The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 0 to Regulatory Guide (RG) 1.231, ``Acceptance of Commercial- Grade Design and Analysis Computer Programs for Nuclear Power Plants.'' This RG describes methods that the NRC considers acceptable in meeting regulatory requirements for acceptance and dedication of commercial- grade design and analysis computer programs used in safety-related applications for nuclear power plants.

Federal Register, Volume 81 Issue 250 (Thursday, December 29, 2016)
[Federal Register Volume 81, Number 250 (Thursday, December 29, 2016)]
[Notices]
[Pages 96050-96051]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31603]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0153]


Acceptance of Commercial-Grade Design and Analysis Computer 
Programs for Nuclear Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory Guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Revision 0 to Regulatory Guide (RG) 1.231, ``Acceptance of Commercial-
Grade Design and Analysis Computer Programs for Nuclear Power Plants.'' 
This RG describes methods that the NRC considers acceptable in meeting 
regulatory requirements for acceptance and dedication of commercial-
grade design and analysis computer programs used in safety-related 
applications for nuclear power plants.

DATES: Revision 0 to RG 1.231 is available on December 29, 2016.

ADDRESSES: Please refer to Docket ID NRC-2015-0153 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publically-available information related to this document, 
using the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0153. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Document collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this notice (if 
that document is available in ADAMS) is provided the first time that a 
document is referenced. Revision 0 to Regulatory Guide 1.231, and the 
regulatory analysis may be found in ADAMS under Accession Nos. 
ML16126A183 and ML16126A181 respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
    Regulatory guides are not copyrighted, and the NRC's approval is 
not required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Greg Galletti, Office of New Reactors, 
telephone: 301-415-1831; email: [email protected]; and Stephen 
Burton, Office of Nuclear Regulatory Research, telephone: 301-415-7000; 
email: [email protected]. Both are staff of the U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is issuing a new guide in the NRC's ``Regulatory Guide'' 
series. This series was developed to describe and make available to the 
public information regarding methods that are acceptable to the NRC for 
implementing specific parts of the agency's regulations, techniques 
that the NRC uses in evaluating specific issues or postulated events, 
and data that the NRC needs in its review of applications for permits 
and licenses.
    Revision 0 of RG 1.231 was issued with a temporary identification 
of Draft Regulatory Guide, DG-1305. This RG is being issued to endorse 
Revision 1 of EPRI Technical Report 1025243, ``Plant Engineering: 
Guideline for the Acceptance of Commercial-Grade Design and Analysis 
Computer Programs Used in Nuclear Safety-Related Applications,'' with 
respect to acceptance of commercial-grade design and analysis computer 
programs associated with basic components for nuclear power plants.

II. Additional Information

    The NRC published a notice of the availability of DG-1305 in the 
Federal Register on July 1, 2015, (80 FR 37666) for a 60-day public 
comment period. The public comment period closed on August 31, 2015. 
Public comments on DG-1305 and the NRC's responses to the public 
comments are available in ADAMS under Accession No. ML16126A179.

III. Congressional Review Act

    This regulatory guide is a rule as defined in the Congressional 
Review Act (5 U.S.C. 801-808). However, the Office of Management and 
Budget has not found it to be a major rule as defined in the 
Congressional Review Act.

IV. Backfitting and Issue Finality

    This regulatory guide describes acceptable methods for meeting the 
dedication requirements in part 21 of title 10 of the Code of Federal 
Regulations (10 CFR) and Sec.  50.55(e) with respect to design and 
analysis computer programs for nuclear power plants. The regulatory 
guide, does not constitute backfitting as defined in 10 CFR 50.109 (the 
Backfit Rule) and is not otherwise inconsistent with the issue finality 
provisions in 10 CFR part 52, ``Licenses, Certifications and Approvals 
for Nuclear Power Plants.'' This regulatory guide, if finalized, 
represents the first NRC guidance on this subject. Issuance of new 
guidance, by itself, does not represent backfitting unless the NRC 
intends to impose the guidance on existing licensees and currently-
approved design certification rules issued under 10 CFR part 52. The 
NRC does not have such an intention.
    Existing licensees and applicants of final design certification 
rules will not be required to comply with the positions set forth in 
this regulatory guide, unless the licensee or design certification rule 
applicant seeks a voluntary change to its licensing basis with respect 
to safety-related power operated valve actuators, and where the NRC 
determines that the safety review must include consideration of the 
qualification of the valve actuators. Further information on the NRC's 
use of the regulatory guide, is contained in the regulatory guide under 
Section D. Implementation.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue 
finality provisions under 10 CFR part 52--with certain exclusions

[[Page 96051]]

discussed below--were intended to every NRC action which substantially 
changes the expectations of current and future applicants. Therefore, 
the positions in any final regulatory guide, if imposed on applicants, 
would not represent backfitting (except as discussed below).
    The exceptions to the general principle are applicable whenever a 
combined license applicant references a 10 CFR part 52 license (i.e., 
an early site permit or a manufacturing license) and/or 10 CFR part 52 
regulatory approval (i.e., a design certification rule or design 
approval). The NRC does not, at this time, intend to impose the 
positions represented in the regulatory guide in a manner that is 
inconsistent with any issue finality provisions in the 10 CFR part 52 
licenses and regulatory approvals. If, in the future, the NRC seeks to 
impose a position in this regulatory guide in a manner which does not 
provide issue finality as described in the applicable issue finality 
provision, then the NRC must address the criteria for avoiding issue 
finality as described in the applicable issue finality provision.

    Dated at Rockville, Maryland, this 23rd day of December 2016.

    For the Nuclear Regulatory Commission.
Edward O'Donnell,
Acting Chief, Regulatory Guidance and Generic Issues Branch, Division 
of Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2016-31603 Filed 12-28-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                    96050                     Federal Register / Vol. 81, No. 250 / Thursday, December 29, 2016 / Notices

                                                    granted the exemption and issued the                    http://www.nrc.gov/reading-rm/                        II. Additional Information
                                                    amendment that the licensee requested                   adams.html. To begin the search, select                 The NRC published a notice of the
                                                    on December 17, 2015 and                                ‘‘ADAMS Public Documents’’ and then                   availability of DG–1305 in the Federal
                                                    supplemented on September 6, 2016.                      select ‘‘Begin Web-based ADAMS                        Register on July 1, 2015, (80 FR 37666)
                                                       The exemption and amendment were                     Search.’’ For problems with ADAMS,                    for a 60-day public comment period.
                                                    issued on October 31, 2016 as part of a                 please contact the NRC’s Public                       The public comment period closed on
                                                    combined package to the licensee                        Document Room (PDR) reference staff at                August 31, 2015. Public comments on
                                                    (ADAMS Accession No. ML16273A142).                      1–800–397–4209, 301–415–4737, or by                   DG–1305 and the NRC’s responses to
                                                       Dated at Rockville, Maryland, this 19th day          email to pdr.resource@nrc.gov. The                    the public comments are available in
                                                    of December 2016.                                       ADAMS accession number for each                       ADAMS under Accession No.
                                                       For the Nuclear Regulatory Commission.               document referenced in this notice (if                ML16126A179.
                                                    Brian Hughes,                                           that document is available in ADAMS)
                                                                                                            is provided the first time that a                     III. Congressional Review Act
                                                    Acting Chief, Licensing Branch 4, Division
                                                    of New Reactor Licensing, Office of New                 document is referenced. Revision 0 to                   This regulatory guide is a rule as
                                                    Reactors.                                               Regulatory Guide 1.231, and the                       defined in the Congressional Review
                                                    [FR Doc. 2016–31591 Filed 12–28–16; 8:45 am]            regulatory analysis may be found in                   Act (5 U.S.C. 801–808). However, the
                                                    BILLING CODE 7590–01–P                                  ADAMS under Accession Nos.                            Office of Management and Budget has
                                                                                                            ML16126A183 and ML16126A181                           not found it to be a major rule as
                                                                                                            respectively.                                         defined in the Congressional Review
                                                    NUCLEAR REGULATORY                                         • NRC’s PDR: You may examine and                   Act.
                                                    COMMISSION                                              purchase copies of public documents at                IV. Backfitting and Issue Finality
                                                    [NRC–2015–0153]                                         the NRC’s PDR, Room O1–F21, One
                                                                                                                                                                     This regulatory guide describes
                                                                                                            White Flint North, 11555 Rockville
                                                    Acceptance of Commercial-Grade                                                                                acceptable methods for meeting the
                                                                                                            Pike, Rockville, Maryland 20852.
                                                    Design and Analysis Computer                                                                                  dedication requirements in part 21 of
                                                                                                               Regulatory guides are not                          title 10 of the Code of Federal
                                                    Programs for Nuclear Power Plants
                                                                                                            copyrighted, and the NRC’s approval is                Regulations (10 CFR) and § 50.55(e)
                                                    AGENCY:  Nuclear Regulatory                             not required to reproduce them.                       with respect to design and analysis
                                                    Commission.                                                                                                   computer programs for nuclear power
                                                                                                            FOR FURTHER INFORMATION CONTACT:     Greg
                                                    ACTION: Regulatory Guide; issuance.                     Galletti, Office of New Reactors,                     plants. The regulatory guide, does not
                                                                                                            telephone: 301–415–1831; email:                       constitute backfitting as defined in 10
                                                    SUMMARY:   The U.S. Nuclear Regulatory                                                                        CFR 50.109 (the Backfit Rule) and is not
                                                    Commission (NRC) is issuing Revision 0                  greg.galletti@nrc.gov; and Stephen
                                                                                                            Burton, Office of Nuclear Regulatory                  otherwise inconsistent with the issue
                                                    to Regulatory Guide (RG) 1.231,                                                                               finality provisions in 10 CFR part 52,
                                                    ‘‘Acceptance of Commercial-Grade                        Research, telephone: 301–415–7000;
                                                                                                            email: Stephen.Burton@nrc.gov. Both                   ‘‘Licenses, Certifications and Approvals
                                                    Design and Analysis Computer                                                                                  for Nuclear Power Plants.’’ This
                                                    Programs for Nuclear Power Plants.’’                    are staff of the U.S. Nuclear Regulatory
                                                                                                            Commission, Washington, DC 20555–                     regulatory guide, if finalized, represents
                                                    This RG describes methods that the NRC                                                                        the first NRC guidance on this subject.
                                                    considers acceptable in meeting                         0001.
                                                                                                                                                                  Issuance of new guidance, by itself, does
                                                    regulatory requirements for acceptance                  SUPPLEMENTARY INFORMATION:                            not represent backfitting unless the NRC
                                                    and dedication of commercial-grade                                                                            intends to impose the guidance on
                                                    design and analysis computer programs                   I. Introduction                                       existing licensees and currently-
                                                    used in safety-related applications for                                                                       approved design certification rules
                                                    nuclear power plants.                                      The NRC is issuing a new guide in the
                                                                                                                                                                  issued under 10 CFR part 52. The NRC
                                                    DATES: Revision 0 to RG 1.231 is
                                                                                                            NRC’s ‘‘Regulatory Guide’’ series. This
                                                                                                                                                                  does not have such an intention.
                                                    available on December 29, 2016.                         series was developed to describe and
                                                                                                                                                                     Existing licensees and applicants of
                                                                                                            make available to the public information
                                                    ADDRESSES: Please refer to Docket ID                                                                          final design certification rules will not
                                                                                                            regarding methods that are acceptable to
                                                    NRC–2015–0153 when contacting the                                                                             be required to comply with the
                                                                                                            the NRC for implementing specific parts
                                                    NRC about the availability of                                                                                 positions set forth in this regulatory
                                                                                                            of the agency’s regulations, techniques
                                                    information regarding this document.                                                                          guide, unless the licensee or design
                                                                                                            that the NRC uses in evaluating specific
                                                    You may obtain publically-available                                                                           certification rule applicant seeks a
                                                                                                            issues or postulated events, and data
                                                    information related to this document,                                                                         voluntary change to its licensing basis
                                                                                                            that the NRC needs in its review of
                                                    using the following methods:                                                                                  with respect to safety-related power
                                                                                                            applications for permits and licenses.
                                                       • Federal Rulemaking Web site: Go to                                                                       operated valve actuators, and where the
                                                    http://www.regulations.gov and search                      Revision 0 of RG 1.231 was issued                  NRC determines that the safety review
                                                    for Docket ID NRC–2016–0153. Address                    with a temporary identification of Draft              must include consideration of the
                                                    questions about NRC dockets to Carol                    Regulatory Guide, DG–1305. This RG is                 qualification of the valve actuators.
                                                    Gallagher; telephone: 301–415–3463;                     being issued to endorse Revision 1 of                 Further information on the NRC’s use of
                                                    email: Carol.Gallagher@nrc.gov. For                     EPRI Technical Report 1025243, ‘‘Plant                the regulatory guide, is contained in the
                                                    technical questions, contact the                        Engineering: Guideline for the                        regulatory guide under Section D.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    individuals listed in the FOR FURTHER                   Acceptance of Commercial-Grade                        Implementation.
                                                    INFORMATION CONTACT section of this                     Design and Analysis Computer                             Applicants and potential applicants
                                                    document.                                               Programs Used in Nuclear Safety-                      are not, with certain exceptions,
                                                       • NRC’s Agencywide Documents                         Related Applications,’’ with respect to               protected by either the Backfit Rule or
                                                    Access and Management System                            acceptance of commercial-grade design                 any issue finality provisions under 10
                                                    (ADAMS): You may obtain publicly-                       and analysis computer programs                        CFR part 52. Neither the Backfit Rule
                                                    available documents online in the                       associated with basic components for                  nor the issue finality provisions under
                                                    ADAMS Public Document collection at                     nuclear power plants.                                 10 CFR part 52—with certain exclusions


                                               VerDate Sep<11>2014   18:41 Dec 28, 2016   Jkt 241001   PO 00000   Frm 00095   Fmt 4703   Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1


                                                                              Federal Register / Vol. 81, No. 250 / Thursday, December 29, 2016 / Notices                                         96051

                                                    discussed below—were intended to                        January 4, 2017 (Comment due date                     statutory and regulatory requirements
                                                    every NRC action which substantially                    applies to MC2017–64 and CP2017–92;                   include 39 U.S.C. 3632, 39 U.S.C. 3633,
                                                    changes the expectations of current and                 MC2017–65 and CP2017–93; MC2017–                      39 U.S.C. 3642, 39 CFR part 3015, and
                                                    future applicants. Therefore, the                       66 and CP2017–94.                                     39 CFR part 3020, subpart B. Comment
                                                    positions in any final regulatory guide,                ADDRESSES: Submit comments                            deadline(s) for each request appear in
                                                    if imposed on applicants, would not                     electronically via the Commission’s                   section II.
                                                    represent backfitting (except as                        Filing Online system at http://                       II. Docketed Proceeding(s)
                                                    discussed below).                                       www.prc.gov. Those who cannot submit
                                                       The exceptions to the general                        comments electronically should contact                   1. Docket No(s).: MC2017–59 and
                                                    principle are applicable whenever a                     the person identified in the FOR FURTHER              CP2017–87; Filing Title: Request of the
                                                    combined license applicant references a                 INFORMATION CONTACT section by
                                                                                                                                                                  United States Postal Service to Add
                                                    10 CFR part 52 license (i.e., an early site             telephone for advice on filing                        Priority Mail Contract 279 to
                                                    permit or a manufacturing license) and/                 alternatives.                                         Competitive Product List and Notice of
                                                    or 10 CFR part 52 regulatory approval                                                                         Filing (Under Seal) of Unredacted
                                                                                                            FOR FURTHER INFORMATION CONTACT:                      Governors’ Decision, Contract, and
                                                    (i.e., a design certification rule or design
                                                                                                            David A. Trissell, General Counsel, at                Supporting Data; Filing Acceptance
                                                    approval). The NRC does not, at this
                                                                                                            202–789–6820.                                         Date: December 21, 2016; Filing
                                                    time, intend to impose the positions
                                                    represented in the regulatory guide in a                SUPPLEMENTARY INFORMATION:                            Authority: 39 U.S.C. 3642 and 39 CFR
                                                    manner that is inconsistent with any                                                                          3020.30 et seq.; Public Representative:
                                                                                                            Table of Contents
                                                    issue finality provisions in the 10 CFR                                                                       Christopher C. Mohr; Comments Due:
                                                    part 52 licenses and regulatory                         I. Introduction                                       January 3, 2017.
                                                                                                            II. Docketed Proceeding(s)                               2. Docket No(s).: MC2017–60 and
                                                    approvals. If, in the future, the NRC
                                                                                                            I. Introduction                                       CP2017–88; Filing Title: Request of the
                                                    seeks to impose a position in this
                                                                                                                                                                  United States Postal Service to Add
                                                    regulatory guide in a manner which                         The Commission gives notice that the               Priority Mail Contract 280 to
                                                    does not provide issue finality as                      Postal Service filed request(s) for the               Competitive Product List and Notice of
                                                    described in the applicable issue finality              Commission to consider matters related                Filing (Under Seal) of Unredacted
                                                    provision, then the NRC must address                    to negotiated service agreement(s). The               Governors’ Decision, Contract, and
                                                    the criteria for avoiding issue finality as             request(s) may propose the addition or                Supporting Data; Filing Acceptance
                                                    described in the applicable issue finality              removal of a negotiated service                       Date: December 21, 2016; Filing
                                                    provision.                                              agreement from the market dominant or                 Authority: 39 U.S.C. 3642 and 39 CFR
                                                      Dated at Rockville, Maryland, this 23rd day           the competitive product list, or the                  3020.30 et seq.; Public Representative:
                                                    of December 2016.                                       modification of an existing product                   Christopher C. Mohr; Comments Due:
                                                      For the Nuclear Regulatory Commission.                currently appearing on the market                     January 3, 2017.
                                                    Edward O’Donnell,                                       dominant or the competitive product                      3. Docket No(s).: MC2017–61 and
                                                    Acting Chief, Regulatory Guidance and                   list.                                                 CP2017–89; Filing Title: Request of the
                                                    Generic Issues Branch, Division of                         Section II identifies the docket                   United States Postal Service to Add
                                                    Engineering, Office of Nuclear Regulatory               number(s) associated with each Postal                 Priority Mail Contract 281 to
                                                    Research.                                               Service request, the title of each Postal             Competitive Product List and Notice of
                                                    [FR Doc. 2016–31603 Filed 12–28–16; 8:45 am]            Service request, the request’s acceptance             Filing (Under Seal) of Unredacted
                                                    BILLING CODE 7590–01–P                                  date, and the authority cited by the                  Governors’ Decision, Contract, and
                                                                                                            Postal Service for each request. For each             Supporting Data; Filing Acceptance
                                                                                                            request, the Commission appoints an                   Date: December 21, 2016; Filing
                                                    POSTAL REGULATORY COMMISSION                            officer of the Commission to represent                Authority: 39 U.S.C. 3642 and 39 CFR
                                                                                                            the interests of the general public in the            3020.30 et seq.; Public Representative:
                                                    [Docket Nos. MC2017–59 and CP2017–87;                   proceeding, pursuant to 39 U.S.C. 505                 Christopher C. Mohr; Comments Due:
                                                    MC2017–60 and CP2017–88; MC2017–61                      (Public Representative). Section II also              January 3, 2017.
                                                    and CP2017–89; MC2017–62 and CP2017–                    establishes comment deadline(s)                          4. Docket No(s).: MC2017–62 and
                                                    90; MC2017–63 and CP2017–91; MC2017–
                                                                                                            pertaining to each request.                           CP2017–90; Filing Title: Request of the
                                                    64 and CP2017–92; MC2017–65 and
                                                    CP2017–93; MC2017–66 and CP2017–94]
                                                                                                               The public portions of the Postal                  United States Postal Service to Add
                                                                                                            Service’s request(s) can be accessed via              First-Class Package Service Contract 71
                                                    New Postal Products                                     the Commission’s Web site (http://                    to Competitive Product List and Notice
                                                                                                            www.prc.gov). Non-public portions of                  of Filing (Under Seal) of Unredacted
                                                    AGENCY:   Postal Regulatory Commission.                 the Postal Service’s request(s), if any,              Governors’ Decision, Contract, and
                                                    ACTION:   Notice.                                       can be accessed through compliance                    Supporting Data; Filing Acceptance
                                                                                                            with the requirements of 39 CFR                       Date: December 21, 2016; Filing
                                                    SUMMARY:   The Commission is noticing                   3007.40.                                              Authority: 39 U.S.C. 3642 and 39 CFR
                                                    recent Postal Service filings for the                      The Commission invites comments on                 3020.30 et seq.; Public Representative:
                                                    Commission’s consideration concerning                   whether the Postal Service’s request(s)               Max E. Schnidman; Comments Due:
                                                    negotiated service agreements. This                     in the captioned docket(s) are consistent             January 3, 2017.
                                                    notice informs the public of the filing,                with the policies of title 39. For                       5. Docket No(s).: MC2017–63 and
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    invites public comment, and takes other                 request(s) that the Postal Service states             CP2017–91; Filing Title: Request of the
                                                    administrative steps.                                   concern market dominant product(s),                   United States Postal Service to Add
                                                    DATES: Comments are due: January 3,                     applicable statutory and regulatory                   Priority Mail Express & Priority Mail
                                                    2017 (Comment due date applies to                       requirements include 39 U.S.C. 3622, 39               Contract 39 to Competitive Product List
                                                    MC2017–59 and CP2017–87; MC2017–                        U.S.C. 3642, 39 CFR part 3010, and 39                 and Notice of Filing (Under Seal) of
                                                    60 and CP2017–88; MC2017–61 and                         CFR part 3020, subpart B. For request(s)              Unredacted Governors’ Decision,
                                                    CP2017–89; MC2017–62 and CP2017–                        that the Postal Service states concern                Contract, and Supporting Data; Filing
                                                    90; MC2017–63 and CP2017–91); and                       competitive product(s), applicable                    Acceptance Date: December 21, 2016;


                                               VerDate Sep<11>2014   18:41 Dec 28, 2016   Jkt 241001   PO 00000   Frm 00096   Fmt 4703   Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1



Document Created: 2016-12-29 01:58:43
Document Modified: 2016-12-29 01:58:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory Guide; issuance.
DatesRevision 0 to RG 1.231 is available on December 29, 2016.
ContactGreg Galletti, Office of New Reactors, telephone: 301-415-1831; email: [email protected]; and Stephen Burton, Office of Nuclear Regulatory Research, telephone: 301-415-7000; email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.