon                  notice in the Federal Register                        the procurement of radio consoles under
                                                  completion of these projects.                           announcing the Buy America waiver                     49 U.S.C. 5323(j)(2)(B) and 49 CFR
                                                     As a part of its search for domestic                 request (Docket No. FTA–2016–0036)                    661.7(c).
                                                  Replacement Parts, NCTD issued a                        and sought comments from all                             With certain exceptions, FTA’s Buy
                                                  Request for Information (RFI) on                        interested parties, including potential               America requirements prevent FTA
                                                  November 12, 2013 to maintenance and                    vendors and suppliers. The comment                    from obligating an amount that may be
                                                  engineering communities to determine                    period closed on November 14, 2016,                   appropriated to carry out its program for
                                                  if any firms existed that could either                  and no comments were received.                        a project unless ‘‘the steel, iron, and
                                                  supply Buy America compliant parts                                                                            manufactured goods used in the project
                                                  and components, or reverse engineer the                    Therefore, based on the information                are produced in the United States.’’ 49
                                                  parts and components utilizing plans                    provided in support of NCTD’s request                 U.S.C. 5323(j)(1). A manufactured
                                                  and specifications provided. More than                  for a Buy America waiver and the lack                 product is considered produced in the
                                                  300 vendors received the RFI; 19                        of any comments, FTA hereby waives its                United States if: (1) All of the
                                                  downloaded the RFI. One vendor                          Buy America requirements for the                      manufacturing processes for the product
                                                  responded that ‘‘with proper                            procurement of the various Replacement                take place in the United States; and (2)
mstockstill on DSK3G9T082PROD with NOTICES




                                                  specifications, drawings, and samples,                  Parts on the grounds that the                         all of the components of the product are
                                                  we may be able to design and supply                     manufactured product is not available                 of U.S. origin. A component is
                                                  Buy America Compliant, OE equivalent,                   in the U.S. This waiver is limited to the             considered of U.S. origin if it is
                                                  air bellows, primary suspension, and                    purchase of replacement parts for the 12              manufactured in the United States,
                                                  passenger bellows.’’ However, the                       DMUs which will be acquired for the                   regardless of the origin of its
                                                  original equipment manufacturer                         replacement of the components over                    subcomponents. 49 CFR 661.5(d). If,
                                                  (‘‘OEM’’) would not provide the                         several phases from 2018 through 2026.                however, FTA determines that ‘‘the


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016   Jkt 241001   PO 00000   Frm 00147   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1



Document Created: 2018-02-14 09:05:20
Document Modified: 2018-02-14 09:05:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Buy America waiver.
DatesThe waiver is effective immediately.
ContactCecelia Comito, Assistant Chief Counsel, at (202) 366-2217 or [email protected]
FR Citation81 FR 89570 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR