81_FR_92239 81 FR 91996 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

81 FR 91996 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration

Federal Register Volume 81, Issue 243 (December 19, 2016)

Page Range91996-91997
FR Document2016-30446

Federal Register, Volume 81 Issue 243 (Monday, December 19, 2016)
[Federal Register Volume 81, Number 243 (Monday, December 19, 2016)]
[Notices]
[Pages 91996-91997]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30446]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket Number FRA-2016-0112]


Notice of Application for Approval of Discontinuance or 
Modification of a Railroad Signal System

    In accordance with part 235 of Title 49 Code of Federal Regulations 
and 49 U.S.C. 20502(a), this document provides the public notice that 
by a document dated November 16, 2016, Union Pacific Railroad (UP) 
petitioned the Federal Railroad Administration (FRA) seeking approval 
for the discontinuance or modification of a signal system. FRA assigned 
the petition Docket Number FRA-2016-0112.
    Applicant: Union Pacific Railroad, Mr. Kevin D. Hicks, AVP 
Engineering--Design, 1400 Douglas Street, MS 0910, Omaha, NE 68179.
    UP seeks approval of the modification of the coded track circuits 
on the siding, between control point (CP) 0233 at Milepost (MP) 233.4 
and CP 0235, MP 235.0, on the San Antonio Service Unit, Austin 
Subdivision, in the cities of Schertz and New Braunfels, TX. The

[[Page 91997]]

Red Over Yellow and Red Over Flashing Yellow signal aspects will be 
removed at each CP with the Red Over Flashing Red aspects remaining.
    The reason given for the proposed modification is to accommodate an 
increased volume of switching operations, which will take place in the 
siding with the construction of a new rock facility adjacent to Corbyn 
Yard.
    A copy of the petition, as well as any written communications 
concerning the petition, is available for review online at 
www.regulations.gov and in person at the U. S. Department of 
Transportation's (DOT) Docket Operations Facility, 1200 New Jersey 
Avenue SE., W12-140, Washington, DC 20590. The Docket Operations 
Facility is open from 9 a.m. to 5 p.m., Monday through Friday, except 
Federal Holidays.
    Interested parties are invited to participate in these proceedings 
by submitting written views, data, or comments. FRA does not anticipate 
scheduling a public hearing in connection with these proceedings since 
the facts do not appear to warrant a hearing. If any interested party 
desires an opportunity for oral comment, they should notify FRA, in 
writing, before the end of the comment period and specify the basis for 
their request.
    All communications concerning these proceedings should identify the 
appropriate docket number and may be submitted by any of the following 
methods:
     Web site: http://www.regulations.gov. Follow the online 
instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: Docket Operations Facility, U.S. Department of 
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC 
20590.
     Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140, 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal Holidays.
    Communications received by February 2, 2017 will be considered by 
FRA before final action is taken. Comments received after that date 
will be considered as far as practicable.
    Anyone is able to search the electronic form of any written 
communications and comments received into any of our dockets by the 
name of the individual submitting the comment (or signing the document, 
if submitted on behalf of an association, business, labor union, etc.). 
In accordance with 5 U.S.C. 553(c), DOT solicits comments from the 
public to better inform its processes. DOT posts these comments, 
without edit, including any personal information the commenter 
provides, to www.regulations.gov, as described in the system of records 
notice (DOT/ALL-14 FDMS), which can be reviewed at www.dot.gov/privacy. 
See also https://www.regulations.gov/privacyNotice for the privacy 
notice of regulations.gov.

    Issued in Washington, DC.
Robert C. Lauby,
Associate Administrator for Safety, Chief Safety Officer.
[FR Doc. 2016-30446 Filed 12-16-16; 8:45 am]
 BILLING CODE 4910-06-P



                                                91996                      Federal Register / Vol. 81, No. 243 / Monday, December 19, 2016 / Notices

                                                and recordkeeping requirements to                       ACTION:  Notice to Rescind a Notice of                concerns on approximately 18 miles of
                                                OMB for review and approval, and to                     Intent for an Environmental Impact                    U.S. 51 between Interstate 39/90, east of
                                                publish a notice in the Federal Register                Statement.                                            the City of Stoughton, to U.S. 12/18
                                                notifying the public that the agency has                                                                      (Madison South Beltline Highway).
                                                made such a submission.                                 SUMMARY:   The FHWA is issuing this                      The federal fiscal constraint
                                                                                                        notice to advise the public that FHWA                 requirement applied to WisDOT
                                                DATES: Submit comments on or before
                                                                                                        and Wisconsin Department of                           environmental studies requires that
                                                January 18, 2017. If you intend to
                                                                                                        Transportation (WisDOT) will no longer                funding be identified for the next major
                                                comment but cannot prepare comments
                                                                                                        prepare a Tier 1 EIS for the US 51                    project action to advance the project
                                                promptly, please advise the OMB
                                                                                                        corridor in Dane County, Wisconsin                    within a reasonable timeframe. Based on
                                                Reviewer and the Agency Clearance
                                                                                                        generally between Interstate 39/90 east               statewide priorities, it was determined
                                                Officer before the deadline.
                                                                                                        of the City of Stoughton and US 12/18                 that the U.S. 51 corridor alternatives
                                                ADDRESSES: Address all comments                         (Madison South Beltline Highway)
                                                concerning this notice to: Agency                                                                             proposed in the DEIS would not receive
                                                                                                        because funding to complete                           funding for the next major action to
                                                Clearance Officer, Curtis Rich, Small                   improvements to be considered would
                                                Business Administration, 409 3rd Street                                                                       advance the project. It is anticipated 30+
                                                                                                        not be available in the foreseeable                   years might elapse before improvements
                                                SW., 5th Floor, Washington, DC 20416;                   future.
                                                and OMB Reviewer, Office of                                                                                   recommended in a Tier 1 EIS might
                                                Information and Regulatory Affairs,                     FOR FURTHER INFORMATION CONTACT:                      align with funding. As such, the
                                                Office of Management and Budget, New                    Anna Varney, Major Projects Engineer,                 preparation of the EIS for the U.S. 51
                                                Executive Office Building, Washington,                  Federal Highway Administration, 525                   corridor in Dane County, Wisconsin
                                                DC 20503.                                               Junction Road, Suite 8000, Madison,                   generally between Interstate 39/90 east
                                                                                                        Wisconsin, 53717–2157, Telephone:                     of the City of Stoughton and U.S. 12/18
                                                FOR FURTHER INFORMATION CONTACT:                                                                              (Madison South Beltline Highway) will
                                                                                                        (608) 829–7514. You may also contact
                                                Curtis Rich, Agency Clearance Officer,                  Steve Krebs, Director, Bureau of                      not be completed. Any future
                                                (202) 205–7030 curtis.rich@sba.gov.                     Technical Services, Wisconsin                         transportation improvements along the
                                                SUPPLEMENTARY INFORMATION:                              Department of Transportation, P.O. Box                U.S. 51 corridor will progress under a
                                                   Copies: Request for clearance (OMB                   7965, Madison, Wisconsin 53707–7965,                  separate environmental review process
                                                83–1), supporting statement, and other                  Telephone: (608) 246- 7930.                           in accordance with all applicable laws
                                                documents submitted to OMB for                          SUPPLEMENTARY INFORMATION: A Notice                   and regulations.
                                                review may be obtained from the                         of Intent (NOI) to prepare an                          Issued on: December 8, 2016.
                                                Agency Clearance Officer.                               Environmental Impact Statement (EIS)                  Anna Varney,
                                                   Abstract: SBA Forms 2181, 2182 and                   was published in 77 FR 5087, Feb. 1,                  Major Projects Engineer, Federal Highway
                                                2183 provide SBA with the necessary                     2012 for proposed transportation                      Administration, Madison, Wisconsin.
                                                information to make informed and                        improvements in the United States                     [FR Doc. 2016–30379 Filed 12–16–16; 8:45 am]
                                                proper decisions regarding the approval                 Highway (US) 51 corridor in Dane                      BILLING CODE 4910–22–P
                                                or denial of an applicant for a small                   County, Wisconsin generally between
                                                business investment company (SBIC)                      Interstate 39/90 east of the City of
                                                license. SBA uses this information to                   Stoughton and US 12/18 (Madison                       DEPARTMENT OF TRANSPORTATION
                                                assess an applicant’s ability to                        South Beltline Highway). A revised NOI
                                                successfully operate an SBIC with the                   was published in 80 FR 19111, Apr. 9,                 Federal Railroad Administration
                                                scope of the Small Business Investment                  2015 to advise that the environmental
                                                Act, as amended.                                                                                              [Docket Number FRA–2016–0112]
                                                                                                        review process was being changed to a
                                                   Title: SBIC License Application.                     tiered process in which a Tier 1 EIS
                                                   Frequency: On Occasion.                                                                                    Notice of Application for Approval of
                                                                                                        would be prepared to evaluate potential               Discontinuance or Modification of a
                                                   SBA Form Numbers: 2181, 2182,                        corridors for a future project-specific
                                                2183.                                                                                                         Railroad Signal System
                                                                                                        alignment.
                                                   Description of Respondents: Small                       A needs assessment was conducted                     In accordance with part 235 of Title
                                                Business Owners and Farmers.                            for the project corridor in 2004 followed             49 Code of Federal Regulations and 49
                                                   Responses: 400.                                      by initiation of the environmental                    U.S.C. 20502(a), this document provides
                                                   Annual Burden: 7,370.                                review process for an EIS. The EIS                    the public notice that by a document
                                                   Authority: 44 U.S.C. Chapter 35.                     review process examined factors                       dated November 16, 2016, Union Pacific
                                                                                                        contributing to the need for                          Railroad (UP) petitioned the Federal
                                                Curtis Rich,                                            improvements within the U.S. 51 study                 Railroad Administration (FRA) seeking
                                                Management Analyst.                                     corridor (long-term planning and                      approval for the discontinuance or
                                                [FR Doc. 2016–30370 Filed 12–16–16; 8:45 am]            corridor preservation, safety, roadway                modification of a signal system. FRA
                                                BILLING CODE P                                          deficiencies, bike and pedestrian                     assigned the petition Docket Number
                                                                                                        accommodations, and travel demand                     FRA–2016–0112.
                                                                                                        and capacity). Based on statewide                       Applicant: Union Pacific Railroad,
                                                                                                        transportation priorities, it was                     Mr. Kevin D. Hicks, AVP Engineering—
                                                DEPARTMENT OF TRANSPORTATION                            determined a commitment to                            Design, 1400 Douglas Street, MS 0910,
                                                                                                        improvements that address all of the                  Omaha, NE 68179.
sradovich on DSK3GMQ082PROD with NOTICES




                                                Federal Highway Administration                          need factors could not be made and the                  UP seeks approval of the modification
                                                Notice To Rescind a Notice of Intent                    environmental review process was                      of the coded track circuits on the siding,
                                                for an Environmental Impact                             converted from a standard EIS to a Tier               between control point (CP) 0233 at
                                                Statement: Dane County, Wisconsin                       1 EIS. FHWA, in cooperation with                      Milepost (MP) 233.4 and CP 0235, MP
                                                                                                        WisDOT, planned to prepare a Tier 1                   235.0, on the San Antonio Service Unit,
                                                AGENCY:Federal Highway                                  EIS for proposed improvements to                      Austin Subdivision, in the cities of
                                                Administration (FHWA), DOT.                             address safety, operational and capacity              Schertz and New Braunfels, TX. The


                                           VerDate Sep<11>2014   20:55 Dec 16, 2016   Jkt 241001   PO 00000   Frm 00097   Fmt 4703   Sfmt 4703   E:\FR\FM\19DEN1.SGM   19DEN1


                                                                           Federal Register / Vol. 81, No. 243 / Monday, December 19, 2016 / Notices                                             91997

                                                Red Over Yellow and Red Over Flashing                   commenter provides, to                                crew will cut-in the ACS onboard
                                                Yellow signal aspects will be removed                   www.regulations.gov, as described in                  system, perform a departure test, and, if
                                                at each CP with the Red Over Flashing                   the system of records notice (DOT/ALL–                successful, continue the trip through the
                                                Red aspects remaining.                                  14 FDMS), which can be reviewed at                    project limits under ACS operation. If
                                                   The reason given for the proposed                    www.dot.gov/privacy. See also https://                the ACS onboard system cut-in and/or
                                                modification is to accommodate an                       www.regulations.gov/privacyNotice for                 departure test are not completed
                                                increased volume of switching                           the privacy notice of regulations.gov.                successfully, the train will continue to
                                                operations, which will take place in the                  Issued in Washington, DC.                           operate under the provisions of 49 CFR
                                                siding with the construction of a new                                                                         236.567, restrictions imposed when
                                                                                                        Robert C. Lauby,
                                                rock facility adjacent to Corbyn Yard.                                                                        device fails and/or is cut out en route.
                                                   A copy of the petition, as well as any               Associate Administrator for Safety, Chief
                                                                                                                                                                UP notes that the ACS and PTC
                                                                                                        Safety Officer.
                                                written communications concerning the                                                                         systems are not integrated on the
                                                petition, is available for review online at             [FR Doc. 2016–30446 Filed 12–16–16; 8:45 am]
                                                                                                                                                              locomotive and their concurrent use
                                                www.regulations.gov and in person at                    BILLING CODE 4910–06–P
                                                                                                                                                              would potentially be confusing and
                                                the U. S. Department of Transportation’s                                                                      distracting to the train crew, due to
                                                (DOT) Docket Operations Facility, 1200                                                                        differences in the content of their
                                                New Jersey Avenue SE., W12–140,                         DEPARTMENT OF TRANSPORTATION
                                                                                                                                                              displays, audible and visual alerts
                                                Washington, DC 20590. The Docket                        Federal Railroad Administration                       provided, and required
                                                Operations Facility is open from 9 a.m.                                                                       acknowledgement protocols.
                                                to 5 p.m., Monday through Friday,                       [Docket Number FRA–2016–0108]                           A copy of the petition, as well as any
                                                except Federal Holidays.                                                                                      written communications concerning the
                                                   Interested parties are invited to                    Petition for Waiver of Compliance                     petition, is available for review online at
                                                participate in these proceedings by                        In accordance with part 211 of Title               www.regulations.gov and in person at
                                                submitting written views, data, or                      49 Code of Federal Regulations (CFR),                 the Department of Transportation’s
                                                comments. FRA does not anticipate                       this document provides the public                     Docket Operations Facility, 1200 New
                                                scheduling a public hearing in                          notice that by a document dated                       Jersey Avenue SE., W12–140,
                                                connection with these proceedings since                 November 2, 2016, Union Pacific                       Washington, DC 20590. The Docket
                                                the facts do not appear to warrant a                    Railroad Company (UP) has petitioned                  Operations Facility is open from 9 a.m.
                                                hearing. If any interested party desires                the Federal Railroad Administration                   to 5 p.m., Monday through Friday,
                                                an opportunity for oral comment, they                   (FRA) for a waiver of compliance from                 except Federal Holidays.
                                                should notify FRA, in writing, before                   certain provisions of the Federal                       Interested parties are invited to
                                                the end of the comment period and                       railroad safety regulations contained at              participate in these proceedings by
                                                specify the basis for their request.                    49 CFR part 236. FRA assigned the                     submitting written views, data, or
                                                   All communications concerning these                                                                        comments. FRA does not anticipate
                                                                                                        petition Docket Number FRA–2016–
                                                proceedings should identify the                                                                               scheduling a public hearing in
                                                                                                        0108. UP seeks a waiver from
                                                appropriate docket number and may be                                                                          connection with these proceedings since
                                                                                                        compliance with cab signal system
                                                submitted by any of the following                                                                             the facts do not appear to warrant a
                                                                                                        requirements found in 49 CFR
                                                methods:                                                                                                      hearing. If any interested party desires
                                                   • Web site: http://                                  236.566—Locomotive of each train
                                                                                                        operating in train stop, train control, or            an opportunity for oral comment, they
                                                www.regulations.gov. Follow the online                                                                        should notify FRA, in writing, before
                                                instructions for submitting comments.                   cab signal territory; equipped.
                                                                                                        Specifically, UP seeks relief to operate              the end of the comment period and
                                                   • Fax: 202–493–2251.                                                                                       specify the basis for their request.
                                                   • Mail: Docket Operations Facility,                  Positive Train Control (PTC) equipped
                                                                                                                                                                All communications concerning these
                                                U.S. Department of Transportation, 1200                 controlling locomotives with the
                                                                                                                                                              proceedings should identify the
                                                New Jersey Avenue SE., W12–140,                         automatic cab signals (ACS) cut-out.
                                                                                                                                                              appropriate docket number and may be
                                                Washington, DC 20590.                                      The relief would be within a PTC
                                                                                                                                                              submitted by any of the following
                                                   • Hand Delivery: 1200 New Jersey                     revenue service demonstration (RSD)
                                                                                                                                                              methods:
                                                Avenue SE., Room W12–140,                               area on UP’s Portland Subdivision, on                   • Web site: http://
                                                Washington, DC 20590, between 9 a.m.                    which a PTC system is installed and                   www.regulations.gov. Follow the online
                                                and 5 p.m., Monday through Friday,                      operative; the PTC system is                          instructions for submitting comments.
                                                except Federal Holidays.                                successfully initialized; and a                         • Fax: 202–493–2251.
                                                   Communications received by                           locomotive engineer trained and                         • Mail: Docket Operations Facility,
                                                February 2, 2017 will be considered by                  qualified in the operation of PTC is                  U.S. Department of Transportation, 1200
                                                FRA before final action is taken.                       present for the operation of the train                New Jersey Avenue SE., W12–140,
                                                Comments received after that date will                  with the ACS cut-out.                                 Washington, DC 20590.
                                                be considered as far as practicable.                       Locations of requested relief on the                 • Hand Delivery: 1200 New Jersey
                                                   Anyone is able to search the                         Portland Subdivision are:                             Avenue SE., Room W12–140,
                                                electronic form of any written                             1. Between Milepost (MP) 81.6 and                  Washington, DC 20590, between 9 a.m.
                                                communications and comments                             MP 15.6 for westward moves.                           and 5 p.m., Monday through Friday,
                                                received into any of our dockets by the                    2. Between MP 15.6 and MP 81.6 for                 except Federal Holidays.
                                                name of the individual submitting the                   eastward moves.                                         Communications received by January
                                                comment (or signing the document, if                       3. Between MP 0.6 and MP 15.6 on
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              18, 2017 will be considered by FRA
                                                submitted on behalf of an association,                  the Graham Line.                                      before final action is taken. Comments
                                                business, labor union, etc.). In                           The PTC system to be utilized is UP’s              received after that date will be
                                                accordance with 5 U.S.C. 553(c), DOT                    implementation of the Interoperable                   considered as far as practicable.
                                                solicits comments from the public to                    Electronic Train Management System                      Anyone is able to search the
                                                better inform its processes. DOT posts                  (I–ETMS).                                             electronic form of any written
                                                these comments, without edit, including                    If the PTC system fails and/or is cut-             communications and comments
                                                any personal information the                            out enroute as a result of same, the train            received into any of our dockets by the


                                           VerDate Sep<11>2014   20:55 Dec 16, 2016   Jkt 241001   PO 00000   Frm 00098   Fmt 4703   Sfmt 4703   E:\FR\FM\19DEN1.SGM   19DEN1



Document Created: 2016-12-17 03:15:18
Document Modified: 2016-12-17 03:15:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 91996 