81_FR_96775 81 FR 96524 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consolidation of Uninterruptible Power Supply System Spare Battery Terminal Boxes

81 FR 96524 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consolidation of Uninterruptible Power Supply System Spare Battery Terminal Boxes

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 251 (December 30, 2016)

Page Range96524-96526
FR Document2016-31714

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 54 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 81 Issue 251 (Friday, December 30, 2016)
[Federal Register Volume 81, Number 251 (Friday, December 30, 2016)]
[Notices]
[Pages 96524-96526]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31714]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Consolidation of Uninterruptible Power 
Supply System Spare Battery Terminal Boxes

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment No. 54 to Combined Licenses (COL), NPF-91 and NPF-92. 
The COLs were issued to Southern Nuclear Operating Company, Inc., and 
Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, 
LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, 
and the City of Dalton, Georgia (the licensee); for construction and 
operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, 
located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then

[[Page 96525]]

select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated April 9, 2015, and available in ADAMS under Accession No. 
ML15099A568.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from Paragraph B of Section III, 
``Scope and Contents,'' of Appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of Title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment No. 54 to COLs, NPF-91 and NPF-
92, to the licensee. The exemption is required by Paragraph A.4 of 
Section VIII, ``Processes for Changes and Departures,'' Appendix D, to 
10 CFR part 52 to allow the licensee to depart from Tier 1 information. 
With the requested amendment, the licensee sought proposed changes to 
the Class 1E direct current (DC) and Uninterruptible Power Supply 
System by replacing four Spare Termination Boxes with a single Spare 
Battery Termination Box. Part of the justification for granting the 
exemption was provided by the review of the amendment. Because the 
exemption is necessary in order to issue the requested license 
amendment, the NRC granted the exemption and issued the amendment 
concurrently, rather than in sequence. This included issuing a combined 
safety evaluation containing the NRC staff's review of both the 
exemption request and the license amendment. The exemption met all 
applicable regulatory criteria set forth in 10 CFR 50.12, 10 CFR 52.7, 
and Section VIII.A.4 of Appendix D to 10 CFR part 52. The license 
amendment was found to be acceptable as well. The combined safety 
evaluation is available in ADAMS under Accession No. ML16202A163.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML16202A128 and 
ML16202A136, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML16202A112 and 
ML16202A118, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated April 9, 2015, the licensee requested from the 
Commission an exemption to allow departures from Tier 1 information in 
the certified DCD incorporated by reference in 10 CFR part 52, Appendix 
D, as part of license amendment request 15-004, ``Consolidation of 
Uninterruptible Power System Spare Battery Termination Boxes.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation that supports this license amendment, which can be found at 
ADAMS Accession Number ML16202A163, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information related to Class 1E DC and 
Uninterruptible Power Supply System, as described in the licensee's 
request dated April 9, 2015. This exemption is related to, and 
necessary for the granting of License Amendment No. 54, which is being 
issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
that supports this license amendment (ADAMS Accession Number 
ML16202A163), this exemption meets the eligibility criteria for 
categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, 
pursuant to 10 CFR 51.22(b), no environmental impact statement or 
environmental assessment needs to be prepared in connection with the 
issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated April 9, 2015, the licensee requested that the NRC 
amend the COLs for VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The 
proposed amendment is described in Section I of this Federal Register 
notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
July 21, 2015 (80 FR 43123). No comments were received during the 30-
day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on April 9, 2015.
    The exemption and amendment were issued on September 20, 2016, as 
part of a combined package to the licensee (ADAMS Accession No. 
ML16202A099).

    Dated at Rockville, Maryland, this 19th day of December 2016.


[[Page 96526]]


    For the Nuclear Regulatory Commission.

Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2016-31714 Filed 12-29-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                96524                       Federal Register / Vol. 81, No. 251 / Friday, December 30, 2016 / Notices

                                                documents for VEGP Units 3 and 4 can                    for categorical exclusion set forth in 10             NUCLEAR REGULATORY
                                                be found in ADAMS under Accession                       CFR 51.22(c)(9). Therefore, pursuant to               COMMISSION
                                                Nos. ML16244A301 and ML16244A324,                       10 CFR 51.22(b), no environmental
                                                                                                                                                              [Docket Nos. 52–025 and 52–026; NRC–
                                                respectively. The exemption is                          impact statement or environmental                     2008–0252]
                                                reproduced (with the exception of                       assessment needs to be prepared in
                                                abbreviated titles and additional                       connection with the issuance of the                   Southern Nuclear Operating Company,
                                                citations) in Section II of this document.              exemption.                                            Inc.; Vogtle Electric Generating Plant,
                                                The amendment documents for COLs                          4. This exemption is effective as of the            Units 3 and 4; Consolidation of
                                                NPF–91 and NPF–92 are available in                      date of its issuance.                                 Uninterruptible Power Supply System
                                                ADAMS under Accession Nos.                                                                                    Spare Battery Terminal Boxes
                                                ML16244A270 and ML16244A283,                            III. License Amendment Request
                                                respectively. A summary of the                                                                                AGENCY:  Nuclear Regulatory
                                                amendment documents is provided in                         By letter dated June 3, 2016, the                  Commission.
                                                Section III of this document.                           licensee requested that the NRC amend                 ACTION: Exemption and combined
                                                                                                        the COLs for VEGP, Units 3 and 4, COLs                license amendment; issuance.
                                                II. Exemption                                           NPF–91 and NPF–92. The proposed
                                                   Reproduced below is the exemption                    amendment is described in Section I of                SUMMARY:    The U.S. Nuclear Regulatory
                                                document issued to VEGP Units 3 and                     this Federal Register notice.                         Commission (NRC) is granting an
                                                Unit 4. It makes reference to the                          The Commission has determined for                  exemption to allow a departure from the
                                                combined safety evaluation that                         these amendments that the application                 certification information of Tier 1 of the
                                                provides the reasoning for the findings                 complies with the standards and                       generic design control document (DCD)
                                                made by the NRC (and listed under Item                  requirements of the Atomic Energy Act                 and is issuing License Amendment No.
                                                1) in order to grant the exemption:                     of 1954, as amended (the Act), and the                54 to Combined Licenses (COL), NPF–
                                                   1. In an application dated June 3,                   Commission’s rules and regulations.                   91 and NPF–92. The COLs were issued
                                                2016, the licensee requested from the                   The Commission has made appropriate                   to Southern Nuclear Operating
                                                Commission an exemption to allow                        findings as required by the Act and the               Company, Inc., and Georgia Power
                                                departures from Tier 1 information in                   Commission’s rules and regulations in                 Company, Oglethorpe Power
                                                the certified DCD incorporated by                       10 CFR Chapter I, which are set forth in              Corporation, MEAG Power SPVM, LLC,
                                                reference in 10 CFR part 52, appendix                   the license amendment.                                MEAG Power SPVJ, LLC, MEAG Power
                                                D, as part of license amendment request                                                                       SPVP, LLC, Authority of Georgia, and
                                                16–008, ‘‘Tier 1 Editorial and                             A notice of consideration of issuance              the City of Dalton, Georgia (the
                                                Consistency Changes.’’                                  of amendment to facility operating                    licensee); for construction and operation
                                                   For the reasons set forth in Section 3               license or COL, as applicable, proposed               of the Vogtle Electric Generating Plant
                                                of the NRC’s Safety Evaluation, which                   no significant hazards consideration                  (VEGP) Units 3 and 4, located in Burke
                                                can be found at ADAMS Accession No.                     determination, and opportunity for a                  County, Georgia.
                                                ML16244A345, the Commission finds                       hearing in connection with these                         The granting of the exemption allows
                                                that:                                                   actions, was published in the Federal                 the changes to Tier 1 information asked
                                                   A. The exemption is authorized by                    Register on August 2, 2016 (81 FR                     for in the amendment. Because the
                                                law;                                                    50729). No comments were received                     acceptability of the exemption was
                                                   B. the exemption presents no undue                   during the 30-day comment period.                     determined in part by the acceptability
                                                risk to public health and safety;                          The Commission has determined that                 of the amendment, the exemption and
                                                   C. the exemption is consistent with                  these amendments satisfy the criteria for             amendment are being issued
                                                the common defense and security;                        categorical exclusion in accordance                   concurrently.
                                                   D. special circumstances are present                 with 10 CFR 51.22. Therefore, pursuant
                                                in that the application of the rule in this                                                                   ADDRESSES:   Please refer to Docket ID
                                                                                                        to 10 CFR 51.22(b), no environmental                  NRC–2008–0252 when contacting the
                                                circumstance is not necessary to serve                  impact statement or environmental
                                                the underlying purpose of the rule;                                                                           NRC about the availability of
                                                                                                        assessment need be prepared for these                 information regarding this document.
                                                   E. the special circumstances outweigh                amendments.
                                                any decrease in safety that may result                                                                        You may obtain publicly-available
                                                from the reduction in standardization                   IV. Conclusion                                        information related to this document
                                                caused by the exemption; and                                                                                  using any of the following methods:
                                                   F. the exemption will not result in a                  Using the reasons set forth in the                     • Federal Rulemaking Web site: Go to
                                                significant decrease in the level of safety             combined safety evaluation, the NRC                   http://www.regulations.gov and search
                                                otherwise provided by the design.                       granted the exemption and issued the                  for Docket ID NRC–2008–0252. Address
                                                   2. Accordingly, the licensee is granted              amendment that the licensee requested                 questions about NRC dockets to Carol
                                                an exemption from the certified DCD                     on June 3, 2016. The exemption and                    Gallagher; telephone: 301–415–3463;
                                                Tier 1 information, with corresponding                  amendment were issued on October 12,                  email: Carol.Gallagher@nrc.gov. For
                                                information in COL Appendix C of the                    2016 as part of a combined package to                 technical questions, contact the
                                                Facility Combined License as described                  the licensee (ADAMS Accession No.                     individual listed in the FOR FURTHER
                                                in the licensee’s request dated June 3,                 ML16308A174).                                         INFORMATION CONTACT section of this
                                                2016. This exemption is related to, and                   Dated at Rockville, Maryland, this 19th day         document.
                                                necessary for the granting of License                                                                            • NRC’s Agencywide Documents
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                        of December 2016.
                                                Amendment No. 56, which is being                                                                              Access and Management System
                                                                                                          For the Nuclear Regulatory Commission.
                                                issued concurrently with this                                                                                 (ADAMS): You may obtain publicly-
                                                                                                        Jennifer Dixon-Herrity,                               available documents online in the
                                                exemption.
                                                   3. As explained in Section 5.0 of the                Chief, Licensing Branch 4, Division of New            ADAMS Public Documents collection at
                                                NRC’s Safety Evaluation (ADAMS                          Reactor Licensing, Office of New Reactors.            http://www.nrc.gov/reading-rm/
                                                Accession No. ML16244A345), this                        [FR Doc. 2016–31720 Filed 12–29–16; 8:45 am]          adams.html. To begin the search, select
                                                exemption meets the eligibility criteria                BILLING CODE 7590–01–P                                ‘‘ADAMS Public Documents’’ and then


                                           VerDate Sep<11>2014   19:18 Dec 29, 2016   Jkt 241001   PO 00000   Frm 00092   Fmt 4703   Sfmt 4703   E:\FR\FM\30DEN1.SGM   30DEN1


                                                                            Federal Register / Vol. 81, No. 251 / Friday, December 30, 2016 / Notices                                             96525

                                                select ‘‘Begin Web-based ADAMS                             Identical exemption documents                      No. 54, which is being issued
                                                Search.’’ For problems with ADAMS,                      (except for referenced unit numbers and               concurrently with this exemption.
                                                please contact the NRC’s Public                         license numbers) were issued to the                     3. As explained in Section 5.0 of the
                                                Document Room (PDR) reference staff at                  licensee for VEGP Units 3 and 4 (COLs                 NRC staff’s Safety Evaluation that
                                                1–800–397–4209, 301–415–4737, or by                     NPF–91 and NPF–92). The exemption                     supports this license amendment
                                                email to pdr.resource@nrc.gov. The                      documents for VEGP Units 3 and 4 can                  (ADAMS Accession Number
                                                ADAMS accession number for each                         be found in ADAMS under Accession                     ML16202A163), this exemption meets
                                                document referenced (if it is available in              Nos. ML16202A128 and ML16202A136,                     the eligibility criteria for categorical
                                                ADAMS) is provided the first time that                  respectively. The exemption is                        exclusion set forth in 10 CFR
                                                it is mentioned in this document. The                   reproduced (with the exception of                     51.22(c)(9). Therefore, pursuant to 10
                                                request for the amendment and                           abbreviated titles and additional                     CFR 51.22(b), no environmental impact
                                                exemption was submitted by letter                       citations) in Section II of this document.            statement or environmental assessment
                                                dated April 9, 2015, and available in                   The amendment documents for COLs                      needs to be prepared in connection with
                                                ADAMS under Accession No.                               NPF–91 and NPF–92 are available in                    the issuance of the exemption.
                                                ML15099A568.                                            ADAMS under Accession Nos.
                                                                                                                                                                4. This exemption is effective as of the
                                                   • NRC’s PDR: You may examine and                     ML16202A112 and ML16202A118,
                                                                                                                                                              date of its issuance.
                                                purchase copies of public documents at                  respectively. A summary of the
                                                the NRC’s PDR, Room O1–F21, One                         amendment documents is provided in                    III. License Amendment Request
                                                White Flint North, 11555 Rockville                      Section III of this document.
                                                                                                                                                                 By letter dated April 9, 2015, the
                                                Pike, Rockville, Maryland 20852.                        II. Exemption                                         licensee requested that the NRC amend
                                                FOR FURTHER INFORMATION CONTACT:                           Reproduced below is the exemption                  the COLs for VEGP, Units 3 and 4, COLs
                                                Chandu Patel, Office of New Reactors,                   document issued to VEGP Units 3 and                   NPF–91 and NPF–92. The proposed
                                                U.S. Nuclear Regulatory Commission,                     Unit 4. It makes reference to the                     amendment is described in Section I of
                                                Washington, DC 20555–0001; telephone:                   combined safety evaluation that                       this Federal Register notice.
                                                301–415–3025; email: Chandu.Patel@                      provides the reasoning for the findings                  The Commission has determined for
                                                nrc.gov.                                                made by the NRC (and listed under Item                these amendments that the application
                                                SUPPLEMENTARY INFORMATION:                              1) in order to grant the exemption:                   complies with the standards and
                                                                                                           1. In a letter dated April 9, 2015, the            requirements of the Atomic Energy Act
                                                I. Introduction                                         licensee requested from the Commission                of 1954, as amended (the Act), and the
                                                   The NRC is granting an exemption                     an exemption to allow departures from                 Commission’s rules and regulations.
                                                from Paragraph B of Section III, ‘‘Scope                Tier 1 information in the certified DCD               The Commission has made appropriate
                                                and Contents,’’ of Appendix D, ‘‘Design                 incorporated by reference in 10 CFR                   findings as required by the Act and the
                                                Certification Rule for the AP1000,’’ to                 part 52, Appendix D, as part of license               Commission’s rules and regulations in
                                                part 52 of Title 10 of the Code of Federal              amendment request 15–004,                             10 CFR Chapter I, which are set forth in
                                                Regulations (10 CFR), and issuing                       ‘‘Consolidation of Uninterruptible                    the license amendment.
                                                License Amendment No. 54 to COLs,                       Power System Spare Battery
                                                                                                                                                                 A notice of consideration of issuance
                                                NPF–91 and NPF–92, to the licensee.                     Termination Boxes.’’
                                                                                                           For the reasons set forth in Section 3.1           of amendment to facility operating
                                                The exemption is required by Paragraph                                                                        license or COL, as applicable, proposed
                                                                                                        of the NRC staff’s Safety Evaluation that
                                                A.4 of Section VIII, ‘‘Processes for                                                                          no significant hazards consideration
                                                                                                        supports this license amendment, which
                                                Changes and Departures,’’ Appendix D,                                                                         determination, and opportunity for a
                                                                                                        can be found at ADAMS Accession
                                                to 10 CFR part 52 to allow the licensee                                                                       hearing in connection with these
                                                                                                        Number ML16202A163, the
                                                to depart from Tier 1 information. With                                                                       actions, was published in the Federal
                                                                                                        Commission finds that:
                                                the requested amendment, the licensee                      A. The exemption is authorized by                  Register on July 21, 2015 (80 FR 43123).
                                                sought proposed changes to the Class 1E                 law;                                                  No comments were received during the
                                                direct current (DC) and Uninterruptible                    B. the exemption presents no undue                 30-day comment period.
                                                Power Supply System by replacing four                   risk to public health and safety;                        The Commission has determined that
                                                Spare Termination Boxes with a single                      C. the exemption is consistent with                these amendments satisfy the criteria for
                                                Spare Battery Termination Box. Part of                  the common defense and security;                      categorical exclusion in accordance
                                                the justification for granting the                         D. special circumstances are present               with 10 CFR 51.22. Therefore, pursuant
                                                exemption was provided by the review                    in that the application of the rule in this           to 10 CFR 51.22(b), no environmental
                                                of the amendment. Because the                           circumstance is not necessary to serve                impact statement or environmental
                                                exemption is necessary in order to issue                the underlying purpose of the rule;                   assessment need be prepared for these
                                                the requested license amendment, the                       E. the special circumstances outweigh              amendments.
                                                NRC granted the exemption and issued                    any decrease in safety that may result
                                                the amendment concurrently, rather                      from the reduction in standardization                 IV. Conclusion
                                                than in sequence. This included issuing                 caused by the exemption; and                             Using the reasons set forth in the
                                                a combined safety evaluation containing                    F. the exemption will not result in a
                                                                                                                                                              combined safety evaluation, the staff
                                                the NRC staff’s review of both the                      significant decrease in the level of safety
                                                                                                                                                              granted the exemption and issued the
                                                exemption request and the license                       otherwise provided by the design.
                                                                                                                                                              amendment that the licensee requested
                                                amendment. The exemption met all                           2. Accordingly, the licensee is granted
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                                                                              on April 9, 2015.
                                                applicable regulatory criteria set forth in             an exemption from the certified DCD
                                                10 CFR 50.12, 10 CFR 52.7, and Section                  Tier 1 information related to Class 1E                   The exemption and amendment were
                                                VIII.A.4 of Appendix D to 10 CFR part                   DC and Uninterruptible Power Supply                   issued on September 20, 2016, as part of
                                                52. The license amendment was found                     System, as described in the licensee’s                a combined package to the licensee
                                                to be acceptable as well. The combined                  request dated April 9, 2015. This                     (ADAMS Accession No. ML16202A099).
                                                safety evaluation is available in ADAMS                 exemption is related to, and necessary                  Dated at Rockville, Maryland, this 19th day
                                                under Accession No. ML16202A163.                        for the granting of License Amendment                 of December 2016.



                                           VerDate Sep<11>2014   19:18 Dec 29, 2016   Jkt 241001   PO 00000   Frm 00093   Fmt 4703   Sfmt 4703   E:\FR\FM\30DEN1.SGM   30DEN1


                                                96526                       Federal Register / Vol. 81, No. 251 / Friday, December 30, 2016 / Notices

                                                   For the Nuclear Regulatory Commission.               braille, large print), please notify                  ACTION:   Notice.
                                                Jennifer Dixon-Herrity,                                 Kimberly Meyer, NRC Disability
                                                                                                        Program Manager, at 301–287–0739, by                  SUMMARY:    The Postal Service gives
                                                Chief, Licensing Branch 4, Division of New
                                                Reactor Licensing, Office of New Reactors.              videophone at 240–428–3217, or by                     notice of filing a request with the Postal
                                                                                                        email at Kimberly.Meyer-Chambers@                     Regulatory Commission to add a
                                                [FR Doc. 2016–31714 Filed 12–29–16; 8:45 am]
                                                                                                        nrc.gov. Determinations on requests for               domestic shipping services contract to
                                                BILLING CODE 7590–01–P
                                                                                                        reasonable accommodation will be                      the list of Negotiated Service
                                                                                                        made on a case-by-case basis.                         Agreements in the Mail Classification
                                                NUCLEAR REGULATORY                                      *     *      *    *      *                            Schedule’s Competitive Products List.
                                                COMMISSION                                                 Members of the public may request to               DATES: Effective date: December 30,
                                                                                                        receive this information electronically.              2016.
                                                [NRC–2016–0001]
                                                                                                        If you would like to be added to the
                                                                                                                                                              FOR FURTHER INFORMATION CONTACT:
                                                Sunshine Act Meeting Notice                             distribution, please contact the Nuclear
                                                                                                                                                              Elizabeth A. Reed, 202–268–3179.
                                                                                                        Regulatory Commission, Office of the
                                                DATES:January 2, 9, 16, 23, 30, 2017.                   Secretary, Washington, DC 20555 (301–                 SUPPLEMENTARY INFORMATION:      The
                                                PLACE:Commissioners’ Conference                         415–1969), or email                                   United States Postal Service® hereby
                                                Room, 11555 Rockville Pike, Rockville,                  Brenda.Akstulewicz@nrc.gov or                         gives notice that, pursuant to 39 U.S.C.
                                                Maryland.                                               Patricia.Jimenez@nrc.gov.                             3642 and 3632(b)(3), on December 22,
                                                                                                                                                              2016, it filed with the Postal Regulatory
                                                STATUS: Public and Closed.                                Dated: December 28, 2016.
                                                                                                                                                              Commission a Request of the United
                                                                                                        Denise L. McGovern,                                   States Postal Service to Add Priority
                                                Week of January 2, 2017
                                                                                                        Policy Coordinator, Office of the Secretary.          Mail Contract 283 to Competitive
                                                  There are no meetings scheduled for                   [FR Doc. 2016–31785 Filed 12–28–16; 11:15 am]         Product List. Documents are available at
                                                the week of January 2, 2017.                            BILLING CODE 7590–01–P                                www.prc.gov, Docket Nos. MC2017–69,
                                                Week of January 9, 2017—Tentative                                                                             CP2017–97.
                                                Friday, January 13, 2017                                                                                      Stanley F. Mires,
                                                                                                        POSTAL SERVICE
                                                9:00 a.m. Briefing on Operator                                                                                Attorney, Federal Compliance.
                                                    Licensing Program (Public                           Product Change—Priority Mail                          [FR Doc. 2016–31673 Filed 12–29–16; 8:45 am]
                                                    Meeting); (Contact: Nancy Salgado:                  Negotiated Service Agreement                          BILLING CODE 7710–12–P
                                                    301–415–1324)
                                                                                                        AGENCY:   Postal ServiceTM.
                                                  This meeting will be webcast live at
                                                the Web address—http://www.nrc.gov/.                    ACTION:   Notice.                                     POSTAL SERVICE

                                                Week of January 16, 2017—Tentative                      SUMMARY:    The Postal Service gives                  Product Change—Priority Mail Express
                                                                                                        notice of filing a request with the Postal            and Priority Mail Negotiated Service
                                                  There are no meetings scheduled for
                                                                                                        Regulatory Commission to add a                        Agreement
                                                the week of January 16, 2017.
                                                                                                        domestic shipping services contract to
                                                Week of January 23, 2017—Tentative                      the list of Negotiated Service                        AGENCY: Postal ServiceTM.
                                                  Monday, January 23, 2017                              Agreements in the Mail Classification                 ACTION: Notice.
                                                10:00 a.m. Discussion of Management                     Schedule’s Competitive Products List.
                                                                                                        DATES: Effective date: December 30,                   SUMMARY:    The Postal Service gives
                                                    and Personnel Issues (Closed Ex. 2
                                                                                                        2016.                                                 notice of filing a request with the Postal
                                                    & 6)
                                                                                                                                                              Regulatory Commission to add a
                                                Week of January 30, 2017—Tentative                      FOR FURTHER INFORMATION CONTACT:                      domestic shipping services contract to
                                                                                                        Elizabeth A. Reed, 202–268–3179.                      the list of Negotiated Service
                                                   There are no meetings scheduled for
                                                                                                        SUPPLEMENTARY INFORMATION:      The                   Agreements in the Mail Classification
                                                the week of January 30, 2017.
                                                                                                        United States Postal Service® hereby                  Schedule’s Competitive Products List.
                                                *      *    *    *     *                                gives notice that, pursuant to 39 U.S.C.
                                                   The schedule for Commission                                                                                DATES: Effective date: December 30,
                                                                                                        3642 and 3632(b)(3), on December 22,                  2016.
                                                meetings is subject to change on short                  2016, it filed with the Postal Regulatory
                                                notice. For more information or to verify               Commission a Request of the United                    FOR FURTHER INFORMATION CONTACT:
                                                the status of meetings, contact Denise                  States Postal Service to Add Priority                 Elizabeth A. Reed, 202–268–3179.
                                                McGovern at 301–415–0981 or via email                   Mail Contract 282 to Competitive
                                                at Denise.McGovern@nrc.gov.                                                                                   SUPPLEMENTARY INFORMATION:      The
                                                                                                        Product List. Documents are available at              United States Postal Service® hereby
                                                *      *    *    *     *                                www.prc.gov, Docket Nos. MC2017–68,                   gives notice that, pursuant to 39 U.S.C.
                                                   The NRC Commission Meeting                           CP2017–96.                                            3642 and 3632(b)(3), on December 22,
                                                Schedule can be found on the Internet                                                                         2016, it filed with the Postal Regulatory
                                                at: http://www.nrc.gov/public-involve/                  Stanley F. Mires,
                                                                                                        Attorney, Federal Compliance.                         Commission a Request of the United
                                                public-meetings/schedule.html.                                                                                States Postal Service to Add Priority
                                                *      *    *    *     *                                [FR Doc. 2016–31672 Filed 12–29–16; 8:45 am]
                                                                                                                                                              Mail Express & Priority Mail Contract 41
                                                   The NRC provides reasonable                          BILLING CODE 7710–12–P
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                                                                              to Competitive Product List. Documents
                                                accommodation to individuals with                                                                             are available at www.prc.gov, Docket
                                                disabilities where appropriate. If you                                                                        Nos. MC2017–67, CP2017–95.
                                                need a reasonable accommodation to                      POSTAL SERVICE
                                                participate in these public meetings, or                                                                      Stanley F. Mires,
                                                                                                        Product Change—Priority Mail                          Attorney, Federal Compliance.
                                                need this meeting notice or the                         Negotiated Service Agreement
                                                transcript or other information from the                                                                      [FR Doc. 2016–31671 Filed 12–29–16; 8:45 am]
                                                public meetings in another format (e.g.                 AGENCY:    Postal ServiceTM.                          BILLING CODE 7710–12–P




                                           VerDate Sep<11>2014   19:18 Dec 29, 2016   Jkt 241001   PO 00000   Frm 00094   Fmt 4703   Sfmt 9990   E:\FR\FM\30DEN1.SGM   30DEN1



Document Created: 2016-12-30 05:16:07
Document Modified: 2016-12-30 05:16:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation81 FR 96524 