DEPARTMENT OF ENERGY
Western Area Power Administration

Federal Register Volume 82, Issue 4 (January 6, 2017)

Page Range1730-1732
FR Document2017-00053

On December 18, 2015, Western Area Power Administration (WAPA), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the proposed 500-kilovolt (kV) transmission line. This proposed Project is known as the Colusa- Sutter (CoSu) 500-kV Transmission Line Project. In that previous notice, WAPA described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by February 16, 2016. On February 5, 2016, an additional notice was published extending the due date for comments on the scope of the EIS/ EIR to April 18, 2016. By this notice, WAPA announces additional public scoping meetings and reopens the period for submitting comments on the scope of the EIS/EIR.

Federal Register, Volume 82 Issue 4 (Friday, January 6, 2017)
[Federal Register Volume 82, Number 4 (Friday, January 6, 2017)]
[Notices]
[Pages 1730-1732]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-00053]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration

[DOE/EIS-0514]


Colusa-Sutter 500-Kilovolt Transmission Line Project, Colusa, 
Sutter, Yolo and Sacramento Counties, California

AGENCY: Western Area Power Administration, Department of Energy.

ACTION: Notice of additional public scoping meetings.

-----------------------------------------------------------------------

SUMMARY: On December 18, 2015, Western Area Power Administration 
(WAPA), an agency of the Department of Energy (DOE), announced the 
Notice of Intent to prepare an Environmental Impact Statement/
Environmental Impact Report (EIS/EIR) for the proposed 500-kilovolt 
(kV) transmission line. This proposed Project is known as the Colusa-
Sutter (CoSu) 500-kV Transmission Line Project. In that previous 
notice, WAPA described the schedule for scoping meetings and advised 
the public that comments on the scope of the EIS/EIR were due by 
February 16, 2016. On February 5, 2016, an additional notice was 
published extending the due date for comments on the scope of the EIS/
EIR to April 18, 2016. By this notice, WAPA announces additional public 
scoping meetings and reopens the period for submitting comments on the 
scope of the EIS/EIR.

DATES: WAPA will accept comments on the scope of the EIS/EIR from 
January 6, 2017 to March 7, 2017.

ADDRESSES: Written comments on the proposed scope of the Draft EIS/EIR 
for this proposed Project may be mailed or emailed to Mr. Andrew M. 
Monta[ntilde]o, National Environmental Policy Act (NEPA) Document 
Manager, Western Area Power Administration, Headquarters, P.O. Box 
281213, Lakewood, CO 80228-8213, or by email: [email protected].

FOR FURTHER INFORMATION CONTACT: For further information and/or to have 
your

[[Page 1731]]

name added to our mailing list, please contact Andrew M. 
Monta[ntilde]o, at (720) 962-7253 or at the address listed above in the 
ADDRESSES section. For the most recent information and for 
announcements, please visit the Project Web site at: www.CoSuLine.com.
    For general information on DOE's NEPA review procedures or status 
of a NEPA review, contact Ms. Carol M. Borgstrom, Director of NEPA 
Policy and Compliance, GC-54, U.S. Department of Energy, 1000 
Independence Avenue SW., Washington, DC 20585; telephone (202) 586-4600 
or (800) 472-2756; or email: [email protected].
    For general information on the Sacramento Municipal Utility 
District (SMUD) California Environmental Quality Act (CEQA) review 
procedures or status of the CEQA review, please contact Ms. Kim 
Crawford, Environmental Specialist, SMUD, 6201 S. Street, Mail Stop 
H201, Sacramento, CA 95852-1830; telephone (916) 732-5063; email: 
[email protected].

SUPPLEMENTARY INFORMATION: On December 18, 2015, WAPA announced the 
Notice of Intent to prepare an EIS for the Colusa-Sutter (CoSu) 500-kV 
Transmission Line Project (80 FR 79037). An additional notice was 
published on February 5, 2016, announcing the extension of the scoping 
period to April 18, 2016 (81 FR 6257). The EIS/EIR will examine the 
potential environmental effects of the CoSu transmission line. WAPA 
will prepare the EIS/EIR with the SMUD, the lead state agency for CEQA. 
WAPA will be the lead Federal agency under NEPA.
    WAPA and SMUD held public scoping meetings from December 2015 to 
April 2016 to gather public input on the proposed project. As a result 
of these original public scoping meetings and the scoping comments 
received, WAPA and SMUD decided to add additional project alternatives 
closer to the Sacramento area. The new study area is further described 
below.

Original Alternatives

    1. Northern Corridor Alternative: Constructing a new transmission 
line (approximately 44 miles in length) adjacent to WAPA's existing 
230-kV Olinda-O'Banion and Keswick-O'Banion double circuit transmission 
lines. The Northern Corridor Alternative would interconnect the 
existing California-Oregon Transmission Project (COTP) transmission 
line system near the existing COTP's Maxwell Series Compensation 
Substation to WAPA's CVP transmission system near the existing WAPA's 
O'Banion Substation. The new transmission line would require the 
construction of an additional substation adjacent to the existing 
Maxwell Series Compensation Substation and an additional substation 
adjacent to the existing O'Banion Substation.
    2. Southern Corridor Alternative: Constructing a new transmission 
line (approximately 27 miles in length) so that it interconnects along 
the existing COTP transmission line system approximately 8 miles 
northwest of the community of Arbuckle, California, and proceeds 
eastwardly towards the existing O'Banion Substation. The Southern 
Corridor Alternative would also require the construction of an 
additional substation adjacent to the existing COTP transmission line 
northwest of Arbuckle and an additional substation adjacent to the 
existing O'Banion Substation.
    3. Segment 1 Alternative: Approximately 9 miles in length and just 
west of the existing O'Banion Substation, this segment would provide an 
alternate north-to-south route for the Northern Corridor Alternative. 
Instead of following WAPA's existing 230-kV Olinda-O'Banion and 
Keswick-O'Banion double circuit transmission lines to the O'Banion 
substation, this segment would extend south, at a location 
approximately 30 miles from the Maxwell Substation, and then continue 
due east to connect to the O'Banion substation. Under this segment 
alternative, the new line would be located further away from the Sutter 
National Wildlife Refuge.

New Alternatives

    4. County Road 16 Alternative: Constructing a new transmission line 
(approximately 27 miles in length) so that it interconnects along the 
existing COTP transmission line system approximately 8 miles west of 
the community of Dufour, California, and proceeds eastwardly towards 
the existing Elverta Substation. The County Road 16 Alternative would 
also require the construction of an additional substation adjacent to 
the existing COTP transmission line northwest of Dufour and an 
additional substation adjacent to the existing Elverta Substation.
    5. Segment 2 Alternative: Approximately 9 miles in length and 6 
miles northwest of the existing Elverta Substation, this segment would 
provide an alternate west-to-east route for the County Road 16 
Alternative. This segment would extend north in a loop-like fashion, at 
a location approximately 2.5 miles north of the Sacramento 
International Airport, and then rejoin the County Road 16 Alternative 
as it continues due east to connect to the Elverta Substation. Under 
this segment alternative, the new line would be located further away 
from the Sacramento International Airport to provide sufficient 
clearance of transmission structures for airplanes.
    6. No Action Alternative: WAPA will also consider a No Action 
Alternative in the EIS/EIR. Under the No Action Alternative, for the 
purpose of establishing a baseline for impact analysis and comparison 
in the EIS/EIR, WAPA would not construct the proposed Project and the 
environmental impacts associated with construction and operation would 
not occur.

Public Participation

    The EIS/EIR process includes a public scoping period and public 
scoping meetings; publication, public review and hearing of the Draft 
EIS/EIR; publication of a Final EIS/EIR; and publication of a ROD.
    WAPA and SMUD will hold six additional public scoping meetings at 
the following times and locations:
    (1) Tuesday, January 24, 2017, from 5:00 p.m. to 8:00 p.m. at the 
Sutter Youth Organization Center, 7740 Butte House Road, Sutter, CA 
95982;
    (2) Thursday, January 26, 2017, from 5:00 p.m. to 8:00 p.m. at the 
Colusa Casino Community Room, 3770 California 45, Colusa, CA 95932;
    (3) Tuesday, January 31, 2017, from 9:00 a.m. to 12:00 p.m. at the 
Woodland Community and Senior Center Banquet Rooms, 2001 East Street, 
Woodland, CA 95776;
    (4) Tuesday, January 31, 2017, from 5:00 p.m. to 8:00 p.m. at the 
Woodland Community and Senior Center Banquet Rooms, 2001 East Street, 
Woodland, CA 95776;
    (5) Thursday, February 2, 2017, from 9:00 a.m. to 12:00 p.m. at the 
Haggin-Grant American Legion Post 521, 6700 8th Street, Rio Linda, CA 
95673; and,
    (6) Thursday, February 2, 2017, from 5:00 p.m. to 8:00 p.m. at the 
Haggin-Grant American Legion Post 521, 6700 8th Street, Rio Linda, CA 
95673.
    The meetings will be informal, and attendees will be able to speak 
directly with both WAPA and SMUD representatives about the proposed 
Project. Attendees also may provide comments at these meetings. For the 
most recent information and for announcements, please visit the Project 
Web site at: www.CoSuLine.com.
    At the conclusion of the NEPA process, WAPA will prepare a ROD. 
Persons interested in receiving future notices, proposed Project 
information, copies of the EIS/EIR, and other information on the NEPA 
review process should contact Mr. Monta[ntilde]o at

[[Page 1732]]

the address listed in the ADDRESSES section.
    The purpose of the additional scoping meetings is to provide 
information about the proposed Project, review Project maps, answer 
questions, and take oral and written comments from interested parties. 
All meeting locations will be handicapped-accessible. Anyone needing 
special accommodations should contact Mr. Monta[ntilde]o to make 
arrangements.
    The public will have the opportunity to provide written comments at 
the public scoping meetings. Written comments may also be sent to Mr. 
Monta[ntilde]o by email or U.S. Postal Service mail. To help define the 
scope of the EIS/EIR, comments should be received by WAPA no later than 
March 7, 2017. WAPA will consider any comments received from April 18, 
2016 and March 7, 2017 to be timely submitted. All comments received 
during the public scoping period will be considered when developing 
project alternatives and establishing the scope of issues to be 
analyzed in the EIS/EIR.

    Dated: December 19, 2016.
Mark A. Gabriel,
Administrator.
[FR Doc. 2017-00053 Filed 1-5-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                1730                             Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Notices

                                                ER14–1524–008; ER16–2194–002;                              Applicants: Tenaska Alabama II                         eFiling is encouraged. More detailed
                                                ER10–3308–025; ER10–3018–005;                           Partners, L.P.                                         information relating to filing
                                                ER10–3015–005; ER10–1020–023;                              Description: § 205(d) Rate Filing:                  requirements, interventions, protests,
                                                ER13–1536–013; ER10–1078–023;                           Market-Based Rate Tariff Revisions to be               service, and qualifying facilities filings
                                                ER10–1080–023; ER16–2708–002;                           effective 12/30/2016.                                  can be found at: http://www.ferc.gov/
                                                ER10–1081–024; ER15–2293–002;                              Filed Date: 12/29/16.                               docs-filing/efiling/filing-req.pdf. For
                                                ER14–2145–006; ER10–2180–027;                              Accession Number: 20161229–5089.                    other information, call (866) 208–3676
                                                ER10–1143–024; ER10–2992–005;                              Comments Due: 5 p.m. ET 1/19/17.                    (toll free). For TTY, call (202) 502–8659.
                                                ER10–3030–005.                                             Docket Numbers: ER17–699–000.                         Dated: December 29, 2016.
                                                   Applicants: Atlantic City Electric                      Applicants: Tenaska Georgia Partners,               Nathaniel J. Davis, Sr.,
                                                Company, Baltimore Gas and Electric                     L.P.
                                                                                                                                                               Deputy Secretary.
                                                Company, Bethlehem Renewable                               Description: § 205(d) Rate Filing:
                                                                                                                                                               [FR Doc. 2016–32043 Filed 1–5–17; 8:45 am]
                                                Energy, LLC, Commonwealth Edison                        Market-Based Rate Tariff Revisions to be
                                                Company, Constellation Energy                                                                                  BILLING CODE 6717–01–P
                                                                                                        effective 12/30/2016.
                                                Commodities Group Maine, LLC,                              Filed Date: 12/29/16.
                                                Constellation Energy Services, Inc.,                       Accession Number: 20161229–5090.
                                                                                                           Comments Due: 5 p.m. ET 1/19/17.                    DEPARTMENT OF ENERGY
                                                Constellation Energy Services of New
                                                York, Inc., Constellation Mystic Power,                    Docket Numbers: ER17–700–000.                       Western Area Power Administration
                                                LLC, Constellation NewEnergy, Inc.,                        Applicants: Tenaska Virginia
                                                Constellation Power Source Generation,                  Partners, L.P.                                         [DOE/EIS–0514]
                                                LLC, Clinton Battery Utility, LLC,                         Description: § 205(d) Rate Filing:
                                                Criterion Power Partners, LLC,                                                                                 Colusa-Sutter 500-Kilovolt
                                                                                                        Market-Based Rate Tariff Revisions to be
                                                Delmarva Power & Light Company,                                                                                Transmission Line Project, Colusa,
                                                                                                        effective 12/30/2016.
                                                Eastern Landfill Gas, LLC, Exelon                          Filed Date: 12/29/16.                               Sutter, Yolo and Sacramento Counties,
                                                Framingham, LLC, Exelon Generation                         Accession Number: 20161229–5091.                    California
                                                Company, LLC, Exelon New Boston,                           Comments Due: 5 p.m. ET 1/19/17.                    AGENCY: Western Area Power
                                                LLC, Exelon West Medway, LLC, Exelon                       Docket Numbers: ER17–701–000.                       Administration, Department of Energy.
                                                West Medway II, LLC, Exelon Wyman,                         Applicants: Midcontinent                            ACTION: Notice of additional public
                                                LLC, Fair Wind Power Partners, LLC,                     Independent System Operator, Inc.                      scoping meetings.
                                                Fourmile Wind Energy, LLC, Handsome                        Description: § 205(d) Rate Filing:
                                                Lake Energy, LLC, PECO Energy                           2016–12–29_SA 2985 MidAmerican-                        SUMMARY:   On December 18, 2015,
                                                Company, Pepco Energy Services, Inc.,                   MidAmerican GIA (J499) to be effective                 Western Area Power Administration
                                                Potomac Electric Power Company.                         12/30/2016.                                            (WAPA), an agency of the Department of
                                                   Description: Updated Market Power                       Filed Date: 12/29/16.                               Energy (DOE), announced the Notice of
                                                Analysis for the Northeast Region of the                   Accession Number: 20161229–5093.                    Intent to prepare an Environmental
                                                Exelon Northeast entities.                                 Comments Due: 5 p.m. ET 1/19/17.                    Impact Statement/Environmental
                                                   Filed Date: 12/29/16.                                   Docket Numbers: ER17–702–000.                       Impact Report (EIS/EIR) for the
                                                   Accession Number: 20161229–5147.                        Applicants: Midcontinent                            proposed 500-kilovolt (kV) transmission
                                                   Comments Due: 5 p.m. ET 2/27/17.                     Independent System Operator, Inc.                      line. This proposed Project is known as
                                                   Docket Numbers: ER16–2364–001.                          Description: § 205(d) Rate Filing:                  the Colusa-Sutter (CoSu) 500-kV
                                                   Applicants: Algonquin SKIC 10 Solar,                 2016–12–29_SA 2986 MidAmerican-                        Transmission Line Project. In that
                                                LLC.                                                    MidAmerican GIA (J501) to be effective                 previous notice, WAPA described the
                                                   Description: Notice of Non-Material                  12/30/2016.                                            schedule for scoping meetings and
                                                Change in Status of Algonquin SKIC 10                      Filed Date: 12/29/16.                               advised the public that comments on
                                                Solar, LLC.                                                Accession Number: 20161229–5095.                    the scope of the EIS/EIR were due by
                                                   Filed Date: 12/29/16.                                   Comments Due: 5 p.m. ET 1/19/17.                    February 16, 2016. On February 5, 2016,
                                                   Accession Number: 20161229–5115.                        Docket Numbers: ER17–703–000.                       an additional notice was published
                                                   Comments Due: 5 p.m. ET 1/19/17.                        Applicants: PacifiCorp.                             extending the due date for comments on
                                                   Docket Numbers: ER17–696–000.                           Description: § 205(d) Rate Filing: BPA              the scope of the EIS/EIR to April 18,
                                                   Applicants: Calpine Energy Solutions,                NITSA (Yakama) Rev 7 to be effective                   2016. By this notice, WAPA announces
                                                LLC.                                                    12/1/2016.                                             additional public scoping meetings and
                                                   Description: § 205(d) Rate Filing:                      Filed Date: 12/29/16.                               reopens the period for submitting
                                                Notice of Succession and Revisions to                      Accession Number: 20161229–5101.                    comments on the scope of the EIS/EIR.
                                                Market-Based Rate Tariff to be effective                   Comments Due: 5 p.m. ET 1/19/17.                    DATES: WAPA will accept comments on
                                                12/30/2016.                                                The filings are accessible in the                   the scope of the EIS/EIR from January 6,
                                                   Filed Date: 12/29/16.                                Commission’s eLibrary system by                        2017 to March 7, 2017.
                                                   Accession Number: 20161229–5019.                     clicking on the links or querying the                  ADDRESSES: Written comments on the
                                                   Comments Due: 5 p.m. ET 1/19/17.                     docket number.                                         proposed scope of the Draft EIS/EIR for
                                                   Docket Numbers: ER17–697–000.                           Any person desiring to intervene or                 this proposed Project may be mailed or
                                                   Applicants: Tenaska Alabama                          protest in any of the above proceedings                emailed to Mr. Andrew M. Montaño,
                                                Partners, L.P.                                          must file in accordance with Rules 211                 National Environmental Policy Act
sradovich on DSK3GMQ082PROD with NOTICES




                                                   Description: § 205(d) Rate Filing:                   and 214 of the Commission’s                            (NEPA) Document Manager, Western
                                                Market-Based Rate Tariff Revisions to be                Regulations (18 CFR 385.211 and                        Area Power Administration,
                                                effective 12/30/2016.                                   385.214) on or before 5:00 p.m. Eastern                Headquarters, P.O. Box 281213,
                                                   Filed Date: 12/29/16.                                time on the specified comment date.                    Lakewood, CO 80228–8213, or by email:
                                                   Accession Number: 20161229–5088.                     Protests may be considered, but                        montano@wapa.gov.
                                                   Comments Due: 5 p.m. ET 1/19/17.                     intervention is necessary to become a                  FOR FURTHER INFORMATION CONTACT: For
                                                   Docket Numbers: ER17–698–000.                        party to the proceeding.                               further information and/or to have your


                                           VerDate Sep<11>2014   18:06 Jan 05, 2017   Jkt 241001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\06JAN1.SGM   06JAN1


                                                                                 Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Notices                                           1731

                                                name added to our mailing list, please                  substation adjacent to the existing                    alternative, the new line would be
                                                contact Andrew M. Montaño, at (720)                    Maxwell Series Compensation                            located further away from the
                                                962–7253 or at the address listed above                 Substation and an additional substation                Sacramento International Airport to
                                                in the ADDRESSES section. For the most                  adjacent to the existing O’Banion                      provide sufficient clearance of
                                                recent information and for                              Substation.                                            transmission structures for airplanes.
                                                announcements, please visit the Project                    2. Southern Corridor Alternative:                      6. No Action Alternative: WAPA will
                                                Web site at: www.CoSuLine.com.                          Constructing a new transmission line                   also consider a No Action Alternative in
                                                   For general information on DOE’s                     (approximately 27 miles in length) so                  the EIS/EIR. Under the No Action
                                                NEPA review procedures or status of a                   that it interconnects along the existing               Alternative, for the purpose of
                                                NEPA review, contact Ms. Carol M.                       COTP transmission line system                          establishing a baseline for impact
                                                Borgstrom, Director of NEPA Policy and                  approximately 8 miles northwest of the                 analysis and comparison in the EIS/EIR,
                                                Compliance, GC–54, U.S. Department of                   community of Arbuckle, California, and                 WAPA would not construct the
                                                Energy, 1000 Independence Avenue                        proceeds eastwardly towards the                        proposed Project and the environmental
                                                SW., Washington, DC 20585; telephone                    existing O’Banion Substation. The                      impacts associated with construction
                                                (202) 586–4600 or (800) 472–2756; or                    Southern Corridor Alternative would                    and operation would not occur.
                                                email: askNEPA@hq.doe.gov.                              also require the construction of an
                                                   For general information on the                       additional substation adjacent to the                  Public Participation
                                                Sacramento Municipal Utility District                   existing COTP transmission line                           The EIS/EIR process includes a public
                                                (SMUD) California Environmental                         northwest of Arbuckle and an additional                scoping period and public scoping
                                                Quality Act (CEQA) review procedures                    substation adjacent to the existing                    meetings; publication, public review
                                                or status of the CEQA review, please                    O’Banion Substation.                                   and hearing of the Draft EIS/EIR;
                                                contact Ms. Kim Crawford,                                  3. Segment 1 Alternative:                           publication of a Final EIS/EIR; and
                                                Environmental Specialist, SMUD, 6201                    Approximately 9 miles in length and                    publication of a ROD.
                                                S. Street, Mail Stop H201, Sacramento,                  just west of the existing O’Banion                        WAPA and SMUD will hold six
                                                CA 95852–1830; telephone (916) 732–                     Substation, this segment would provide                 additional public scoping meetings at
                                                5063; email: kim.crawford@smud.org.                     an alternate north-to-south route for the              the following times and locations:
                                                SUPPLEMENTARY INFORMATION: On                           Northern Corridor Alternative. Instead                    (1) Tuesday, January 24, 2017, from
                                                December 18, 2015, WAPA announced                       of following WAPA’s existing 230-kV                    5:00 p.m. to 8:00 p.m. at the Sutter
                                                the Notice of Intent to prepare an EIS for              Olinda-O’Banion and Keswick-O’Banion                   Youth Organization Center, 7740 Butte
                                                the Colusa-Sutter (CoSu) 500-kV                         double circuit transmission lines to the               House Road, Sutter, CA 95982;
                                                Transmission Line Project (80 FR                        O’Banion substation, this segment
                                                                                                                                                                  (2) Thursday, January 26, 2017, from
                                                79037). An additional notice was                        would extend south, at a location
                                                                                                                                                               5:00 p.m. to 8:00 p.m. at the Colusa
                                                published on February 5, 2016,                          approximately 30 miles from the
                                                                                                                                                               Casino Community Room, 3770
                                                announcing the extension of the scoping                 Maxwell Substation, and then continue
                                                                                                                                                               California 45, Colusa, CA 95932;
                                                period to April 18, 2016 (81 FR 6257).                  due east to connect to the O’Banion
                                                                                                        substation. Under this segment                            (3) Tuesday, January 31, 2017, from
                                                The EIS/EIR will examine the potential                                                                         9:00 a.m. to 12:00 p.m. at the Woodland
                                                environmental effects of the CoSu                       alternative, the new line would be
                                                                                                        located further away from the Sutter                   Community and Senior Center Banquet
                                                transmission line. WAPA will prepare                                                                           Rooms, 2001 East Street, Woodland, CA
                                                the EIS/EIR with the SMUD, the lead                     National Wildlife Refuge.
                                                                                                                                                               95776;
                                                state agency for CEQA. WAPA will be                     New Alternatives                                          (4) Tuesday, January 31, 2017, from
                                                the lead Federal agency under NEPA.
                                                   WAPA and SMUD held public                               4. County Road 16 Alternative:                      5:00 p.m. to 8:00 p.m. at the Woodland
                                                scoping meetings from December 2015                     Constructing a new transmission line                   Community and Senior Center Banquet
                                                to April 2016 to gather public input on                 (approximately 27 miles in length) so                  Rooms, 2001 East Street, Woodland, CA
                                                the proposed project. As a result of                    that it interconnects along the existing               95776;
                                                these original public scoping meetings                  COTP transmission line system                             (5) Thursday, February 2, 2017, from
                                                and the scoping comments received,                      approximately 8 miles west of the                      9:00 a.m. to 12:00 p.m. at the Haggin-
                                                WAPA and SMUD decided to add                            community of Dufour, California, and                   Grant American Legion Post 521, 6700
                                                additional project alternatives closer to               proceeds eastwardly towards the                        8th Street, Rio Linda, CA 95673; and,
                                                the Sacramento area. The new study                      existing Elverta Substation. The County                   (6) Thursday, February 2, 2017, from
                                                area is further described below.                        Road 16 Alternative would also require                 5:00 p.m. to 8:00 p.m. at the Haggin-
                                                                                                        the construction of an additional                      Grant American Legion Post 521, 6700
                                                Original Alternatives                                   substation adjacent to the existing COTP               8th Street, Rio Linda, CA 95673.
                                                   1. Northern Corridor Alternative:                    transmission line northwest of Dufour                     The meetings will be informal, and
                                                Constructing a new transmission line                    and an additional substation adjacent to               attendees will be able to speak directly
                                                (approximately 44 miles in length)                      the existing Elverta Substation.                       with both WAPA and SMUD
                                                adjacent to WAPA’s existing 230-kV                         5. Segment 2 Alternative:                           representatives about the proposed
                                                Olinda-O’Banion and Keswick-O’Banion                    Approximately 9 miles in length and 6                  Project. Attendees also may provide
                                                double circuit transmission lines. The                  miles northwest of the existing Elverta                comments at these meetings. For the
                                                Northern Corridor Alternative would                     Substation, this segment would provide                 most recent information and for
                                                interconnect the existing California-                   an alternate west-to-east route for the                announcements, please visit the Project
                                                Oregon Transmission Project (COTP)                      County Road 16 Alternative. This                       Web site at: www.CoSuLine.com.
sradovich on DSK3GMQ082PROD with NOTICES




                                                transmission line system near the                       segment would extend north in a loop-                     At the conclusion of the NEPA
                                                existing COTP’s Maxwell Series                          like fashion, at a location approximately              process, WAPA will prepare a ROD.
                                                Compensation Substation to WAPA’s                       2.5 miles north of the Sacramento                      Persons interested in receiving future
                                                CVP transmission system near the                        International Airport, and then rejoin                 notices, proposed Project information,
                                                existing WAPA’s O’Banion Substation.                    the County Road 16 Alternative as it                   copies of the EIS/EIR, and other
                                                The new transmission line would                         continues due east to connect to the                   information on the NEPA review
                                                require the construction of an additional               Elverta Substation. Under this segment                 process should contact Mr. Montaño at


                                           VerDate Sep<11>2014   18:06 Jan 05, 2017   Jkt 241001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\06JAN1.SGM   06JAN1


                                                1732                             Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Notices

                                                the address listed in the ADDRESSES                     the Scrubgrass Generating Co., L.P.                    expeditiously deliver notice of EPA’s
                                                section.                                                power plant (‘‘Scrubgrass Plant’’),                    response to the Office of the Federal
                                                   The purpose of the additional scoping                located in Venango County,                             Register for review and publication
                                                meetings is to provide information                      Pennsylvania. The proposed consent                     following signature of such response. In
                                                about the proposed Project, review                      decree would establish a deadline for                  addition, the proposed consent decree
                                                Project maps, answer questions, and                     EPA to take such action.                               outlines the procedure for the Plaintiffs
                                                take oral and written comments from                     DATES: Written comments on the                         to request costs of litigation, including
                                                interested parties. All meeting locations               proposed consent decree must be                        attorney fees. See the proposed consent
                                                will be handicapped-accessible. Anyone                  received by February 6, 2017.                          decree for the specific details.
                                                needing special accommodations should                   ADDRESSES: Submit your comments,                          For a period of thirty (30) days
                                                contact Mr. Montaño to make                            identified by Docket ID number EPA–                    following the date of publication of this
                                                arrangements.                                           HQ–OGC–2016–0778, online at                            notice, the Agency will accept written
                                                   The public will have the opportunity                 www.regulations.gov. For comments                      comments relating to the proposed
                                                to provide written comments at the                      submitted at www.regulations.gov,                      consent decree from persons who are
                                                public scoping meetings. Written                        follow the online instructions for                     not named as parties or intervenors to
                                                comments may also be sent to Mr.                        submitting comments. Once submitted,                   the litigation in question. EPA or the
                                                Montaño by email or U.S. Postal Service                comments cannot be edited or removed                   Department of Justice may withdraw or
                                                mail. To help define the scope of the                   from www.regulations.gov. The EPA                      withhold consent to the proposed
                                                EIS/EIR, comments should be received                    may publish any comment received to                    consent decree if the comments disclose
                                                by WAPA no later than March 7, 2017.                    its public docket. Do not submit                       facts or considerations that indicate that
                                                WAPA will consider any comments                         electronically any information you                     such consent is inappropriate,
                                                received from April 18, 2016 and March                  consider to be Confidential Business                   improper, inadequate, or inconsistent
                                                7, 2017 to be timely submitted. All                     Information (CBI) or other information                 with the requirements of the Act. Unless
                                                comments received during the public                     whose disclosure is restricted by statute.             EPA or the Department of Justice
                                                scoping period will be considered when                  Multimedia submissions (audio, video,                  determines that consent to this consent
                                                developing project alternatives and                     etc.) must be accompanied by a written                 decree should be withdrawn, the terms
                                                establishing the scope of issues to be                  comment. The written comment is                        of the consent decree will be affirmed.
                                                analyzed in the EIS/EIR.                                considered the official comment and                    II. Additional Information About
                                                 Dated: December 19, 2016.                              should include discussion of all points                Commenting on the Proposed Consent
                                                Mark A. Gabriel,                                        you wish to make. The EPA generally                    Decree
                                                Administrator.                                          will not consider comments or comment
                                                                                                        contents located outside of the primary                A. How can I get a copy of the consent
                                                [FR Doc. 2017–00053 Filed 1–5–17; 8:45 am]
                                                                                                        submission (i.e. on the web, cloud, or                 decree?
                                                BILLING CODE 6450–01–P
                                                                                                        other file sharing system). For                           The official public docket for this
                                                                                                        additional submission methods, please                  action (identified by Docket ID No.
                                                ENVIRONMENTAL PROTECTION                                contact the person identified in the FOR               EPA–HQ–OGC–2016–0778) contains a
                                                                                                        FURTHER INFORMATION CONTACT section.                   copy of the proposed consent decree.
                                                AGENCY
                                                                                                        For the full EPA public comment policy,                The official public docket is available
                                                [EPA–HQ–OGC–2016–0778; FRL–9957–94–                     information about CBI or multimedia                    for public viewing at the Office of
                                                OGC]                                                    submissions, and general guidance on                   Environmental Information (‘‘OEI’’)
                                                                                                        making effective comments, please visit                Docket in the EPA Docket Center, EPA
                                                Proposed Consent Decree, Clean Air                      http://www2.epa.gov/dockets/                           West, Room 3334, 1301 Constitution
                                                Act Citizen Suit                                        commenting-epa-dockets.                                Ave. NW., Washington, DC. The EPA
                                                AGENCY:  Environmental Protection                       FOR FURTHER INFORMATION CONTACT:                       Docket Center Public Reading Room is
                                                Agency (EPA).                                           Charles Starrs, Air and Radiation Law                  open from 8:30 a.m. to 4:30 p.m.,
                                                ACTION: Notice of proposed consent                      Office (2322A), Office of General                      Monday through Friday, excluding legal
                                                decree; request for public comment.                     Counsel, U.S. Environmental Protection                 holidays. The telephone number for the
                                                                                                        Agency, 1200 Pennsylvania Ave. NW.,                    Public Reading Room is (202) 566–1744,
                                                SUMMARY:   In accordance with section                   Washington, DC 20460; telephone: (202)                 and the telephone number for the OEI
                                                113(g) of the Clean Air Act, as amended                 564–1996; email address:                               Docket is (202) 566–1752.
                                                (‘‘CAA’’ or the ‘‘Act’’), notice is hereby              starrs.charles@epa.gov.                                   An electronic version of the public
                                                given of a proposed consent decree in                   SUPPLEMENTARY INFORMATION:                             docket is available through
                                                Sierra Club v. McCarthy, Civil Action                                                                          www.regulations.gov. You may use
                                                No. 1:16–cv–01831–EGS (D. DC). On                       I. Additional Information About the                    www.regulations.gov to submit or view
                                                September 15, 2016, the Sierra Club                     Proposed Consent Decree                                public comments, access the index
                                                filed a complaint in the United States                     The proposed consent decree would                   listing of the contents of the official
                                                District Court for the District of                      resolve a lawsuit filed by Sierra Club                 public docket, and access those
                                                Columbia, alleging that Gina McCarthy,                  seeking to compel the Administrator to                 documents in the public docket that are
                                                in her official capacity as Administrator               take actions under CAA section                         available electronically. Once in the
                                                of the United States Environmental                      505(b)(2). Under the terms of the                      system, key in the appropriate docket
                                                Protection Agency (‘‘EPA’’), failed to
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        proposed consent decree, EPA would                     identification number then select
                                                perform a non-discretionary duty to                     agree to sign its response granting or                 ‘‘search.’’
                                                grant or deny within 60 days a petition                 denying the petition filed by Sierra Club                 It is important to note that EPA’s
                                                submitted by Sierra Club on May 3,                      regarding the Scrubgrass Plant, pursuant               policy is that public comments, whether
                                                2016 requesting that EPA object to a                    to section 505(b)(2) of the CAA, on or                 submitted electronically or in paper,
                                                CAA Title V permit issued by the                        before May 12, 2017.                                   will be made available for public
                                                Pennsylvania Department of                                 Under the terms of the proposed                     viewing online at www.regulations.gov
                                                Environmental Protection (‘‘PDEP’’) for                 consent decree, EPA would                              without change, unless the comment


                                           VerDate Sep<11>2014   18:06 Jan 05, 2017   Jkt 241001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\06JAN1.SGM   06JAN1



Document Created: 2017-01-06 01:30:01
Document Modified: 2017-01-06 01:30:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of additional public scoping meetings.
DatesWAPA will accept comments on the scope of the EIS/EIR from January 6, 2017 to March 7, 2017.
ContactFor further information and/or to have your name added to our mailing list, please contact Andrew M.