The Federal Transit Administration (FTA) received a request from the Central Puget Sound Transit Authority (Sound Transit) for a Buy America non-availability waiver for the procurement of ultrastraight rail. Sound Transit seeks to procure approximately 15,100 feet ultrastraight rail for a portion of its Northgate Link light rail extension to avoid exceedance of contractually-mandated vibration thresholds. The FTA hereby waives its Buy America requirements, finding that the materials for which the waiver is requested are not produced in the United States in sufficient and reasonably available quantities and of satisfactory quality. This waiver is limited to a single procurement by Sound Transit.

Federal Register, Volume 81 Issue 238 (Monday, December 12, 2016)
[Federal Register Volume 81, Number 238 (Monday, December 12, 2016)]
[Notices]
[Pages 89573-89574]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29684]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

[Docket No. FTA-2016-0037]


Notice of Buy America Waiver for Ultrastraight Rail

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice of Buy America waiver.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) received a request 
from the Central Puget Sound Transit Authority (Sound Transit) for a 
Buy America non-availability waiver for the procurement of 
ultrastraight rail. Sound Transit seeks to procure approximately 15,100 
feet ultrastraight rail for a portion of its Northgate Link light rail 
extension to avoid exceedance of contractually-mandated vibration 
thresholds. The FTA hereby waives its Buy America requirements, finding 
that the materials for which the waiver is requested are not produced 
in the United States in sufficient and reasonably available quantities 
and of satisfactory quality. This waiver is limited to a single 
procurement by Sound Transit.

DATES: The waiver is effective immediately.

FOR FURTHER INFORMATION CONTACT: Cecelia Comito, Assistant Chief 
Counsel, at (202) 366-2217 or [email protected].

SUPPLEMENTARY INFORMATION: The purpose of this notice is to announce 
that FTA has granted a Buy America non-availability waiver for Sound 
Transit for the procurement of approximately 15,100 feet of 
ultrastraight rail pursuant to 49 U.S.C. 5323(j)(2)(B) and 49 CFR 
661.7(c).
    With certain exceptions, FTA's Buy America requirements prevent FTA 
from obligating an amount that may be appropriated to carry out its 
program for a project unless ``the steel, iron, and manufactured goods 
used in the project are produced in the United States.'' 49 U.S.C. 
5323(j)(1). A manufactured product is considered produced in the United 
States if: (1) All of the manufacturing processes for the product take 
place in the United States; and (2) all of the components of the 
product are of U.S. origin. A component is considered of U.S. origin if 
it is manufactured in the United States, regardless of the origin of 
its subcomponents. 49 CFR 661.5(d). If, however, FTA determines that 
``the steel, iron, and goods produced in the United States are not 
produced in a sufficient and reasonably available amount or are not of 
a satisfactory quality,'' then FTA may issue a non-availability waiver. 
49 U.S.C. 5323(j)(2)(B); 49 CFR 661.7(c). ``It will be presumed that 
the conditions exist to grant this non-availability waiver if no 
responsive and responsible bid is received offering an item produced in 
the United States.'' 49 CFR 661.7(c)(1).
    Sound Transit's Northgate Link extension is a $1.9 billion rail 
project that consists of 4.3 miles and 3 new stations, and runs through 
residential and employment areas, including the University of 
Washington. Approximately 15,100 feet of that extension will run under 
the University of Washington's Health Sciences and Physics-Astronomy 
buildings, which house precision-measurement laboratories and 
experiments conducted by Nobel Prize winning faculty. The project's 
potential impact on the University's buildings was considered as part 
of the environmental review process required by the National 
Environmental Policy Act (NEPA). In 2006, FTA issued a final Record of 
Decision (ROD) for the project, and required implementation of 
mitigation measures, including a measure that would minimize vibration 
under the University buildings. Sound Transit then executed a 2007 
agreement with the University of Washington in which Sound Transit 
agreed to not exceed specified vibration thresholds, which could be met 
through use of ultrastraight rail, with parameters for that 
ultrastraight rail based on American Railway Engineers Maintenance-of-
Way Association (``AREMA'') standards.
    Sound Transit contacted domestic rail manufacturers regarding their 
ability to produce ultrastraight rail within the agreed upon AREMA 
specifications for the rail. Two leading manufacturers, Steel Dynamics, 
Inc. (SDI) and EVRAZ North America (EVRAZ), stated unequivocally that 
they are unable to fabricate rail that meets the specification. Sound 
Transit subsequently explored using domestically-sourced, milled rail. 
However, testing of the as-installed milled rail found that the rail 
failed to meet the applicable vibration thresholds. Due to its 
unsuccessful

[[Page 89574]]

efforts to procure domestically-sourced ultrastraight rail within the 
vibration thresholds, Sound Transit seeks a non-availability waiver of 
the Buy America requirements for domestically-sourced steel. FTA 
published a notice in the Federal Register announcing the Buy America 
waiver request (Docket No. FTA-2016-0037) and sought comments from all 
interested parties, including potential vendors and suppliers. The 
comment period closed on November 8, 2016, and no comments were 
received.
    Therefore, based on the information supplied in support of Sound 
Transit's request for a Buy America waiver and the lack of any 
comments, FTA hereby waives its Buy America requirements for the 
procurement of ultrastraight rail on the grounds that the manufactured 
product is not available in the U.S. This waiver is limited to a single 
procurement by Sound Transit for the procurement of approximately 
15,100 feet of ultrastraight rail.

Ellen Partridge,
Chief Counsel.
[FR Doc. 2016-29684 Filed 12-9-16; 8:45 am]
 BILLING CODE P



                                                                             Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices                                           89573

                                                  rebuild the WTC Hub. Because the WTC                    million—awarded to PANYNJ. This                       take place in the United States; and (2)
                                                  Hub project was funded with FEMA                        public interest waiver is limited to the              all of the components of the product are
                                                  grant funds, FTA’s Buy America                          Hurricane Sandy recovery projects at                  of U.S. origin. A component is
                                                  requirements did not apply to the                       the WTC Hub only, and does not apply                  considered of U.S. origin if it is
                                                  project.                                                to separately funded resiliency projects.             manufactured in the United States,
                                                     In October 2012, the WTC Hub project                                                                       regardless of the origin of its
                                                                                                          Ellen Partridge,
                                                  was an active construction site, with an                                                                      subcomponents. 49 CFR 661.5(d). If,
                                                  estimated project completion date of                    Chief Counsel.
                                                                                                                                                                however, FTA determines that ‘‘the
                                                  December 2015. Hurricane Sandy                          [FR Doc. 2016–29686 Filed 12–9–16; 8:45 am]           steel, iron, and goods produced in the
                                                  caused extensive damage to the                          BILLING CODE P                                        United States are not produced in a
                                                  construction site, resulting in more than                                                                     sufficient and reasonably available
                                                  $214 million in damage to the                                                                                 amount or are not of a satisfactory
                                                  construction site. FTA awarded                          DEPARTMENT OF TRANSPORTATION                          quality,’’ then FTA may issue a non-
                                                  PANYNJ two grants—NY–44–X005 for                                                                              availability waiver. 49 U.S.C.
                                                                                                          Federal Transit Administration
                                                  $54.24 million and NY–44–X014 for                                                                             5323(j)(2)(B); 49 CFR 661.7(c). ‘‘It will
                                                  $159.72 million—in Hurricane Sandy                      [Docket No. FTA–2016–0037]                            be presumed that the conditions exist to
                                                  recovery funds to be used for recovery                                                                        grant this non-availability waiver if no
                                                  and emergency repair work for the WTC                   Notice of Buy America Waiver for                      responsive and responsible bid is
                                                  Hub project. Because the repair work                    Ultrastraight Rail                                    received offering an item produced in
                                                  was for an ongoing construction project,                AGENCY:    Federal Transit Administration,            the United States.’’ 49 CFR 661.7(c)(1).
                                                  PANYNJ was required to use existing                     DOT.                                                     Sound Transit’s Northgate Link
                                                  contracts that were originally procured                 ACTION:   Notice of Buy America waiver.               extension is a $1.9 billion rail project
                                                  in accordance with the requirements for                                                                       that consists of 4.3 miles and 3 new
                                                  the FEMA-funded WTC Hub project. To                     SUMMARY:   The Federal Transit                        stations, and runs through residential
                                                  apply FTA’s Buy America requirements                    Administration (FTA) received a request               and employment areas, including the
                                                  to replace or repair equipment installed                from the Central Puget Sound Transit                  University of Washington.
                                                  on an ongoing construction project                      Authority (Sound Transit) for a Buy                   Approximately 15,100 feet of that
                                                  would result in significant delay to                    America non-availability waiver for the               extension will run under the University
                                                  completion of the project, impact                       procurement of ultrastraight rail. Sound              of Washington’s Health Sciences and
                                                  contracts awarded under the FEMA                        Transit seeks to procure approximately                Physics-Astronomy buildings, which
                                                  funds, and potentially impact                           15,100 feet ultrastraight rail for a                  house precision-measurement
                                                  previously provided warranties.                         portion of its Northgate Link light rail              laboratories and experiments conducted
                                                  Moreover, a public interest waiver                      extension to avoid exceedance of                      by Nobel Prize winning faculty. The
                                                  would maintain overall consistency of                   contractually-mandated vibration                      project’s potential impact on the
                                                  administration, oversight and                           thresholds. The FTA hereby waives its                 University’s buildings was considered
                                                  implementation of both the ongoing                      Buy America requirements, finding that                as part of the environmental review
                                                  WTC Hub project and the WTC                             the materials for which the waiver is                 process required by the National
                                                  Hurricane Sandy recovery work.                          requested are not produced in the                     Environmental Policy Act (NEPA). In
                                                     On November 4, 2016, and in                          United States in sufficient and                       2006, FTA issued a final Record of
                                                  accordance with 49 U.S.C. 5323(j)(3)(A),                reasonably available quantities and of                Decision (ROD) for the project, and
                                                  FTA published a notice in the Federal                   satisfactory quality. This waiver is                  required implementation of mitigation
                                                  Register announcing PANYNJ’s Buy                        limited to a single procurement by                    measures, including a measure that
                                                  America waiver request (81 FR 76999)                    Sound Transit.                                        would minimize vibration under the
                                                  seeking public comment. The comment                     DATES: The waiver is effective                        University buildings. Sound Transit
                                                  period closed on November 14, 2016,                     immediately.                                          then executed a 2007 agreement with
                                                  and FTA received one comment. The                                                                             the University of Washington in which
                                                  comment was provided by a private                       FOR FURTHER INFORMATION CONTACT:                      Sound Transit agreed to not exceed
                                                  citizen who supports granting the                       Cecelia Comito, Assistant Chief                       specified vibration thresholds, which
                                                  waiver. The commenter noted that the                    Counsel, at (202) 366–2217 or                         could be met through use of
                                                  WTC Hub is a critical connection for                    cecelia.comito@dot.gov.                               ultrastraight rail, with parameters for
                                                  Lower Manhattan employers and New                       SUPPLEMENTARY INFORMATION: The                        that ultrastraight rail based on American
                                                  Jersey employees. The commenter also                    purpose of this notice is to announce                 Railway Engineers Maintenance-of-Way
                                                  noted while projects that abide to the                  that FTA has granted a Buy America                    Association (‘‘AREMA’’) standards.
                                                  Buy America requirements promote                        non-availability waiver for Sound                        Sound Transit contacted domestic rail
                                                  domestic industry and the livelihoods                   Transit for the procurement of                        manufacturers regarding their ability to
                                                  or hard-working Americans, that                         approximately 15,100 feet of                          produce ultrastraight rail within the
                                                  occurrences like Hurricane Sandy                        ultrastraight rail pursuant to 49 U.S.C.              agreed upon AREMA specifications for
                                                  demonstrate the need for flexibility to                 5323(j)(2)(B) and 49 CFR 661.7(c).                    the rail. Two leading manufacturers,
                                                  waive Buy America under certain                           With certain exceptions, FTA’s Buy                  Steel Dynamics, Inc. (SDI) and EVRAZ
                                                  circumstances.                                          America requirements prevent FTA                      North America (EVRAZ), stated
                                                     Accordingly, because the original                    from obligating an amount that may be                 unequivocally that they are unable to
                                                  project was funded by FEMA and                          appropriated to carry out its program for             fabricate rail that meets the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  therefore, not subject to FTA’s Buy                     a project unless ‘‘the steel, iron, and               specification. Sound Transit
                                                  America regulations, and the lack of any                manufactured goods used in the project                subsequently explored using
                                                  comments opposing the waiver, FTA is                    are produced in the United States.’’ 49               domestically-sourced, milled rail.
                                                  granting a general public interest waiver               U.S.C. 5323(j)(1). A manufactured                     However, testing of the as-installed
                                                  of FTA’s Buy America requirements for                   product is considered produced in the                 milled rail found that the rail failed to
                                                  the two grants, NY–44–X005 for $54.24                   United States if: (1) All of the                      meet the applicable vibration
                                                  million and NY–44–X014 for $159.72                      manufacturing processes for the product               thresholds. Due to its unsuccessful


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016   Jkt 241001   PO 00000   Frm 00149   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1


                                                  89574                      Federal Register / Vol. 81, No. 238 / Monday, December 12, 2016 / Notices

                                                  efforts to procure domestically-sourced                 ADDRESSES:    Submit written comments                 information was published at 81 FR
                                                  ultrastraight rail within the vibration                 on the collection of information through              66136 on September 26, 2016,
                                                  thresholds, Sound Transit seeks a non-                  Federal Docket Management System                         Affected Public: Individuals or
                                                  availability waiver of the Buy America                  (FDMS) at www.Regulations.gov or to                   households interring Veterans or
                                                  requirements for domestically-sourced                   Office of Information and Regulatory                  eligible dependents, and funeral
                                                  steel. FTA published a notice in the                    Affairs, Office of Management and                     directors facilitating such interments.
                                                  Federal Register announcing the Buy                     Budget, Attn: VA Desk Officer; 725 17th                  Estimated Annual Burden Hours,
                                                  America waiver request (Docket No.                      St. NW., Washington, DC 20503 or sent                 Burden per Respondents, and Number
                                                  FTA–2016–0037) and sought comments                      through electronic mail to oira_                      of Respondents:
                                                  from all interested parties, including                  submission@omb.eop.gov. Please refer                  I. National Cemetery Administration
                                                  potential vendors and suppliers. The                    to ‘‘OMB Control No. 2900–0571’’ in                   Mail Surveys
                                                  comment period closed on November 8,                    any correspondence. During the
                                                  2016, and no comments were received.                    comment period, comments may be                          a. Next of Kin National Customer
                                                     Therefore, based on the information                  viewed online through the FDMS.                       Satisfaction Survey (Mail to 15,000
                                                  supplied in support of Sound Transit’s                                                                        respondents/30 minutes per survey) =
                                                                                                          FOR FURTHER INFORMATION CONTACT:
                                                  request for a Buy America waiver and                                                                          7,500 hours.
                                                                                                          Cynthia Harvey-Pryor, Enterprise                         b. Funeral Directors National
                                                  the lack of any comments, FTA hereby                    Records Service (005R1B), Department
                                                  waives its Buy America requirements                                                                           Customer Satisfaction Survey (Mail to
                                                                                                          of Veterans Affairs, 810 Vermont                      4,000 respondents/30 minutes per
                                                  for the procurement of ultrastraight rail               Avenue NW., Washington, DC 20420,
                                                  on the grounds that the manufactured                                                                          survey) = 2,000 hours.
                                                                                                          (202) 461–5870 or email cynthia.harvey-                  c. Veterans-At-Large National
                                                  product is not available in the U.S. This               pryor@va.gov. Please refer to ‘‘OMB
                                                  waiver is limited to a single                                                                                 Customer Satisfaction Survey (Mail to
                                                                                                          Control No. 2900–0571.’’                              5,000 respondents/30 minutes per
                                                  procurement by Sound Transit for the
                                                  procurement of approximately 15,100                     SUPPLEMENTARY INFORMATION: Under the                  survey) = 2,500 hours.
                                                  feet of ultrastraight rail.                             PRA of 1995 (Pub. L. 104–13; 44 U.S.C.
                                                                                                          3501–21), Federal agencies must obtain                IV. Program/Specialized Service Survey
                                                  Ellen Partridge,                                        approval from the Office of Management                  National Cemetery Administration
                                                  Chief Counsel.                                          and Budget (OMB) for each collection of               Headstone and Marker/PMC Survey
                                                  [FR Doc. 2016–29684 Filed 12–9–16; 8:45 am]             information they conduct or sponsor.                  (Mail to 6,000 surveys/15 minutes per
                                                  BILLING CODE P                                          This request for comment is being made                each) = 1,000.
                                                                                                          pursuant to Section 3506(c)(2)(A) of the                Frequency of Response: Annually.
                                                                                                          PRA.                                                    By direction of the Secretary.
                                                  DEPARTMENT OF VETERANS                                    With respect to the following                       Cynthia Harvey-Pryor,
                                                  AFFAIRS                                                 collection of information, NCA invites                Program Specialist, Office of Privacy and
                                                                                                          comments on: (1) Whether the proposed                 Records Management, Department of
                                                  [OMB Control No. 2900–0571]                             collection of information is necessary                Veterans Affairs.
                                                  Agency Information Collection Activity                  for the proper performance of NCA’s                   [FR Doc. 2016–29665 Filed 12–9–16; 8:45 am]
                                                  Under OMB Review: (Customer                             functions, including whether the                      BILLING CODE 8320–01–P
                                                  Satisfaction Surveys)                                   information will have practical utility;
                                                                                                          (2) the accuracy of NCA’s estimate of the
                                                  AGENCY:  National Cemetery                              burden of the proposed collection of                  DEPARTMENT OF VETERANS
                                                  Administration, Department of Veterans                  information; (3) ways to enhance the                  AFFAIRS
                                                  Affairs.                                                quality, utility, and clarity of the
                                                  ACTION: Notice.                                         information to be collected; and (4)                  [OMB Control No. 2900–0554]
                                                                                                          ways to minimize the burden of the
                                                  SUMMARY:   The Department of Veterans                                                                         Agency Information Collection Activity
                                                                                                          collection of information on
                                                  Affairs (VA) National Cemetery                                                                                Under OMB Review: (VA Homeless
                                                                                                          respondents, including through the use
                                                  Administration (NCA) is announcing an                                                                         Providers Grant and Per Diem
                                                                                                          of automated collection techniques or
                                                  opportunity for public comment on the                                                                         Program)
                                                                                                          the use of other forms of information
                                                  proposed collection of certain                          technology.                                           AGENCY:  Veterans Health
                                                  information by the agency. Under the                      Title: Customer Satisfaction Surveys.               Administration, Department of Veterans
                                                  Paperwork Reduction Act (PRA) of                          OMB Control Number: 2900–0571.                      Affairs.
                                                  1995, Federal agencies are required to                    Type of Review: Revision of an                      ACTION: Notice.
                                                  publish notice in the Federal Register                  approved collection.
                                                  concerning each proposed collection of                    Abstract: Improving Customer Service                SUMMARY:   In compliance with the
                                                  information, including each revised                     through Effective Performance                         Paperwork Reduction Act (PRA) of 1995
                                                  collection allow 30 days for public                     Management, NCA will conduct surveys                  (44 U.S.C. 3501–3521), this notice
                                                  comment in response to the notice. This                 to determine the level of satisfaction                announces that the Veterans Health
                                                  notice solicits comments on the                         with existing services among their                    Administration (VHA), Department of
                                                  collection of perceptions of the quality                customers. The surveys will solicit                   Veterans Affairs, will submit the
                                                  of service afforded by the National                     voluntary opinions and are not intended               collection of information abstracted
                                                  Cemetery Administration as judged by                    to collect information required to obtain             below to the Office of Management and
mstockstill on DSK3G9T082PROD with NOTICES




                                                  next of kin of those interred, or funeral               or maintain eligibility for a VA program              Budget (OMB) for review and comment.
                                                  directors who facilitate these                          or benefit. Baseline data obtained                    The PRA submission describes the
                                                  interments.                                             through these information collections                 nature of the information collection and
                                                  DATES: Written comments and                             are used to validate customer service                 its expected cost and burden; it includes
                                                  recommendations on the proposed                         standards. The Federal Register Notice                the actual data collection instrument.
                                                  collection of information should be                     with a 60-day comment period soliciting               DATES: Comments must be submitted on
                                                  received on or before January 11, 2017.                 comments on this collection of                        or before January 11, 2017.


                                             VerDate Sep<11>2014   18:59 Dec 09, 2016   Jkt 241001   PO 00000   Frm 00150   Fmt 4703   Sfmt 4703   E:\FR\FM\12DEN1.SGM   12DEN1



Document Created: 2018-02-14 09:05:16
Document Modified: 2018-02-14 09:05:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Buy America waiver.
DatesThe waiver is effective immediately.
ContactCecelia Comito, Assistant Chief Counsel, at (202) 366-2217 or [email protected]
FR Citation81 FR 89573 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR