82_FR_14945 82 FR 14890 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed St. James Supply Project and Request for Comments on Environmental Issues

82 FR 14890 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed St. James Supply Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 55 (March 23, 2017)

Page Range14890-14892
FR Document2017-05781

Federal Register, Volume 82 Issue 55 (Thursday, March 23, 2017)
[Federal Register Volume 82, Number 55 (Thursday, March 23, 2017)]
[Notices]
[Pages 14890-14892]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05781]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-58-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To 
Prepare an Environmental Assessment for the Proposed St. James Supply 
Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the St. James Supply Project 
involving construction and operation of facilities by Transcontinental 
Gas Pipe Line Company, LLC (Transco) in St. James, Pointe Coupee, and 
St. Helena Parishes, Louisiana. The Commission will use this EA in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before April 14, 2017.
    If you sent comments on this project to the Commission before the 
opening of this docket on February 6, 2017, you will need to file those 
comments in Docket No. CP17-58-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Transco provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP17-58-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy

[[Page 14891]]

Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Summary of the Proposed Project

    The St. James Supply Project would deliver 161,500 dekatherms per 
day of firm transportation capacity from Transco's existing mainline 
Compressor Station 65 in St. Helena Parish, Louisiana to the planned 
Yuhuang Chemical Plant in St. James Parish, Louisiana. Transco would 
use its existing Southeast Lateral Pipeline (SELA) to deliver gas to 
the chemical plant. Proposed construction would provide bi-directional 
flow of natural gas on the SELA pipeline and a secondary source of 
natural gas to the chemical plant using an existing interconnection on 
Transco's mainline with the Texas Eastern Transmission Company Pipeline 
in Pointe Coupee Parish, Louisiana.
    The St. James Supply Project would consist of the following 
facilities:
     0.7 mile of 20-inch-diameter pipeline;
     one new pig receiver site; \1\
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

     two new meter and regulating (M&R) stations (Old River 
Road and Cajun Road M&R Stations);
     a new interconnection to the chemical plant site;
     one new valve and piping to tie the Old River Road M&R 
Station into the SELA pipeline; and
     piping and valve modifications at existing Transco 
Compressor Stations 63 and 65.
    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 77.8 
acres of land for the aboveground facilities and the pipeline. 
Following construction, Transco would maintain about 12.0 acres for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     water resources and wetlands;
     fisheries, vegetation, and wildlife;
     endangered and threatened species;
     land use;
     cultural resources;
     air quality and noise;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\4\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\5\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

[[Page 14892]]

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP17-
058). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: March 17, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-05781 Filed 3-22-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                14890                        Federal Register / Vol. 82, No. 55 / Thursday, March 23, 2017 / Notices

                                                concrete-lined power shaft penstock; (5)                Enter the docket number (P–14813) in                  notify their constituents of this
                                                a 1,420-foot-long 30-foot-diameter,                     the docket number field to access the                 proposed project and encourage them to
                                                concrete-lined, power tunnel penstock                   document. For assistance, contact FERC                comment on their areas of concern.
                                                that will split into three 16-foot-                     Online Support.                                          If you are a landowner receiving this
                                                diameter penstocks approximately 450-                     Dated: March 16, 2017.                              notice, a pipeline company
                                                foot-long, that will extend to the                      Kimberly D. Bose,                                     representative may contact you about
                                                powerhouse; (6) an underground                                                                                the acquisition of an easement to
                                                                                                        Secretary.
                                                powerhouse/pump station, containing                                                                           construct, operate, and maintain the
                                                three reversible pump-turbine                           [FR Doc. 2017–05792 Filed 3–22–17; 8:45 am]
                                                                                                                                                              proposed facilities. The company would
                                                generating units, with a total generating               BILLING CODE 6717–01–P
                                                                                                                                                              seek to negotiate a mutually acceptable
                                                capacity of 600 megawatts; (7) a 6,620                                                                        agreement. However, if the Commission
                                                foot-long tailrace tunnel to; the existing                                                                    approves the project, that approval
                                                Corps Lake Dardanelle as its lower                      DEPARTMENT OF ENERGY
                                                                                                                                                              conveys with it the right of eminent
                                                reservoir; (8) an intake/outlet structure                                                                     domain. Therefore, if easement
                                                                                                        Federal Energy Regulatory
                                                located on the south shore of Lake                                                                            negotiations fail to produce an
                                                                                                        Commission
                                                Dardanelle; (9) a 8,000-foot-long, 500-                                                                       agreement, the pipeline company could
                                                kilovolt overhead transmission line                     [Docket No. CP17–58–000]                              initiate condemnation proceedings
                                                from the powerhouse to (10) a proposed                                                                        where compensation would be
                                                substation at the point of                              Transcontinental Gas Pipe Line                        determined in accordance with state
                                                interconnection with an existing utility                Company, LLC; Notice of Intent To                     law.
                                                transmission line. The proposed project                 Prepare an Environmental Assessment
                                                                                                                                                                 Transco provided landowners with a
                                                would have an annual energy generation                  for the Proposed St. James Supply
                                                                                                                                                              fact sheet prepared by the FERC entitled
                                                of 640,000 megawatt-hours.                              Project and Request for Comments on
                                                                                                                                                              ‘‘An Interstate Natural Gas Facility On
                                                   Applicant Contact: Curtis Warner,                    Environmental Issues
                                                                                                                                                              My Land? What Do I Need To Know?’’
                                                Arkansas Electric Cooperative                                                                                 This fact sheet addresses a number of
                                                                                                           The staff of the Federal Energy
                                                Corporation, 1 Cooperative Way, Little                                                                        typically asked questions, including the
                                                                                                        Regulatory Commission (FERC or
                                                Rock, Arkansas 72209; phone (501) 570–                                                                        use of eminent domain and how to
                                                                                                        Commission) will prepare an
                                                2462.                                                                                                         participate in the Commission’s
                                                   FERC Contact: Chris Casey,                           environmental assessment (EA) that will
                                                                                                        discuss the environmental impacts of                  proceedings. It is also available for
                                                christiane.casey@ferc.gov, (202) 502–
                                                                                                        the St. James Supply Project involving                viewing on the FERC Web site
                                                8577.
                                                   Deadline for filing comments, motions                construction and operation of facilities              (www.ferc.gov).
                                                to intervene, competing applications                    by Transcontinental Gas Pipe Line                     Public Participation
                                                (without notices of intent), or notices of              Company, LLC (Transco) in St. James,
                                                intent to file competing applications: 60               Pointe Coupee, and St. Helena Parishes,                 For your convenience, there are three
                                                days from the issuance of this notice.                  Louisiana. The Commission will use                    methods you can use to submit your
                                                Competing applications and notices of                   this EA in its decision-making process                comments to the Commission. The
                                                intent must meet the requirements of 18                 to determine whether the project is in                Commission encourages electronic filing
                                                CFR 4.36. Comments, motions to                          the public convenience and necessity.                 of comments and has expert staff
                                                intervene, notices of intent, and                          This notice announces the opening of               available to assist you at (202) 502–8258
                                                competing applications may be filed                     the scoping process the Commission                    or efiling@ferc.gov. Please carefully
                                                electronically via the Internet. See 18                 will use to gather input from the public              follow these instructions so that your
                                                CFR 385.2001(a)(1)(iii) and the                         and interested agencies on the project.               comments are properly recorded.
                                                instructions on the Commission’s Web                    You can make a difference by providing                   (1) You can file your comments
                                                site http://www.ferc.gov/docs-filing/                   us with your specific comments or                     electronically using the eComment
                                                efiling.asp. Commenters can submit                      concerns about the project. Your                      feature on the Commission’s Web site
                                                brief comments up to 6,000 characters,                  comments should focus on the potential                (www.ferc.gov) under the link to
                                                without prior registration, using the                   environmental effects, reasonable                     Documents and Filings. This is an easy
                                                eComment system at http://                              alternatives, and measures to avoid or                method for submitting brief, text-only
                                                www.ferc.gov/docs-filing/                               lessen environmental impacts. Your                    comments on a project;
                                                ecomment.asp. You must include your                     input will help the Commission staff                     (2) You can file your comments
                                                name and contact information at the end                 determine what issues they need to                    electronically by using the eFiling
                                                of your comments. For assistance,                       evaluate in the EA. To ensure that your               feature on the Commission’s Web site
                                                please contact FERC Online Support at                   comments are timely and properly                      (www.ferc.gov) under the link to
                                                FERCOnlineSupport@ferc.gov or toll                      recorded, please send your comments so                Documents and Filings. With eFiling,
                                                free at 1–866–208–3676, or for TTY,                     that the Commission receives them in                  you can provide comments in a variety
                                                (202) 502–8659. Although the                            Washington, DC on or before April 14,                 of formats by attaching them as a file
                                                Commission strongly encourages                          2017.                                                 with your submission. New eFiling
                                                electronic filing, documents may also be                   If you sent comments on this project               users must first create an account by
                                                paper-filed. To paper-file, mail an                     to the Commission before the opening of               clicking on ‘‘eRegister.’’ If you are filing
                                                original and five copies to: Kimberly D.                this docket on February 6, 2017, you                  a comment on a particular project,
                                                                                                        will need to file those comments in                   please select ‘‘Comment on a Filing’’ as
sradovich on DSK3GMQ082PROD with NOTICES




                                                Bose, Secretary, Federal Energy
                                                Regulatory Commission, 888 First Street                 Docket No. CP17–58–000 to ensure they                 the filing type; or
                                                NE., Washington, DC 20426.                              are considered as part of this                           (3) You can file a paper copy of your
                                                   More information about this project,                 proceeding.                                           comments by mailing them to the
                                                including a copy of the application, can                   This notice is being sent to the                   following address. Be sure to reference
                                                be viewed or printed on the ‘‘eLibrary’’                Commission’s current environmental                    the project docket number (CP17–58–
                                                link of Commission’s Web site at http://                mailing list for this project. State and              000) with your submission: Kimberly D.
                                                www.ferc.gov/docs-filing/elibrary.asp.                  local government representatives should               Bose, Secretary, Federal Energy


                                           VerDate Sep<11>2014   17:13 Mar 22, 2017   Jkt 241001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                                                              Federal Register / Vol. 82, No. 55 / Thursday, March 23, 2017 / Notices                                                      14891

                                                Regulatory Commission, 888 First Street                 impacts that could result from an action              Consultations Under Section 106 of the
                                                NE., Room 1A, Washington, DC 20426.                     whenever it considers the issuance of a               National Historic Preservation Act
                                                                                                        Certificate of Public Convenience and                   In accordance with the Advisory
                                                Summary of the Proposed Project
                                                                                                        Necessity. NEPA also requires us 3 to                 Council on Historic Preservation’s
                                                   The St. James Supply Project would                   discover and address concerns the                     implementing regulations for section
                                                deliver 161,500 dekatherms per day of                   public may have about proposals. This                 106 of the National Historic
                                                firm transportation capacity from                       process is referred to as ‘‘scoping.’’ The            Preservation Act, we are using this
                                                Transco’s existing mainline Compressor                  main goal of the scoping process is to                notice to initiate consultation with the
                                                Station 65 in St. Helena Parish,                        focus the analysis in the EA on the                   applicable State Historic Preservation
                                                Louisiana to the planned Yuhuang                        important environmental issues. By this               Office (SHPO), and to solicit their views
                                                Chemical Plant in St. James Parish,                     notice, the Commission requests public                and those of other government agencies,
                                                Louisiana. Transco would use its                        comments on the scope of the issues to                interested Indian tribes, and the public
                                                existing Southeast Lateral Pipeline                     address in the EA. We will consider all               on the project’s potential effects on
                                                (SELA) to deliver gas to the chemical                   filed comments during the preparation                 historic properties.5 We will define the
                                                plant. Proposed construction would                      of the EA.                                            project-specific Area of Potential Effects
                                                provide bi-directional flow of natural                     In the EA we will discuss impacts that             (APE) in consultation with the SHPO as
                                                gas on the SELA pipeline and a                          could occur as a result of the                        the project develops. On natural gas
                                                secondary source of natural gas to the                  construction and operation of the                     facility projects, the APE at a minimum
                                                chemical plant using an existing                        proposed project under these general                  encompasses all areas subject to ground
                                                interconnection on Transco’s mainline                   headings:                                             disturbance (examples include
                                                with the Texas Eastern Transmission                        • Geology and soils;                               construction right-of-way, contractor/
                                                Company Pipeline in Pointe Coupee                          • water resources and wetlands;                    pipe storage yards, compressor stations,
                                                Parish, Louisiana.                                         • fisheries, vegetation, and wildlife;             and access roads). Our EA for this
                                                   The St. James Supply Project would                      • endangered and threatened species;               project will document our findings on
                                                consist of the following facilities:                       • land use;
                                                   • 0.7 mile of 20-inch-diameter                                                                             the impacts on historic properties and
                                                                                                           • cultural resources;                              summarize the status of consultations
                                                pipeline;                                                  • air quality and noise;
                                                   • one new pig receiver site; 1                                                                             under section 106.
                                                                                                           • public safety; and
                                                   • two new meter and regulating                          • cumulative impacts.                              Environmental Mailing List
                                                (M&R) stations (Old River Road and                         We will also evaluate reasonable                      The environmental mailing list
                                                Cajun Road M&R Stations);                               alternatives to the proposed project or               includes federal, state, and local
                                                   • a new interconnection to the                       portions of the project, and make                     government representatives and
                                                chemical plant site;                                    recommendations on how to lessen or                   agencies; elected officials;
                                                   • one new valve and piping to tie the                avoid impacts on the various resource                 environmental and public interest
                                                Old River Road M&R Station into the                     areas.                                                groups; Native American Tribes; other
                                                SELA pipeline; and                                         The EA will present our independent                interested parties; and local libraries
                                                   • piping and valve modifications at                  analysis of the issues. The EA will be                and newspapers. This list also includes
                                                existing Transco Compressor Stations 63                 available in the public record through                all affected landowners (as defined in
                                                and 65.                                                 eLibrary. Depending on the comments                   the Commission’s regulations) who are
                                                   The general location of the project                  received during the scoping process, we               potential right-of-way grantors, whose
                                                facilities is shown in appendix 1.2                     may also publish and distribute the EA                property may be used temporarily for
                                                Land Requirements for Construction                      to the public for an allotted comment                 project purposes, or who own homes
                                                                                                        period. We will consider all comments                 within certain distances of aboveground
                                                  Construction of the proposed facilities
                                                                                                        on the EA before making our                           facilities, and anyone who submits
                                                would disturb about 77.8 acres of land
                                                                                                        recommendations to the Commission.                    comments on the project. We will
                                                for the aboveground facilities and the
                                                                                                        To ensure we have the opportunity to                  update the environmental mailing list as
                                                pipeline. Following construction,
                                                                                                        consider and address your comments,                   the analysis proceeds to ensure that we
                                                Transco would maintain about 12.0
                                                                                                        please carefully follow the instructions              send the information related to this
                                                acres for permanent operation of the
                                                                                                        in the Public Participation section,                  environmental review to all individuals,
                                                project’s facilities; the remaining
                                                                                                        beginning on page 2.                                  organizations, and government entities
                                                acreage would be restored and revert to
                                                                                                           With this notice, we are asking                    interested in and/or potentially affected
                                                former uses.
                                                                                                        agencies with jurisdiction by law and/                by the proposed project.
                                                The EA Process                                          or special expertise with respect to the                 If we publish and distribute the EA,
                                                  The National Environmental Policy                     environmental issues of this project to               copies will be sent to the environmental
                                                Act (NEPA) requires the Commission to                   formally cooperate with us in the                     mailing list for public review and
                                                take into account the environmental                     preparation of the EA.4 Agencies that                 comment. If you would prefer to receive
                                                                                                        would like to request cooperating                     a paper copy of the document instead of
                                                  1 A ‘‘pig’’ is a tool that the pipeline company       agency status should follow the                       the CD version or would like to remove
                                                inserts into and pushes through the pipeline for        instructions for filing comments                      your name from the mailing list, please
                                                cleaning the pipeline, conducting internal              provided under the Public Participation               return the attached Information Request
                                                inspections, or other purposes.                         section of this notice.
sradovich on DSK3GMQ082PROD with NOTICES




                                                  2 The appendices referenced in this notice will
                                                                                                                                                              (appendix 2).
                                                not appear in the Federal Register. Copies of
                                                                                                          3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
                                                appendices were sent to all those receiving this                                                                5 The Advisory Council on Historic Preservation’s

                                                notice in the mail and are available at www.ferc.gov    environmental staff of the Commission’s Office of     regulations are at Title 36, Code of Federal
                                                using the link called ‘‘eLibrary’’ or from the          Energy Projects.                                      Regulations, Part 800. Those regulations define
                                                Commission’s Public Reference Room, 888 First             4 The Council on Environmental Quality              historic properties as any prehistoric or historic
                                                Street NE., Washington, DC 20426, or call (202)         regulations addressing cooperating agency             district, site, building, structure, or object included
                                                502–8371. For instructions on connecting to             responsibilities are at Title 40, Code of Federal     in or eligible for inclusion in the National Register
                                                eLibrary, refer to the last page of this notice.        Regulations, Part 1501.6.                             of Historic Places.



                                           VerDate Sep<11>2014   17:13 Mar 22, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                                14892                        Federal Register / Vol. 82, No. 55 / Thursday, March 23, 2017 / Notices

                                                Becoming an Intervenor                                  DEPARTMENT OF ENERGY                                  its environmental assessment (EA) and
                                                                                                                                                              place it into the Commission’s public
                                                   In addition to involvement in the EA                 Federal Energy Regulatory                             record (eLibrary) for this proceeding; or
                                                scoping process, you may want to                        Commission                                            issue a Notice of Schedule for
                                                become an ‘‘intervenor’’ which is an                                                                          Environmental Review. If a Notice of
                                                                                                        [Docket No. CP17–71–000]
                                                official party to the Commission’s                                                                            Schedule for Environmental Review is
                                                proceeding. Intervenors play a more                     ANR Storage Company; Notice of                        issued, it will indicate, among other
                                                formal role in the process and are able                 Request Under Blanket Authorization                   milestones, the anticipated date for the
                                                to file briefs, appear at hearings, and be                                                                    Commission staff’s issuance of the final
                                                heard by the courts if they choose to                      Take notice that on March 7, 2017
                                                                                                        ANR Storage Company (ANR Storage),                    environmental impact statement (FEIS)
                                                appeal the Commission’s final ruling.                                                                         or EA for this proposal. The filing of the
                                                                                                        700 Louisiana Street, Houston, Texas
                                                An intervenor formally participates in                                                                        EA in the Commission’s public record
                                                                                                        77002–2700, filed in Docket No. CP17–
                                                the proceeding by filing a request to                   71–000 a prior notice request pursuant                for this proceeding or the issuance of a
                                                intervene. Instructions for becoming an                 to sections 157.205 and 157.216 of the                Notice of Schedule for Environmental
                                                intervenor are in the ‘‘Document-less                   Commission’s regulations under the                    Review will serve to notify federal and
                                                Intervention Guide’’ under the ‘‘e-filing’’             Natural Gas Act (NGA) and ANR                         state agencies of the timing for the
                                                link on the Commission’s Web site.                      Storage’s authorization in Docket No.                 completion of all necessary reviews, and
                                                Motions to intervene are more fully                     CP82–523–000, 21 FERC ¶ 62,109                        the subsequent need to complete all
                                                described at http://www.ferc.gov/                       (1982), for authorization to abandon one              federal authorizations within 90 days of
                                                resources/guides/how-to/intervene.asp.                  injection/withdrawal (I/W) well at its                the date of issuance of the Commission
                                                                                                        Cold Springs 12 Storage Field in                      staff’s FEIS or EA.
                                                Additional Information
                                                                                                        Kalkaska County, Michigan, all as more
                                                                                                        fully set forth in the application which                 Persons who wish to comment only
                                                   Additional information about the
                                                                                                        is on file with the Commission and open               on the environmental review of this
                                                project is available from the
                                                                                                        to public inspection. The filing may also             project should submit an original and
                                                Commission’s Office of External Affairs,
                                                                                                        be viewed on the web at http://                       two copies of their comments to the
                                                at (866) 208–FERC, or on the FERC Web
                                                                                                        www.ferc.gov using the ‘‘eLibrary’’ link.             Secretary of the Commission.
                                                site at www.ferc.gov using the
                                                                                                        Enter the docket number excluding the                 Environmental commenter’s will be
                                                ‘‘eLibrary’’ link. Click on the eLibrary
                                                                                                        last three digits in the docket number                placed on the Commission’s
                                                link, click on ‘‘General Search’’ and
                                                                                                        field to access the document. For                     environmental mailing list, will receive
                                                enter the docket number, excluding the                  assistance, please contact FERC Online                copies of the environmental documents,
                                                last three digits in the Docket Number                  Support at                                            and will be notified of meetings
                                                field (i.e., CP17–058). Be sure you have                FERCOnlineSupport@ferc.gov or toll                    associated with the Commission’s
                                                selected an appropriate date range. For                 free at (866) 208–3676, or TTY, contact               environmental review process.
                                                assistance, please contact FERC Online                  (202) 502–8659.                                       Environmental commenter’s will not be
                                                Support at FercOnlineSupport@ferc.gov                      Any questions concerning this                      required to serve copies of filed
                                                or toll free at (866) 208–3676, or for                  application may be directed to Linda                  documents on all other parties.
                                                TTY, contact (202) 502–8659. The                        Farquhar, Manager, Project                            However, the non-party commentary,
                                                eLibrary link also provides access to the               Determinations & Regulatory                           will not receive copies of all documents
                                                texts of formal documents issued by the                 Administration, ANR Storage Company,                  filed by other parties or issued by the
                                                Commission, such as orders, notices,                    700 Louisiana Street, Suite 700,
                                                                                                                                                              Commission (except for the mailing of
                                                and rulemakings.                                        Houston, Texas, 77002–2700, at (832)
                                                                                                                                                              environmental documents issued by the
                                                   In addition, the Commission offers a                 320–5685 or fax (832) 320–6685 or
                                                                                                        linda_farquhar@transcanada.com.                       Commission) and will not have the right
                                                free service called eSubscription which                                                                       to seek court review of the
                                                                                                           Any person or the Commission’s staff
                                                allows you to keep track of all formal                  may, within 60 days after issuance of                 Commission’s final order.
                                                issuances and submittals in specific                    the instant notice by the Commission,                    The Commission strongly encourages
                                                dockets. This can reduce the amount of                  file pursuant to Rule 214 of the                      electronic filings of comments, protests,
                                                time you spend researching proceedings                  Commission’s Procedural Rules (18 CFR                 and interventions via the internet in lieu
                                                by automatically providing you with                     385.214) a motion to intervene or notice              of paper. See 18 CFR 385.2001(a) (1) (iii)
                                                notification of these filings, document                 of intervention and pursuant to section               and the instructions on the
                                                summaries, and direct links to the                      157.205 of the regulations under the                  Commission’s Web site (www.ferc.gov)
                                                documents. Go to www.ferc.gov/docs-                     NGA (18 CFR 157.205), a protest to the                under the ‘‘e-Filing’’ link. Persons
                                                filing/esubscription.asp.                               request. If no protest is filed within the            unable to file electronically should
                                                   Finally, public sessions or site visits              time allowed therefore, the proposed                  submit an original and 5 copies of the
                                                will be posted on the Commission’s                      activity shall be deemed to be                        protest or intervention to the Federal
                                                calendar located at www.ferc.gov/                       authorized effective the day after the                Energy Regulatory Commission, 888
                                                EventCalendar/EventsList.aspx along                     time allowed for filing a protest. If a
                                                                                                                                                              First Street NE., Washington, DC 20426.
                                                with other related information.                         protest is filed and not withdrawn
                                                                                                        within 30 days after the allowed time                   Dated: March 16, 2017.
                                                  Dated: March 17, 2017.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        for filing a protest, the instant request             Kimberly D. Bose,
                                                Kimberly D. Bose,                                       shall be treated as an application for                Secretary.
                                                Secretary.                                              authorization pursuant to section 7 of                [FR Doc. 2017–05793 Filed 3–22–17; 8:45 am]
                                                [FR Doc. 2017–05781 Filed 3–22–17; 8:45 am]             the NGA.
                                                                                                                                                              BILLING CODE 6717–01–P
                                                BILLING CODE 6717–01–P
                                                                                                           Pursuant to section 157.9 of the
                                                                                                        Commission’s rules, 18 CFR 157.9,
                                                                                                        within 90 days of this Notice the
                                                                                                        Commission staff will either: Complete


                                           VerDate Sep<11>2014   17:13 Mar 22, 2017   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 9990   E:\FR\FM\23MRN1.SGM   23MRN1



Document Created: 2017-03-23 02:45:56
Document Modified: 2017-03-23 02:45:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 14890 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR