81_FR_94066 81 FR 93820 - Drawbridge Operation Regulation; Harlem River, New York, NY

81 FR 93820 - Drawbridge Operation Regulation; Harlem River, New York, NY

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 246 (December 22, 2016)

Page Range93820-93820
FR Document2016-30858

The Coast Guard has issued a temporary deviation from the operating schedule that governs the 125 Street (Triborough) Bridge across the Harlem River, mile 1.3, at New York, New York. This deviation is necessary to allow the bridge owner to facilitate rehabilitation of the mechanical and electrical components of the bridge. This deviation allows the bridge to remain in the closed position for the duration of the rehabilitation project.

Federal Register, Volume 81 Issue 246 (Thursday, December 22, 2016)
[Federal Register Volume 81, Number 246 (Thursday, December 22, 2016)]
[Rules and Regulations]
[Page 93820]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30858]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-1038]


Drawbridge Operation Regulation; Harlem River, New York, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the 125 Street (Triborough) Bridge 
across the Harlem River, mile 1.3, at New York, New York. This 
deviation is necessary to allow the bridge owner to facilitate 
rehabilitation of the mechanical and electrical components of the 
bridge. This deviation allows the bridge to remain in the closed 
position for the duration of the rehabilitation project.

DATES: This deviation is effective from January 17, 2017 through May 
15, 2017.

ADDRESSES: The docket for this deviation, [USCG-2016-1038] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Joe M. Arca, Project Officer, First 
Coast Guard District, telephone (212) 514-4336, email 
[email protected].

SUPPLEMENTARY INFORMATION: The 125 Street (Triborough) Bridge, mile 
1.3, across the Harlem River, has a vertical clearance in the closed 
position of 54 feet at mean high water and 59 feet at mean low water. 
The existing bridge operating regulations are found at 33 CFR 
117.789(b)(1).
    The waterway is transited by commercial tugs, barges and 
recreational vessels. There have been no requests for bridge openings 
in the last two years.
    The bridge owner, Triborough Bridge and Tunnel Authority (TBTA), 
requested a temporary deviation from the normal operating schedule to 
facilitate rehabilitation of the mechanical and electrical components 
of the bridge.
    Under this temporary deviation, the 125 Street Bridge may remain in 
the closed position from January 17, 2017 through May 15, 2017.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will not be able to open for emergencies 
and there is an alternate route for vessels to pass.
    The Coast Guard will inform the users of the waterways through our 
Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operations can arrange their 
transits to minimize any impact caused by the temporary deviation. The 
Coast Guard notified known companies of the commercial vessels, NYPD, 
and FDNY in the area and they have no objections to the temporary 
deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: December 15, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-30858 Filed 12-21-16; 8:45 am]
BILLING CODE 9110-04-P



                                           93820            Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Rules and Regulations

                                           data shows the bridge has not received                   ADDRESSES:    The docket for this                     ENVIRONMENTAL PROTECTION
                                           a request to open during these dates and                 deviation, [USCG–2016–1038] is                        AGENCY
                                           times in the last three years.                           available at http://www.regulations.gov.
                                              Under this temporary deviation, the                   Type the docket number in the                         40 CFR Part 52
                                           Long Beach Bridge shall open on signal                   ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                  [EPA–R09–OAR–2016–0322; FRL–9955–16–
                                           from 5 p.m. on December 23, 2016, to                     Click on Open Docket Folder on the line               Region 9]
                                           7 a.m. on December 26, 2016 and from                     associated with this deviation.
                                           5 p.m. on December 30, 2016, to 7 a.m.                   FOR FURTHER INFORMATION CONTACT: If                   Approval and Limited Approval and
                                           on January 2, 2017, if at least four-hour                you have questions on this temporary                  Limited Disapproval of California State
                                           advance notice is given by calling the                   deviation, call or email Joe M. Arca,                 Implementation Plan Revisions; Butte
                                           number posted at the bridge.                             Project Officer, First Coast Guard                    County Air Quality Management
                                              Vessels able to pass under the bridge                 District, telephone (212) 514–4336,                   District; Stationary Source Permits
                                           in the closed position may do so at                      email joe.m.arca@uscg.mil.
                                           anytime. The bridge will not be able to                                                                        AGENCY:  Environmental Protection
                                                                                                    SUPPLEMENTARY INFORMATION: The 125                    Agency (EPA).
                                           immediately open for emergencies and
                                                                                                    Street (Triborough) Bridge, mile 1.3,                 ACTION: Final rule.
                                           there are no alternate routes for vessels
                                                                                                    across the Harlem River, has a vertical
                                           to pass.                                                                                                       SUMMARY:    The Environmental Protection
                                                                                                    clearance in the closed position of 54
                                              The Coast Guard will also inform the                                                                        Agency (EPA) is finalizing action on
                                                                                                    feet at mean high water and 59 feet at
                                           users of the waterways through our                                                                             three permitting rules submitted as a
                                                                                                    mean low water. The existing bridge
                                           Local and Broadcast Notices to Mariners                                                                        revision to the Butte County Air Quality
                                                                                                    operating regulations are found at 33
                                           of the change in operating schedule for                                                                        Management District (BCAQMD)
                                                                                                    CFR 117.789(b)(1).
                                           the bridge so that vessels can arrange                                                                         portion of the California State
                                                                                                       The waterway is transited by
                                           their transits to minimize any impact                                                                          Implementation Plan (SIP). We are
                                                                                                    commercial tugs, barges and
                                           caused by the temporary deviation.                                                                             finalizing a limited approval and
                                                                                                    recreational vessels. There have been no
                                              This deviation from the operating                                                                           limited disapproval of one rule; we are
                                                                                                    requests for bridge openings in the last
                                           regulations is authorized under 33 CFR                                                                         finalizing approval of two permitting
                                                                                                    two years.
                                           117.35. In accordance with 33 CFR                                                                              rules; and we are deleting ten rules from
                                                                                                       The bridge owner, Triborough Bridge
                                           117.35(e), the drawbridge must return to                                                                       the SIP. These revisions concern the
                                                                                                    and Tunnel Authority (TBTA),
                                           its regular operating schedule                                                                                 District’s New Source Review (NSR)
                                                                                                    requested a temporary deviation from
                                           immediately at the end of the effective                                                                        permitting program for new and
                                                                                                    the normal operating schedule to
                                           period of this temporary deviation.                                                                            modified sources of air pollution. This
                                                                                                    facilitate rehabilitation of the
                                             Dated: December 19, 2016.                              mechanical and electrical components                  limited disapproval will trigger
                                           C.J. Bisignano,                                          of the bridge.                                        sanctions under CAA section 179 and
                                           Supervisory Bridge Management Specialist,                   Under this temporary deviation, the                40 CFR 52.31 unless the EPA approves
                                           First Coast Guard District.                              125 Street Bridge may remain in the                   subsequent SIP revisions that correct the
                                           [FR Doc. 2016–30864 Filed 12–21–16; 8:45 am]             closed position from January 17, 2017                 rule deficiencies within 18 months of
                                           BILLING CODE 9110–04–P                                   through May 15, 2017.                                 the effective date of the final action.
                                                                                                       Vessels able to pass through the                   DATES: This rule will be effective on
                                                                                                    bridge in the closed position may do so               January 23, 2017.
                                           DEPARTMENT OF HOMELAND                                   at any time. The bridge will not be able              ADDRESSES: The EPA has established a
                                           SECURITY                                                 to open for emergencies and there is an               docket for this action under Docket No.
                                                                                                    alternate route for vessels to pass.                  EPA–R09–OAR–2016–0322. All
                                           Coast Guard                                                 The Coast Guard will inform the users              documents in the docket are listed on
                                                                                                    of the waterways through our Local and                the http://www.regulations.gov Web
                                           33 CFR Part 117                                          Broadcast Notices to Mariners of the                  site. Although listed in the index, some
                                           [Docket No. USCG–2016–1038]                              change in operating schedule for the                  information is not publicly available,
                                                                                                    bridge so that vessel operations can                  e.g., CBI or other information whose
                                           Drawbridge Operation Regulation;                         arrange their transits to minimize any                disclosure is restricted by statute.
                                           Harlem River, New York, NY                               impact caused by the temporary                        Certain other material, such as
                                                                                                    deviation. The Coast Guard notified                   copyrighted material, is not placed on
                                           AGENCY: Coast Guard, DHS.
                                                                                                    known companies of the commercial                     the Internet and will be publicly
                                           ACTION:Notice of deviation from                          vessels, NYPD, and FDNY in the area                   available only in hard copy form.
                                           drawbridge regulation.                                   and they have no objections to the                    Publicly available docket materials are
                                           SUMMARY:  The Coast Guard has issued a                   temporary deviation.                                  available through http://
                                           temporary deviation from the operating                      In accordance with 33 CFR 117.35(e),               www.regulations.gov, or please contact
                                           schedule that governs the 125 Street                     the drawbridge must return to its regular             the person identified in the FOR FURTHER
                                           (Triborough) Bridge across the Harlem                    operating schedule immediately at the                 INFORMATION CONTACT section for
                                           River, mile 1.3, at New York, New York.                  end of the effective period of this                   additional availability information.
                                           This deviation is necessary to allow the                 temporary deviation. This deviation                   FOR FURTHER INFORMATION CONTACT:
                                           bridge owner to facilitate rehabilitation                from the operating regulations is                     Thien Khoi Nguyen, EPA Region IX,
                                           of the mechanical and electrical                         authorized under 33 CFR 117.35.                       (415) 947–4120, nguyen.thien@epa.gov.
Lhorne on DSK30JT082PROD with RULES




                                           components of the bridge. This                             Dated: December 15, 2016.                           SUPPLEMENTARY INFORMATION:
                                           deviation allows the bridge to remain in                 C.J. Bisignano,                                       Throughout this document, the terms
                                           the closed position for the duration of                  Supervisory Bridge Management Specialist,             ‘‘we,’’ ‘‘us,’’ and ‘‘our’’ refer to EPA.
                                           the rehabilitation project.                              First Coast Guard District.
                                                                                                                                                          Table of Contents
                                           DATES: This deviation is effective from                  [FR Doc. 2016–30858 Filed 12–21–16; 8:45 am]
                                           January 17, 2017 through May 15, 2017.                   BILLING CODE 9110–04–P                                I. Proposed Action



                                      VerDate Sep<11>2014    15:15 Dec 21, 2016   Jkt 241001   PO 00000   Frm 00030   Fmt 4700   Sfmt 4700   E:\FR\FM\22DER1.SGM   22DER1



Document Created: 2016-12-21 23:51:59
Document Modified: 2016-12-21 23:51:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from January 17, 2017 through May 15, 2017.
ContactIf you have questions on this temporary deviation, call or email Joe M. Arca, Project Officer, First Coast Guard District, telephone (212) 514-4336, email [email protected]
FR Citation81 FR 93820 