81_FR_95377 81 FR 95129 - Town of Alma, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 95129 - Town of Alma, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 248 (December 27, 2016)

Page Range95129-95130
FR Document2016-31093

Federal Register, Volume 81 Issue 248 (Tuesday, December 27, 2016)
[Federal Register Volume 81, Number 248 (Tuesday, December 27, 2016)]
[Notices]
[Pages 95129-95130]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31093]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-5-000]


Town of Alma, Colorado; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On December 15, 2016, the Town of Alma, Colorado filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Alma WTP Hydro Project would have an installed capacity of 25 
kilowatts (kW) and would be located at the end of the Town of Alma's 
existing raw water pipeline. The project would be located near the Town 
of Alma in Park County, Colorado.
    Applicant Contact: Nancy Comer, Town Administrator, Town of Alma, 
Colorado, P.O. Box 1050, Alma, CO 80420, Phone No. (719) 836-2712.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 8-foot long, 6-inch-diameter 
intake pipe teeing off of the existing 8-inch raw water pipeline; (2) a 
proposed powerhouse containing one generating unit with an installed 
capacity of 25-kW; (3) a proposed 8-foot long, 6-inch-diameter 
discharge pipe connected to the existing 8-inch raw water pipeline; and 
(4) appurtenant facilities. The proposed project would have an 
estimated annual generating capacity of 200 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                  Satisfies  (Y/
           Statutory provision                                  Description                             N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA......  The conduit is a tunnel, canal, pipeline, aqueduct,                Y
                                            flume, ditch, or similar manmade water conveyance
                                            that is operated for the distribution of water for
                                            agricultural, municipal, or industrial consumption
                                            and not primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA...  The facility is constructed, operated, or maintained               Y
                                            for the generation of electric power and uses for
                                            such generation only the hydroelectric potential of
                                            a non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA..  The facility has an installed capacity that does not               Y
                                            exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA.  On or before August 9, 2013, the facility is not                   Y
                                            licensed, or exempted from the licensing
                                            requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at

[[Page 95130]]

[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD17-5-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-31093 Filed 12-23-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices                                                 95129

                                                       Docket Numbers: ER17–589–000.                        other information, call (866) 208–3676                and would be located at the end of the
                                                       Applicants: Southwest Power Pool,                    (toll free). For TTY, call (202) 502–8659.            Town of Alma’s existing raw water
                                                    Inc.                                                      Dated: December 20, 2016.                           pipeline. The project would be located
                                                       Description: § 205(d) Rate Filing: 3283              Nathaniel J. Davis, Sr.,                              near the Town of Alma in Park County,
                                                    NextEra Energy and Sunflower Electric                                                                         Colorado.
                                                                                                            Deputy Secretary.
                                                    Meter Agent Agreement to be effective                                                                           Applicant Contact: Nancy Comer,
                                                                                                            [FR Doc. 2016–31147 Filed 12–23–16; 8:45 am]
                                                    12/1/2016.                                                                                                    Town Administrator, Town of Alma,
                                                                                                            BILLING CODE 6717–01–P
                                                       Filed Date: 12/20/16.                                                                                      Colorado, P.O. Box 1050, Alma, CO
                                                                                                                                                                  80420, Phone No. (719) 836–2712.
                                                       Accession Number: 20161220–5110.
                                                                                                                                                                    FERC Contact: Robert Bell, Phone No.
                                                       Comments Due: 5 p.m. ET 1/10/17.                     DEPARTMENT OF ENERGY
                                                                                                                                                                  (202) 502–6062, email: robert.bell@
                                                       The filings are accessible in the                                                                          ferc.gov.
                                                                                                            Federal Energy Regulatory
                                                    Commission’s eLibrary system by                                                                                 Qualifying Conduit Hydropower
                                                                                                            Commission
                                                    clicking on the links or querying the                                                                         Facility Description: The proposed
                                                    docket number.                                          [Docket No. CD17–5–000]                               project would consist of: (1) A proposed
                                                       Any person desiring to intervene or                                                                        8-foot long, 6-inch-diameter intake pipe
                                                    protest in any of the above proceedings                 Town of Alma, Colorado; Notice of
                                                                                                                                                                  teeing off of the existing 8-inch raw
                                                    must file in accordance with Rules 211                  Preliminary Determination of a
                                                                                                                                                                  water pipeline; (2) a proposed
                                                    and 214 of the Commission’s                             Qualifying Conduit Hydropower
                                                                                                                                                                  powerhouse containing one generating
                                                    Regulations (18 CFR 385.211 and                         Facility and Soliciting Comments and
                                                                                                                                                                  unit with an installed capacity of 25-
                                                    385.214) on or before 5:00 p.m. Eastern                 Motions To Intervene
                                                                                                                                                                  kW; (3) a proposed 8-foot long, 6-inch-
                                                    time on the specified comment date.                       On December 15, 2016, the Town of                   diameter discharge pipe connected to
                                                    Protests may be considered, but                         Alma, Colorado filed a notice of intent               the existing 8-inch raw water pipeline;
                                                    intervention is necessary to become a                   to construct a qualifying conduit                     and (4) appurtenant facilities. The
                                                    party to the proceeding.                                hydropower facility, pursuant to section              proposed project would have an
                                                       eFiling is encouraged. More detailed                 30 of the Federal Power Act (FPA), as                 estimated annual generating capacity of
                                                    information relating to filing                          amended by section 4 of the                           200 megawatt-hours.
                                                    requirements, interventions, protests,                  Hydropower Regulatory Efficiency Act                    A qualifying conduit hydropower
                                                    service, and qualifying facilities filings              of 2013 (HREA). The proposed Alma                     facility is one that is determined or
                                                    can be found at: http://www.ferc.gov/                   WTP Hydro Project would have an                       deemed to meet all of the criteria shown
                                                    docs-filing/efiling/filing-req.pdf. For                 installed capacity of 25 kilowatts (kW)               in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                       Satisfies
                                                                Statutory provision                                                            Description                                              (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ..             The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade               Y
                                                                                                         water conveyance that is operated for the distribution of water for agricultural,
                                                                                                         municipal, or industrial consumption and not primarily for the generation of elec-
                                                                                                         tricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                         erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................         Y
                                                      HREA.
                                                    FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-                Y
                                                      HREA.                                             censing requirements of Part I of the FPA.



                                                       Preliminary Determination: Based                     385.214. Any motions to intervene must                Commission’s regulations.1 All
                                                    upon the above criteria, Commission                     be received on or before the specified                comments contesting Commission staff’s
                                                    staff has preliminarily determined that                 deadline date for the particular                      preliminary determination that the
                                                    the proposal satisfies the requirements                 proceeding.                                           facility meets the qualifying criteria
                                                    for a qualifying conduit hydropower                                                                           must set forth their evidentiary basis.
                                                                                                               Filing and Service of Responsive                      The Commission strongly encourages
                                                    facility under 16 U.S.C. 823a, and is
                                                                                                            Documents: All filings must (1) bear in               electronic filing. Please file motions to
                                                    exempted from the licensing
                                                    requirements of the FPA.                                all capital letters the ‘‘COMMENTS                    intervene and comments using the
                                                       Comments and Motions to Intervene:                   CONTESTING QUALIFICATION FOR A                        Commission’s eFiling system at http://
                                                    The deadline for filing comments                        CONDUIT HYDROPOWER FACILITY’’                         www.ferc.gov/docs-filing/efiling.asp.
                                                    contesting whether the facility meets the               or ‘‘MOTION TO INTERVENE,’’ as                        Commenters can submit brief comments
                                                                                                            applicable; (2) state in the heading the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    qualifying criteria is 45 days from the                                                                       up to 6,000 characters, without prior
                                                    issuance date of this notice.                           name of the applicant and the project                 registration, using the eComment system
                                                       The deadline for filing motions to                   number of the application to which the                at http://www.ferc.gov/docs-filing/
                                                    intervene is 30 days from the issuance                  filing responds; (3) state the name,                  ecomment.asp. You must include your
                                                    date of this notice.                                    address, and telephone number of the                  name and contact information at the end
                                                       Anyone may submit comments or a                      person filing; and (4) otherwise comply               of your comments. For assistance,
                                                    motion to intervene in accordance with                  with the requirements of sections                     please contact FERC Online Support at
                                                    the requirements of Rules of Practice                   385.2001 through 385.2005 of the
                                                    and Procedure, 18 CFR 385.210 and                                                                               1 18   CFR 385.2001–2005 (2015).



                                               VerDate Sep<11>2014   20:45 Dec 23, 2016   Jkt 241001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\27DEN1.SGM    27DEN1


                                                    95130                      Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices

                                                    FERCOnlineSupport@ferc.gov, (866)                         Dated: December 20, 2016.                             The project would be located near the
                                                    208–3676 (toll free), or (202) 502–8659                 Kimberly D. Bose,                                       City of Louisville in Boulder County,
                                                    (TTY). In lieu of electronic filing, please             Secretary.                                              Colorado.
                                                    send a paper copy to: Secretary, Federal                [FR Doc. 2016–31093 Filed 12–23–16; 8:45 am]              Applicant Contact: Cory Peterson,
                                                    Energy Regulatory Commission, 888                       BILLING CODE 6717–01–P                                  Water Resources Engineer, City of
                                                    First Street NE., Washington, DC 20426.                                                                         Louisville, Colorado, 749 Main Street,
                                                    A copy of all other filings in reference                                                                        Louisville, CO 80027, Phone No. (303)
                                                    to this application must be accompanied                 DEPARTMENT OF ENERGY                                    335–4610.
                                                    by proof of service on all persons listed                                                                         FERC Contact: Robert Bell, Phone No.
                                                                                                            Federal Energy Regulatory                               (202) 502–6062, email: robert.bell@
                                                    in the service list prepared by the
                                                                                                            Commission                                              ferc.gov.
                                                    Commission in this proceeding, in
                                                    accordance with 18 CFR 4.34(b) and                      [Docket No. CD17–4–000]                                   Qualifying Conduit Hydropower
                                                    385.2010.                                                                                                       Facility Description: The proposed
                                                                                                            City of Louisville, Colorado; Notice of                 project would consist of: (1) A proposed
                                                      Locations of Notice of Intent: Copies                 Preliminary Determination of a                          12-foot long, 24-inch-diameter intake
                                                    of the notice of intent can be obtained                 Qualifying Conduit Hydropower                           pipe teeing off of the existing 14-inch
                                                    directly from the applicant or such                     Facility and Soliciting Comments and                    raw water pipeline; (2) a proposed
                                                    copies can be viewed and reproduced at                  Motions To Intervene                                    powerhouse containing one generating
                                                    the Commission in its Public Reference                                                                          unit with an installed capacity of 34-
                                                                                                              On December 15, 2016, the City of
                                                    Room, Room 2A, 888 First Street NE.,                                                                            kW; (3) a proposed 12-foot long, 24-
                                                                                                            Louisville, Colorado filed a notice of
                                                    Washington, DC 20426. The filing may                                                                            inch-diameter discharge pipe connected
                                                                                                            intent to construct a qualifying conduit
                                                    also be viewed on the web at http://                    hydropower facility, pursuant to section                to the existing 14-inch raw water
                                                    www.ferc.gov/docs-filing/elibrary.asp                   30 of the Federal Power Act (FPA), as                   pipeline; and (4) appurtenant facilities.
                                                    using the ‘‘eLibrary’’ link. Enter the                  amended by section 4 of the                             The proposed project would have an
                                                    docket number (e.g., CD17–5–000) in                     Hydropower Regulatory Efficiency Act                    estimated annual generating capacity of
                                                    the docket number field to access the                   of 2013 (HREA). The proposed SCWTP                      196 megawatt-hours.
                                                    document. For assistance, call toll-free                Hydro Project would have an installed                     A qualifying conduit hydropower
                                                    1–866–208–3676 or email                                 capacity of 34 kilowatts (kW) and would                 facility is one that is determined or
                                                    FERCOnlineSupport@ferc.gov. For TTY,                    be located at the end of the City of                    deemed to meet all of the criteria shown
                                                    call (202) 502–8659.                                    Louisville’s existing raw water pipeline.               in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                     Statutory provision                                                              Description                                    (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ...............           The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar         Y
                                                                                                                    manmade water conveyance that is operated for the distribution of water
                                                                                                                    for agricultural, municipal, or industrial consumption and not primarily for
                                                                                                                    the generation of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA ............           The facility is constructed, operated, or maintained for the generation of           Y
                                                                                                                    electric power and uses for such generation only the hydroelectric poten-
                                                                                                                    tial of a non-federally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended by HREA ...........           The facility has an installed capacity that does not exceed 5 megawatts .....        Y
                                                    FPA 30(a)(3)(C)(iii), as amended by HREA ..........           On or before August 9, 2013, the facility is not licensed, or exempted from          Y
                                                                                                                    the licensing requirements of Part I of the FPA.



                                                       Preliminary Determination: Based                     be received on or before the specified                  preliminary determination that the
                                                    upon the above criteria, Commission                     deadline date for the particular                        facility meets the qualifying criteria
                                                    staff has preliminarily determined that                 proceeding.                                             must set forth their evidentiary basis.
                                                    the proposal satisfies the requirements                    Filing and Service of Responsive                        The Commission strongly encourages
                                                    for a qualifying conduit hydropower                     Documents: All filings must (1) bear in                 electronic filing. Please file motions to
                                                    facility under 16 U.S.C. 823a, and is                   all capital letters the ‘‘COMMENTS                      intervene and comments using the
                                                    exempted from the licensing                             CONTESTING QUALIFICATION FOR A                          Commission’s eFiling system at http://
                                                    requirements of the FPA.                                CONDUIT HYDROPOWER FACILITY’’                           www.ferc.gov/docs-filing/efiling.asp.
                                                       Comments and Motions to Intervene:                   or ‘‘MOTION TO INTERVENE,’’ as                          Commenters can submit brief comments
                                                    The deadline for filing comments                        applicable; (2) state in the heading the                up to 6,000 characters, without prior
                                                    contesting whether the facility meets the               name of the applicant and the project                   registration, using the eComment system
                                                    qualifying criteria is 45 days from the                 number of the application to which the                  at http://www.ferc.gov/docs-filing/
                                                    issuance date of this notice.                           filing responds; (3) state the name,                    ecomment.asp. You must include your
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       The deadline for filing motions to                   address, and telephone number of the                    name and contact information at the end
                                                    intervene is 30 days from the issuance                  person filing; and (4) otherwise comply                 of your comments. For assistance,
                                                    date of this notice.                                    with the requirements of sections                       please contact FERC Online Support at
                                                       Anyone may submit comments or a                      385.2001 through 385.2005 of the                        FERCOnlineSupport@ferc.gov, (866)
                                                    motion to intervene in accordance with                  Commission’s regulations.1 All                          208–3676 (toll free), or (202) 502–8659
                                                    the requirements of Rules of Practice                   comments contesting Commission staff’s                  (TTY). In lieu of electronic filing, please
                                                    and Procedure, 18 CFR 385.210 and                                                                               send a paper copy to: Secretary, Federal
                                                    385.214. Any motions to intervene must                    1 18   CFR 385.2001–2005 (2015).                      Energy Regulatory Commission, 888


                                               VerDate Sep<11>2014   20:45 Dec 23, 2016   Jkt 241001   PO 00000    Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\27DEN1.SGM   27DEN1



Document Created: 2018-02-14 09:13:12
Document Modified: 2018-02-14 09:13:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: