DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 246 (December 22, 2016)

Page Range93910-93911
FR Document2016-30851

Federal Register, Volume 81 Issue 246 (Thursday, December 22, 2016)
[Federal Register Volume 81, Number 246 (Thursday, December 22, 2016)]
[Notices]
[Pages 93910-93911]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30851]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 619-164]


Pacific Gas and Electric Company and City of Santa Clara, 
California; Notice of Application Tendered for Filing With the 
Commission and Establishing Procedural Schedule for Licensing and 
Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License
    b. Project No.: 619-164
    c. Date Filed: December 12, 2016
    d. Applicant: Pacific Gas and Electric Company (PG&E) and City of 
Santa Clara, California
    e. Name of Project: Bucks Creek Hydropower Project
    f. Location: The Bucks Creek Project is located on Bucks, Grizzly, 
and Milk Ranch Creeks in Plumas County, California. Portions of the 
project are located within the Plumas National Forest.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r)
    h. Applicant Contact: Alan Soneda, PG&E, Mail Code N13C, P. 0. Box 
770000, San Francisco, California 94177-0001; (415) 973-4054
    i. FERC Contact: Alan Mitchnick at (202) 502-6074 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Project Description:

Bucks Lake Dam and Reservoir (Bucks Creek Development)

    The Bucks Lake dam consists of a rock-fill with concrete face dam. 
It has a structural height of 123 feet and a length of 1,320 feet. 
Bucks Creek dam impounds Bucks Lake, which extends 5 miles from the 
dam. Total storage in the 1,827-acre reservoir is approximately 105,605 
acre-feet at the normal maximum water surface elevation of 
approximately 5,157 feet. From Bucks Lake, the project's water flow is 
released immediately downstream into Lower Bucks Lake.

Three Lakes Dam and Reservoir, and Milk Ranch Conduit (Bucks Creek 
Development)

    The Three Lakes dam consists of a rock-fill dam with a structural 
height of 30 feet and a length of 584 feet. Three Lakes dam impounds 
the flow of Milk Ranch Creek, forming Upper Lake, Middle Lake, and 
Lower Lake, collectively known as Three Lakes reservoir. These water 
bodies are hydraulically linked and are approximately 0.75 mile from 
the dam. Total storage in the 40-acre reservoir is approximately 513 
acre-feet at the normal maximum water surface elevation of 
approximately 6,074 feet.
    Milk Ranch conduit conveys the project's water flow from Three 
Lakes reservoir and feeder diversions to Lower Bucks Lake. The maximum 
capacity of the approximately 8-mile-long conduit is about 70 cubic 
foot per second (cfs). It collects additional flow from several 
diversions located on unnamed tributaries.

Lower Bucks Lake Dam and Reservoir (Bucks Creek Development)

    The Lower Bucks Lake dam consists of a concrete arch dam with a 
structural height of 99 feet and a length of 500 feet. Lower Bucks 
Creek dam impounds Lower Bucks Lake, which extends approximately 1.1 
miles from the dam. Total storage in the 136-acre reservoir is 
approximately 5,843 acre-feet at the normal maximum water surface 
elevation of approximately 5,022 feet. Water is conveyed from Lower 
Bucks Lake to the Grizzly powerhouse by the Grizzly powerhouse tunnel.

Grizzly Powerhouse Tunnel (Grizzly Development)

    The 12,320-foot-long Grizzly powerhouse tunnel (including a 4,900-
foot-long buried penstock) conveys the water flow from Lower Bucks Lake 
to Grizzly powerhouse. The maximum flow capacity is 400 cfs.

Grizzly Powerhouse (Grizzly Development)

    The Grizzly powerhouse is a 65-foot-long by 55-foot-wide, steel 
frame and concrete building constructed from reinforced concrete, with 
a maximum capacity of 20 megawatts (MW) and an average annual 
generation production of 48.9 gigawatt-hours (GWh). Grizzly powerhouse 
discharges the project's water flow directly into the Grizzly forebay.
    A 3.2-mile-long, 115-kilovolt (kV) transmission line transmits 
power from Grizzly powerhouse to PG&E's 115-kV Caribou-Sycamore 
transmission line, part of the interconnected system.

Grizzly Forebay Dam and Reservoir (Bucks Creek Development)

    The Grizzly forebay dam consists of a concrete arch dam with a 
structural height of 98 feet and a length of 520 feet. Grizzly forebay 
dam impounds the

[[Page 93911]]

Grizzly forebay, forming the Grizzly forebay reservoir that extends 
approximately 0.8 mile. Total storage in the 38-acre reservoir is 
approximately 1,112 acre-feet at the normal maximum water surface 
elevation of approximately 4,316 feet.

Grizzly Forebay Tunnel (Bucks Creek Development)

    From Grizzly forebay, the project's water flow is conveyed through 
the horseshoe-shaped Grizzly forebay tunnel. The tunnel is 9,575-foot-
long with two 4,786-foot-long penstocks leading to Bucks Creek 
powerhouse. The maximum flow capacity is 400 cfs.

Bucks Creek Powerhouse (Bucks Creek Development)

    The project's water flow is conveyed through the Grizzly forebay 
tunnel to Bucks Creek powerhouse. The Bucks Creek powerhouse is a 47-
foot-long by 132-foot-wide, steel frame and concrete building 
constructed from reinforced concrete. The powerhouse has a total 
maximum capacity of 65 MW with an average annual generation of 234.8 
GWh. The powerhouse connects directly to the non-project switchyard 
adjacent to the powerhouse part of the interconnected transmission 
system.
    Bucks Creek powerhouse discharges the project's water flow in the 
North Fork Feather River, one mile upstream of Rock Creek powerhouse, 
part of PG&E's Rock Creek-Cresta Hydroelectric Project (FERC Project 
No. 1962).
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule:
    The application will be processed according to the following 
preliminary Hydro Licensing Schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for     February 2017.
 Environmental Analysis.
Filing of recommendations, preliminary       April 2017.
 terms and conditions, and fishway
 prescriptions.
Commission issues Draft Environmental        October 2017.
 Impact Statement (EIS).
Comments on Draft EIS......................  December 2017.
Modified Terms and Conditions..............  February 2018.
Commission Issues Final EIS................  May 2018.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the Notice 
of Ready for Environmental Analysis.

    Dated: December 16, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-30851 Filed 12-21-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                93910                     Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Notices

                                                blanket authorization, under 18 CFR                     DEPARTMENT OF ENERGY                                  Ranch Creek, forming Upper Lake,
                                                part 34, of future issuances of securities                                                                    Middle Lake, and Lower Lake,
                                                and assumptions of liability.                           Federal Energy Regulatory                             collectively known as Three Lakes
                                                                                                        Commission                                            reservoir. These water bodies are
                                                   Any person desiring to intervene or to
                                                protest should file with the Federal                    [Project No. 619–164]                                 hydraulically linked and are
                                                                                                                                                              approximately 0.75 mile from the dam.
                                                Energy Regulatory Commission, 888
                                                                                                        Pacific Gas and Electric Company and                  Total storage in the 40-acre reservoir is
                                                First Street NE., Washington, DC 20426,
                                                                                                        City of Santa Clara, California; Notice               approximately 513 acre-feet at the
                                                in accordance with Rules 211 and 214                                                                          normal maximum water surface
                                                                                                        of Application Tendered for Filing With
                                                of the Commission’s Rules of Practice                                                                         elevation of approximately 6,074 feet.
                                                                                                        the Commission and Establishing
                                                and Procedure (18 CFR 385.211 and                                                                                Milk Ranch conduit conveys the
                                                                                                        Procedural Schedule for Licensing and
                                                385.214). Anyone filing a motion to                                                                           project’s water flow from Three Lakes
                                                                                                        Deadline for Submission of Final
                                                intervene or protest must serve a copy                  Amendments                                            reservoir and feeder diversions to Lower
                                                of that document on the Applicant.                                                                            Bucks Lake. The maximum capacity of
                                                   Notice is hereby given that the                         Take notice that the following                     the approximately 8-mile-long conduit
                                                deadline for filing protests with regard                hydroelectric application has been filed              is about 70 cubic foot per second (cfs).
                                                                                                        with the Commission and is available                  It collects additional flow from several
                                                to the applicant’s request for blanket
                                                                                                        for public inspection.                                diversions located on unnamed
                                                authorization, under 18 CFR part 34, of
                                                                                                           a. Type of Application: New Major                  tributaries.
                                                future issuances of securities and                      License
                                                assumptions of liability, is January 5,                    b. Project No.: 619–164                            Lower Bucks Lake Dam and Reservoir
                                                2017.                                                      c. Date Filed: December 12, 2016                   (Bucks Creek Development)
                                                   The Commission encourages                               d. Applicant: Pacific Gas and Electric               The Lower Bucks Lake dam consists
                                                electronic submission of protests and                   Company (PG&E) and City of Santa                      of a concrete arch dam with a structural
                                                interventions in lieu of paper, using the               Clara, California                                     height of 99 feet and a length of 500 feet.
                                                FERC Online links at http://                               e. Name of Project: Bucks Creek                    Lower Bucks Creek dam impounds
                                                www.ferc.gov. To facilitate electronic                  Hydropower Project                                    Lower Bucks Lake, which extends
                                                service, persons with Internet access                      f. Location: The Bucks Creek Project               approximately 1.1 miles from the dam.
                                                who will eFile a document and/or be                     is located on Bucks, Grizzly, and Milk                Total storage in the 136-acre reservoir is
                                                listed as a contact for an intervenor                   Ranch Creeks in Plumas County,                        approximately 5,843 acre-feet at the
                                                must create and validate an                             California. Portions of the project are               normal maximum water surface
                                                                                                        located within the Plumas National                    elevation of approximately 5,022 feet.
                                                eRegistration account using the
                                                                                                        Forest.                                               Water is conveyed from Lower Bucks
                                                eRegistration link. Select the eFiling
                                                                                                           g. Filed Pursuant to: Federal Power                Lake to the Grizzly powerhouse by the
                                                link to log on and submit the                           Act, 16 U.S.C. 791 (a)-825(r)
                                                intervention or protests.                                                                                     Grizzly powerhouse tunnel.
                                                                                                           h. Applicant Contact: Alan Soneda,
                                                   Persons unable to file electronically                PG&E, Mail Code N13C, P. 0. Box                       Grizzly Powerhouse Tunnel (Grizzly
                                                should submit an original and 5 copies                  770000, San Francisco, California                     Development)
                                                of the intervention or protest to the                   94177–0001; (415) 973–4054                               The 12,320-foot-long Grizzly
                                                Federal Energy Regulatory Commission,                      i. FERC Contact: Alan Mitchnick at                 powerhouse tunnel (including a 4,900-
                                                888 First Street, NE., Washington, DC                   (202) 502–6074 or alan.mitchnick@                     foot-long buried penstock) conveys the
                                                20426.                                                  ferc.gov.                                             water flow from Lower Bucks Lake to
                                                                                                           j. This application is not ready for               Grizzly powerhouse. The maximum
                                                   The filings in the above-referenced
                                                                                                        environmental analysis at this time.                  flow capacity is 400 cfs.
                                                proceeding are accessible in the                           k. The Project Description:
                                                Commission’s eLibrary system by                                                                               Grizzly Powerhouse (Grizzly
                                                clicking on the appropriate link in the                 Bucks Lake Dam and Reservoir (Bucks                   Development)
                                                above list. They are also available for                 Creek Development)
                                                                                                                                                                 The Grizzly powerhouse is a 65-foot-
                                                electronic review in the Commission’s                      The Bucks Lake dam consists of a                   long by 55-foot-wide, steel frame and
                                                Public Reference Room in Washington,                    rock-fill with concrete face dam. It has              concrete building constructed from
                                                DC. There is an eSubscription link on                   a structural height of 123 feet and a                 reinforced concrete, with a maximum
                                                the Web site that enables subscribers to                length of 1,320 feet. Bucks Creek dam                 capacity of 20 megawatts (MW) and an
                                                receive email notification when a                       impounds Bucks Lake, which extends 5                  average annual generation production of
                                                document is added to a subscribed                       miles from the dam. Total storage in the              48.9 gigawatt-hours (GWh). Grizzly
                                                docket(s). For assistance with any FERC                 1,827-acre reservoir is approximately                 powerhouse discharges the project’s
                                                Online service, please email                            105,605 acre-feet at the normal                       water flow directly into the Grizzly
                                                FERCOnlineSupport@ferc.gov. or call                     maximum water surface elevation of                    forebay.
                                                (866) 208–3676 (toll free). For TTY, call               approximately 5,157 feet. From Bucks                     A 3.2-mile-long, 115-kilovolt (kV)
                                                (202) 502–8659.                                         Lake, the project’s water flow is released            transmission line transmits power from
                                                                                                        immediately downstream into Lower                     Grizzly powerhouse to PG&E’s 115-kV
                                                  Dated: December 16, 2016.                             Bucks Lake.                                           Caribou-Sycamore transmission line,
                                                Nathaniel J. Davis, Sr.,
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              part of the interconnected system.
                                                                                                        Three Lakes Dam and Reservoir, and
                                                Deputy Secretary.
                                                                                                        Milk Ranch Conduit (Bucks Creek                       Grizzly Forebay Dam and Reservoir
                                                [FR Doc. 2016–30839 Filed 12–21–16; 8:45 am]
                                                                                                        Development)                                          (Bucks Creek Development)
                                                BILLING CODE 6717–01–P
                                                                                                          The Three Lakes dam consists of a                     The Grizzly forebay dam consists of a
                                                                                                        rock-fill dam with a structural height of             concrete arch dam with a structural
                                                                                                        30 feet and a length of 584 feet. Three               height of 98 feet and a length of 520 feet.
                                                                                                        Lakes dam impounds the flow of Milk                   Grizzly forebay dam impounds the


                                           VerDate Sep<11>2014   17:40 Dec 21, 2016   Jkt 241001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\22DEN1.SGM   22DEN1


                                                                                  Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Notices                                                                         93911

                                                Grizzly forebay, forming the Grizzly                                   Creek powerhouse is a 47-foot-long by                                  last three digits in the docket number
                                                forebay reservoir that extends                                         132-foot-wide, steel frame and concrete                                field to access the document. For
                                                approximately 0.8 mile. Total storage in                               building constructed from reinforced                                   assistance, please contact FERC Online
                                                the 38-acre reservoir is approximately                                 concrete. The powerhouse has a total                                   Support at FERCOnlineSupport@
                                                1,112 acre-feet at the normal maximum                                  maximum capacity of 65 MW with an                                      ferc.gov, (866) 208–3676 (toll free), or
                                                water surface elevation of                                             average annual generation of 234.8                                     (202) 502–8659 (TTY). A copy is also
                                                approximately 4,316 feet.                                              GWh. The powerhouse connects                                           available for inspection and
                                                                                                                       directly to the non-project switchyard                                 reproduction at the address in item (h)
                                                Grizzly Forebay Tunnel (Bucks Creek                                    adjacent to the powerhouse part of the                                 above.
                                                Development)                                                           interconnected transmission system.                                       m. You may also register online at
                                                  From Grizzly forebay, the project’s                                    Bucks Creek powerhouse discharges                                    http://www.ferc.gov/docs-filing/
                                                water flow is conveyed through the                                     the project’s water flow in the North                                  esubscription.asp to be notified via
                                                horseshoe-shaped Grizzly forebay                                       Fork Feather River, one mile upstream                                  email of new filings and issuances
                                                tunnel. The tunnel is 9,575-foot-long                                  of Rock Creek powerhouse, part of                                      related to this or other pending projects.
                                                with two 4,786-foot-long penstocks                                     PG&E’s Rock Creek-Cresta Hydroelectric                                 For assistance, contact FERC Online
                                                leading to Bucks Creek powerhouse.                                     Project (FERC Project No. 1962).                                       Support.
                                                The maximum flow capacity is 400 cfs.                                    l. Locations of the Application: A
                                                                                                                       copy of the application is available for                                  n. Procedural Schedule:
                                                Bucks Creek Powerhouse (Bucks Creek                                    review at the Commission in the Public                                    The application will be processed
                                                Development)                                                           Reference Room or may be viewed on                                     according to the following preliminary
                                                  The project’s water flow is conveyed                                 the Commission’s Web site at http://                                   Hydro Licensing Schedule. Revisions to
                                                through the Grizzly forebay tunnel to                                  www.ferc.gov using the ‘‘eLibrary’’ link.                              the schedule may be made as
                                                Bucks Creek powerhouse. The Bucks                                      Enter the docket number excluding the                                  appropriate.

                                                                                                                      Milestone                                                                                         Target date

                                                Notice of Acceptance/Notice of Ready for Environmental Analysis ..................................................................                            February 2017.
                                                Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...............................                                        April 2017.
                                                Commission issues Draft Environmental Impact Statement (EIS) ....................................................................                             October 2017.
                                                Comments on Draft EIS .....................................................................................................................................   December 2017.
                                                Modified Terms and Conditions .........................................................................................................................       February 2018.
                                                Commission Issues Final EIS ............................................................................................................................      May 2018.



                                                  o. Final amendments to the                                             Description: Tariff Amendment: APS                                     Applicants: Niagara Mohawk Power
                                                application must be filed with the                                     Response to Request for Additional                                     Corporation, New York Independent
                                                Commission no later than 30 days from                                  Information to be effective 11/23/2016.                                System Operator, Inc.
                                                the issuance date of the Notice of Ready                                 Filed Date: 12/16/16.                                                  Description: § 205(d) Rate Filing: Cost
                                                for Environmental Analysis.                                              Accession Number: 20161216–5125.                                     Reimbursement Agreement 2324-
                                                  Dated: December 16, 2016.
                                                                                                                         Comments Due: 5 p.m. ET 1/6/17.                                      Niagara Mohawk and Erie Boulevard
                                                                                                                         Docket Numbers: ER17–468–001.                                        Hydropower to be effective 11/18/2016.
                                                Kimberly D. Bose,
                                                                                                                         Applicants: Ohio Valley Electric                                       Filed Date: 12/16/16.
                                                Secretary.                                                                                                                                      Accession Number: 20161216–5114.
                                                                                                                       Corporation.
                                                [FR Doc. 2016–30851 Filed 12–21–16; 8:45 am]
                                                                                                                         Description: Compliance filing: Errata                                 Comments Due: 5 p.m. ET 1/6/17.
                                                BILLING CODE 6717–01–P                                                 to Amendment J, K and P to be effective                                  Docket Numbers: ER17–567–000.
                                                                                                                       10/14/2016.                                                              Applicants: Duke Energy Progress,
                                                                                                                         Filed Date: 12/16/16.                                                LLC.
                                                DEPARTMENT OF ENERGY                                                     Accession Number: 20161216–5182.                                       Description: § 205(d) Rate Filing:
                                                                                                                         Comments Due: 5 p.m. ET 1/6/17.                                      Southampton Solar Affected System
                                                Federal Energy Regulatory                                                                                                                     Operating Agreement to be effective 1/
                                                Commission                                                               Docket Numbers: ER17–563–000.
                                                                                                                         Applicants: Arizona Public Service                                   19/2017.
                                                                                                                                                                                                Filed Date: 12/16/16.
                                                Combined Notice of Filings #2                                          Company.                                                                 Accession Number: 20161216–5145.
                                                                                                                         Description: § 205(d) Rate Filing:                                     Comments Due: 5 p.m. ET 1/6/17.
                                                   Take notice that the Commission                                     Administrative Filing for Collation
                                                received the following electric rate                                                                                                            Docket Numbers: ER17–568–000.
                                                                                                                       Correction to be effective 12/16/2016.                                   Applicants: Midcontinent
                                                filings:                                                                 Filed Date: 12/16/16.
                                                   Docket Numbers: ER16–1967–001.                                                                                                             Independent System Operator, Inc.
                                                                                                                         Accession Number: 20161216–5082.                                       Description: § 205(d) Rate Filing:
                                                   Applicants: PJM Interconnection,                                      Comments Due: 5 p.m. ET 1/6/17.
                                                L.L.C.                                                                                                                                        2016–12–16_Attachment X-Quarterly
                                                                                                                         Docket Numbers: ER17–565–000.                                        Operating Limits to be effective 2/15/
                                                   Description: Compliance filing:                                       Applicants: PJM Interconnection,                                     2017.
                                                Compliance filing per 4/21/2016 order-                                 L.L.C.                                                                   Filed Date: 12/16/16.
                                                Docket No. EL13–88 re: Generator                                         Description: § 205(d) Rate Filing:
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                                Accession Number: 20161216–5155.
                                                Deactivat to be effective 2/14/2017.                                   Revisions to OATT Definitions and Att                                    Comments Due: 5 p.m. ET 1/6/17.
                                                   Filed Date: 12/15/16.                                               Q RE: Refinements to PJM’s Credit                                        Docket Numbers: ER17–569–000.
                                                   Accession Number: 20161215–5249.                                    Policy to be effective 2/14/2017.                                        Applicants: National Choice Energy
                                                   Comments Due: 5 p.m. ET 1/5/17.                                       Filed Date: 12/16/16.                                                LLC.
                                                   Docket Numbers: ER16–2656–001.                                        Accession Number: 20161216–5098.                                       Description: Baseline eTariff Filing:
                                                   Applicants: Arizona Public Service                                    Comments Due: 5 p.m. ET 1/6/17.                                      Baseline New to be effective 12/30/
                                                Company.                                                                 Docket Numbers: ER17–566–000.                                        2016.


                                           VerDate Sep<11>2014        17:40 Dec 21, 2016       Jkt 241001      PO 00000       Frm 00031      Fmt 4703      Sfmt 4703      E:\FR\FM\22DEN1.SGM            22DEN1



Document Created: 2016-12-21 23:52:32
Document Modified: 2016-12-21 23:52:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: