81_FR_95378 81 FR 95130 - City of Louisville, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 95130 - City of Louisville, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 248 (December 27, 2016)

Page Range95130-95131
FR Document2016-31092

Federal Register, Volume 81 Issue 248 (Tuesday, December 27, 2016)
[Federal Register Volume 81, Number 248 (Tuesday, December 27, 2016)]
[Notices]
[Pages 95130-95131]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31092]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-4-000]


City of Louisville, Colorado; Notice of Preliminary Determination 
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On December 15, 2016, the City of Louisville, Colorado filed a 
notice of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed SCWTP Hydro Project would have an installed capacity of 34 
kilowatts (kW) and would be located at the end of the City of 
Louisville's existing raw water pipeline. The project would be located 
near the City of Louisville in Boulder County, Colorado.
    Applicant Contact: Cory Peterson, Water Resources Engineer, City of 
Louisville, Colorado, 749 Main Street, Louisville, CO 80027, Phone No. 
(303) 335-4610.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 12-foot long, 24-inch-diameter 
intake pipe teeing off of the existing 14-inch raw water pipeline; (2) 
a proposed powerhouse containing one generating unit with an installed 
capacity of 34-kW; (3) a proposed 12-foot long, 24-inch-diameter 
discharge pipe connected to the existing 14-inch raw water pipeline; 
and (4) appurtenant facilities. The proposed project would have an 
estimated annual generating capacity of 196 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
              Statutory provision                                 Description                    Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA...........  The conduit is a tunnel, canal, pipeline,                     Y
                                                 aqueduct, flume, ditch, or similar manmade
                                                 water conveyance that is operated for the
                                                 distribution of water for agricultural,
                                                 municipal, or industrial consumption and not
                                                 primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA........  The facility is constructed, operated, or                     Y
                                                 maintained for the generation of electric
                                                 power and uses for such generation only the
                                                 hydroelectric potential of a non-federally
                                                 owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA.......  The facility has an installed capacity that                   Y
                                                 does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA......  On or before August 9, 2013, the facility is                  Y
                                                 not licensed, or exempted from the licensing
                                                 requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888

[[Page 95131]]

First Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD17-4-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-31092 Filed 12-23-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    95130                      Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices

                                                    FERCOnlineSupport@ferc.gov, (866)                         Dated: December 20, 2016.                             The project would be located near the
                                                    208–3676 (toll free), or (202) 502–8659                 Kimberly D. Bose,                                       City of Louisville in Boulder County,
                                                    (TTY). In lieu of electronic filing, please             Secretary.                                              Colorado.
                                                    send a paper copy to: Secretary, Federal                [FR Doc. 2016–31093 Filed 12–23–16; 8:45 am]              Applicant Contact: Cory Peterson,
                                                    Energy Regulatory Commission, 888                       BILLING CODE 6717–01–P                                  Water Resources Engineer, City of
                                                    First Street NE., Washington, DC 20426.                                                                         Louisville, Colorado, 749 Main Street,
                                                    A copy of all other filings in reference                                                                        Louisville, CO 80027, Phone No. (303)
                                                    to this application must be accompanied                 DEPARTMENT OF ENERGY                                    335–4610.
                                                    by proof of service on all persons listed                                                                         FERC Contact: Robert Bell, Phone No.
                                                                                                            Federal Energy Regulatory                               (202) 502–6062, email: robert.bell@
                                                    in the service list prepared by the
                                                                                                            Commission                                              ferc.gov.
                                                    Commission in this proceeding, in
                                                    accordance with 18 CFR 4.34(b) and                      [Docket No. CD17–4–000]                                   Qualifying Conduit Hydropower
                                                    385.2010.                                                                                                       Facility Description: The proposed
                                                                                                            City of Louisville, Colorado; Notice of                 project would consist of: (1) A proposed
                                                      Locations of Notice of Intent: Copies                 Preliminary Determination of a                          12-foot long, 24-inch-diameter intake
                                                    of the notice of intent can be obtained                 Qualifying Conduit Hydropower                           pipe teeing off of the existing 14-inch
                                                    directly from the applicant or such                     Facility and Soliciting Comments and                    raw water pipeline; (2) a proposed
                                                    copies can be viewed and reproduced at                  Motions To Intervene                                    powerhouse containing one generating
                                                    the Commission in its Public Reference                                                                          unit with an installed capacity of 34-
                                                                                                              On December 15, 2016, the City of
                                                    Room, Room 2A, 888 First Street NE.,                                                                            kW; (3) a proposed 12-foot long, 24-
                                                                                                            Louisville, Colorado filed a notice of
                                                    Washington, DC 20426. The filing may                                                                            inch-diameter discharge pipe connected
                                                                                                            intent to construct a qualifying conduit
                                                    also be viewed on the web at http://                    hydropower facility, pursuant to section                to the existing 14-inch raw water
                                                    www.ferc.gov/docs-filing/elibrary.asp                   30 of the Federal Power Act (FPA), as                   pipeline; and (4) appurtenant facilities.
                                                    using the ‘‘eLibrary’’ link. Enter the                  amended by section 4 of the                             The proposed project would have an
                                                    docket number (e.g., CD17–5–000) in                     Hydropower Regulatory Efficiency Act                    estimated annual generating capacity of
                                                    the docket number field to access the                   of 2013 (HREA). The proposed SCWTP                      196 megawatt-hours.
                                                    document. For assistance, call toll-free                Hydro Project would have an installed                     A qualifying conduit hydropower
                                                    1–866–208–3676 or email                                 capacity of 34 kilowatts (kW) and would                 facility is one that is determined or
                                                    FERCOnlineSupport@ferc.gov. For TTY,                    be located at the end of the City of                    deemed to meet all of the criteria shown
                                                    call (202) 502–8659.                                    Louisville’s existing raw water pipeline.               in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                     Statutory provision                                                              Description                                    (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ...............           The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar         Y
                                                                                                                    manmade water conveyance that is operated for the distribution of water
                                                                                                                    for agricultural, municipal, or industrial consumption and not primarily for
                                                                                                                    the generation of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA ............           The facility is constructed, operated, or maintained for the generation of           Y
                                                                                                                    electric power and uses for such generation only the hydroelectric poten-
                                                                                                                    tial of a non-federally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended by HREA ...........           The facility has an installed capacity that does not exceed 5 megawatts .....        Y
                                                    FPA 30(a)(3)(C)(iii), as amended by HREA ..........           On or before August 9, 2013, the facility is not licensed, or exempted from          Y
                                                                                                                    the licensing requirements of Part I of the FPA.



                                                       Preliminary Determination: Based                     be received on or before the specified                  preliminary determination that the
                                                    upon the above criteria, Commission                     deadline date for the particular                        facility meets the qualifying criteria
                                                    staff has preliminarily determined that                 proceeding.                                             must set forth their evidentiary basis.
                                                    the proposal satisfies the requirements                    Filing and Service of Responsive                        The Commission strongly encourages
                                                    for a qualifying conduit hydropower                     Documents: All filings must (1) bear in                 electronic filing. Please file motions to
                                                    facility under 16 U.S.C. 823a, and is                   all capital letters the ‘‘COMMENTS                      intervene and comments using the
                                                    exempted from the licensing                             CONTESTING QUALIFICATION FOR A                          Commission’s eFiling system at http://
                                                    requirements of the FPA.                                CONDUIT HYDROPOWER FACILITY’’                           www.ferc.gov/docs-filing/efiling.asp.
                                                       Comments and Motions to Intervene:                   or ‘‘MOTION TO INTERVENE,’’ as                          Commenters can submit brief comments
                                                    The deadline for filing comments                        applicable; (2) state in the heading the                up to 6,000 characters, without prior
                                                    contesting whether the facility meets the               name of the applicant and the project                   registration, using the eComment system
                                                    qualifying criteria is 45 days from the                 number of the application to which the                  at http://www.ferc.gov/docs-filing/
                                                    issuance date of this notice.                           filing responds; (3) state the name,                    ecomment.asp. You must include your
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       The deadline for filing motions to                   address, and telephone number of the                    name and contact information at the end
                                                    intervene is 30 days from the issuance                  person filing; and (4) otherwise comply                 of your comments. For assistance,
                                                    date of this notice.                                    with the requirements of sections                       please contact FERC Online Support at
                                                       Anyone may submit comments or a                      385.2001 through 385.2005 of the                        FERCOnlineSupport@ferc.gov, (866)
                                                    motion to intervene in accordance with                  Commission’s regulations.1 All                          208–3676 (toll free), or (202) 502–8659
                                                    the requirements of Rules of Practice                   comments contesting Commission staff’s                  (TTY). In lieu of electronic filing, please
                                                    and Procedure, 18 CFR 385.210 and                                                                               send a paper copy to: Secretary, Federal
                                                    385.214. Any motions to intervene must                    1 18   CFR 385.2001–2005 (2015).                      Energy Regulatory Commission, 888


                                               VerDate Sep<11>2014   20:45 Dec 23, 2016   Jkt 241001   PO 00000    Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\27DEN1.SGM   27DEN1


                                                                               Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices                                                95131

                                                    First Street NE., Washington, DC 20426.                 Assessment (EA) for the Project. This                 summaries, and direct links to the
                                                    A copy of all other filings in reference                instant notice identifies the FERC staff’s            documents. Go to www.ferc.gov/docs-
                                                    to this application must be accompanied                 planned schedule for the completion of                filing/esubscription.asp.
                                                    by proof of service on all persons listed               the EA for the Project.                                  Additional information about the
                                                    in the service list prepared by the                                                                           Project is available from the
                                                                                                            Schedule for Environmental Review                     Commission’s Office of External Affairs
                                                    Commission in this proceeding, in
                                                    accordance with 18 CFR 4.34(b) and                      Issuance of EA—March 13, 2017                         at (866) 208–FERC or on the FERC Web
                                                    385.2010.                                               90-day Federal Authorization Decision                 site (www.ferc.gov). Using the
                                                      Locations of Notice of Intent: Copies                    Deadline—June 11, 2017                             ‘‘eLibrary’’ link, select ‘‘General Search’’
                                                    of the notice of intent can be obtained                    If a schedule change becomes                       from the eLibrary menu, enter the
                                                    directly from the applicant or such                     necessary, additional notice will be                  selected date range and ‘‘Docket
                                                    copies can be viewed and reproduced at                  provided so that the relevant agencies                Number’’ excluding the last three digits
                                                    the Commission in its Public Reference                  are kept informed of the Project’s                    (i.e., CP16–498), and follow the
                                                    Room, Room 2A, 888 First Street NE.,                    progress.                                             instructions. For assistance with access
                                                    Washington, DC 20426. The filing may                    Project Description                                   to eLibrary, the helpline can be reached
                                                    also be viewed on the web at http://                                                                          at (866) 208–3676, TTY (202) 502–8659,
                                                    www.ferc.gov/docs-filing/elibrary.asp                     Columbia would abandon in place                     or at FERCOnlineSupport@ferc.gov. The
                                                    using the ‘‘eLibrary’’ link. Enter the                  approximately 17.5 miles of its Line B–               eLibrary link on the FERC Web site also
                                                    docket number (e.g., CD17–4–000) in                     105; replace 14.0 miles of its Line B–                provides access to the texts of formal
                                                    the docket number field to access the                   111; replace 0.1 mile of its Line B–121;              documents issued by the Commission,
                                                    document. For assistance, call toll-free                replace 0.5 mile of its Line B–130;                   such as orders, notices, and rule
                                                    1–866–208–3676 or email                                 construct 7.6 miles of new pipeline Line              makings.
                                                    FERCOnlineSupport@ferc.gov. For TTY,                    K–270 and appurtenant facilities; and
                                                                                                                                                                    Dated: December 20, 2016.
                                                    call (202) 502–8659.                                    modify various point of delivery and
                                                                                                            point of receipt customer interconnects               Kimberly D. Bose,
                                                      Dated: December 20, 2016.                             in Fairfield and Franklin Counties,                   Secretary.
                                                    Kimberly D. Bose,                                       Ohio.                                                 [FR Doc. 2016–31094 Filed 12–23–16; 8:45 am]
                                                    Secretary.                                                                                                    BILLING CODE 6717–01–P
                                                                                                            Background
                                                    [FR Doc. 2016–31092 Filed 12–23–16; 8:45 am]
                                                    BILLING CODE 6717–01–P                                     On May 6, 2016, the Commission
                                                                                                            issued a Notice of Intent to Prepare an               ENVIRONMENTAL PROTECTION
                                                                                                            Environmental Assessment for the                      AGENCY
                                                    DEPARTMENT OF ENERGY                                    Proposed B-System Project and Request
                                                                                                            for Comments on Environmental Issues                  [EPA–HQ–OPP–2016–0122; FRL–9957–37–
                                                    Federal Energy Regulatory                                                                                     OEI]
                                                                                                            (NOI). The NOI was issued during the
                                                    Commission                                              pre-filing review of the Project in Docket            Information Collection Request
                                                    [Docket No. Cp16–498–000; Pf16–4–000]                   No. PF16–4–000 and was sent to                        Submitted to OMB for Review and
                                                                                                            affected landowners; federal, state, and              Approval; Comment Request; Notice of
                                                    Columbia Gas Transmission, LLC;                         local government agencies; elected                    Arrival of Pesticides and Devices
                                                    Notice of Schedule for Environmental                    officials; environmental and public                   Under Section 17(c) of the Federal
                                                    Review of the B-System Project                          interest groups; Native American tribes;              Insecticide, Fungicide, and
                                                                                                            other interested parties; and local                   Rodenticide Act
                                                       On September 9, 2016, Columbia Gas                   libraries and newspapers. In response to
                                                    Transmission, LLC (Columbia) filed an                   the NOI, the Commission received                      AGENCY: Environmental Protection
                                                    application in Docket No. CP16–498–                     comments from one U.S. representative,                Agency (EPA).
                                                    000 requesting a Certificate of Public                  three Ohio state representatives, the                 ACTION: Notice.
                                                    Convenience and Necessity pursuant to                   U.S. Fish and Wildlife Service, the
                                                    Sections 7(b) and 7(c) of the Natural Gas               Miami Tribe of Oklahoma, the Ohio                     SUMMARY:   The Environmental Protection
                                                    Act to abandon, construct, and operate                  Department of Natural Resources,                      Agency has submitted an information
                                                    certain natural gas pipeline facilities.                Columbia Gas of Ohio, Inc., and four                  collection request (ICR), ‘‘Notice of
                                                    The proposed project is known as the B-                 landowners. The primary issues raised                 Arrival of Pesticides and Devices under
                                                    System Project (Project), and would                     by the commentors are pipeline route                  section 17(c) of the Federal Insecticide,
                                                    modernize and upgrade Columbia’s B-                     alternatives, pollinator habitat,                     Fungicide, and Rodenticide Act’’ (EPA
                                                    System pipelines by replacing and                       endangered species, migratory birds,                  ICR No. 0152.12, OMB Control No.
                                                    abandoning old pipeline as well as                      and methods of pipe abandonment.                      2070–0020) to the Office of Management
                                                    constructing new pipeline and                              The Ohio Department of Natural                     and Budget (OMB) for review and
                                                    appurtenant facilities in Fairfield and                 Resources is a cooperating agency in the              approval in accordance with the
                                                    Franklin Counties, Ohio.                                preparation of the EA.                                Paperwork Reduction Act (44 U.S.C.
                                                       On September 21, 2016, the Federal                                                                         3501 et seq.). This is a proposed
                                                    Energy Regulatory Commission                            Additional Information                                extension of the ICR, which is currently
                                                    (Commission or FERC) issued its Notice                     In order to receive notification of the            approved through December 31, 2016.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    of Application for the Project. Among                   issuance of the EA and to keep track of               Public comments were previously
                                                    other things, that notice alerted agencies              all formal issuances and submittals in                requested via the Federal Register (81
                                                    issuing federal authorizations of the                   specific dockets, the Commission offers               FR 22261) on April 15, 2016 during a
                                                    requirement to complete all necessary                   a free service called eSubscription. This             60-day comment period. This notice
                                                    reviews and to reach a final decision on                can reduce the amount of time you                     allows for an additional 30 days for
                                                    a request for a federal authorization                   spend researching proceedings by                      public comments. A fuller description
                                                    within 90 days of the date of issuance                  automatically providing you with                      of the ICR is given below, including its
                                                    of the Commission staff’s Environmental                 notification of these filings, document               estimated burden and cost to the public.


                                               VerDate Sep<11>2014   20:45 Dec 23, 2016   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\27DEN1.SGM   27DEN1



Document Created: 2018-02-14 09:13:39
Document Modified: 2018-02-14 09:13:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 95130 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR