82_FR_1338 82 FR 1335 - Washoe Project-Rate Order No. WAPA-176

82 FR 1335 - Washoe Project-Rate Order No. WAPA-176

DEPARTMENT OF ENERGY
Western Area Power Administration

Federal Register Volume 82, Issue 3 (January 5, 2017)

Page Range1335-1336
FR Document2016-31973

The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through September 30, 2022. The existing Non-Firm Power Formula Rate Schedule SNF-7 expires on September 30, 2017. The extended formula rate will be in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) approves the extension on a final basis, or until superseded.

Federal Register, Volume 82 Issue 3 (Thursday, January 5, 2017)
[Federal Register Volume 82, Number 3 (Thursday, January 5, 2017)]
[Notices]
[Pages 1335-1336]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31973]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration


Washoe Project-Rate Order No. WAPA-176

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of rate order extending Washoe project, Stampede 
Division, non-firm power formula rate.

-----------------------------------------------------------------------

SUMMARY: The Deputy Secretary of Energy extended, on an interim basis, 
the existing Washoe Project, Stampede Division, Non-Firm Power Formula 
Rate, effective October 1, 2017, through September 30, 2022. The 
existing Non-Firm Power Formula Rate Schedule SNF-7 expires on 
September 30, 2017. The extended formula rate will be in effect on an 
interim basis until the Federal Energy Regulatory Commission (FERC) 
approves the extension on a final basis, or until superseded.

DATES: This action is effective October 1, 2017.

FOR FURTHER INFORMATION CONTACT: Mr. Subhash Paluru, Regional Manager, 
Sierra Nevada Region, Western Area Power Administration, 114 Parkshore 
Drive, Folsom, CA 95630-4710, telephone (916) 353-4418, email 
[email protected]; or Ms. Regina Rieger, Rates Manager, Sierra Nevada 
Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, 
CA 95630-4710, telephone (916) 353-4629, email [email protected].

SUPPLEMENTARY INFORMATION: On September 9, 2016, Western Area Power 
Administration (WAPA) proposed its intent to seek a five-year formula 
rate extension and allowed for a 30-day comment period in a Notice 
published in the Federal Register.\1\ No comments were received.
---------------------------------------------------------------------------

    \1\ See 81 FR 62499 (September 9, 2016).
---------------------------------------------------------------------------

    By Delegation Order No. 00-037.00B, effective November 19, 2016, 
the Secretary of Energy delegated: (1) The authority to develop power 
and transmission rates to the Administrator of WAPA; (2) the authority 
to confirm, approve, and place such rates into effect on an interim 
basis to the Deputy Secretary of Energy; and (3) the authority to 
confirm, approve, and place into effect on a final basis, to remand, or 
to disapprove such rates to FERC. Federal rules, specifically 10 CFR 
903.23(a), govern Department of Energy procedures for this rate 
extension.
    Under Delegation Order No. 00-037.00B and in compliance with 10 CFR 
part 903, I hereby approve, on an interim basis, Rate Order No. WAPA-
176, which extends without adjustment, the existing Washoe Project, 
Stampede Division, Non-Firm Power Formula Rate, Rate Schedule SNF-7, 
through September 30, 2022. Rate Schedule SNF-7 will be submitted 
promptly to FERC for confirmation and approval on a final basis.

    Dated: December 23, 2016.
Elizabeth Sherwood-Randall,
Deputy Secretary of Energy.

Department of Energy

Deputy Secretary

    In the Matter of: Western Area Power Administration, Sierra 
Nevada Region, Extension of the Washoe Project, Stampede Division, 
Non-Firm Power Formula Rate, Rate Order No. WAPA-176.

Order Extending the Existing Washoe Project, Stampede Division, Non-
Firm Power Formula Rate on an Interim Basis

    The existing formula rate was established in accordance with 
Section 302 of the Department of Energy (DOE) Organization Act (42 
U.S.C. 7152). This act transferred to and vested in the Secretary of 
Energy the power marketing functions of the Secretary of the Department 
of the Interior and the Bureau of Reclamation under the Reclamation Act 
of 1902 (ch. 1093, 32 Stat. 388), as amended and supplemented by 
subsequent laws, particularly section 9(c) of the Reclamation Project 
Act of 1939 (43 U.S.C. 485h(c)), section 5 of the Flood Control Act of 
1944 (16 U.S.C. 825s), and other acts that specifically apply to the 
project involved.
    By Delegation Order No. 00-037.00B, effective November 19, 2016, 
the Secretary of Energy delegated: (1) The authority to develop power 
and transmission rates to the Administrator of the Western Area Power 
Administration (WAPA); (2) the authority to confirm, approve, and place 
such rates into effect on an interim basis to the Deputy Secretary of 
Energy; and (3) the authority to confirm, approve, and place into 
effect on a final basis, to remand, or to disapprove such rates to the 
Federal Energy Regulatory Commission (FERC). Federal rules, 
specifically 10 CFR 903.23(a), govern Department of Energy procedures 
for this rate extension.

Background

    The existing Washoe Project Non-Firm Power Formula Rate, Rate 
Schedule SNF-7, expires on September 30, 2017. FERC confirmed and 
approved Rate Schedule SNF-7, on April 16, 2009,\1\ and the subsequent 
extension on September 5, 2013.\2\ WAPA published a notice in the 
Federal Register on September 9, 2016, proposing to further extend Rate 
Schedule SNF-7 for five

[[Page 1336]]

years, without adjustment.\3\ In accordance with 10 CFR 903.23(a), WAPA 
provided for a consultation and comment period that ended on October 
11, 2016. WAPA received no comments.
---------------------------------------------------------------------------

    \1\ See U. S. Dept. of Energy, Western Area Power Admin., 127 
FERC ] 62,043 (2009).
    \2\ See U. S. Dept. of Energy, Western Area Power Admin., 144 
FERC ] 62,213 (2013).
    \3\ See 81 FR 62499 (September 9, 2016).
---------------------------------------------------------------------------

Discussion

    Rate Schedule SNF-7 provides sufficient annual revenue to recover 
annual expenses, interest, and capital investments, within the cost 
recovery criteria set forth in DOE Order RA 6120.2. Congress, by 
legislation, declared all Washoe Project costs to be non-reimbursable 
except the Stampede Powerplant (Stampede).\4\ The average Stampede 
generation, approximately 10 gigawatt-hours annually, is used 
principally to provide energy for two Federal fish hatcheries. Since 
the Washoe Project has no Federally-owned transmission lines, WAPA 
contracted with Truckee Donner Public Utility District and the City of 
Fallon (TDPUD/Fallon) to accept Stampede generation and serve project 
use loads. Energy in excess of project use loads is integrated with the 
Central Valley Project (CVP) and marketed under the 2004 Power 
Marketing Plan. Pursuant to Rate Schedule SNF-7, each year, any 
remaining reimbursable expenses, in excess of the revenue collected 
under contract, are incorporated into the CVP power revenue 
requirement. For the proposed extension period, WAPA forecasts the 
Washoe Project cost to CVP to be approximately $255,000 annually.
---------------------------------------------------------------------------

    \4\ See Fallon Paiute Shoshone Indian Tribes Water Rights 
Settlement Act, Pub. L. No. 101-618, 104 Stat. 3289, 3307 (1990).
---------------------------------------------------------------------------

    Extending Rate Schedule SNF-7 will provide sufficient revenue to 
recover annual expenses, interest, and capital requirements, thus 
ensuring project repayment within the cost recovery criteria set forth 
in DOE Order RA 6120.2.

Order

    In view of the foregoing and under the authority delegated to me, I 
hereby extend, on an interim basis, the existing Washoe Project, 
Stampede Division, Non-Firm Power Formula Rate, Rate Schedule SNF-7. 
Rate Order No. WAPA-176 extends, without adjustment, Rate Schedule 
SNF[dash]7 through September 30, 2022. Rate Schedule SNF-7 shall remain 
in effect on an interim basis, pending FERC's confirmation and approval 
of this extension, or substitute formula rate, on a final basis.
Dated: December 23, 2016
Elizabeth Sherwood-Randall, Deputy Secretary of Energy

Rate Schedule SNF-7

(Supersedes Schedule SNF-6)

United States Department of Energy Western Area Power Administration

Sierra Nevada Region, Washoe Project, Stampede Division

Non-Firm Power Formula Rate

Effective:

    The first day of the first full billing period beginning on or 
after August 1, 2008, through September 30, 2022, or until superseded 
by another rate schedule, whichever occurs earlier.

Available:

    Within the marketing area served by the Sierra Nevada Region.

Applicable:

    To preference customers under the 2004 Power Marketing Plan and the 
applicable third party(ies) who are under contract (Contractor) with 
the Western Area Power Administration (WAPA).

Character and Conditions of Service:

    Alternating current, 60 hertz, three-phase, delivered and metered 
at the voltages and points established by contract.
    Non-Firm Power Formula Rate:
    In order to serve project use loads and effectively market the 
energy from Stampede, WAPA has contracted with a third party Contractor 
that provides for a Stampede Energy Exchange Account (SEEA). The SEEA 
is an annual energy exchange account for Stampede energy. In the SEEA, 
the revenues from sales (generation revenues) made at the SEEA Rate are 
reduced by the project use and station service power costs and SEEA 
administrative costs. WAPA applies the ratio of project use costs to 
the generation revenue recorded in the SEEA to determine a non-
reimbursable percentage. One hundred percent minus this non-
reimbursable percentage establishes a reimbursable percentage. This 
reimbursable percentage is then applied to the appropriate power-
related costs to determine the reimbursable costs for repayment. The 
reimbursable costs are then netted against generation revenues made at 
the SEEA Rate. As stipulated under the 2004 Power Marketing Plan, any 
remaining reimbursable costs, to include interest and annual capital 
costs, are then transferred to the Central Valley Project for 
incorporation into the CVP Power Revenue Requirement.

The formula rate for Stampede power is:

Stampede Annual Transferred PRR = Stampede Annual PRR--Stampede Revenue
Where:
Stampede Annual Transferred
Power Revenue Requirement (PRR) = Stampede Annual PRR as identified as 
a cost transferred to the CVP.
Stampede Annual PRR = The total PRR for Stampede required to repay all 
annual costs, including interest, and the investment within the 
allowable period.
Stampede Revenue = Revenue from applying the SEEA Rate to project 
generation.
Billing: Billing for the SEEA Rate will be as specified in the service 
agreement.
Adjustment for Losses: Losses will be accounted for under this rate 
schedule as stated in the service agreement.

[FR Doc. 2016-31973 Filed 1-4-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                Federal Register / Vol. 82, No. 3 / Thursday, January 5, 2017 / Notices                                                     1335

                                                  Commission in determining the                           the existing Washoe Project, Stampede                    Dated: December 23, 2016.
                                                  appropriate action to be taken, but will                Division, Non-Firm Power Formula                       Elizabeth Sherwood-Randall,
                                                  not serve to make protestants parties to                Rate, effective October 1, 2017, through               Deputy Secretary of Energy.
                                                  the proceeding. Any person wishing to                   September 30, 2022. The existing Non-
                                                  become a party must file a notice of                                                                           Department of Energy
                                                                                                          Firm Power Formula Rate Schedule
                                                  intervention or motion to intervene, as                 SNF–7 expires on September 30, 2017.                   Deputy Secretary
                                                  appropriate. Such notices, motions, or                  The extended formula rate will be in                     In the Matter of: Western Area Power
                                                  protests must be filed on or before the                 effect on an interim basis until the                   Administration, Sierra Nevada Region,
                                                  comment date. Anyone filing a motion                    Federal Energy Regulatory Commission                   Extension of the Washoe Project, Stampede
                                                  to intervene or protest must serve a copy               (FERC) approves the extension on a                     Division, Non-Firm Power Formula Rate,
                                                  of that document on the Petitioner.                     final basis, or until superseded.                      Rate Order No. WAPA–176.
                                                     The Commission encourages
                                                  electronic submission of protests and                   DATES: This action is effective October                Order Extending the Existing Washoe
                                                  interventions in lieu of paper, using the                                                                      Project, Stampede Division, Non-Firm
                                                                                                          1, 2017.
                                                  FERC Online links at http://                                                                                   Power Formula Rate on an Interim
                                                  www.ferc.gov. To facilitate electronic                  FOR FURTHER INFORMATION CONTACT:  Mr.                  Basis
                                                  service, persons with Internet access                   Subhash Paluru, Regional Manager,                         The existing formula rate was
                                                  who will eFile a document and/or be                     Sierra Nevada Region, Western Area                     established in accordance with Section
                                                  listed as a contact for an intervenor                   Power Administration, 114 Parkshore                    302 of the Department of Energy (DOE)
                                                  must create and validate an                             Drive, Folsom, CA 95630–4710,                          Organization Act (42 U.S.C. 7152). This
                                                  eRegistration account using the                         telephone (916) 353–4418, email                        act transferred to and vested in the
                                                  eRegistration link. Select the eFiling                  paluru@wapa.gov; or Ms. Regina Rieger,                 Secretary of Energy the power marketing
                                                  link to log on and submit the                           Rates Manager, Sierra Nevada Region,                   functions of the Secretary of the
                                                  intervention or protests.                               Western Area Power Administration,                     Department of the Interior and the
                                                     Persons unable to file electronically                114 Parkshore Drive, Folsom, CA                        Bureau of Reclamation under the
                                                  should submit an original and 5 copies                  95630–4710, telephone (916) 353–4629,                  Reclamation Act of 1902 (ch. 1093, 32
                                                  of the intervention or protest to the                   email SNR-Rates@wapa.gov.                              Stat. 388), as amended and
                                                  Federal Energy Regulatory Commission,                                                                          supplemented by subsequent laws,
                                                  888 First Street NE., Washington, DC                    SUPPLEMENTARY INFORMATION:        On
                                                                                                                                                                 particularly section 9(c) of the
                                                  20426.                                                  September 9, 2016, Western Area Power                  Reclamation Project Act of 1939 (43
                                                     The filings in the above proceeding                  Administration (WAPA) proposed its                     U.S.C. 485h(c)), section 5 of the Flood
                                                  are accessible in the Commission’s                      intent to seek a five-year formula rate                Control Act of 1944 (16 U.S.C. 825s),
                                                  eLibrary system by clicking on the                      extension and allowed for a 30-day                     and other acts that specifically apply to
                                                  appropriate link in the above list. They                comment period in a Notice published                   the project involved.
                                                  are also available for review in the                    in the Federal Register.1 No comments                     By Delegation Order No. 00–037.00B,
                                                  Commission’s Public Reference Room in                   were received.                                         effective November 19, 2016, the
                                                  Washington, DC. There is an                                By Delegation Order No. 00–037.00B,                 Secretary of Energy delegated: (1) The
                                                  eSubscription link on the Web site that                 effective November 19, 2016, the                       authority to develop power and
                                                  enables subscribers to receive email                    Secretary of Energy delegated: (1) The                 transmission rates to the Administrator
                                                  notification when a document is added                   authority to develop power and                         of the Western Area Power
                                                  to a subscribed docket(s). For assistance               transmission rates to the Administrator                Administration (WAPA); (2) the
                                                  with any FERC Online service, please                                                                           authority to confirm, approve, and place
                                                                                                          of WAPA; (2) the authority to confirm,
                                                  email FERCOnlineSupport@ferc.gov.or                                                                            such rates into effect on an interim basis
                                                                                                          approve, and place such rates into effect
                                                  call (866) 208–3676 (toll free). For TTY,                                                                      to the Deputy Secretary of Energy; and
                                                                                                          on an interim basis to the Deputy
                                                  call (202) 502–8659.                                                                                           (3) the authority to confirm, approve,
                                                     Comment Date: 5:00 p.m. Eastern time                 Secretary of Energy; and (3) the
                                                                                                                                                                 and place into effect on a final basis, to
                                                  on January 20, 2017.                                    authority to confirm, approve, and place
                                                                                                                                                                 remand, or to disapprove such rates to
                                                                                                          into effect on a final basis, to remand,
                                                    Dated: December 28, 2016.                                                                                    the Federal Energy Regulatory
                                                                                                          or to disapprove such rates to FERC.                   Commission (FERC). Federal rules,
                                                  Nathaniel J. Davis, Sr.,
                                                                                                          Federal rules, specifically 10 CFR                     specifically 10 CFR 903.23(a), govern
                                                  Deputy Secretary.                                       903.23(a), govern Department of Energy
                                                  [FR Doc. 2016–32021 Filed 1–4–17; 8:45 am]
                                                                                                                                                                 Department of Energy procedures for
                                                                                                          procedures for this rate extension.                    this rate extension.
                                                  BILLING CODE 6717–01–P
                                                                                                             Under Delegation Order No. 00–
                                                                                                                                                                 Background
                                                                                                          037.00B and in compliance with 10 CFR
                                                                                                          part 903, I hereby approve, on an                        The existing Washoe Project Non-
                                                  DEPARTMENT OF ENERGY
                                                                                                          interim basis, Rate Order No. WAPA–                    Firm Power Formula Rate, Rate
                                                  Western Area Power Administration                       176, which extends without adjustment,                 Schedule SNF–7, expires on September
                                                                                                          the existing Washoe Project, Stampede                  30, 2017. FERC confirmed and approved
                                                  Washoe Project-Rate Order No.                           Division, Non-Firm Power Formula                       Rate Schedule SNF–7, on April 16,
                                                  WAPA–176                                                Rate, Rate Schedule SNF–7, through                     2009,1 and the subsequent extension on
                                                                                                          September 30, 2022. Rate Schedule                      September 5, 2013.2 WAPA published a
mstockstill on DSK3G9T082PROD with NOTICES




                                                  AGENCY: Western Area Power                                                                                     notice in the Federal Register on
                                                  Administration, DOE.                                    SNF–7 will be submitted promptly to
                                                                                                                                                                 September 9, 2016, proposing to further
                                                  ACTION: Notice of rate order extending                  FERC for confirmation and approval on
                                                                                                                                                                 extend Rate Schedule SNF–7 for five
                                                  Washoe project, Stampede Division,                      a final basis.
                                                  non-firm power formula rate.                                                                                    1 See U. S. Dept. of Energy, Western Area Power

                                                                                                                                                                 Admin., 127 FERC ¶ 62,043 (2009).
                                                  SUMMARY:  The Deputy Secretary of                                                                               2 See U. S. Dept. of Energy, Western Area Power

                                                  Energy extended, on an interim basis,                     1 See   81 FR 62499 (September 9, 2016).             Admin., 144 FERC ¶ 62,213 (2013).



                                             VerDate Sep<11>2014   21:06 Jan 04, 2017   Jkt 241001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\05JAN1.SGM   05JAN1


                                                  1336                          Federal Register / Vol. 82, No. 3 / Thursday, January 5, 2017 / Notices

                                                  years, without adjustment.3 In                          Rate Schedule SNF–7                                    The formula rate for Stampede power is:
                                                  accordance with 10 CFR 903.23(a),
                                                                                                          (Supersedes Schedule SNF–6)                            Stampede Annual Transferred PRR =
                                                  WAPA provided for a consultation and
                                                                                                                                                                 Stampede Annual PRR—Stampede
                                                  comment period that ended on October                    United States Department of Energy
                                                                                                                                                                 Revenue
                                                  11, 2016. WAPA received no comments.                    Western Area Power Administration
                                                                                                                                                                 Where:
                                                  Discussion                                              Sierra Nevada Region, Washoe Project,                  Stampede Annual Transferred
                                                     Rate Schedule SNF–7 provides                         Stampede Division                                      Power Revenue Requirement (PRR) =
                                                  sufficient annual revenue to recover                    Non-Firm Power Formula Rate                              Stampede Annual PRR as identified
                                                  annual expenses, interest, and capital                                                                           as a cost transferred to the CVP.
                                                  investments, within the cost recovery                   Effective:                                             Stampede Annual PRR = The total PRR
                                                  criteria set forth in DOE Order RA                                                                               for Stampede required to repay all
                                                                                                            The first day of the first full billing                annual costs, including interest, and
                                                  6120.2. Congress, by legislation,                       period beginning on or after August 1,
                                                  declared all Washoe Project costs to be                                                                          the investment within the allowable
                                                                                                          2008, through September 30, 2022, or                     period.
                                                  non-reimbursable except the Stampede                    until superseded by another rate
                                                  Powerplant (Stampede).4 The average                                                                            Stampede Revenue = Revenue from
                                                                                                          schedule, whichever occurs earlier.                      applying the SEEA Rate to project
                                                  Stampede generation, approximately 10
                                                  gigawatt-hours annually, is used                        Available:                                               generation.
                                                                                                                                                                 Billing: Billing for the SEEA Rate will be
                                                  principally to provide energy for two
                                                                                                            Within the marketing area served by                    as specified in the service agreement.
                                                  Federal fish hatcheries. Since the                                                                             Adjustment for Losses: Losses will be
                                                  Washoe Project has no Federally-owned                   the Sierra Nevada Region.
                                                                                                                                                                   accounted for under this rate schedule
                                                  transmission lines, WAPA contracted                     Applicable:                                              as stated in the service agreement.
                                                  with Truckee Donner Public Utility
                                                                                                                                                                 [FR Doc. 2016–31973 Filed 1–4–17; 8:45 am]
                                                  District and the City of Fallon (TDPUD/                   To preference customers under the
                                                                                                                                                                 BILLING CODE 6450–01–P
                                                  Fallon) to accept Stampede generation                   2004 Power Marketing Plan and the
                                                  and serve project use loads. Energy in                  applicable third party(ies) who are
                                                  excess of project use loads is integrated               under contract (Contractor) with the
                                                  with the Central Valley Project (CVP)                   Western Area Power Administration                      ENVIRONMENTAL PROTECTION
                                                  and marketed under the 2004 Power                       (WAPA).                                                AGENCY
                                                  Marketing Plan. Pursuant to Rate                                                                               [EPA–HQ–OW–2015–0056; FRL–9957–69–
                                                  Schedule SNF–7, each year, any                          Character and Conditions of Service:
                                                                                                                                                                 OW]
                                                  remaining reimbursable expenses, in                        Alternating current, 60 hertz, three-
                                                  excess of the revenue collected under                                                                          National Advisory Council for
                                                                                                          phase, delivered and metered at the
                                                  contract, are incorporated into the CVP                                                                        Environmental Policy and Technology:
                                                                                                          voltages and points established by
                                                  power revenue requirement. For the                                                                             Assumable Waters Subcommittee;
                                                                                                          contract.
                                                  proposed extension period, WAPA                                                                                Notice of Public Meeting
                                                  forecasts the Washoe Project cost to CVP                   Non-Firm Power Formula Rate:
                                                                                                                                                                 AGENCY: Environmental Protection
                                                  to be approximately $255,000 annually.                     In order to serve project use loads and             Agency (EPA).
                                                     Extending Rate Schedule SNF–7 will                   effectively market the energy from
                                                                                                                                                                 ACTION: Notice of Federal advisory
                                                  provide sufficient revenue to recover                   Stampede, WAPA has contracted with a
                                                                                                                                                                 subcommittee meetings.
                                                  annual expenses, interest, and capital                  third party Contractor that provides for
                                                  requirements, thus ensuring project                     a Stampede Energy Exchange Account                     SUMMARY:    Consistent with the Federal
                                                  repayment within the cost recovery                      (SEEA). The SEEA is an annual energy                   Advisory Committee Act, the
                                                  criteria set forth in DOE Order RA                      exchange account for Stampede energy.                  Environmental Protection Agency (EPA)
                                                  6120.2.                                                 In the SEEA, the revenues from sales                   is giving notice of an upcoming public
                                                  Order                                                   (generation revenues) made at the SEEA                 meeting of the Assumable Waters
                                                                                                          Rate are reduced by the project use and                Subcommittee convened under the
                                                     In view of the foregoing and under the               station service power costs and SEEA                   National Advisory Council for
                                                  authority delegated to me, I hereby                     administrative costs. WAPA applies the                 Environmental Policy and Technology
                                                  extend, on an interim basis, the existing               ratio of project use costs to the                      (NACEPT). The Assumable Waters
                                                  Washoe Project, Stampede Division,                      generation revenue recorded in the                     Subcommittee will provide advice and
                                                  Non-Firm Power Formula Rate, Rate                       SEEA to determine a non-reimbursable                   recommendations as to how the EPA
                                                  Schedule SNF–7. Rate Order No.                          percentage. One hundred percent minus                  can best clarify assumable waters for
                                                  WAPA–176 extends, without                               this non-reimbursable percentage                       dredge and fill permit programs
                                                  adjustment, Rate Schedule SNF-7                         establishes a reimbursable percentage.                 pursuant to Clean Water Act section
                                                  through September 30, 2022. Rate                        This reimbursable percentage is then                   404(g)(1). The EPA is undertaking this
                                                  Schedule SNF–7 shall remain in effect                   applied to the appropriate power-related               effort to support states and tribes that
                                                  on an interim basis, pending FERC’s                     costs to determine the reimbursable                    wish to assume the program. Similar to
                                                  confirmation and approval of this                       costs for repayment. The reimbursable                  the parent NACEPT, the subcommittee
                                                  extension, or substitute formula rate, on               costs are then netted against generation               represents a diversity of interests from
                                                  a final basis.                                          revenues made at the SEEA Rate. As                     academia, industry, non-governmental
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Dated: December 23, 2016                                stipulated under the 2004 Power                        organizations, and local, State, and
                                                  Elizabeth Sherwood-Randall,                             Marketing Plan, any remaining                          tribal governments. Meeting agendas
                                                  Deputy Secretary of Energy                              reimbursable costs, to include interest                and materials will be posted at
                                                    3 See
                                                                                                          and annual capital costs, are then                     www.epa.gov/cwa-404/assumable-
                                                          81 FR 62499 (September 9, 2016).
                                                    4 See
                                                                                                          transferred to the Central Valley Project              waters-sub-committee.
                                                          Fallon Paiute Shoshone Indian Tribes Water
                                                  Rights Settlement Act, Pub. L. No. 101–618, 104         for incorporation into the CVP Power                   DATES: The Assumable Waters
                                                  Stat. 3289, 3307 (1990).                                Revenue Requirement.                                   Subcommittee will hold a three-day


                                             VerDate Sep<11>2014   21:06 Jan 04, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\05JAN1.SGM   05JAN1



Document Created: 2018-02-01 14:51:00
Document Modified: 2018-02-01 14:51:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of rate order extending Washoe project, Stampede Division, non-firm power formula rate.
DatesThis action is effective October 1, 2017.
ContactMr. Subhash Paluru, Regional Manager, Sierra Nevada Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, CA 95630-4710, telephone (916) 353-4418, email [email protected]; or Ms. Regina Rieger, Rates Manager, Sierra Nevada Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, CA 95630-4710, telephone (916) 353-4629, email [email protected]
FR Citation82 FR 1335 

2025 Federal Register | Disclaimer | Privacy Policy