81_FR_9213 81 FR 9177 - Dominion Transmission, Inc.; Notice of Schedule for Environmental Review of the Leidy South Project

81 FR 9177 - Dominion Transmission, Inc.; Notice of Schedule for Environmental Review of the Leidy South Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 36 (February 24, 2016)

Page Range9177-9178
FR Document2016-03833

Federal Register, Volume 81 Issue 36 (Wednesday, February 24, 2016)
[Federal Register Volume 81, Number 36 (Wednesday, February 24, 2016)]
[Notices]
[Pages 9177-9178]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-03833]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-492-000]


Dominion Transmission, Inc.; Notice of Schedule for Environmental 
Review of the Leidy South Project

    On May 15, 2015, Dominion Transmission, Inc. (DTI) filed an 
application in Docket No. CP15-492-000 requesting a Certificate of 
Public Convenience and Necessity pursuant to Section 7(c) of the 
Natural Gas Act to construct and operate certain natural gas pipeline 
facilities. The proposed project is known as the Leidy South Project 
(Project), and would provide an incremental 155 MMcf per day of firm 
transportation service in the Mid-Atlantic region and to meet the need 
of increasing demand for natural gas at existing and new power 
generation facilities.
    On May 27, 2015, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA March 30, 2016
90-day Federal Authorization Decision Deadline June 28, 2016

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    DTI proposes the following facilities in Pennsylvania to replace 
two 1,100 horsepower (hp) compressor units with one 10,915 hp unit at 
the Finnefrock Compressor Station in Clinton County; install one 
suction filter/separator at the Centre Compressor Station in Centre 
County; and install one 13,220 hp unit at the Chambersburg Compressor 
Station in Franklin County. DTI would also install the following 
facilities in Virginia, a new cooler and filter separator at the 
Quantico Compressor Station in Fauquier County; one 8,000 hp unit at 
the Leesburg Compressor Station and construct a new meter

[[Page 9178]]

station at the Panda Stonewall Power Project both in Loudoun County. 
Finally, DTI would install one 15,900 hp unit at the Myersville 
Compressor Station in Frederick County, Maryland.

Background

    On July 23, 2015, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Leidy South 
Project and Request for Comments on Environmental Issues (NOI). The NOI 
was sent to affected landowners; federal, state, and local government 
agencies; elected officials; environmental and public interest groups; 
Native American tribes; other interested parties; and local libraries 
and newspapers. In response to the NOI, the Commission received 
comments from several state and federal agencies and from the Allegheny 
Defense Project, Wild Virginia, and Chesapeake Climate Action Network. 
The primary issues raised by the commentors are the purpose and need 
for the Project; potential impacts on wildlife, surface water, drinking 
water, and wetland resources; the potential for increased soil 
compactions and watershed impacts on the Tamarack Swamp Natural Area; 
noise impacts; climate change; and cumulative impacts.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP15-492), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-03833 Filed 2-23-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 81, No. 36 / Wednesday, February 24, 2016 / Notices                                              9177

                                                  statements regarding any of the items on                turbine-generators having a total                     DEPARTMENT OF ENERGY
                                                  the agenda, you must contact Elliott                    combined generating capacity of 2.8
                                                  Levine at; Email: Elliott.Levine@                       MW; (4) a new 90-foot-long by 60-foot-                Federal Energy Regulatory
                                                  ee.doe.gov and Roy Tiley at (410) 997–                  wide tailrace; (5) a new 45-foot-long by              Commission
                                                  7778 ext. 220; Email: rtiley@bcs-hq.com                 30-foot-wide substation; (6) a new 1-                 [Docket No. CP15–492–000]
                                                  at least 5 business days prior to the                   mile-long, 69-kilovolt transmission line;
                                                  meeting. Members of the public will be                  and (7) appurtenant facilities. The                   Dominion Transmission, Inc.; Notice of
                                                  heard in the order in which they sign up                project would have an estimated annual                Schedule for Environmental Review of
                                                  at the beginning of the meeting.                        generation of 8.24 gigawatt-hours.                    the Leidy South Project
                                                  Reasonable provision will be made to
                                                  include the scheduled oral statements                      Applicant Contact: Mr. Ander                          On May 15, 2015, Dominion
                                                  on the agenda. The Co-chairs of the                     Gonzalez, 350 Lincoln Road, 2nd Floor,                Transmission, Inc. (DTI) filed an
                                                  Committee will make every effort to                     Miami, FL 33139; telephone (954) 248–                 application in Docket No. CP15–492–
                                                  hear the views of all interested parties.               8425.                                                 000 requesting a Certificate of Public
                                                  If you would like to file a written                                                                           Convenience and Necessity pursuant to
                                                                                                             FERC Contact: Tyrone A. Williams,
                                                  statement with the Committee, you may                                                                         Section 7(c) of the Natural Gas Act to
                                                                                                          (202) 502–6331.
                                                  do so either before or after the meeting.                                                                     construct and operate certain natural gas
                                                                                                             Deadline for filing comments, motions              pipeline facilities. The proposed project
                                                  The Co-chairs will conduct the meeting
                                                                                                          to intervene, competing applications                  is known as the Leidy South Project
                                                  to facilitate the orderly conduct of
                                                                                                          (without notices of intent), or notices of            (Project), and would provide an
                                                  business.
                                                     Minutes: The summary of the meeting                  intent to file competing applications: 60             incremental 155 MMcf per day of firm
                                                  will be available for public review and                 Days from the issuance of this notice.                transportation service in the Mid-
                                                  copying at http://biomassboard.gov/                     Competing applications and notices of                 Atlantic region and to meet the need of
                                                  committee/meetings.html.                                intent must meet the requirements of 18               increasing demand for natural gas at
                                                                                                          CFR 4.36. The Commission strongly                     existing and new power generation
                                                    Issued at Washington, DC, on February 18,                                                                   facilities.
                                                  2016.
                                                                                                          encourages electronic filing. Please file
                                                                                                          comments, motions to intervene, notices                  On May 27, 2015, the Federal Energy
                                                  LaTanya R. Butler,                                                                                            Regulatory Commission (Commission or
                                                                                                          of intent, and competing applications
                                                  Deputy Committee Management Officer.                                                                          FERC) issued its Notice of Application
                                                                                                          using the Commission’s eFiling system
                                                  [FR Doc. 2016–03848 Filed 2–23–16; 8:45 am]
                                                                                                          at http://www.ferc.gov/docs-filing/                   for the Project. Among other things, that
                                                  BILLING CODE 6450–01–P
                                                                                                          efiling.asp. Commenters can submit                    notice alerted agencies issuing federal
                                                                                                                                                                authorizations of the requirement to
                                                                                                          brief comments up to 6,000 characters,
                                                                                                                                                                complete all necessary reviews and to
                                                  DEPARTMENT OF ENERGY                                    without prior registration, using the
                                                                                                                                                                reach a final decision on a request for
                                                                                                          eComment system at http://
                                                                                                                                                                a federal authorization within 90 days of
                                                  Federal Energy Regulatory                               www.ferc.gov/docs-filing/                             the date of issuance of the Commission
                                                  Commission                                              ecomment.asp. You must include your                   staff’s Environmental Assessment (EA)
                                                  [Project No. 14747–000]
                                                                                                          name and contact information at the end               for the Project. This instant notice
                                                                                                          of your comments. For assistance,                     identifies the FERC staff’s planned
                                                  Energy Resources USA Inc.; Notice of                    please contact FERC Online Support at                 schedule for the completion of the EA
                                                  Preliminary Permit Application                          FERCOnlineSupport@ferc.gov, (866)                     for the Project.
                                                  Accepted for Filing and Soliciting                      208–3676 (toll free), or (202) 502–8659
                                                  Comments, Motions To Intervene, and                     (TTY). In lieu of electronic filing, please           Schedule for Environmental Review
                                                  Competing Applications                                  send a paper copy to: Secretary, Federal              Issuance of EA March 30, 2016
                                                                                                          Energy Regulatory Commission, 888                     90-day Federal Authorization Decision
                                                     On December 22, 2015, the Energy                     First Street NE., Washington, DC 20426.                  Deadline June 28, 2016
                                                  Resources USA Inc. filed an application                 The first page of any filing should                      If a schedule change becomes
                                                  for a preliminary permit under section                  include docket number P–14747–000.                    necessary, additional notice will be
                                                  4(f) of the Federal Power Act proposing                                                                       provided so that the relevant agencies
                                                  to study the feasibility of the proposed                   More information about this project,
                                                                                                                                                                are kept informed of the Project’s
                                                  William H. Harsha Lake Dam                              including a copy of the application, can              progress.
                                                  Hydroelectric Project No. 14747–000, to                 be viewed or printed on the ‘‘eLibrary’’
                                                  be located at the existing William H.                   link of Commission’s Web site at                      Project Description
                                                  Harsha Lake Dam on the East Fork of                     http://www.ferc.gov/docs-filing/                         DTI proposes the following facilities
                                                  Little Miami River, near the City of                    elibrary.asp. Enter the docket number                 in Pennsylvania to replace two 1,100
                                                  Batavia, in Clermont County, Ohio. The                  (P–14747) in the docket number field to               horsepower (hp) compressor units with
                                                  William H. Harsha Lake Dam is owned                     access the document. For assistance,                  one 10,915 hp unit at the Finnefrock
                                                  by the United States government and                     contact FERC Online Support.                          Compressor Station in Clinton County;
                                                  operated by the U.S. Army Corps of                        Dated: February 18, 2016.
                                                                                                                                                                install one suction filter/separator at the
                                                  Engineers.                                                                                                    Centre Compressor Station in Centre
                                                     The proposed project would consist                   Nathaniel J. Davis, Sr.,                              County; and install one 13,220 hp unit
                                                                                                          Deputy Secretary.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  of: (1) A new 16-foot by 7.5-foot by 9-                                                                       at the Chambersburg Compressor
                                                  foot concrete conduit fitted with a 7-foot              [FR Doc. 2016–03827 Filed 2–23–16; 8:45 am]           Station in Franklin County. DTI would
                                                  by 8-foot discharge gate; (2) a new 210-                BILLING CODE 6717–01–P                                also install the following facilities in
                                                  foot-long, 6-foot-diameter steel penstock                                                                     Virginia, a new cooler and filter
                                                  fitted with a butterfly valve; (3) a new                                                                      separator at the Quantico Compressor
                                                  65-foot by 45-foot reinforced concrete                                                                        Station in Fauquier County; one 8,000
                                                  powerhouse containing two 1.4-                                                                                hp unit at the Leesburg Compressor
                                                  megawatt (MW) horizontal Francis                                                                              Station and construct a new meter


                                             VerDate Sep<11>2014   17:59 Feb 23, 2016   Jkt 238001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\24FEN1.SGM   24FEN1


                                                  9178                      Federal Register / Vol. 81, No. 36 / Wednesday, February 24, 2016 / Notices

                                                  station at the Panda Stonewall Power                      Dated: February 18, 2016.                              Description: Section 4(d) Rate Filing:
                                                  Project both in Loudoun County.                         Nathaniel J. Davis, Sr.,                              Cap Rel Neg Rate Agmt (EOG 34687 to
                                                  Finally, DTI would install one 15,900                   Deputy Secretary.                                     Tenaska 45706) to be effective 4/1/2016.
                                                  hp unit at the Myersville Compressor                    [FR Doc. 2016–03833 Filed 2–23–16; 8:45 am]              Filed Date: 2/12/16.
                                                  Station in Frederick County, Maryland.                  BILLING CODE 6717–01–P
                                                                                                                                                                   Accession Number: 20160212–5018.
                                                                                                                                                                   Comments Due: 5 p.m. ET 2/24/16.
                                                  Background                                                                                                       Docket Numbers: RP16–610–000.
                                                     On July 23, 2015, the Commission                     DEPARTMENT OF ENERGY                                     Applicants: Northern Natural Gas
                                                  issued a Notice of Intent to Prepare an                                                                       Company.
                                                                                                          Federal Energy Regulatory                                Description: Northern Natural Gas
                                                  Environmental Assessment for the
                                                                                                          Commission                                            submits report of the penalty and daily
                                                  Proposed Leidy South Project and
                                                                                                                                                                delivery variance charge (DDVC)
                                                  Request for Comments on                                 Combined Notice of Filings                            revenues that have been credited to
                                                  Environmental Issues (NOI). The NOI
                                                                                                            Take notice that the Commission has                 shippers under RP16–610.
                                                  was sent to affected landowners; federal,                                                                        Filed Date: 2/12/16.
                                                  state, and local government agencies;                   received the following Natural Gas                       Accession Number: 20160212–5136.
                                                  elected officials; environmental and                    Pipeline Rate and Refund Report filings:                 Comments Due: 5 p.m. ET 2/24/16.
                                                  public interest groups; Native American                 Filings Instituting Proceedings                          Docket Numbers: RP16–611–000.
                                                  tribes; other interested parties; and local                                                                      Applicants: Iroquois Gas
                                                  libraries and newspapers. In response to                   Docket Numbers: RP16–604–000.
                                                                                                             Applicants: Wyckoff Gas Storage                    Transmission System, L.P.
                                                  the NOI, the Commission received                                                                                 Description: Section 4(d) Rate Filing:
                                                  comments from several state and federal                 Company, LLC.
                                                                                                             Description: Compliance filing                     02/16/16 Negotiated Rates—Mercuria
                                                  agencies and from the Allegheny                                                                               Energy Gas Trading LLC to be effective
                                                  Defense Project, Wild Virginia, and                     NAESB v. 3.0 Compliance to be effective
                                                                                                          4/1/2016.                                             2/13/2016.
                                                  Chesapeake Climate Action Network.                                                                               Filed Date: 2/16/16.
                                                                                                             Filed Date: 2/11/16.
                                                  The primary issues raised by the                                                                                 Accession Number: 20160216–5224.
                                                                                                             Accession Number: 20160211–5112.
                                                  commentors are the purpose and need                                                                              Comments Due: 5 p.m. ET 2/29/16.
                                                                                                             Comments Due: 5 p.m. ET 2/23/16.
                                                  for the Project; potential impacts on                                                                            Docket Numbers: RP16–612–000.
                                                  wildlife, surface water, drinking water,                   Docket Numbers: RP16–605–000.                         Applicants: Iroquois Gas
                                                  and wetland resources; the potential for                   Applicants: Enable Gas Transmission,
                                                                                                                                                                Transmission System, L.P.
                                                  increased soil compactions and                          LLC.                                                     Description: Section 4(d) Rate Filing:
                                                                                                             Description: Section 4(d) Rate Filing:
                                                  watershed impacts on the Tamarack                                                                             02/16/16 Negotiated Rates—ConEdison
                                                                                                          Negotiated Rate Filing—February 11,
                                                  Swamp Natural Area; noise impacts;                                                                            Energy, Inc. (HUB) 2275–89 to be
                                                                                                          2016—CEM 1006966 to be effective 2/
                                                  climate change; and cumulative                                                                                effective 2/14/2016.
                                                                                                          11/2016.                                                 Filed Date: 2/16/16.
                                                  impacts.
                                                                                                             Filed Date: 2/11/16.                                  Accession Number: 20160216–5229.
                                                  Additional Information                                     Accession Number: 20160211–5138.                      Comments Due: 5 p.m. ET 2/29/16.
                                                                                                             Comments Due: 5 p.m. ET 2/23/16.
                                                     In order to receive notification of the                                                                       Docket Numbers: RP16–613–000.
                                                                                                             Docket Numbers: RP16–606–000.                         Applicants: Alliance Pipeline L.P.
                                                  issuance of the EA and to keep track of                    Applicants: Iroquois Gas
                                                  all formal issuances and submittals in                                                                           Description: Section 4(d) Rate Filing:
                                                                                                          Transmission System, L.P.                             Daily Open Season Feb 12–19 2016 to
                                                  specific dockets, the Commission offers                    Description: Section 4(d) Rate Filing:
                                                  a free service called eSubscription. This                                                                     be effective 2/12/2016.
                                                                                                          02/11/16 Negotiated Rates—ConEdison                      Filed Date: 2/16/16.
                                                  can reduce the amount of time you                       Energy, Inc. (HUB) 2275–89 to be                         Accession Number: 20160216–5362.
                                                  spend researching proceedings by                        effective 2/11/2016.                                     Comments Due: 5 p.m. ET 2/29/16.
                                                  automatically providing you with                           Filed Date: 2/11/16.
                                                  notification of these filings, document                                                                          Any person desiring to intervene or
                                                                                                             Accession Number: 20160211–5148.                   protest in any of the above proceedings
                                                  summaries, and direct links to the                         Comments Due: 5 p.m. ET 2/23/16.
                                                  documents. Go to www.ferc.gov/docs-                                                                           must file in accordance with Rules 211
                                                                                                             Docket Numbers: RP16–607–000.                      and 214 of the Commission’s
                                                  filing/esubscription.asp.                                  Applicants: Iroquois Gas                           Regulations (18 CFR 385.211 and
                                                     Additional information about the                     Transmission System, L.P.                             385.214) on or before 5:00 p.m. Eastern
                                                  Project is available from the                              Description: Section 4(d) Rate Filing:             time on the specified comment date.
                                                  Commission’s Office of External Affairs                 02/11/16 Negotiated Rates—Mercuria                    Protests may be considered, but
                                                  at (866) 208–FERC or on the FERC Web                    Energy Gas Trading LLC (HUB) 7540–89                  intervention is necessary to become a
                                                  site (www.ferc.gov). Using the                          to be effective 2/12/2016.                            party to the proceeding.
                                                  ‘‘eLibrary’’ link, select ‘‘General Search’’               Filed Date: 2/11/16.
                                                  from the eLibrary menu, enter the                          Accession Number: 20160211–5189.                   Filings in Existing Proceedings
                                                  selected date range and ‘‘Docket                           Comments Due: 5 p.m. ET 2/23/16.                     Docket Numbers: RP16–524–001.
                                                  Number’’ excluding the last three digits                   Docket Numbers: RP16–608–000.                        Applicants: SG Resources Mississippi,
                                                  (i.e., CP15–492), and follow the                           Applicants: ANR Pipeline Company.                  L.L.C.
                                                  instructions. For assistance with access                   Description: Section 4(d) Rate Filing:               Description: Compliance filing SG
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  to eLibrary, the helpline can be reached                J. Aron NC Service Agmt to be effective               Resources Mississippi, L.L.C.—Order
                                                  at (866) 208–3676, TTY (202) 502–8659,                  4/1/2016.                                             No. 587–W Revised Compliance Filing
                                                  or at FERCOnlineSupport@ferc.gov. The                      Filed Date: 2/12/16.                               to be effective 4/1/2016.
                                                  eLibrary link on the FERC Web site also                    Accession Number: 20160212–5003.                     Filed Date: 2/11/16.
                                                  provides access to the texts of formal                     Comments Due: 5 p.m. ET 2/24/16.                     Accession Number: 20160211–5171.
                                                  documents issued by the Commission,                        Docket Numbers: RP16–609–000.                        Comments Due: 5 p.m. ET 2/23/16.
                                                  such as orders, notices, and rule                          Applicants: Gulf South Pipeline                      Any person desiring to protest in any
                                                  makings.                                                Company, LP.                                          of the above proceedings must file in


                                             VerDate Sep<11>2014   17:59 Feb 23, 2016   Jkt 238001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\24FEN1.SGM   24FEN1



Document Created: 2016-02-23 23:55:31
Document Modified: 2016-02-23 23:55:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 9177 