82_FR_12160 82 FR 12122 - Information Collection Activities: Application for Permit To Drill (APD, Revised APD), Supplemental APD Information Sheet, and All Supporting Documentation; Submitted for Office of Management and Budget (OMB) Review; Comment Request

82 FR 12122 - Information Collection Activities: Application for Permit To Drill (APD, Revised APD), Supplemental APD Information Sheet, and All Supporting Documentation; Submitted for Office of Management and Budget (OMB) Review; Comment Request

DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement

Federal Register Volume 82, Issue 38 (February 28, 2017)

Page Range12122-12128
FR Document2017-03855

To comply with the Paperwork Reduction Act of 1995 (PRA), the Bureau of Safety and Environmental Enforcement (BSEE) is notifying the public that we have submitted to OMB an information collection request (ICR) to renew approval of the paperwork requirements in the regulations at 30 CFR part 250, Oil and Gas and Sulfur Operations in the Outer Continental Shelf. This notice also provides the public a second opportunity to comment on the revised paperwork burden of these regulatory requirements.

Federal Register, Volume 82 Issue 38 (Tuesday, February 28, 2017)
[Federal Register Volume 82, Number 38 (Tuesday, February 28, 2017)]
[Notices]
[Pages 12122-12128]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-03855]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Safety and Environmental Enforcement

[Docket ID BSEE-2016-0012; OMB Number 1014-0025; 17XE1700DX EEEE500000 
EX1SF0000.DAQ000]


Information Collection Activities: Application for Permit To 
Drill (APD, Revised APD), Supplemental APD Information Sheet, and All 
Supporting Documentation; Submitted for Office of Management and Budget 
(OMB) Review; Comment Request

ACTION: 30-day notice.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), the 
Bureau of Safety and Environmental Enforcement (BSEE) is notifying the 
public that we have submitted to OMB an information collection request 
(ICR) to renew approval of the paperwork requirements in the 
regulations at 30 CFR part 250, Oil and Gas and Sulfur Operations in 
the Outer Continental Shelf. This notice also provides the public a 
second opportunity to comment on the revised paperwork burden of these 
regulatory requirements.

DATE: You must submit comments by March 30, 2017.

ADDRESSES: Submit comments by either fax (202) 395-5806 or email 
([email protected]) directly to the Office of Information and 
Regulatory Affairs, OMB, Attention: Desk Officer for the Department of 
the Interior (1014-0025). Please provide a copy of your comments to 
BSEE by any of the means below.
     Electronically go to http://www.regulations.gov. In the 
Search box, enter BSEE-2016-0012 then click search. Follow the 
instructions to submit public comments and view all related materials. 
We will post all comments.
     Email [email protected], fax (703) 787-1546, or mail or 
hand-carry comments to the Department of the Interior; Bureau of Safety 
and Environmental Enforcement; Regulations and Standards Branch; ATTN: 
Nicole Mason; 45600 Woodland Road, Sterling, VA 20166. Please reference 
ICR 1014-0025 in your comment and include your name and return address.

FOR FURTHER INFORMATION CONTACT: Nicole Mason, Regulations and 
Standards Branch, (703) 787-1607, to request additional information 
about this ICR. To see a copy of the entire ICR submitted to OMB, go to 
http://www.reginfo.gov (select Information Collection Review, Currently 
Under Review).

SUPPLEMENTARY INFORMATION: 
    Title: 30 CFR part 250, Application for Permit to Drill (APD, 
Revised APD), Supplemental APD Information Sheet, and all supporting 
documentation.
    Form(s): BSEE-0123 and -0123S.
    OMB Control Number: 1014-0025.
    Abstract: The Outer Continental Shelf (OCS) Lands Act at 43 U.S.C. 
1334 authorizes the Secretary of the Interior to prescribe rules and 
regulations necessary for the administration of the leasing provisions 
of that Act related to mineral resources on the OCS. Such rules and 
regulations will apply to all operations conducted under a lease, 
right-of-way, or a right-of-use and easement. Operations on the OCS 
must preserve, protect, and develop oil and natural gas resources in a 
manner that is consistent with the need to make such resources 
available to meet the Nation's energy needs as rapidly as possible; to 
balance orderly energy resource development with protection of human, 
marine, and coastal environments; to ensure the public a fair and 
equitable return on the resources of the OCS; and to preserve and 
maintain free enterprise competition.
    In addition to the general rulemaking authority of the OCSLA at 43 
U.S.C. 1334, section 301(a) of the Federal Oil and Gas Royalty 
Management Act (FOGRMA), 30 U.S.C. 1751(a), grants authority to the 
Secretary to prescribe such rules and regulations as are reasonably 
necessary to carry out FOGRMA's provisions. While the majority of 
FOGRMA is directed to royalty collection and enforcement, some 
provisions apply to offshore operations. For example, section 108 of 
FOGRMA, 30 U.S.C. 1718, grants the Secretary broad authority to inspect 
lease sites for the purpose of determining whether there is compliance 
with the mineral leasing laws. Section 109(c)(2) and (d)(1), 30 U.S.C. 
1719(c)(2) and (d)(1), impose substantial civil penalties for failure 
to permit lawful inspections and for knowing or willful preparation or 
submission of false, inaccurate, or misleading reports, records, or 
other information. Because the Secretary has delegated some of the 
authority under FOGRMA to BSEE, 30 U.S.C. 1751 is included as 
additional authority for these requirements.
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and OMB Circular A-25, authorize Federal agencies to recover the 
full cost of services that confer special benefits. Under the 
Department of the Interior's implementing policy, BSEE is required to 
charge fees for services that provide special benefits or privileges to 
an identifiable non-Federal recipient above and beyond those which 
accrue to the public at large. Applications for permits to drill are 
subject to cost recovery, and BSEE regulations specify a service fee 
for this request.
    This authority and responsibility are among those delegated to 
BSEE. The regulations at 30 CFR part 250 stipulates the various 
requirements that must be submitted with forms BSEE-0123, Application 
for Permit to Drill (APD), Revised APD, and BSEE-0123S, Supplemental 
APD Information Sheet. The forms and the numerous submittals included 
with them are the subject of this collection. There are no changes 
being made to the forms with this ICR submission. This request also 
covers any related Notices to Lessees and Operators (NTLs) that BSEE 
issues to clarify, supplement, or provide

[[Page 12123]]

additional guidance on some aspects of our regulations.
    Most responses are mandatory, while some are required to obtain or 
retain a benefit. No questions of a sensitive nature are asked. BSEE 
will protect any confidential commercial or proprietary information 
according to section 26 of OCSLA (43 U.S.C. 1352); the Freedom of 
Information Act (5 U.S.C. 552); and DOI's implementing regulations (43 
CFR 2), and according to 30 CFR 250.197, Data and information to be 
made available to the public or for limited inspection, and 30 CFR part 
252, OCS Oil and Gas Information Program.
    BSEE uses the information from forms BSEE-0123 and BSEE-0123s to 
ensure safe drilling operations and to protect the human, marine, and 
coastal environment. Among other things, BSEE specifically uses the 
information to ensure: The drilling unit is fit for the intended 
purpose; the lessee or operator will not encounter geologic conditions 
that present a hazard to operations; equipment is maintained in a state 
of readiness and meets safety standards; each drilling crew is properly 
trained and able to promptly perform well-control activities at any 
time during well operations; compliance with safety standards; and the 
current regulations will provide for safe and proper field or reservoir 
development, resource evaluation, conservation, protection of 
correlative rights, safety, and environmental protection. We also 
review well records to ascertain whether drilling operations have 
encountered hydrocarbons or H2S and to ensure that H2S detection 
equipment, personnel protective equipment, and training of the crew are 
adequate for safe operations in zones known to contain H2S and zones 
where the presence of H2S is unknown.
    Also, we use the information to determine the conditions of a 
drilling site to avoid hazards inherent in drilling operations. 
Specifically, we use the information to evaluate the adequacy of a 
lessee's or operator's plan and equipment for drilling, sidetracking, 
or deepening operations. This includes the adequacy of the proposed 
casing design, casing setting depths, drilling fluid (mud) programs, 
cementing programs, and BOP systems to ascertain that the proposed 
operations will be conducted in an operationally safe manner that 
provides adequate protection for the environment. The BSEE also reviews 
the information to ensure conformance with specific provisions of the 
lease. In addition, except for proprietary data, BSEE is required by 
the OCS Lands Act to make available to the public certain information 
submitted on Forms BSEE-0123 and -0123S. The information on the forms 
is as follows:

BSEE-0123

    Heading: BSEE uses the information to identify the type of proposed 
drilling activity for which approval is requested.
    Well at Total Depth/Surface: Information utilized to identify the 
location (area, block, lease, latitude and longitude) of the proposed 
drilling activity.
    Significant Markers Anticipated: Identification of significant 
geologic formations, structures and/or horizons that the lessee or 
operator expects to encounter. This information, in conjunction with 
seismic data, is needed to correlate with other wells drilled in the 
area to assess the risks and hazards inherent in drilling operations.
    Question/Information: The information is used to ascertain the 
adequacy of the drilling fluids (mud) program to ensure control of the 
well, the adequacy of the surface casing compliance with EPA offshore 
pollutant discharge requirements and the shut in of adjacent wells to 
ensure safety while moving a rig on and off a drilling location, as 
well that the worst case discharge scenario information reflects the 
well and is updated if applicable. This information is also provided in 
the course of electronically requesting approval of drilling operations 
via eWell.

BSEE-0123S

    Heading: BSEE uses this information to identify the lease operator, 
rig name, rig elevation, water depth, type well (exploratory, 
development), and the presence of H2S and other data which is needed to 
assess operational risks and safety.
    Well Design Information: This engineering data identifies casing 
size, pressure rating, setting depth and current volume, hole size, mud 
weight, blowout preventer (BOP) and well bore designs, formation and 
BOP test data and other criteria. The information is utilized by BSEE 
engineers to verify operational safety and ensure well control to 
prevent blowouts and other hazards to personnel and the environment. 
This form accommodates requested data collection for successive 
sections of the borehole as drilling proceeds toward total depth below 
each intermediate casing point.
    Frequency: On occasion and as required by regulations.
    Description of Respondents: Potential respondents comprise Federal 
OCS oil, gas, or sulfur lessees and/or operators.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this information collection is a total of 63,561 
hours and $862,104 non-hour costs. The following chart details the 
individual components and estimated hour burdens. In calculating the 
burdens, we assumed that respondents perform certain requirements in 
the normal course of their activities. We consider these to be usual 
and customary and took that into account in estimating the burden.
    [Note: In the Burden Table, a Revised APD hour burden is preceded 
by the letter R]

                                                Burden Breakdown
----------------------------------------------------------------------------------------------------------------
                                         Reporting or                                              Annual burden
 Citation 30 CFR 250; application        recordkeeping         Hour burden    Average number of        hours
    for permit to drill (APD)            requirement *                            responses          (rounded)
----------------------------------------------------------------------------------------------------------------
                                                        Non-hour cost burden
----------------------------------------------------------------------------------------------------------------
Subparts A, C, D, E, G, H, P.....  Apply for permit to                    1  408 applications...             408
                                    drill, sidetrack,
                                    bypass, or deepen a
                                    well submitted via
                                    Forms BSEE-0123 (APD)
                                    and BSEE-0123S
                                    (Supplemental APD).
                                                            ----------------------------------------------------
                                   (This burden represents               $2,113 fee x 408 = $862,104
                                    only the filling out of
                                    the forms, the
                                    requirements are listed
                                    separately below.).
----------------------------------------------------------------------------------------------------------------

[[Page 12124]]

 
Subparts D, E, G.................  Obtain approval to                     1  662 submittals.....             662
                                    revise your drilling
                                    plan or change major
                                    drilling equipment by
                                    submitting a Revised
                                    APD and Supplemental
                                    APD [no cost recovery
                                    fee for Revised APDs].
                                    (This burden represents
                                    only the filling out of
                                    the forms, the
                                    requirements are listed
                                    separately below).
----------------------------------------------------------------------------------------------------------------
    Subtotal...............................................................  1,070 responses....           1,070
                                  ------------------------------------------------------------------------------
                                        $862,104 non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                                    Subpart A
----------------------------------------------------------------------------------------------------------------
125..............................  Submit evidence of your     Exempt under 5 CFR 1320.3(h)(1).                0
                                    fee for services
                                    receipt.
----------------------------------------------------------------------------------------------------------------
197..............................  Written confidentiality     Exempt under 5 CFR 1320.5(d)(2).                0
                                    agreement.
----------------------------------------------------------------------------------------------------------------
                                                    Subpart C
----------------------------------------------------------------------------------------------------------------
300(b)(1), (2)...................  Obtain approval to add               150  1 request..........             150
                                    petroleum-based
                                    substance to drilling
                                    mud system or approval
                                    for method of disposal
                                    of drill cuttings,
                                    sand, & other well
                                    solids, including those
                                    containing NORM.
----------------------------------------------------------------------------------------------------------------
    Subtotal for C.........................................................  1 response.........             150
----------------------------------------------------------------------------------------------------------------
                                                    Subpart D
----------------------------------------------------------------------------------------------------------------
408; 414(h)......................  Request approval of         Burden covered under subpart A,                 0
                                    alternate procedures or               1014-0022.
                                    equipment during
                                    drilling operations.
----------------------------------------------------------------------------------------------------------------
409..............................  Request departure                      1  367 approvals......             367
                                    approval from the
                                    drilling requirements
                                    specified in this
                                    subpart; identify and
                                    discuss.
----------------------------------------------------------------------------------------------------------------
410(b); 417(b); 713..............  Reference well and site-               8  1 submittal........               8
                                    specific information in
                                    case it is not approved
                                    in your Exploration
                                    Plan, Development and
                                    Production Plan,
                                    Development Operations
                                    Coordination Document.
                                    Burdens pertaining to
                                    EPs, DPPs, DOCDs are
                                    covered under BOEM 1010-
                                    0151.
----------------------------------------------------------------------------------------------------------------
410(d)...........................  Submit to the District               0.5  380 submittals.....             190
                                    Manager: An original
                                    and two complete copies
                                    of APD and Supplemental
                                    APD; separate public
                                    information copy of
                                    forms per Sec.
                                    250.186.
                                                            ----------------------------------------------------
                                                                      R-0.5  380 submittals.....             190
----------------------------------------------------------------------------------------------------------------
411; 412.........................  Submit plat showing                    2  380 submittals.....             760
                                    location of the
                                    proposed well and all
                                    the plat requirements
                                    associated with this
                                    section.
----------------------------------------------------------------------------------------------------------------
411; 413; 414; 415; 420..........  Submit design criteria                15  707 submittals.....          10,605
                                    used and all
                                    description
                                    requirements;
                                  --------------------------
                                   drilling prognosis with
                                    description of the
                                    procedures you will
                                    follow; and
----------------------------------------------------------------------------------------------------------------
                                   casing and cementing
                                    program requirements.
----------------------------------------------------------------------------------------------------------------
411; 416; 731....................  Submit diverter and BOP               11  380 submittals.....           4,180
                                    systems descriptions
                                    and all the regulatory
                                    requirements associated
                                    with this section.
----------------------------------------------------------------------------------------------------------------
411; 713.........................  Provide information for               10  682 submittals.....           6,820
                                    using a MODU and all
                                    the regulatory
                                    requirements associated
                                    with this section.
----------------------------------------------------------------------------------------------------------------

[[Page 12125]]

 
411; 418.........................  Additional information                20  380 submittals.....           7,600
                                    required when providing
                                    an APD include, but not
                                    limited to, rated
                                    capacities of drilling
                                    rig and equipment if
                                    not already on file;
                                    drilling fluids
                                    program, including
                                    weight materials;
                                    directional plot; H2S
                                    contingency plan;
                                    welding plan; and
                                    information we may
                                    require per
                                    requirements, etc.
----------------------------------------------------------------------------------------------------------------
420(a)(7)........................  Include signed                         3  1,034 certification           3,102
                                    registered professional
                                    engineer certification
                                    and related information.
----------------------------------------------------------------------------------------------------------------
423(c)...........................  Submit for approval                    3  527 procedures &              1,581
                                    casing pressure test                      criteria.
                                    procedures and
                                    criteria. On casing
                                    seal assembly ensure
                                    proper installation of
                                    casing or liner (subsea
                                    BOP's only).
----------------------------------------------------------------------------------------------------------------
428(b)...........................  Submit to District                   125  1 submittal........             125
                                    Manager for approval
                                    revised casing setting
                                    depths or hole interval
                                    drilling depth; include
                                    certification by PE.
----------------------------------------------------------------------------------------------------------------
428(k)...........................  Submit a description of              125  1 submittal........             125
                                    the plan to use a
                                    valve(s) on the drive
                                    pipe during cementing
                                    operations for the
                                    conductor casing,
                                    surface casing, or
                                    liner.
----------------------------------------------------------------------------------------------------------------
432..............................  Request departure from                 8  53 requests........             424
                                    diverter requirements;
                                    with discussion and
                                    receive approval.
----------------------------------------------------------------------------------------------------------------
460(a)...........................  Include your projected                17  2 plans............              34
                                    plans if well testing
                                    along with the required
                                    information.
----------------------------------------------------------------------------------------------------------------
462(c)...........................  Submit a description of              125  1 submittal........             125
                                    your source control and
                                    containment
                                    capabilities to the
                                    Regional Supervisor and
                                    receive approval; all
                                    required information.
----------------------------------------------------------------------------------------------------------------
490(c)...........................  Request to classify an                 3  91 requests........             273
                                    area for the presence
                                    of H2S.
                                  ------------------------------------------------------------------------------
                                   Support request with                   3  73 submittals......             219
                                    available information
                                    such as G&G data, well
                                    logs, formation tests,
                                    cores and analysis of
                                    formation fluids.
                                  ------------------------------------------------------------------------------
                                   Submit a request for                   1  4 requests.........               4
                                    reclassification of a
                                    zone when a different
                                    classification is
                                    needed.
----------------------------------------------------------------------------------------------------------------
Alaska Region:...................  Due to the difficulties            2,800  1 request..........           2,800
410; 412 thru 418; 420; 442; 444;   of drilling in Alaska,
 449; 456; 470; 472.                along with the
                                    shortened time window
                                    allowed for drilling,
                                    Alaska hours are done
                                    here as stand-alone
                                    requirements. Also,
                                    note that these
                                    specific hours are
                                    based on the first APD
                                    in Alaska in more than
                                    10 years.
----------------------------------------------------------------------------------------------------------------
    Subpart D subtotal.....................................................  5,445 responses....          39,532
----------------------------------------------------------------------------------------------------------------
                                                    Subpart E
----------------------------------------------------------------------------------------------------------------
513..............................  Obtain written approval                3  288 requests.......             864
                                    to begin well
                                    completion operations.
                                    If completion is
                                    planned and the data
                                    are available you may
                                    submit on forms.
                                                            ----------------------------------------------------
                                                                        R-3  1 request..........               3
                                  ------------------------------------------------------------------------------
                                   Submit description of               18.5  295 submittals.....           5,458
                                    well-completion,
                                    schematics, logs, any
                                    H2S.
                                                            ----------------------------------------------------
                                                                       R-26  1 submittal........              26
----------------------------------------------------------------------------------------------------------------
    Subpart E subtotal.....................................................  585 responses......           6,351
----------------------------------------------------------------------------------------------------------------

[[Page 12126]]

 
                                                    Subpart G
----------------------------------------------------------------------------------------------------------------
701..............................  Identify and discuss        Burden covered under subpart A,                 0
                                    your proposed alternate               1014-0022
                                    procedures or equipment.
----------------------------------------------------------------------------------------------------------------
702..............................  Identify and discuss        Burden covered under subpart A,                 0
                                    departure requests.                   1014-0022
----------------------------------------------------------------------------------------------------------------
713(b)...........................  Submit plat of the rig's             125  1 submittal........             125
                                    anchor pattern for a
                                    moored rig approved in
                                    your EP, DPP, or DOCD.
----------------------------------------------------------------------------------------------------------------
713(e)...........................  Provide contingency plan              10  682 submittals.....           6,820
                                    for using dynamically
                                    positioned MODU and all
                                    the regulatory
                                    requirements associated
                                    with this section.
----------------------------------------------------------------------------------------------------------------
713(g)...........................  Describe specific                     45  1 submittal........              45
                                    current speeds when
                                    implementing rig
                                    shutdown and/or move-
                                    off procedures for
                                    water depths > 400
                                    meters; discussion of
                                    specific measures you
                                    will take to curtail
                                    rig operations/move-off
                                    location.
----------------------------------------------------------------------------------------------------------------
720(b)...........................  Request approval to                    5  518 approval                  2,590
                                    displace kill-weight                      requests.
                                    fluid; include reasons
                                    why along with step-by-
                                    step procedures.
----------------------------------------------------------------------------------------------------------------
721(g)(4)........................  Submit test procedures               2.5  355 submittals 1                888
                                    and criteria for a                  R-4   change.                          4
                                    successful negative
                                    pressure test for
                                    approval. If any
                                    change, submit changes
                                    for approval.
----------------------------------------------------------------------------------------------------------------
724(b)...........................  Submit certification                 109  1 submittal........             109
                                    that you have a real-
                                    time monitoring plan
                                    that meets the criteria
                                    listed.
----------------------------------------------------------------------------------------------------------------
731..............................  Submit complete                      114  1 submittal........             114
                                    description of BOP
                                    system and components;
                                    schematic drawings;
                                    certification by BAVO
                                    (additional BAVO if BOP
                                    is subsea, in HTHP, or
                                    surface on floating
                                    facility); autoshear,
                                    deadman, EDS systems;
                                    certification for MIA
                                    report.
----------------------------------------------------------------------------------------------------------------
733(b)...........................  Describe annulus                      67  1 submittal........              67
                                    monitoring plan; and
                                    how the well will be
                                    secured if leak is
                                    detected.
----------------------------------------------------------------------------------------------------------------
734(b)...........................  Submit verification                 R-64  1 report...........              64
                                    report from BAVO
                                    documenting repairs &
                                    that BOP is fit for
                                    service.
----------------------------------------------------------------------------------------------------------------
734(c)...........................  Submit revision,                    R-66  1 submittal........              66
                                    including all
                                    verifications required,
                                    before drilling out
                                    surface casing.
----------------------------------------------------------------------------------------------------------------
737(a)...........................  Request approval from                  1  358 casing/liner                358
                                    District Manager to                       info.
                                    omit BOP pressure test.
                                    Indicate which casing
                                    strings and liners meet
                                    the criteria for this
                                    request.
----------------------------------------------------------------------------------------------------------------
737(b)(2)........................  Request approval of test               2  353 requests.......             706
                                    pressures (RAM BOPs).
----------------------------------------------------------------------------------------------------------------
737(b)(3)........................  Request approval of       ..............  380 requests.......             760
                                    pressure test (annular
                                    BOPs).
----------------------------------------------------------------------------------------------------------------
737(d)(2)........................  Submit test procedures               2.5  507 submittals.....           1,268
                                    for approval for
                                    surface BOP.
----------------------------------------------------------------------------------------------------------------
737(d)(3); (d)(4)................  Submit test procedures,                2  507 submittals.....           1,014
                                    including how you will
                                    test each ROV
                                    intervention function,
                                    for approval (subsea
                                    BOPs only).
----------------------------------------------------------------------------------------------------------------
737(d)(12).......................  Submit test procedures               2.5  507 submittals.....           1,268
                                    (autoshear and deadman
                                    systems) for approval.
                                    Include documentation
                                    of the controls/
                                    circuitry system used
                                    for each test; describe
                                    how the ROV will be
                                    utilized during this
                                    operation.
----------------------------------------------------------------------------------------------------------------

[[Page 12127]]

 
738(m)...........................  Request approval to use               66  1 request..........              66
                                    additional well control
                                    equipment, including
                                    BAVO report; as well as
                                    other information
                                    required by District
                                    Manager.
----------------------------------------------------------------------------------------------------------------
738(n)...........................  Submit which pipe/                    64  1 submittal........              64
                                    variable bore rams have
                                    no current utility or
                                    well control purposes.
----------------------------------------------------------------------------------------------------------------
    Subpart G subtotal.....................................................  4,177 response.....          16,396
----------------------------------------------------------------------------------------------------------------
                                                    Subpart H
----------------------------------------------------------------------------------------------------------------
807(a)...........................  Submit detailed                       13  1 submittal........              13
                                    information that
                                    demonstrates the SSSVs
                                    and related equipment
                                    are capable of
                                    performing in HPHT.
----------------------------------------------------------------------------------------------------------------
    Subpart H subtotal.....................................................  1 response.........              13
----------------------------------------------------------------------------------------------------------------
                                                    Subpart P
----------------------------------------------------------------------------------------------------------------
Note that for Sulfur Operations, while there may be 49 burden hours listed, we have not had any sulfur leases
 for numerous years, therefore, we have submitted minimal burden.
----------------------------------------------------------------------------------------------------------------
1605(b)(3).......................  Submit information on                  6  1 submittal........               6
                                    the fitness of the
                                    drilling unit.
----------------------------------------------------------------------------------------------------------------
1617.............................  Submit fully completed                40  1 submittal........              40
                                    application (Form BSEE-
                                    0123) include rated
                                    capacities of the
                                    proposed drilling unit
                                    and of major drilling
                                    equipment; as well as
                                    all required
                                    information listed in
                                    this section.
----------------------------------------------------------------------------------------------------------------
1622(b)..........................  Submit description of                  3  1 submittal........               3
                                    well-completion or
                                    workover procedures,
                                    schematic, and if H2S
                                    is present.
----------------------------------------------------------------------------------------------------------------
    Subpart P subtotal.....................................................  3 responses........              49
----------------------------------------------------------------------------------------------------------------
    Total Burden...........................................................  11,282 Responses...          63,561
                                  ------------------------------------------------------------------------------
                                         $862,104 Non Hour Cost Burden
----------------------------------------------------------------------------------------------------------------
* In the future, BSEE may require electronic filing of some submissions.

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: We have 
identified one non-hour cost burden associated with the collection of 
information for a total of $862,104. It is the $2,113 service fee 
required to recover the Federal Government's processing costs of the 
APD. We have not identified any other non-hour cost burdens associated 
with this collection of information.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.,) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et 
seq.,) requires each agency ``. . . to provide notice . . . and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information . . .'' Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    To comply with the public consultation process, on September 22, 
2016, we published a Federal Register notice (81 FR 65399) announcing 
that we would submit this ICR to OMB for approval. The notice provided 
the required 60-day comment period. In addition, Sec.  250.199 provides 
the OMB Control Number for the information collection requirements 
imposed by the regulations and forms. The regulations also inform the 
public that they may comment at any time on the collections of 
information and provides the address to which they should send 
comments. We received no comments in response to the Federal Register 
notice, nor did we receive any unsolicited comments.
    Public Availability of Comments: Before including your address, 
phone number, email address, or other personal identifying information 
in your comment, you should be aware that your entire comment--
including your personal identifying information--may be made publicly 
available at any time. While you can ask us in your comment to withhold 
your personal identifying information from public review, we cannot 
guarantee that we will be able to do so.


[[Page 12128]]


    Dated: February 2, 2017.
Eric Miller,
Acting Deputy Chief, Office of Offshore Regulatory Programs.
[FR Doc. 2017-03855 Filed 2-27-17; 8:45 am]
 BILLING CODE 4310-VH-P



                                                  12122                       Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices

                                                  opportunity to review the Proposed                      opportunity to comment on the revised                 ensure the public a fair and equitable
                                                  NOS. The Proposed NOS sets forth the                    paperwork burden of these regulatory                  return on the resources of the OCS; and
                                                  proposed terms and conditions of the                    requirements.                                         to preserve and maintain free enterprise
                                                  lease sale, including minimum bids,                     DATE:  You must submit comments by                    competition.
                                                  royalty rates, and rental rates.                        March 30, 2017.                                         In addition to the general rulemaking
                                                  DATES: Affected states may comment on                                                                         authority of the OCSLA at 43 U.S.C.
                                                                                                          ADDRESSES: Submit comments by either
                                                  the size, timing, and location of                                                                             1334, section 301(a) of the Federal Oil
                                                                                                          fax (202) 395–5806 or email (OIRA_
                                                  proposed Cook Inlet Sale 244 within 60                                                                        and Gas Royalty Management Act
                                                                                                          Submission@omb.eop.gov) directly to
                                                  days following their receipt of the                                                                           (FOGRMA), 30 U.S.C. 1751(a), grants
                                                                                                          the Office of Information and Regulatory
                                                  Proposed NOS. The Final NOS will be                                                                           authority to the Secretary to prescribe
                                                                                                          Affairs, OMB, Attention: Desk Officer
                                                  published in the Federal Register at                                                                          such rules and regulations as are
                                                                                                          for the Department of the Interior (1014–
                                                  least 30 days prior to the date of bid                                                                        reasonably necessary to carry out
                                                                                                          0025). Please provide a copy of your
                                                  opening. Bid opening is currently                                                                             FOGRMA’s provisions. While the
                                                                                                          comments to BSEE by any of the means
                                                  scheduled for June 21, 2017.                                                                                  majority of FOGRMA is directed to
                                                                                                          below.
                                                                                                                                                                royalty collection and enforcement,
                                                  SUPPLEMENTARY INFORMATION: The                            • Electronically go to http://
                                                  Proposed NOS for Cook Inlet Sale 244                                                                          some provisions apply to offshore
                                                                                                          www.regulations.gov. In the Search box,
                                                  and a Proposed NOS Package containing                                                                         operations. For example, section 108 of
                                                                                                          enter BSEE–2016–0012 then click
                                                  information essential to potential                                                                            FOGRMA, 30 U.S.C. 1718, grants the
                                                                                                          search. Follow the instructions to
                                                  bidders may be obtained from the                                                                              Secretary broad authority to inspect
                                                                                                          submit public comments and view all
                                                  Alaska OCS Region, Bureau of Ocean                                                                            lease sites for the purpose of
                                                                                                          related materials. We will post all
                                                  Energy Management, 3801 Centerpoint                                                                           determining whether there is
                                                                                                          comments.
                                                                                                                                                                compliance with the mineral leasing
                                                  Drive, Ste. 500, Anchorage, Alaska                        • Email kye.mason@bsee.gov, fax
                                                  99508. Telephone: (907) 334–5200. The                                                                         laws. Section 109(c)(2) and (d)(1), 30
                                                                                                          (703) 787–1546, or mail or hand-carry
                                                  Proposed NOS and Proposed NOS                                                                                 U.S.C. 1719(c)(2) and (d)(1), impose
                                                                                                          comments to the Department of the
                                                  Package also are available on BOEM’s                                                                          substantial civil penalties for failure to
                                                                                                          Interior; Bureau of Safety and
                                                  Web site at http://www.boem.gov/Sale-                                                                         permit lawful inspections and for
                                                                                                          Environmental Enforcement;
                                                  244/.                                                                                                         knowing or willful preparation or
                                                                                                          Regulations and Standards Branch;
                                                    Agency Contact: David Diamond,                                                                              submission of false, inaccurate, or
                                                                                                          ATTN: Nicole Mason; 45600 Woodland
                                                  Chief, Leasing Division,                                                                                      misleading reports, records, or other
                                                                                                          Road, Sterling, VA 20166. Please
                                                  david.diamond@boem.gov.                                                                                       information. Because the Secretary has
                                                                                                          reference ICR 1014–0025 in your
                                                                                                                                                                delegated some of the authority under
                                                   Dated: February 16, 2017.                              comment and include your name and
                                                                                                                                                                FOGRMA to BSEE, 30 U.S.C. 1751 is
                                                  Walter D. Cruickshank,                                  return address.
                                                                                                                                                                included as additional authority for
                                                  Acting Director, Bureau of Ocean Energy                 FOR FURTHER INFORMATION CONTACT:                      these requirements.
                                                  Management.                                             Nicole Mason, Regulations and                           The Independent Offices
                                                  [FR Doc. 2017–03548 Filed 2–27–17; 8:45 am]             Standards Branch, (703) 787–1607, to                  Appropriations Act (31 U.S.C. 9701), the
                                                  BILLING CODE 4310–MR–P                                  request additional information about                  Omnibus Appropriations Bill (Pub. L.
                                                                                                          this ICR. To see a copy of the entire ICR             104–133, 110 Stat. 1321, April 26,
                                                                                                          submitted to OMB, go to http://                       1996), and OMB Circular A–25,
                                                  DEPARTMENT OF THE INTERIOR                              www.reginfo.gov (select Information                   authorize Federal agencies to recover
                                                                                                          Collection Review, Currently Under                    the full cost of services that confer
                                                  Bureau of Safety and Environmental                      Review).                                              special benefits. Under the Department
                                                  Enforcement
                                                                                                          SUPPLEMENTARY INFORMATION:                            of the Interior’s implementing policy,
                                                  [Docket ID BSEE–2016–0012; OMB Number                      Title: 30 CFR part 250, Application for            BSEE is required to charge fees for
                                                  1014–0025; 17XE1700DX EEEE500000                        Permit to Drill (APD, Revised APD),                   services that provide special benefits or
                                                  EX1SF0000.DAQ000]                                       Supplemental APD Information Sheet,                   privileges to an identifiable non-Federal
                                                                                                          and all supporting documentation.                     recipient above and beyond those which
                                                  Information Collection Activities:
                                                                                                             Form(s): BSEE–0123 and –0123S.                     accrue to the public at large.
                                                  Application for Permit To Drill (APD,
                                                                                                             OMB Control Number: 1014–0025.                     Applications for permits to drill are
                                                  Revised APD), Supplemental APD
                                                                                                             Abstract: The Outer Continental Shelf              subject to cost recovery, and BSEE
                                                  Information Sheet, and All Supporting
                                                                                                          (OCS) Lands Act at 43 U.S.C. 1334                     regulations specify a service fee for this
                                                  Documentation; Submitted for Office
                                                                                                          authorizes the Secretary of the Interior              request.
                                                  of Management and Budget (OMB)
                                                                                                          to prescribe rules and regulations                      This authority and responsibility are
                                                  Review; Comment Request
                                                                                                          necessary for the administration of the               among those delegated to BSEE. The
                                                  ACTION:   30-day notice.                                leasing provisions of that Act related to             regulations at 30 CFR part 250 stipulates
                                                                                                          mineral resources on the OCS. Such                    the various requirements that must be
                                                  SUMMARY:   To comply with the                           rules and regulations will apply to all               submitted with forms BSEE–0123,
                                                  Paperwork Reduction Act of 1995                         operations conducted under a lease,                   Application for Permit to Drill (APD),
                                                  (PRA), the Bureau of Safety and                         right-of-way, or a right-of-use and                   Revised APD, and BSEE–0123S,
                                                  Environmental Enforcement (BSEE) is                     easement. Operations on the OCS must                  Supplemental APD Information Sheet.
                                                  notifying the public that we have                       preserve, protect, and develop oil and                The forms and the numerous submittals
mstockstill on DSK3G9T082PROD with NOTICES




                                                  submitted to OMB an information                         natural gas resources in a manner that                included with them are the subject of
                                                  collection request (ICR) to renew                       is consistent with the need to make such              this collection. There are no changes
                                                  approval of the paperwork requirements                  resources available to meet the Nation’s              being made to the forms with this ICR
                                                  in the regulations at 30 CFR part 250,                  energy needs as rapidly as possible; to               submission. This request also covers
                                                  Oil and Gas and Sulfur Operations in                    balance orderly energy resource                       any related Notices to Lessees and
                                                  the Outer Continental Shelf. This notice                development with protection of human,                 Operators (NTLs) that BSEE issues to
                                                  also provides the public a second                       marine, and coastal environments; to                  clarify, supplement, or provide


                                             VerDate Sep<11>2014   18:46 Feb 27, 2017   Jkt 241001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM   28FEN1


                                                                              Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices                                                      12123

                                                  additional guidance on some aspects of                  information to evaluate the adequacy of               This information is also provided in the
                                                  our regulations.                                        a lessee’s or operator’s plan and                     course of electronically requesting
                                                     Most responses are mandatory, while                  equipment for drilling, sidetracking, or              approval of drilling operations via
                                                  some are required to obtain or retain a                 deepening operations. This includes the               eWell.
                                                  benefit. No questions of a sensitive                    adequacy of the proposed casing design,
                                                                                                                                                                BSEE–0123S
                                                  nature are asked. BSEE will protect any                 casing setting depths, drilling fluid
                                                  confidential commercial or proprietary                  (mud) programs, cementing programs,                      Heading: BSEE uses this information
                                                  information according to section 26 of                  and BOP systems to ascertain that the                 to identify the lease operator, rig name,
                                                  OCSLA (43 U.S.C. 1352); the Freedom of                  proposed operations will be conducted                 rig elevation, water depth, type well
                                                  Information Act (5 U.S.C. 552); and                     in an operationally safe manner that                  (exploratory, development), and the
                                                  DOI’s implementing regulations (43 CFR                  provides adequate protection for the                  presence of H2S and other data which
                                                  2), and according to 30 CFR 250.197,                    environment. The BSEE also reviews the                is needed to assess operational risks and
                                                  Data and information to be made                         information to ensure conformance with                safety.
                                                  available to the public or for limited                  specific provisions of the lease. In                     Well Design Information: This
                                                  inspection, and 30 CFR part 252, OCS                    addition, except for proprietary data,                engineering data identifies casing size,
                                                  Oil and Gas Information Program.                        BSEE is required by the OCS Lands Act                 pressure rating, setting depth and
                                                     BSEE uses the information from forms                 to make available to the public certain               current volume, hole size, mud weight,
                                                  BSEE–0123 and BSEE–0123s to ensure                      information submitted on Forms BSEE–                  blowout preventer (BOP) and well bore
                                                  safe drilling operations and to protect                 0123 and -0123S. The information on                   designs, formation and BOP test data
                                                  the human, marine, and coastal                          the forms is as follows:                              and other criteria. The information is
                                                  environment. Among other things, BSEE                                                                         utilized by BSEE engineers to verify
                                                                                                          BSEE–0123                                             operational safety and ensure well
                                                  specifically uses the information to
                                                  ensure: The drilling unit is fit for the                  Heading: BSEE uses the information                  control to prevent blowouts and other
                                                  intended purpose; the lessee or operator                to identify the type of proposed drilling             hazards to personnel and the
                                                  will not encounter geologic conditions                  activity for which approval is requested.             environment. This form accommodates
                                                  that present a hazard to operations;                      Well at Total Depth/Surface:                        requested data collection for successive
                                                  equipment is maintained in a state of                   Information utilized to identify the                  sections of the borehole as drilling
                                                  readiness and meets safety standards;                   location (area, block, lease, latitude and            proceeds toward total depth below each
                                                  each drilling crew is properly trained                  longitude) of the proposed drilling                   intermediate casing point.
                                                  and able to promptly perform well-                      activity.                                                Frequency: On occasion and as
                                                  control activities at any time during                     Significant Markers Anticipated:                    required by regulations.
                                                  well operations; compliance with safety                 Identification of significant geologic                   Description of Respondents: Potential
                                                  standards; and the current regulations                  formations, structures and/or horizons                respondents comprise Federal OCS oil,
                                                  will provide for safe and proper field or               that the lessee or operator expects to                gas, or sulfur lessees and/or operators.
                                                  reservoir development, resource                         encounter. This information, in                          Estimated Reporting and
                                                  evaluation, conservation, protection of                 conjunction with seismic data, is                     Recordkeeping Hour Burden: The
                                                  correlative rights, safety, and                         needed to correlate with other wells                  estimated annual hour burden for this
                                                  environmental protection. We also                       drilled in the area to assess the risks and           information collection is a total of
                                                  review well records to ascertain whether                hazards inherent in drilling operations.              63,561 hours and $862,104 non-hour
                                                  drilling operations have encountered                      Question/Information: The                           costs. The following chart details the
                                                  hydrocarbons or H2S and to ensure that                  information is used to ascertain the                  individual components and estimated
                                                  H2S detection equipment, personnel                      adequacy of the drilling fluids (mud)                 hour burdens. In calculating the
                                                  protective equipment, and training of                   program to ensure control of the well,                burdens, we assumed that respondents
                                                  the crew are adequate for safe                          the adequacy of the surface casing                    perform certain requirements in the
                                                  operations in zones known to contain                    compliance with EPA offshore pollutant                normal course of their activities. We
                                                  H2S and zones where the presence of                     discharge requirements and the shut in                consider these to be usual and
                                                  H2S is unknown.                                         of adjacent wells to ensure safety while              customary and took that into account in
                                                     Also, we use the information to                      moving a rig on and off a drilling                    estimating the burden.
                                                  determine the conditions of a drilling                  location, as well that the worst case                    [Note: In the Burden Table, a Revised
                                                  site to avoid hazards inherent in drilling              discharge scenario information reflects               APD hour burden is preceded by the
                                                  operations. Specifically, we use the                    the well and is updated if applicable.                letter R]

                                                                                                                      BURDEN BREAKDOWN
                                                    Citation 30 CFR 250;                                                                                                                                   Annual
                                                                                                                                                                         Average number of
                                                    application for permit              Reporting or recordkeeping requirement *                   Hour burden                                          burden hours
                                                                                                                                                                             responses
                                                        to drill (APD)                                                                                                                                   (rounded)

                                                                                                                                                                      Non-hour cost burden

                                                  Subparts A, C, D, E, G, H,       Apply for permit to drill, sidetrack, bypass, or deep-                       1    408 applications ...............            408
                                                    P.                               en a well submitted via Forms BSEE–0123 (APD)
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                     and BSEE–0123S (Supplemental APD).

                                                                                   (This burden represents only the filling out of the                              $2,113 fee × 408 = $862,104
                                                                                     forms, the requirements are listed separately
                                                                                     below.).




                                             VerDate Sep<11>2014   18:46 Feb 27, 2017   Jkt 241001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM    28FEN1


                                                  12124                                 Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices

                                                                                                                                 BURDEN BREAKDOWN—Continued
                                                     Citation 30 CFR 250;                                                                                                                                                                              Annual
                                                                                                                                                                                                                Average number of
                                                     application for permit                         Reporting or recordkeeping requirement *                                        Hour burden                                                     burden hours
                                                                                                                                                                                                                    responses
                                                         to drill (APD)                                                                                                                                                                              (rounded)

                                                                                                                                                                                                              Non-hour cost burden

                                                  Subparts D, E, G ..............             Obtain approval to revise your drilling plan or                                                           1    662 submittals .................                662
                                                                                               change major drilling equipment by submitting a
                                                                                               Revised APD and Supplemental APD [no cost re-
                                                                                               covery fee for Revised APDs]. (This burden rep-
                                                                                               resents only the filling out of the forms, the re-
                                                                                               quirements are listed separately below).

                                                        Subtotal .........................................................................................................................................   1,070 responses .............                 1,070

                                                                                                                                                                                                                   $862,104 non-hour cost burdens

                                                                                                                                                        Subpart A

                                                  125 ....................................    Submit evidence of your fee for services receipt ......                                    Exempt under 5 CFR 1320.3(h)(1).                                      0

                                                  197 ....................................    Written confidentiality agreement ..............................                           Exempt under 5 CFR 1320.5(d)(2).                                      0

                                                                                                                                                        Subpart C

                                                  300(b)(1), (2) .....................        Obtain approval to add petroleum-based substance                                                      150      1 request ..........................            150
                                                                                               to drilling mud system or approval for method of
                                                                                               disposal of drill cuttings, sand, & other well solids,
                                                                                               including those containing NORM.

                                                        Subtotal for C ...............................................................................................................................       1 response ......................               150

                                                                                                                                                        Subpart D

                                                  408; 414(h) ........................        Request approval of alternate procedures or equip-                                     Burden covered under subpart A, 1014–                                     0
                                                                                                ment during drilling operations.                                                                     0022.

                                                  409 ....................................    Request departure approval from the drilling require-                                                     1    367 approvals ..................                367
                                                                                               ments specified in this subpart; identify and dis-
                                                                                               cuss.

                                                  410(b); 417(b); 713 ...........             Reference well and site-specific information in case                                                      8    1 submittal .......................               8
                                                                                                it is not approved in your Exploration Plan, Devel-
                                                                                                opment and Production Plan, Development Oper-
                                                                                                ations Coordination Document. Burdens per-
                                                                                                taining to EPs, DPPs, DOCDs are covered under
                                                                                                BOEM 1010–0151.

                                                  410(d) ................................     Submit to the District Manager: An original and two                                                    0.5     380 submittals .................                190
                                                                                                complete copies of APD and Supplemental APD;
                                                                                                separate public information copy of forms per
                                                                                                § 250.186.

                                                                                                                                                                                                R–0.5        380 submittals .................                190

                                                  411; 412 ............................       Submit plat showing location of the proposed well                                                         2    380 submittals .................                760
                                                                                                and all the plat requirements associated with this
                                                                                                section.

                                                  411; 413; 414; 415; 420 ...                 Submit design criteria used and all description re-                                                     15     707 submittals .................             10,605
                                                                                                quirements;

                                                                                              drilling prognosis with description of the procedures
                                                                                                 you will follow; and

                                                                                              casing and cementing program requirements.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  411; 416; 731 ....................          Submit diverter and BOP systems descriptions and                                                        11     380 submittals .................              4,180
                                                                                                all the regulatory requirements associated with
                                                                                                this section.

                                                  411; 713 ............................       Provide information for using a MODU and all the                                                        10     682 submittals .................              6,820
                                                                                                regulatory requirements associated with this sec-
                                                                                                tion.



                                             VerDate Sep<11>2014        18:46 Feb 27, 2017         Jkt 241001       PO 00000        Frm 00046       Fmt 4703       Sfmt 4703      E:\FR\FM\28FEN1.SGM             28FEN1


                                                                                       Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices                                                                                  12125

                                                                                                                             BURDEN BREAKDOWN—Continued
                                                     Citation 30 CFR 250;                                                                                                                                                                       Annual
                                                                                                                                                                                                         Average number of
                                                     application for permit                       Reporting or recordkeeping requirement *                                   Hour burden                                                     burden hours
                                                                                                                                                                                                             responses
                                                         to drill (APD)                                                                                                                                                                       (rounded)

                                                                                                                                                                                                      Non-hour cost burden

                                                  411; 418 ............................      Additional information required when providing an                                                20     380 submittals .................               7,600
                                                                                               APD include, but not limited to, rated capacities of
                                                                                               drilling rig and equipment if not already on file;
                                                                                               drilling fluids program, including weight materials;
                                                                                               directional plot; H2S contingency plan; welding
                                                                                               plan; and information we may require per require-
                                                                                               ments, etc.

                                                  420(a)(7) ...........................      Include signed registered professional engineer cer-                                               3    1,034 certification ............               3,102
                                                                                               tification and related information.

                                                  423(c) ................................    Submit for approval casing pressure test procedures                                                3    527 procedures & criteria                      1,581
                                                                                               and criteria. On casing seal assembly ensure
                                                                                               proper installation of casing or liner (subsea
                                                                                               BOP’s only).

                                                  428(b) ................................    Submit to District Manager for approval revised cas-                                           125      1 submittal .......................              125
                                                                                               ing setting depths or hole interval drilling depth;
                                                                                               include certification by PE.

                                                  428(k) ................................    Submit a description of the plan to use a valve(s) on                                          125      1 submittal .......................              125
                                                                                               the drive pipe during cementing operations for the
                                                                                               conductor casing, surface casing, or liner.

                                                  432 ....................................   Request departure from diverter requirements; with                                                 8    53 requests ......................               424
                                                                                              discussion and receive approval.

                                                  460(a) ................................    Include your projected plans if well testing along                                               17     2 plans .............................             34
                                                                                               with the required information.

                                                  462(c) ................................    Submit a description of your source control and con-                                           125      1 submittal .......................              125
                                                                                               tainment capabilities to the Regional Supervisor
                                                                                               and receive approval; all required information.

                                                  490(c) ................................    Request to classify an area for the presence of H2S                                                3    91 requests ......................               273

                                                                                             Support request with available information such as                                                 3    73 submittals ...................                219
                                                                                               G&G data, well logs, formation tests, cores and
                                                                                               analysis of formation fluids.

                                                                                             Submit a request for reclassification of a zone when                                               1    4 requests ........................                4
                                                                                               a different classification is needed.

                                                  Alaska Region: ..................          Due to the difficulties of drilling in Alaska, along with                                   2,800       1 request ..........................           2,800
                                                  410; 412 thru 418; 420;                      the shortened time window allowed for drilling,
                                                    442; 444; 449; 456; 470;                   Alaska hours are done here as stand-alone re-
                                                    472.                                       quirements. Also, note that these specific hours
                                                                                               are based on the first APD in Alaska in more than
                                                                                               10 years.

                                                        Subpart D subtotal .......................................................................................................................   5,445 responses .............                 39,532

                                                                                                                                                   Subpart E

                                                  513 ....................................   Obtain written approval to begin well completion op-                                               3    288 requests ....................                864
                                                                                              erations. If completion is planned and the data
                                                                                              are available you may submit on forms.

                                                                                                                                                                                            R–3      1 request ..........................               3
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                             Submit description of well-completion, schematics,                                            18.5      295 submittals .................               5,458
                                                                                               logs, any H2S.

                                                                                                                                                                                          R–26       1 submittal .......................               26

                                                        Subpart E subtotal .......................................................................................................................   585 responses ................                 6,351




                                             VerDate Sep<11>2014        18:46 Feb 27, 2017       Jkt 241001      PO 00000      Frm 00047       Fmt 4703      Sfmt 4703      E:\FR\FM\28FEN1.SGM           28FEN1


                                                  12126                                Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices

                                                                                                                        BURDEN BREAKDOWN—Continued
                                                     Citation 30 CFR 250;                                                                                                                                                         Annual
                                                                                                                                                                                           Average number of
                                                     application for permit                      Reporting or recordkeeping requirement *                    Hour burden                                                       burden hours
                                                                                                                                                                                               responses
                                                         to drill (APD)                                                                                                                                                         (rounded)

                                                                                                                                                                                        Non-hour cost burden

                                                                                                                                       Subpart G

                                                  701 ....................................   Identify and discuss your proposed alternate proce-              Burden covered under subpart A, 1014–                                       0
                                                                                               dures or equipment.                                                            0022

                                                  702 ....................................   Identify and discuss departure requests ...................      Burden covered under subpart A, 1014–                                       0
                                                                                                                                                                              0022

                                                  713(b) ................................    Submit plat of the rig’s anchor pattern for a moored                             125      1 submittal .......................              125
                                                                                               rig approved in your EP, DPP, or DOCD.

                                                  713(e) ................................    Provide contingency plan for using dynamically posi-                               10     682 submittals .................               6,820
                                                                                               tioned MODU and all the regulatory requirements
                                                                                               associated with this section.

                                                  713(g) ................................    Describe specific current speeds when imple-                                       45     1 submittal .......................               45
                                                                                              menting rig shutdown and/or move-off procedures
                                                                                              for water depths > 400 meters; discussion of spe-
                                                                                              cific measures you will take to curtail rig oper-
                                                                                              ations/move-off location.

                                                  720(b) ................................    Request approval to displace kill-weight fluid; in-                                 5     518 approval requests .....                    2,590
                                                                                              clude reasons why along with step-by-step proce-
                                                                                              dures.

                                                  721(g)(4) ...........................      Submit test procedures and criteria for a successful                             2.5      355 submittals 1 change                          888
                                                                                               negative pressure test for approval. If any                                   R–4                                                          4
                                                                                               change, submit changes for approval.

                                                  724(b) ................................    Submit certification that you have a real-time moni-                             109      1 submittal .......................              109
                                                                                               toring plan that meets the criteria listed.

                                                  731 ....................................   Submit complete description of BOP system and                                   114       1 submittal .......................              114
                                                                                               components; schematic drawings; certification by
                                                                                               BAVO (additional BAVO if BOP is subsea, in
                                                                                               HTHP, or surface on floating facility); autoshear,
                                                                                               deadman, EDS systems; certification for MIA re-
                                                                                               port.

                                                  733(b) ................................    Describe annulus monitoring plan; and how the well                                 67     1 submittal .......................               67
                                                                                              will be secured if leak is detected.

                                                  734(b) ................................    Submit verification report from BAVO documenting                              R–64        1 report ............................             64
                                                                                               repairs & that BOP is fit for service.

                                                  734(c) ................................    Submit revision, including all verifications required,                        R–66        1 submittal .......................               66
                                                                                               before drilling out surface casing.

                                                  737(a) ................................    Request approval from District Manager to omit                                       1    358 casing/liner info ........                   358
                                                                                              BOP pressure test. Indicate which casing strings
                                                                                              and liners meet the criteria for this request.

                                                  737(b)(2) ...........................      Request approval of test pressures (RAM BOPs) ....                                   2    353 requests ....................                706

                                                  737(b)(3) ...........................      Request approval of pressure test (annular BOPs) ..            ........................   380 requests ....................                760

                                                  737(d)(2) ...........................      Submit test procedures for approval for surface                                   2.5     507 submittals .................               1,268
                                                                                               BOP.

                                                  737(d)(3); (d)(4) ................         Submit test procedures, including how you will test                                 2     507 submittals .................               1,014
                                                                                               each ROV intervention function, for approval
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                               (subsea BOPs only).

                                                  737(d)(12) .........................       Submit test procedures (autoshear and deadman                                     2.5     507 submittals .................               1,268
                                                                                               systems) for approval. Include documentation of
                                                                                               the controls/circuitry system used for each test;
                                                                                               describe how the ROV will be utilized during this
                                                                                               operation.




                                             VerDate Sep<11>2014        18:46 Feb 27, 2017      Jkt 241001   PO 00000    Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM             28FEN1


                                                                                       Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices                                                                                     12127

                                                                                                                               BURDEN BREAKDOWN—Continued
                                                    Citation 30 CFR 250;                                                                                                                                                                           Annual
                                                                                                                                                                                                            Average number of
                                                    application for permit                         Reporting or recordkeeping requirement *                                     Hour burden                                                     burden hours
                                                                                                                                                                                                                responses
                                                        to drill (APD)                                                                                                                                                                           (rounded)

                                                                                                                                                                                                          Non-hour cost burden

                                                  738(m) ...............................     Request approval to use additional well control                                                      66     1 request ..........................             66
                                                                                              equipment, including BAVO report; as well as
                                                                                              other information required by District Manager.

                                                  738(n) ................................    Submit which pipe/variable bore rams have no cur-                                                    64     1 submittal .......................              64
                                                                                               rent utility or well control purposes.

                                                        Subpart G subtotal .......................................................................................................................       4,177 response ...............               16,396

                                                                                                                                                     Subpart H

                                                  807(a) ................................    Submit detailed information that demonstrates the                                                    13     1 submittal .......................              13
                                                                                               SSSVs and related equipment are capable of per-
                                                                                               forming in HPHT.

                                                        Subpart H subtotal .......................................................................................................................       1 response ......................                13

                                                                                                                                                      Subpart P

                                                  Note that for Sulfur Operations, while there may be 49 burden hours listed, we have not had any sulfur leases for numerous years,
                                                   therefore, we have submitted minimal burden.

                                                  1605(b)(3) .........................       Submit information on the fitness of the drilling unit                                                 6    1 submittal .......................               6

                                                  1617 ..................................    Submit fully completed application (Form BSEE–                                                       40     1 submittal .......................              40
                                                                                               0123) include rated capacities of the proposed
                                                                                               drilling unit and of major drilling equipment; as
                                                                                               well as all required information listed in this sec-
                                                                                               tion.

                                                  1622(b) ..............................     Submit description of well-completion or workover                                                      3    1 submittal .......................               3
                                                                                               procedures, schematic, and if H2S is present.

                                                        Subpart P subtotal .......................................................................................................................       3 responses ....................                 49

                                                        Total Burden .................................................................................................................................   11,282 Responses .........                   63,561

                                                                                                                                                                                                               $862,104 Non Hour Cost Burden
                                                     * In the future, BSEE may require electronic filing of some submissions.


                                                    Estimated Reporting and                                               agencies concerning each proposed                                         comment at any time on the collections
                                                  Recordkeeping Non-Hour Cost Burden:                                     collection of information . . .’’ Agencies                                of information and provides the address
                                                  We have identified one non-hour cost                                    must specifically solicit comments to:                                    to which they should send comments.
                                                  burden associated with the collection of                                (a) Evaluate whether the collection is                                    We received no comments in response
                                                  information for a total of $862,104. It is                              necessary or useful; (b) evaluate the                                     to the Federal Register notice, nor did
                                                  the $2,113 service fee required to                                      accuracy of the burden of the proposed                                    we receive any unsolicited comments.
                                                  recover the Federal Government’s                                        collection of information; (c) enhance
                                                                                                                                                                                                      Public Availability of Comments:
                                                  processing costs of the APD. We have                                    the quality, usefulness, and clarity of
                                                  not identified any other non-hour cost                                  the information to be collected; and (d)                                  Before including your address, phone
                                                  burdens associated with this collection                                 minimize the burden on the                                                number, email address, or other
                                                  of information.                                                         respondents, including the use of                                         personal identifying information in your
                                                    Public Disclosure Statement: The PRA                                  technology.                                                               comment, you should be aware that
                                                  (44 U.S.C. 3501, et seq.,) provides that                                   To comply with the public                                              your entire comment—including your
                                                  an agency may not conduct or sponsor                                    consultation process, on September 22,                                    personal identifying information—may
                                                  a collection of information unless it                                   2016, we published a Federal Register                                     be made publicly available at any time.
                                                  displays a currently valid OMB control                                  notice (81 FR 65399) announcing that                                      While you can ask us in your comment
                                                  number. Until OMB approves a                                            we would submit this ICR to OMB for                                       to withhold your personal identifying
mstockstill on DSK3G9T082PROD with NOTICES




                                                  collection of information, you are not                                  approval. The notice provided the                                         information from public review, we
                                                  obligated to respond.                                                   required 60-day comment period. In                                        cannot guarantee that we will be able to
                                                    Comments: Section 3506(c)(2)(A) of                                    addition, § 250.199 provides the OMB                                      do so.
                                                  the PRA (44 U.S.C. 3501, et seq.,)                                      Control Number for the information
                                                  requires each agency ‘‘. . . to provide                                 collection requirements imposed by the
                                                  notice . . . and otherwise consult with                                 regulations and forms. The regulations
                                                  members of the public and affected                                      also inform the public that they may


                                             VerDate Sep<11>2014        18:46 Feb 27, 2017        Jkt 241001      PO 00000       Frm 00049       Fmt 4703       Sfmt 4703      E:\FR\FM\28FEN1.SGM            28FEN1


                                                  12128                        Federal Register / Vol. 82, No. 38 / Tuesday, February 28, 2017 / Notices

                                                    Dated: February 2, 2017.                              were subsidized within the meaning of                 DATES:  Comments are encouraged and
                                                  Eric Miller,                                            section 703(b) of the Act (19 U.S.C.                  will be accepted for an additional 30
                                                  Acting Deputy Chief, Office of Offshore                 1671b(b)) and that imports of certain                 days until March 30, 2017.
                                                  Regulatory Programs.                                    new pneumatic off-the-road tires from                 FOR FURTHER INFORMATION CONTACT: If
                                                  [FR Doc. 2017–03855 Filed 2–27–17; 8:45 am]             India were not dumped within the                      you have additional comments
                                                  BILLING CODE 4310–VH–P                                  meaning of 733(b) of the Act (19 U.S.C.               especially on the estimated public
                                                                                                          1673b(b)). Notice of the scheduling of                burden or associated response time,
                                                                                                          the final phase of the Commission’s                   suggestions, or need a copy of the
                                                  INTERNATIONAL TRADE                                     investigations and of a public hearing to             proposed information collection
                                                  COMMISSION                                              be held in connection therewith was                   instrument with instructions or
                                                                                                          given by posting copies of the notice in              additional information, please contact
                                                  [Investigation Nos. 701–TA–552–553 and                  the Office of the Secretary, U.S.
                                                  731–TA–1308 (Final)]                                                                                          Lubna Shirazi, Office of Information
                                                                                                          International Trade Commission,                       Policy, U.S. Department of Justice, Suite
                                                  Certain New Pneumatic Off-the-Road                      Washington, DC, and by publishing the                 11050, 1425 New York Avenue NW.,
                                                  Tires From India and Sri Lanka                          notice in the Federal Register on                     Washington, DC 20530.
                                                                                                          September 12, 2016 (81 FR 62760). The                 SUPPLEMENTARY INFORMATION: Written
                                                  Determinations                                          hearing was held in Washington, DC, on                comments and suggestions from the
                                                     On the basis of the record 1 developed               January 4, 2017, and all persons who                  public and affected agencies concerning
                                                  in the subject investigations, the United               requested the opportunity were                        the proposed collection of information
                                                  States International Trade Commission                   permitted to appear in person or by                   are encouraged. Your comments should
                                                  (‘‘Commission’’) determines, pursuant                   counsel.                                              address one or more of the following
                                                  to the Tariff Act of 1930 (‘‘the Act’’),                  The Commission made these                           four points:
                                                  that an industry in the United States is                determinations pursuant to sections
                                                                                                                                                                —Evaluate whether the proposed
                                                  materially injured by reason of imports                 705(b) and 735(b) of the Act (19 U.S.C.
                                                                                                                                                                  collection of information is necessary
                                                  of certain new pneumatic off-the-road                   1671d(b) and 19 U.S.C. 1673d(b)). It
                                                                                                                                                                  for the proper performance of the
                                                  tires from India, provided for in                       completed and filed its determinations
                                                                                                                                                                  functions of the Bureau of Justice
                                                  headings 4011, 8431, 8709, and 8716 of                  in these investigations on February 23,
                                                                                                                                                                  Statistics, including whether the
                                                  the Harmonized Tariff Schedule of the                   2017. The views of the Commission are
                                                                                                                                                                  information will have practical utility;
                                                  United States, that have been found by                  contained in USITC Publication 4669
                                                                                                                                                                —Evaluate the accuracy of the agency’s
                                                  the Department of Commerce                              (February 2017), entitled Certain New
                                                                                                                                                                  estimate of the burden of the
                                                  (‘‘Commerce’’) to be sold in the United                 Pneumatic Off-the-Road Tires from
                                                                                                                                                                  proposed collection of information,
                                                  States at less than fair value (‘‘LTFV’’)               India and Sri Lanka: Investigation Nos.
                                                                                                                                                                  including the validity of the
                                                  and subsidized by the government of                     701–TA–552–553 and 731–TA–1308
                                                                                                                                                                  methodology and assumptions used;
                                                  India, and by reason of imports of                      (Final).
                                                                                                                                                                —Evaluate whether and if so how the
                                                  certain new pneumatic off-the-road tires                  By order of the Commission.                           quality, utility, and clarity of the
                                                  found by Commerce to be subsidized by                     Issued: February 23, 2017.                            information to be collected can be
                                                  the government of Sri Lanka.2 3                         Lisa R. Barton,                                         enhanced; and
                                                  Background                                              Secretary to the Commission.                          —Minimize the burden of the collection
                                                                                                          [FR Doc. 2017–03906 Filed 2–27–17; 8:45 am]             of information on those who are to
                                                     The Commission, pursuant to sections                                                                         respond, including through the use of
                                                  705(b) and 735(b) of the Act (19 U.S.C.                 BILLING CODE 7020–02–P
                                                                                                                                                                  appropriate automated, electronic,
                                                  1671d(b) and 19 U.S.C. 1673d(b)),                                                                               mechanical, or other technological
                                                  instituted these investigations effective                                                                       collection techniques or other forms
                                                  January 8, 2016, following receipt of                   DEPARTMENT OF JUSTICE                                   of information technology, e.g.,
                                                  petitions filed with the Commission and                                                                         permitting electronic submission of
                                                  Commerce by Titan Tire Corporation of                   [OMB Number 1110–0056]
                                                                                                                                                                  responses.
                                                  Des Moines, Iowa (‘‘Titan’’) and the
                                                  United Steel, Paper and Forestry,                       Agency Information Collection                         Overview of This Information
                                                  Rubber, Manufacturing, Energy, Allied                   Activities; Proposed eCollection                      Collection
                                                  Industrial and Service Workers                          eComments Requested; Extension of a
                                                                                                          Previously Approved Collection                          1. Type of Information Collection:
                                                  International Union, AFL–CIO, CLC of                                                                          Extension of a currently approved
                                                  Pittsburgh, Pennsylvania (‘‘USW’’). The                 AGENCY:  Justice Management Division,                 collection.
                                                  final phase of the investigations was                   Department of Justice.                                  2. The Title of the Form/Collection:
                                                  scheduled by the Commission following                   ACTION: 30-day notice.                                Certification of Identity.
                                                  notification of preliminary                                                                                     3. The agency form number, if any,
                                                  determinations by Commerce that                         SUMMARY:   The Department of Justice,                 and the applicable component of the
                                                  imports of certain new pneumatic off-                   Justice Management Division has                       Department sponsoring the collection:
                                                  the-road tires from India and Sri Lanka                 submitted the following information                   Form DOJ–361. Facilities and
                                                                                                          collection request to the Office of                   Administrative Services Staff, Justice
                                                    1 The record is defined in sec. 207.2(f) of the
                                                                                                          Management and Budget (OMB) for                       Management Division, U.S. Department
                                                  Commission’s Rules of Practice and Procedure (19
                                                                                                          review and clearance in accordance                    of Justice.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  CFR 207.2(f)).
                                                    2 The Commission also finds that imports subject      with established review procedures of                   4. Affected public who will be asked
                                                  to Commerce’s affirmative critical circumstances        the Paperwork Reduction Act of 1995.                  or required to respond, as well as a brief
                                                  determination are not likely to undermine seriously     This proposed information collection                  abstract:
                                                  the remedial effect of the countervailing duty orders   was previously published in the Federal                 Primary: American Citizens. Other:
                                                  on certain new pneumatic off-the-road tires from
                                                  India and Sri Lanka.                                    Register on January 25, 2017, Volume                  Federal Government. The information
                                                    3 Commissioner Dean A. Pinkert did not                82, Number 15, Page 8437 allowing for                 collection will be used by the
                                                  participate in these investigations.                    a 60 day comment period.                              Department to identify individuals


                                             VerDate Sep<11>2014   18:46 Feb 27, 2017   Jkt 241001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM   28FEN1



Document Created: 2017-02-27 23:53:58
Document Modified: 2017-02-27 23:53:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Action30-day notice.
DatesYou must submit comments by March 30, 2017.
ContactNicole Mason, Regulations and Standards Branch, (703) 787-1607, to request additional information about this ICR. To see a copy of the entire ICR submitted to OMB, go to http://www.reginfo.gov (select Information Collection Review, Currently Under Review).
FR Citation82 FR 12122 