81_FR_94680 81 FR 94433 - Restart of a Nuclear Power Plant Shut Down by a Seismic Event

81 FR 94433 - Restart of a Nuclear Power Plant Shut Down by a Seismic Event

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 247 (December 23, 2016)

Page Range94433-94434
FR Document2016-30895

On November 3, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued for public comment draft regulatory guide (DG) DG-1337, ``Restart of a Nuclear Power Plant Shut Down by a Seismic Event,'' in the Federal Register for a 60-day public comment period which ends on January 3, 2017. The NRC is extending the public comment period to February 28, 2017, recognizing the potential for unavailability of people during the holiday period. The guide describes methods acceptable to the NRC staff that can be used to demonstrate that a nuclear power plant is safe for restarting after a shutdown caused by a seismic event.

Federal Register, Volume 81 Issue 247 (Friday, December 23, 2016)
[Federal Register Volume 81, Number 247 (Friday, December 23, 2016)]
[Notices]
[Pages 94433-94434]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30895]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2016-0224]


Restart of a Nuclear Power Plant Shut Down by a Seismic Event

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; extension of comment period.

-----------------------------------------------------------------------

SUMMARY: On November 3, 2016, the U.S. Nuclear Regulatory Commission 
(NRC) issued for public comment draft regulatory guide (DG) DG-1337, 
``Restart of a Nuclear Power Plant Shut Down by a Seismic Event,'' in 
the Federal Register for a 60-day public comment period which ends on 
January 3, 2017. The NRC is extending the public comment period to 
February 28, 2017, recognizing the potential for unavailability of 
people during the holiday period. The guide describes methods 
acceptable to the NRC staff that can be used to demonstrate that a 
nuclear power plant is safe for restarting after a shutdown caused by a 
seismic event.

DATES: Submit comments by February 28, 2017. Comments received after 
this date will be considered if it is practical to do so, but the NRC 
is able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specified subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID: NRC-2016-0224. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on accessing information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Thomas Weaver, telephone: 301-415-
2383, email: [email protected]; and Edward O'Donnell, telephone: 
301-415-3317, email: [email protected]. Both are staff of the 
Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID: NRC-2016-0224 when contacting the NRC 
about the availability of information regarding this action. You may 
obtain publically-available information related to this action, by any 
of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID: NRC-2016-0224.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
DG is electronically available in ADAMS under Accession No. 
ML16182A321.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2016-0224 in your comment submission. 
The NRC cautions you not to include identifying or contact information 
that you do not want to be publicly disclosed in your comment 
submission. The NRC posts all comment submissions at http://www.regulations.gov as well as enters the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a DG in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
NRC's regulations, techniques that the staff uses in evaluating 
specific issues or postulated events, and data that the staff needs in 
its review of applications for permits and licenses. The DG, entitled 
``Restart of a Nuclear Power Plant Shut Down by a Seismic Event,'' is a 
proposed revised guide temporarily identified by its task number, DG-
1337. The proposed revision of RG 1.167 describes methods acceptable to 
the NRC staff that can be used to demonstrate that a nuclear power 
plant is safe for restarting after a shutdown caused by a seismic 
event. It incorporates lessons learned following the shutdown of 
nuclear power plants due to earthquake ground shaking and post-
earthquake evaluations since Revision 0 was issued in 1997. They 
include experience gained through the shutdown and restart process of 
the North Anna nuclear power plant following the Mineral, Virginia 
earthquake in 2011. It endorses, with some exceptions, sections of ANS/
ANSI-2.23-2016, ``Nuclear Power Plant Response to an Earthquake,'' that 
relate to post-shutdown inspections and tests, inspection criteria, 
documentation, and long-term evaluations. The guidance includes an 
action level matrix to direct actions based on the earthquake level and 
observed damage levels at a nuclear power plant.

II. Backfitting and Issue Finality

    Draft Guide-1337 describes methods acceptable to the NRC staff that 
can be used to demonstrate that a nuclear power plant is safe for 
restarting after a shutdown caused by a seismic event. Issuance of this 
DG, if finalized, would not constitute backfitting as defined in Sec.  
50.109 of title 10 of the Code of Federal Regulations (10 CFR) (the

[[Page 94434]]

Backfit Rule) and would not otherwise be inconsistent with the issue 
finality provisions in 10 CFR Part 52. As discussed in the 
``Implementation'' section of this DG, the NRC has no current intention 
to impose this guide, if finalized, on holders of current operating 
licenses or combined licenses.
    This DG may be applied to applications for operating licenses, 
combined licenses, early site permits, and certified design rules 
docketed by the NRC as of the date of issuance of the final regulatory 
guide, as well as future applications submitted after the issuance of 
the regulatory guide. Such action would not constitute backfitting as 
defined in the Backfit Rule or be otherwise inconsistent with the 
applicable issue finality provision in 10 CFR part 52, inasmuch as such 
applicants or potential applicants are not within the scope of entities 
protected by the Backfit Rule or the relevant issue finality provisions 
in part 52.

    Dated at Rockville, Maryland, this 19th day of December, 2016.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2016-30895 Filed 12-22-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                              Federal Register / Vol. 81, No. 247 / Friday, December 23, 2016 / Notices                                            94433

                                                     For the Nuclear Regulatory Commission.               OWFN–12H08, U.S. Nuclear Regulatory                     If you are requesting or aggregating
                                                  Thomas H. Boyce,                                        Commission, Washington, DC 20555–                     comments from other persons for
                                                  Chief, Regulatory Guidance and Generic                  0001.                                                 submission to the NRC, then you should
                                                  Issues Branch, Division of Engineering, Office            For additional direction on accessing               inform those persons not to include
                                                  of Nuclear Regulatory Research.                         information and submitting comments,                  identifying or contact information that
                                                  [FR Doc. 2016–30896 Filed 12–22–16; 8:45 am]            see ‘‘Obtaining Information and                       they do not want to be publicly
                                                  BILLING CODE 7590–01–P                                  Submitting Comments’’ in the                          disclosed in their comment submission.
                                                                                                          SUPPLEMENTARY INFORMATION section of                  Your request should state that the NRC
                                                                                                          this document.                                        does not routinely edit comment
                                                  NUCLEAR REGULATORY                                      FOR FURTHER INFORMATION CONTACT:                      submissions to remove such information
                                                  COMMISSION                                              Thomas Weaver, telephone: 301–415–                    before making the comment
                                                                                                          2383, email: Thomas.Weaver@nrc.gov;                   submissions available to the public or
                                                  [NRC–2016–0224]
                                                                                                          and Edward O’Donnell, telephone: 301–                 entering the comment submissions into
                                                  Restart of a Nuclear Power Plant Shut                   415–3317, email: Edward.ODonnell@                     ADAMS.
                                                  Down by a Seismic Event                                 nrc.gov. Both are staff of the Office of              II. Additional Information
                                                                                                          Nuclear Regulatory Research, U.S.
                                                  AGENCY: Nuclear Regulatory                              Nuclear Regulatory Commission,                           The NRC is issuing for public
                                                  Commission.                                             Washington, DC 20555–0001.                            comment a DG in the NRC’s ‘‘Regulatory
                                                  ACTION: Draft regulatory guide;                                                                               Guide’’ series. This series was
                                                                                                          SUPPLEMENTARY INFORMATION:
                                                  extension of comment period.                                                                                  developed to describe and make
                                                                                                          I. Obtaining Information and                          available to the public information
                                                  SUMMARY:   On November 3, 2016, the                     Submitting Comments                                   regarding methods that are acceptable to
                                                  U.S. Nuclear Regulatory Commission                                                                            the NRC staff for implementing specific
                                                  (NRC) issued for public comment draft                   A. Obtaining Information                              parts of the NRC’s regulations,
                                                  regulatory guide (DG) DG–1337, ‘‘Restart                   Please refer to Docket ID: NRC–2016–               techniques that the staff uses in
                                                  of a Nuclear Power Plant Shut Down by                   0224 when contacting the NRC about                    evaluating specific issues or postulated
                                                  a Seismic Event,’’ in the Federal                       the availability of information regarding             events, and data that the staff needs in
                                                  Register for a 60-day public comment                    this action. You may obtain publically-               its review of applications for permits
                                                  period which ends on January 3, 2017.                   available information related to this                 and licenses. The DG, entitled ‘‘Restart
                                                  The NRC is extending the public                         action, by any of the following methods:              of a Nuclear Power Plant Shut Down by
                                                  comment period to February 28, 2017,                       • Federal Rulemaking Web site: Go to               a Seismic Event,’’ is a proposed revised
                                                  recognizing the potential for                           http://www.regulations.gov and search                 guide temporarily identified by its task
                                                  unavailability of people during the                     for Docket ID: NRC–2016–0224.                         number, DG–1337. The proposed
                                                  holiday period. The guide describes                        • NRC’s Agencywide Documents                       revision of RG 1.167 describes methods
                                                  methods acceptable to the NRC staff that                Access and Management System                          acceptable to the NRC staff that can be
                                                  can be used to demonstrate that a                       (ADAMS): You may obtain publicly                      used to demonstrate that a nuclear
                                                  nuclear power plant is safe for restarting              available documents online in the                     power plant is safe for restarting after a
                                                  after a shutdown caused by a seismic                    ADAMS Public Documents collection at                  shutdown caused by a seismic event. It
                                                  event.                                                  http://www.nrc.gov/reading-rm/                        incorporates lessons learned following
                                                                                                          adams.html. To begin the search, select               the shutdown of nuclear power plants
                                                  DATES:  Submit comments by February                     ‘‘ADAMS Public Documents’’ and then                   due to earthquake ground shaking and
                                                  28, 2017. Comments received after this                  select ‘‘Begin Web-based ADAMS                        post-earthquake evaluations since
                                                  date will be considered if it is practical              Search.’’ For problems with ADAMS,                    Revision 0 was issued in 1997. They
                                                  to do so, but the NRC is able to ensure                 please contact the NRC’s Public                       include experience gained through the
                                                  consideration only for comments                         Document Room (PDR) reference staff at                shutdown and restart process of the
                                                  received on or before this date.                        1–800–397–4209, 301–415–4737, or by                   North Anna nuclear power plant
                                                  Although a time limit is given,                         email to pdr.resource@nrc.gov. The DG                 following the Mineral, Virginia
                                                  comments and suggestions in                             is electronically available in ADAMS                  earthquake in 2011. It endorses, with
                                                  connection with items for inclusion in                  under Accession No. ML16182A321.                      some exceptions, sections of ANS/
                                                  guides currently being developed or                        • NRC’s PDR: You may examine and                   ANSI–2.23–2016, ‘‘Nuclear Power Plant
                                                  improvements in all published guides                    purchase copies of public documents at                Response to an Earthquake,’’ that relate
                                                  are encouraged at any time.                             the NRC’s PDR, Room O1–F21, One                       to post-shutdown inspections and tests,
                                                  ADDRESSES: You may submit comments                      White Flint North, 11555 Rockville                    inspection criteria, documentation, and
                                                  by any of the following methods (unless                 Pike, Rockville, Maryland 20852.                      long-term evaluations. The guidance
                                                  this document describes a different                                                                           includes an action level matrix to direct
                                                  method for submitting comments on a                     B. Submitting Comments
                                                                                                                                                                actions based on the earthquake level
                                                  specified subject):                                       Please include Docket ID NRC–2016–                  and observed damage levels at a nuclear
                                                    • Federal Rulemaking Web site: Go to                  0224 in your comment submission. The                  power plant.
                                                  http://www.regulations.gov and search                   NRC cautions you not to include
                                                  for Docket ID: NRC–2016–0224. Address                   identifying or contact information that               II. Backfitting and Issue Finality
                                                  questions about NRC dockets to Carol                    you do not want to be publicly                           Draft Guide–1337 describes methods
                                                  Gallagher; telephone: 301–415–3463;                     disclosed in your comment submission.                 acceptable to the NRC staff that can be
mstockstill on DSK3G9T082PROD with NOTICES




                                                  email: Carol.Gallagher@nrc.gov. For                     The NRC posts all comment                             used to demonstrate that a nuclear
                                                  technical questions, contact the                        submissions at http://                                power plant is safe for restarting after a
                                                  individual(s) listed in the FOR FURTHER                 www.regulations.gov as well as enters                 shutdown caused by a seismic event.
                                                  INFORMATION CONTACT section of this                     the comment submissions into ADAMS.                   Issuance of this DG, if finalized, would
                                                  document.                                               The NRC does not routinely edit                       not constitute backfitting as defined in
                                                    • Mail comments to: Cindy Bladey,                     comment submissions to remove                         § 50.109 of title 10 of the Code of
                                                  Office of Administration, Mail Stop:                    identifying or contact information.                   Federal Regulations (10 CFR) (the


                                             VerDate Sep<11>2014   18:33 Dec 22, 2016   Jkt 241001   PO 00000   Frm 00122   Fmt 4703   Sfmt 4703   E:\FR\FM\23DEN1.SGM   23DEN1


                                                  94434                          Federal Register / Vol. 81, No. 247 / Friday, December 23, 2016 / Notices

                                                  Backfit Rule) and would not otherwise                      solicit comments on the proposed rule                    (2) The System defines a complex
                                                  be inconsistent with the issue finality                    change from interested persons.                       order as a debit or credit as follows:
                                                  provisions in 10 CFR Part 52. As                                                                                    (A)–(B) No change.
                                                                                                             I. Self-Regulatory Organization’s                        (C) an order for which all pairs and
                                                  discussed in the ‘‘Implementation’’
                                                                                                             Statement of the Terms of Substance of                loners are debits (credits) is a debit
                                                  section of this DG, the NRC has no
                                                                                                             the Proposed Rule Change                              (credit). For purposes of this check, a
                                                  current intention to impose this guide,
                                                  if finalized, on holders of current                           The Exchange proposes to amend the                 ‘‘pair’’ is a pair of legs in an order for
                                                  operating licenses or combined licenses.                   debit/credit price reasonability check                which both legs are calls or both legs are
                                                     This DG may be applied to                               for complex orders. The text of the                   puts, one leg is a buy and one leg is a
                                                  applications for operating licenses,                       proposed rule change is provided                      sell, and [both]the legs have the same
                                                  combined licenses, early site permits,                     below.                                                expiration date but different exercise
                                                  and certified design rules docketed by                     (additions are italicized; deletions are              prices or, for all options except
                                                  the NRC as of the date of issuance of the                  [bracketed])                                          European-style index options, [the same
                                                  final regulatory guide, as well as future                  *     *    *      *     *                             exercise price but ]different expiration
                                                  applications submitted after the                                                                                 dates and the exercise price for the call
                                                  issuance of the regulatory guide. Such                     C2 Options Exchange, Incorporated                     (put) with the farther expiration date is
                                                  action would not constitute backfitting                    Rules                                                 the same as or lower (higher) than the
                                                  as defined in the Backfit Rule or be                                                                             exercise price for the nearer expiration
                                                                                                             *      *      *      *       *                        date. A ‘‘loner’’ is any leg in an order
                                                  otherwise inconsistent with the
                                                  applicable issue finality provision in 10                  Rule 6.13. Complex Order Execution                    that the System cannot pair with
                                                  CFR part 52, inasmuch as such                                                                                    another leg in the order (including legs
                                                                                                                (a)–(c) No change.
                                                  applicants or potential applicants are                                                                           in orders for European-style index
                                                                                                             . . . Interpretations and Policies:                   options that have the same exercise
                                                  not within the scope of entities
                                                  protected by the Backfit Rule or the                          .01–.03 No change.                                 price but different expiration dates). The
                                                                                                                .04 Price Check Parameters: On a                   System treats the stock leg of a stock-
                                                  relevant issue finality provisions in part
                                                                                                             class-by-class basis, the Exchange may                option order as a loner.
                                                  52.
                                                                                                             determine (and announce via Regulatory                   (i) No change.
                                                     Dated at Rockville, Maryland, this 19th day             Circular) which of the following price                   (ii) The System then, for all options
                                                  of December, 2016.                                         check parameters will apply to eligible               except European-style index options,
                                                     For the Nuclear Regulatory Commission.                  complex orders. Paragraphs (b), (e) and               pairs legs to the extent possible [with
                                                  Thomas H. Boyce,                                           (g) will not be applicable to stock-option            the same exercise prices ]across
                                                  Chief, Regulatory Guidance and Generic                     orders.                                               expiration dates, pairing one [leg]call
                                                  Issues Branch, Division of Engineering, Office                For purposes of this Interpretation                (put) with the [leg]call (put) that has the
                                                  of Nuclear Regulatory Research.                            and Policy .04:                                       next nearest expiration date and the
                                                  [FR Doc. 2016–30895 Filed 12–22–16; 8:45 am]                  Vertical Spread. A ‘‘vertical’’ spread is          same or next lower (higher) exercise
                                                  BILLING CODE 7590–01–P                                     a two-legged complex order with one leg               price.
                                                                                                             to buy a number of calls (puts) and one                  (iii) A pair of calls is a credit (debit)
                                                                                                             leg to sell the same number of calls                  if the exercise price of the buy (sell) leg
                                                                                                             (puts) with the same expiration date but              is higher than the exercise price of the
                                                  SECURITIES AND EXCHANGE                                    different exercise prices.                            sell (buy) leg (if the pair has the same
                                                  COMMISSION                                                    Butterfly Spread. A ‘‘butterfly’’ spread           expiration date) or if the expiration date
                                                                                                             is a three-legged complex order with                  of the sell (buy) leg is farther than the
                                                  [Release No. 34–79590; File No. SR–C2–                     two legs to buy (sell) the same number                expiration date of the buy (sell) leg (if
                                                  2016–024]                                                  of calls (puts) and one leg to sell (buy)             the [pair has the same ]exercise price of
                                                                                                             twice as many calls (puts), all with the              the sell (buy) leg is the same as or lower
                                                  Self-Regulatory Organizations; C2                          same expiration date but different                    than the exercise price of the buy (sell)
                                                  Options Exchange, Incorporated;                            exercise prices, and the exercise price of            leg).
                                                  Notice of Filing and Immediate                             the middle leg is between the exercise                   (iv) A pair of puts is a credit (debit)
                                                  Effectiveness of a Proposed Rule                           prices of the other legs. If the exercise             if the exercise price of the sell (buy) leg
                                                  Change Relating to the Debit/Credit                        price of the middle leg is halfway                    is higher than the exercise price of the
                                                  Price Reasonability Check for Complex                      between the exercise prices of the other              buy (sell) leg (if the pair has the same
                                                  Orders                                                     legs, it is a ‘‘true’’ butterfly; otherwise,          expiration date) or if the expiration date
                                                                                                             it is a ‘‘skewed’’ butterfly.                         of the sell (buy) leg is farther than the
                                                  December 19, 2016.                                            Box Spread. A ‘‘box’’ spread is a four-            expiration date of the buy (sell) leg (if
                                                     Pursuant to Section 19(b)(1) of the                     legged complex order with one leg to                  the [pair has the same ]exercise price of
                                                  Securities Exchange Act of 1934                            buy calls and one leg to sell puts with               the sell (buy) leg is the same as or higher
                                                  (‘‘Act’’),1 and Rule 19b–4 thereunder,2                    one strike price, and one leg to sell calls           than the exercise price of the buy (sell)
                                                  notice is hereby given that on December                    and one leg to buy puts with another                  leg).
                                                  9, 2016, C2 Options Exchange,                              strike price, all of which have the same                 (v) No change.
                                                  Incorporated (‘‘Exchange’’ or ‘‘C2’’) filed                expiration date and are for the same                     The System does not apply the check
                                                  with the Securities and Exchange                           number of contracts.                                  in subparagraph (1) to an order for
                                                  Commission (‘‘Commission’’) the
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                To the extent a price check parameter              which the System cannot define
                                                  proposed rule change as described in                       is applicable, the Exchange will not                  whether it is a debit or credit.
                                                  Items I and II below, which Items have                     automatically execute an eligible                        (3)–(5) No change.
                                                  been prepared by the Exchange. The                         complex order that is:                                   (d)–(h) No change.
                                                  Commission is publishing this notice to                       (a)–(b) No change.                                    .05–.07 No change.
                                                                                                                (c) Debit/Credit Price Reasonability               *       *     *     *     *
                                                    1 15   U.S.C. 78s(b)(1).                                 Checks:                                                  The text of the proposed rule change
                                                    2 17   CFR 240.19b–4.                                       (1) No change.                                     is also available on the Exchange’s Web


                                             VerDate Sep<11>2014      18:33 Dec 22, 2016   Jkt 241001   PO 00000   Frm 00123   Fmt 4703   Sfmt 4703   E:\FR\FM\23DEN1.SGM   23DEN1



Document Created: 2016-12-23 12:29:00
Document Modified: 2016-12-23 12:29:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft regulatory guide; extension of comment period.
DatesSubmit comments by February 28, 2017. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time.
ContactThomas Weaver, telephone: 301-415- 2383, email: [email protected]; and Edward O'Donnell, telephone: 301-415-3317, email: [email protected] Both are staff of the Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation81 FR 94433 