82_FR_18846 82 FR 18770 - Rate Adjustments for Indian Irrigation Projects

82 FR 18770 - Rate Adjustments for Indian Irrigation Projects

DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs

Federal Register Volume 82, Issue 76 (April 21, 2017)

Page Range18770-18775
FR Document2017-08202

The Bureau of Indian Affairs (BIA) owns, or has an interest in, irrigation projects located on or associated with various Indian reservations throughout the United States. We are required to establish irrigation assessment rates to recover the costs to administer, operate, maintain, and rehabilitate these projects. We request your comments on the proposed rate adjustments.

Federal Register, Volume 82 Issue 76 (Friday, April 21, 2017)
[Federal Register Volume 82, Number 76 (Friday, April 21, 2017)]
[Notices]
[Pages 18770-18775]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-08202]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

[177A2100DD/AAKC001030/A0A501010999900]


Rate Adjustments for Indian Irrigation Projects

AGENCY: Bureau of Indian Affairs, Interior.

ACTION: Notice of proposed rate adjustments.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Indian Affairs (BIA) owns, or has an interest 
in, irrigation projects located on or associated with various Indian 
reservations throughout the United States. We are required to establish 
irrigation assessment rates to recover the costs to administer, 
operate, maintain, and rehabilitate these projects. We request your 
comments on the proposed rate adjustments.

DATES: Interested parties may submit comments on the proposed rate 
adjustments on or before June 20, 2017.

ADDRESSES: All comments on the proposed rate adjustments must be in 
writing and addressed to: Yulan Jin, Chief, Division of Water and 
Power, Office of Trust Services, Mail Stop 4637-MIB, 1849 C Street NW., 
Washington, DC 20240, Telephone (202) 219-0941.

FOR FURTHER INFORMATION CONTACT: For details about a particular 
irrigation project, please use the tables in the SUPPLEMENTARY 
INFORMATION section to contact the regional or local office where the 
project is located.

SUPPLEMENTARY INFORMATION: The first table in this notice provides 
contact information for individuals who can give further information 
about the irrigation projects covered by this notice. The second table 
provides the current 2016 irrigation assessment rates, the proposed 
rates for Calendar Year (CY) 2017, and proposed rates for subsequent 
years where these rates are available.

What is the meaning of the key terms used in this notice?

    In this notice:
    Administrative costs mean all costs we incur to administer our 
irrigation projects at the local project level and is a cost factor 
included in calculating your operation and maintenance assessment. 
Costs incurred at the local project level do not normally include 
Agency, Region, or Central Office costs unless we state otherwise in 
writing.
    Assessable acre means lands designated by us to be served by one of

[[Page 18771]]

our irrigation projects, for which we collect assessments in order to 
recover costs for the provision of irrigation service. (See total 
assessable acres.)
    BIA means the Bureau of Indian Affairs.
    Bill means our statement to you of the assessment charges and/or 
fees you owe the United States for administration, operation, 
maintenance, and/or rehabilitation. The date we mail or hand-deliver 
your bill will be stated on it.
    Costs means the costs we incur for administration, operation, 
maintenance, and rehabilitation to provide direct support or benefit to 
an irrigation facility. (See administrative costs, operation costs, 
maintenance costs, and rehabilitation costs).
    Customer means any person or entity to whom or to which we provide 
irrigation service.
    Due date is the date on which your bill is due and payable. This 
date will be stated on your bill.
    I, me, my, you and your means all persons or entities that are 
affected by this notice.
    Irrigation project means a facility or portion thereof for the 
delivery, diversion, and storage of irrigation water that we own or 
have an interest in, including all appurtenant works. The term 
``irrigation project'' is used interchangeably with irrigation 
facility, irrigation system, and irrigation area.
    Irrigation service means the full range of services we provide 
customers of our irrigation projects. This includes our activities to 
administer, operate, maintain, and rehabilitate our projects in order 
to deliver water.
    Maintenance costs means costs we incur to maintain and repair our 
irrigation projects and associated equipment and is a cost factor 
included in calculating your operation and maintenance assessment.
    Operation and maintenance (O&M) assessment means the periodic 
charge you must pay us to reimburse costs of administering, operating, 
maintaining, and rehabilitating irrigation projects consistent with 
this notice and our supporting policies, manuals, and handbooks.
    Operation or operating costs means costs we incur to operate our 
irrigation projects and equipment and is a cost factor included in 
calculating your O&M assessment.
    Past due bill means a bill that has not been paid by the close of 
business on the 30th day after the due date as stated on the bill. 
Beginning on the 31st day after the due date, we begin assessing 
additional charges accruing from the due date.
    Rehabilitation costs means costs we incur to restore our irrigation 
projects or features to original operating condition or to the nearest 
state which can be achieved using current technology and is a cost 
factor included in calculating your O&M assessment.
    Responsible party means an individual or entity that owns or leases 
land within the assessable acreage of one of our irrigation projects 
and is responsible for providing accurate information to our billing 
office and paying a bill for an annual irrigation rate assessment.
    Total assessable acres means the total acres served by one of our 
irrigation projects.
    Water delivery is an activity that is part of the irrigation 
service we provide our customers when water is available.
    We, us, and our means the United States Government, the Secretary 
of the Interior, the BIA, and all who are authorized to represent us in 
matters covered under this notice.

Does this notice affect me?

    This notice affects you if you own or lease land within the 
assessable acreage of one of our irrigation projects or if you have a 
carriage agreement with one of our irrigation projects.

Where can I get information on the regulatory and legal citations in 
this notice?

    You can contact the appropriate office(s) stated in the tables for 
the irrigation project that serves you, or you can use the Internet 
site for the Government Printing Office at http://www.thefederalregister.org.

Why are you publishing this notice?

    We are publishing this notice to inform you that we propose to 
adjust our irrigation assessment rates. This notice is published in 
accordance with the BIA's regulations governing its operation and 
maintenance of irrigation projects, found at 25 CFR part 171. This 
regulation provides for the establishment and publication of the 
proposed rates for annual irrigation assessments as well as related 
information about our irrigation projects.

What authorizes you to issue this notice?

    Our authority to issue this notice is vested in the Secretary of 
the Interior by 5 U.S.C. 301 and the Act of August 14, 1914 (38 Stat. 
583; 25 U.S.C. 385). The Secretary has in turn delegated this authority 
to the Assistant Secretary--Indian Affairs under Part 209, Chapter 
8.1A, of the Department of the Interior's Departmental Manual.

When will you put the rate adjustments into effect?

    We will put the rate adjustments into effect for the CY 2017 and 
subsequent years where applicable.

How do you calculate irrigation rates?

    We calculate annual irrigation assessment rates in accordance with 
25 CFR part 171.500 by estimating the annual costs of operation and 
maintenance at each of our irrigation projects and then dividing by the 
total assessable acres for that particular irrigation project. The 
result of this calculation for each project is stated in the rate table 
in this notice.

What kinds of expenses do you consider in determining the estimated 
annual costs of operation and maintenance?

    Consistent with 25 CFR part 171.500, these expenses include the 
following:
    (a) Salary and benefits for the project engineer/manager and 
project employees under the project engineer/manager's management or 
control;
    (b) Materials and supplies;
    (c) Vehicle and equipment repairs;
    (d) Equipment costs, including lease fees;
    (e) Depreciation;
    (f) Acquisition costs;
    (g) Maintenance of a reserve fund available for contingencies or 
emergency costs needed for the reliable operation of the irrigation 
facility infrastructure;
    (h) Maintenance of a vehicle and heavy equipment replacement fund;
    (i) Systematic rehabilitation and replacement of project 
facilities;
    (j) Carriage Agreements for the transfer of project water through 
irrigation facilities owned by others.
    (k) Any water storage fees for non-BIA-owned reservoirs, as 
applicable,
    (l) Contingencies for unknown costs and omitted budget items; and
    (m) Other expenses we determine necessary to properly perform the 
activities and functions characteristic of an irrigation project.

When should I pay my irrigation assessment?

    We will mail or hand-deliver your bill notifying you (a) the amount 
you owe to the United States and (b) when such amount is due. If we 
mail your bill, we will consider it as being delivered no later than 5 
business days after the day we mail it. You should pay your bill by the 
due date stated on the bill.

[[Page 18772]]

What information must I provide for billing purposes?

    All responsible parties are required to provide the following 
information to the billing office associated with the irrigation 
project where you own or lease land within the project's assessable 
acreage or to the billing office associated with the irrigation project 
with which you have a carriage agreement:
    (1) The full legal name of person or entity responsible for paying 
the bill;
    (2) An adequate and correct address for mailing or hand delivering 
our bill; and
    (3) The taxpayer identification number or social security number of 
the person or entity responsible for paying the bill.

Why are you collecting my taxpayer identification number or social 
security number?

    Public Law 104-134, the Debt Collection Improvement Act of 1996, 
requires that we collect the taxpayer identification number or social 
security number before billing a responsible party and as a condition 
to servicing the account.

What happens if I am a responsible party but I fail to furnish the 
information required to the billing office responsible for the 
irrigation project within which I own or lease assessable land or for 
which I have a carriage agreement?

    If you are late paying your bill because of your failure to furnish 
the required information listed above, you will be assessed interest 
and penalties as provided below, and your failure to provide the 
required information will not provide grounds for you to appeal your 
bill or any penalties assessed.

What can happen if I do not provide the information required for 
billing purposes?

    We can refuse to provide you irrigation service.

If I allow my bill to become past due, could this affect my water 
delivery?

    Yes. 25 CFR 171.545(a) states: ``We will not provide you irrigation 
service until: (1) Your bill is paid; or (2) You make arrangement for 
payment pursuant to Sec.  171.550 of this part.'' If we do not receive 
your payment before the close of business on the 30th day after the due 
date stated on your bill, we will send you a past due notice. This past 
due notice will have additional information concerning your rights. We 
will consider your past due notice as delivered no later than 5 
business days after the day we mail it. We follow the procedures 
provided in 31 CFR 901.2, ``Demand for Payment,'' when demanding 
payment of your past due bill.

Are there any additional charges if I am late paying my bill?

    Yes. We will assess you interest on the amount owed, using the rate 
of interest established annually by the Secretary of the United States 
Treasury (Treasury) to calculate what you will be assessed. You will 
not be assessed this charge until your bill is past due. However, if 
you allow your bill to become past due, interest will accrue from the 
original due date, not the past due date. Also, you will be charged an 
administrative fee of $12.50 for each time we try to collect your past 
due bill. If your bill becomes more than 90 days past due, you will be 
assessed a penalty charge of 6 percent per year, which will accrue from 
the date your bill initially became past due. Pursuant to 31 CFR 901.9, 
``Interest, penalties and administrative costs,'' as a Federal agency, 
we are required to charge interest, penalties, and administrative costs 
in accordance with 31 U.S.C. 3717.

What else will happen to my past due bill?

    If you do not pay your bill or make payment arrangements to which 
we agree, we are required to send your past due bill to the Treasury 
for further action. Under the provisions of 31 CFR 901.1, ``Aggressive 
agency collection activity,'' Federal agencies should consider 
referring debts that are less than 180 days delinquent, and we must 
send any unpaid annual irrigation assessment bill to Treasury no later 
than 180 days after the original due date of the bill.

Who can I contact for further information?

    The following tables are the regional and project/agency contacts 
for our irrigation facilities.

 
------------------------------------------------------------------------
           Project name                    Project/agency contacts
------------------------------------------------------------------------
                        Northwest Region Contacts
------------------------------------------------------------------------
Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest
 Regional Office, 911 N.E. 11th Avenue, Portland, OR 97232-4169,
 Telephone: (503) 231-6702..
------------------------------------------------------------------------
Flathead Irrigation Project.......  Peter Plant, Acting Superintendent,
                                     Pete Plant, Irrigation Project
                                     Manager, P.O. Box 40, Pablo, MT
                                     59855, Telephones: (406) 675-2700
                                     ext. 1300 Superintendent, (406) 745-
                                     2661 ext. 2 Project Manager.
Fort Hall Irrigation Project......  David Bollinger, Irrigation Project
                                     Manager, Building #2 Bannock Ave,
                                     Fort Hall, ID 83203-0220,
                                     Telephone: (208) 238-6264.
Wapato Irrigation Project.........  David Shaw, Superintendent, Larry
                                     Nelson, Acting Project
                                     Administrator, P.O. Box 220,
                                     Wapato, WA 98951-0220, Telephone:
                                     (509) 865-2421 Superintendent,
                                     (509) 877-3155 Acting Project
                                     Administrator.
------------------------------------------------------------------------
                     Rocky Mountain Region Contacts
------------------------------------------------------------------------
Darryl LaCounte, Regional Director, Bureau of Indian Affairs, Rocky
 Mountain Regional Office, 2021 4th Avenue North, Billings, MT 59101,
 Telephone: (406) 247-7943..
------------------------------------------------------------------------
Blackfeet Irrigation Project......  Thedis Crowe, Superintendent, Greg
                                     Tatsey, Irrigation Project Manager,
                                     Box 880, Browning, MT 59417,
                                     Telephones: (406) 338-7544,
                                     Superintendent, (406) 338-7519,
                                     Irrigation Project Manager.
Crow Irrigation Project...........  Vianna Stewart, Superintendent, John
                                     Anevski, Acting Irrigation Project
                                     Manager, P.O. Box 69, Crow Agency,
                                     MT 59022, Telephones: (406) 638-
                                     2672, Superintendent, (406) 247-
                                     7998, Acting Irrigation Project
                                     Manager.
Fort Belknap Irrigation Project...  John St. Pierre, Superintendent,
                                     Vacant, Irrigation Project Manager,
                                     (Project operations & maintenance
                                     contracted to Tribes), R.R.1, Box
                                     980, Harlem, MT 59526, Telephones:
                                     (406) 353-2901, Superintendent,
                                     (406) 353-8454, Irrigation Project
                                     Manager (Tribal Office).
Fort Peck Irrigation Project......  Howard Beemer, Superintendent, Huber
                                     Wright, Acting Irrigation Project
                                     Manager, P.O. Box 637, Poplar, MT
                                     59255, Telephones: (406) 768-5312,
                                     Superintendent, (406) 653-1752,
                                     Irrigation Project Manager.

[[Page 18773]]

 
Wind River Irrigation Project.....  Norma Gourneau, Superintendent, John
                                     Anevski, Acting Irrigation Project
                                     Manager, P.O. Box 158, Fort
                                     Washakie, WY 82514, Telephones:
                                     (307) 332-7810, Superintendent,
                                     (406) 247-7998, Acting Irrigation
                                     Project Manager.
------------------------------------------------------------------------
                        Southwest Region Contacts
------------------------------------------------------------------------
William T. Walker, Regional Director, Bureau of Indian Affairs,
 Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM
 87104, Telephone: (505) 563-3100..
------------------------------------------------------------------------
Pine River Irrigation Project.....  Priscilla Bancroft, Superintendent,
                                     Vickie Begay, Irrigation Project
                                     Manager, P.O. Box 315, Ignacio, CO
                                     81137-0315, Telephones: (970) 563-
                                     4511, Superintendent, (970) 563-
                                     9484, Irrigation Project Manager.
------------------------------------------------------------------------
                         Western Region Contacts
------------------------------------------------------------------------
Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western
 Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ
 85004, Telephone: (602) 379-6600..
------------------------------------------------------------------------
Colorado River Irrigation Project.  Kellie Youngbear, Superintendent,
                                     Gary Colvin, Irrigation Project
                                     Manager, 12124 1st Avenue, Parker,
                                     AZ 85344, Telephone: (928) 669-
                                     7111.
Duck Valley Irrigation Project....  Joseph McDade, Superintendent,
                                     (Project operations & management
                                     compacted to Tribes), 2719 Argent
                                     Ave., Suite 4, Gateway Plaza, Elko,
                                     NV 89801, Telephone: (775) 738-
                                     5165, (208) 759-3100, (Tribal
                                     Office).
Yuma Project, Indian Unit.........  Denni Shields, Superintendent, 256
                                     South Second Avenue, Suite D, Yuma,
                                     AZ 85364, Telephone: (928) 782-
                                     1202.
San Carlos Irrigation Project,      Ferris Begay, Project Manager,
 Indian Works and Joint Works.       Clarence Begay, Irrigation Manager,
                                     13805 N. Arizona Boulevard,
                                     Coolidge, AZ 85128, Telephone:
                                     (520) 723-6225.
Uintah Irrigation Project.........  Bart Stevens Superintendent, Ken
                                     Asay, Irrigation System Manager,
                                     P.O. Box 130, Fort Duchesne, UT
                                     84026, Telephone: (435) 722-4300,
                                     (435) 722-4344.
Walker River Irrigation Project...  Robert Eben, Superintendent, 311 E.
                                     Washington Street, Carson City, NV
                                     89701, Telephone: (775) 887-3500.
------------------------------------------------------------------------

What irrigation assessments or charges are proposed for adjustment by 
this notice?

    The rate table below contains the current rates for all irrigation 
projects where we recover costs of administering, operating, 
maintaining, and rehabilitating them. The table also contains the 
proposed rates for the CY 2017 and subsequent years where applicable. 
An asterisk immediately following the rate category notes the 
irrigation projects where rates are proposed for adjustment.

----------------------------------------------------------------------------------------------------------------
                                                                    Final 2016      Final 2017     Proposed 2018
             Project name                     Rate category            rate            rate           rate **
----------------------------------------------------------------------------------------------------------------
                                           Northwest Region Rate Table
----------------------------------------------------------------------------------------------------------------
Flathead Irrigation Project (See Note   Basic per acre--A.......          $26.00          $26.00          $33.50
 #1).                                   Basic per acre--B.......           13.00           13.00           16.75
                                        Minimum Charge per tract           75.00           75.00           75.00
----------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------
                                                                                    Final 2016     Proposed 2017
                 Project name                             Rate category                rate            rate
----------------------------------------------------------------------------------------------------------------
Fort Hall Irrigation Project..................  Basic per acre *................          $52.00          $54.00
                                                Minimum Charge per tract *......           37.00           38.50
Fort Hall Irrigation Project--Minor Units.....  Basic per acre *................           31.00           32.50
                                                Minimum Charge per tract *......           37.00           38.50
Fort Hall Irrigation Project--Michaud.........  Basic per acre *................           55.00           57.50
                                                Pressure per acre *.............           83.00           88.50
                                                Minimum Charge per tract *......           37.00           38.50
Wapato Irrigation Project--Toppenish/Simcoe     Minimum Charge per bill.........           25.00           25.00
 Units.                                         Basic per acre..................           25.00           25.00
Wapato Irrigation Project--Ahtanum Units......  Minimum Charge per bill.........           30.00           30.00
                                                Basic per acre..................           30.00           30.00
Wapato Irrigation Project--Satus Unit.........  Minimum Charge per bill.........           79.00           79.00
                                                ``A'' Basic per acre............           79.00           79.00
                                                ``B'' Basic per acre............           85.00           85.00
Wapato Irrigation Project--Additional Works...  Minimum Charge per bill.........           78.00           80.00
                                                Basic per acre *................           78.00           80.00
Wapato Irrigation Project--Water Rental.......  Minimum Charge..................           86.00           86.00
                                                Basic per acre..................           86.00           86.00
----------------------------------------------------------------------------------------------------------------
                                        Rocky Mountain Region Rate Table
----------------------------------------------------------------------------------------------------------------
Blackfeet Irrigation Project..................  Basic-per acre..................           20.00           20.00
Crow Irrigation Project--Willow Creek O&M       Basic-per acre *................           26.00           28.00
 (includes Agency, Lodge Grass #1, Lodge Grass
 #2, Reno, Upper Little Horn, and Forty Mile
 Units).
Crow Irrigation Project--All Others (includes   Basic-per acre *................           26.00           28.00
 Bighorn, Soap Creek, and Pryor Units).

[[Page 18774]]

 
Crow Irrigation Project--Two Leggins Unit.....  Basic-per acre..................           14.00           14.00
Crow Irrigation Two Leggins Drainage District.  Basic-per acre..................            2.00            2.00
Fort Belknap Irrigation Project...............  Basic-per acre..................           16.00           16.00
Fort Peck Irrigation Project..................  Basic-per acre *................           26.00           26.50
Wind River Irrigation Project--Units 2, 3 and   Basic-per acre *................           22.50           23.50
 4.
Wind River Irrigation Project--Unit 6.........  Basic-per acre..................           21.00           21.00
Wind River Irrigation Project--LeClair          Basic-per acre..................           47.00           47.00
 District (See Note #2).
Wind River Irrigation Project--Crow Heart Unit  Basic-per acre *................           15.50           15.75
Wind River Irrigation Project--A Canal Unit...  Basic-per acre *................           15.50           15.75
Wind River Irrigation Project--Riverton Valley  Basic-per acre *................           26.00           30.65
 Irrigation District.
----------------------------------------------------------------------------------------------------------------
                                           Southwest Region Rate Table
----------------------------------------------------------------------------------------------------------------
Pine River Irrigation Project.................  Minimum Charge per tract........           50.00           50.00
                                                Basic-per acre *................           18.00           19.00
----------------------------------------------------------------------------------------------------------------
                                            Western Region Rate Table
----------------------------------------------------------------------------------------------------------------
Colorado River Irrigation Project.............  Basic per acre up to 5.75 acre-            54.00           54.00
                                                 feet.
                                                Excess Water per acre-foot over            17.00           17.00
                                                 5.75 acre-feet.
Duck Valley Irrigation Project................  Basic per acre..................            5.30            5.30
Yuma Project, Indian Unit (See Note #3).......  Basic per acre up to 5.0 acre-            113.00           (\1\)
                                                 feet *.
                                                Excess Water per acre-foot over            24.50           27.50
                                                 5.0 acre-feet *.
                                                Basic per acre up to 5.0 acre-            113.00           (\1\)
                                                 feet (Ranch 5) *.
----------------------------------------------------------------------------------------------------------------
\1\ To be determined.


------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
            Project name                          Rate category                         Final 2016 rate                        Final 2017 rate                     Proposed 2018 rate **
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
San Carlos Irrigation Project (Joint  Basic per acre *.....................  $30.00...............................  $25.00...............................  $27.90.
 Works) (See Note #4).
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                            Proposed 2017 Construction Water Rate Schedule
                                     -----------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                    Off project construction           On project construction--gravity     On project construction--pump water
                                                                                                                                     water
                                     -----------------------------------------------------------------------------------------------------------------------------------------------------------
                                      Administrative Fee...................  $300.00..............................  $300.00..............................  $300.00.
                                      Usage Fee............................  $250.00 per month....................  No Fee...............................  $100.00 per acre foot.
                                      Excess Water Rate [dagger]...........  $5.00 per 1,000 gal..................  No Charge............................  No Charge.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
[dagger] The excess water rate applies to all water used in excess of 50,000 gallons in any one month.


----------------------------------------------------------------------------------------------------------------
                                                                                    Final 2016     Proposed 2017
                 Project name                             Rate category                rate            rate
----------------------------------------------------------------------------------------------------------------
San Carlos Irrigation Project (Indian Works)    Basic per acre..................          $81.00          $81.00
 (See Note #5).
Uintah Irrigation Project.....................  Basic per acre..................           18.00           18.00
                                                Minimum Bill....................           25.00           25.00
Walker River Irrigation Project...............  Basic per acre..................           31.00           31.00
----------------------------------------------------------------------------------------------------------------
* Notes irrigation projects where rates are proposed for adjustment.
** The requirement for a proposed 2018 Rate is only applicable to the Flathead and San Carlos Irrigation
  Projects due to their specific billing requirements.
Note #1: Federal Register Notice published August 5, 2016 established the proposed 2017 rate for the Flathead
  Irrigation Project (81 FR 51927) (no comments were received to the proposed notice, proposed rate will be
  issued as final). This notice proposes the 2018 rate for the Flathead Irrigation Project.
Note #2: The O&M rate varies yearly based upon the budget submitted by the LeClair District.
Note #3: The O&M rate for the Yuma Project, Indian Unit has two components. The first component is the O&M rate
  established by the Bureau of Reclamation (BOR), the owner and operator of the Project. The BOR rate for 2017
  is to be determined. The second component is for the O&M rate established by BIA to cover administrative costs
  including billing and collections for the Project. The 2017 BIA rate is proposed to be $3.50/acre.
Note #4: The construction water rate schedule proposes the fees assessed for use of irrigation water for non-
  irrigation purposes.
A separate proposed Federal Register Notice will establish the final 2017 rate for the SCIP-JW. This notice
  proposes the 2018 rate for the SCIP-JW.
Note #5: The proposed 2017 O&M rate for the San Carlos Irrigation Project--Indian Works has three components.
  The first component is the O&M rate established by the San Carlos Irrigation Project--Indian Works, the owner
  and operator of the Project; this rate is proposed to be $50 per acre. The second component is for the O&M
  rate established by the San Carlos Irrigation Project--Joint Works and is determined to be $25.00 per acre.
  The third component is the O&M rate established by the San Carlos Irrigation Project Joint Control Board and
  is proposed to be $6 per acre.


[[Page 18775]]

Consultation and Coordination With Tribal Governments (Executive Order 
13175)

    To fulfill its consultation responsibility to tribes and tribal 
organizations, BIA communicates, coordinates, and consults on a 
continuing basis with these entities on issues of water delivery, water 
availability, and costs of administration, operation, maintenance, and 
rehabilitation of projects that concern them. This is accomplished at 
the individual irrigation project by project, agency, and regional 
representatives, as appropriate, in accordance with local protocol and 
procedures. This notice is one component of our overall coordination 
and consultation process to provide notice to, and request comments 
from, these entities when we adjust irrigation assessment rates. The 
Department of the Interior strives to strengthen its government-to-
government relationship with Indian Tribes through a commitment to 
consultation with Indian Tribes and recognition of their right to self-
governance and Tribal sovereignty. We have evaluated this notice under 
the Department's consultation policy and under the criteria of 
Executive Order 13175 and have determined there to be substantial 
direct effects on federally recognized Tribes because the irrigation 
projects are located on or associated with Indian reservations. To 
fulfill its consultation responsibility to Tribes and Tribal 
organizations, BIA communicates, coordinates, and consults on a 
continuing basis with these entities on issues of water delivery, water 
availability, and costs of administration, operation, maintenance, and 
rehabilitation of projects that concern them. This is accomplished at 
the individual irrigation project by project, agency, and regional 
representatives, as appropriate, in accordance with local protocol and 
procedures. This notice is one component of our overall coordination 
and consultation process to provide notice to, and request comments 
from, these entities when we adjust irrigation assessment rates.

Actions Concerning Regulations That Significantly Affect Energy Supply, 
Distribution, or Use (Executive Order 13211)

    The proposed rate adjustments are not a significant energy action 
under the definition in Executive Order 13211. A Statement of Energy 
Effects is not required.

Regulatory Planning and Review (Executive Order 12866)

    These rate adjustments are not a significant regulatory action and 
do not need to be reviewed by the Office of Management and Budget under 
Executive Order 12866.

Regulatory Flexibility Act

    These proposed rate adjustments are not a rule for the purposes of 
the Regulatory Flexibility Act because they establish ``a rule of 
particular applicability relating to rates.'' 5 U.S.C. 601(2).

Unfunded Mandates Reform Act of 1995

    These proposed rate adjustments do not impose an unfunded mandate 
on state, local, or tribal governments in the aggregate, or on the 
private sector, of more than $130 million per year. The rule does not 
have a significant or unique effect on state, local, or tribal 
governments or the private sector. A statement containing the 
information required by the Unfunded Mandates Reform Act (2 U.S.C. 1531 
et seq.) is not required.

Takings (Executive Order 12630)

    These proposed rate adjustments do not effect a taking of private 
property or otherwise have ``takings'' implications under Executive 
Order 12630. The proposed rate adjustments do not deprive the public, 
state, or local governments of rights or property.

Federalism (Executive Order 13132)

    Under the criteria in section 1 of Executive Order 13132, these 
proposed rate adjustments do not have sufficient federalism 
implications to warrant the preparation of a federalism summary impact 
statement because they will not affect the States, the relationship 
between the national government and the States, or the distribution of 
power and responsibilities among various levels of government. A 
federalism summary impact statement is not required.

Civil Justice Reform (Executive Order 12988)

    This notice complies with the requirements of Executive Order 
12988. Specifically, in issuing this notice, the Department has taken 
the necessary steps to eliminate drafting errors and ambiguity, 
minimize potential litigation, and provide a clear legal standard for 
affected conduct, is required by section 3 of Executive Order 12988.

Paperwork Reduction Act of 1995

    These proposed rate adjustments do not affect the collections of 
information which have been approved by the Office of Information and 
Regulatory Affairs, Office of Management and Budget (OMB), under the 
Paperwork Reduction Act of 1995. The OMB Control Number is 1076-0141 
and expires June 30, 2019.

National Environmental Policy Act

    The Department has determined that these proposed rate adjustments 
do not constitute a major Federal action significantly affecting the 
quality of the human environment and that no detailed statement is 
required under the National Environmental Policy Act of 1969 (42 U.S.C. 
4321-4370(d)).

Data Quality Act

    In developing this notice, we did not conduct or use a study, 
experiment, or survey requiring peer review under the Data Quality Act 
(Pub. L. 106-554).

    Dated: April 12, 2017.
Michael S. Black,
Acting Assistant Secretary--Indian Affairs.
[FR Doc. 2017-08202 Filed 4-20-17; 8:45 am]
 BILLING CODE 4337-15-P



                                                18770                            Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices

                                                DEPARTMENT OF HOUSING AND                               A. Overview of Information Collection                 DEPARTMENT OF THE INTERIOR
                                                URBAN DEVELOPMENT                                         Title of Information Collection:
                                                                                                        Compliance Inspection Report and                      Bureau of Indian Affairs
                                                [Docket No. FR–6001–N–11]                               Mortgagee’s Assurance of Completion.                  [177A2100DD/AAKC001030/
                                                                                                          OMB Approval Number: 2502–0189.                     A0A501010999900]
                                                60-Day Notice of Proposed Information                     Type of Request: Extension of
                                                Collection: Compliance Inspection                       currently approved collection.                        Rate Adjustments for Indian Irrigation
                                                Report and Mortgagee’s Assurance of                       Form Numbers: HUD 92051, HUD–                       Projects
                                                Completion                                              92300.                                                AGENCY:   Bureau of Indian Affairs,
                                                                                                          Description of the need for the
                                                                                                                                                              Interior.
                                                AGENCY:  Office of the Assistant                        information and proposed use: Accurate
                                                Secretary for Housing—Federal Housing                   and thorough property information is                  ACTION: Notice of proposed rate
                                                Commissioner, HUD.                                      critical to the accuracy of underwriting              adjustments.
                                                                                                        for the mortgage insurance process. This              SUMMARY:   The Bureau of Indian Affairs
                                                ACTION:   Notice.
                                                                                                        information collection is needed to                   (BIA) owns, or has an interest in,
                                                                                                        ensure newly built homes financed with                irrigation projects located on or
                                                SUMMARY:   HUD is seeking approval from                 FHA mortgage insurance are
                                                the Office of Management and Budget                                                                           associated with various Indian
                                                                                                        constructed in accordance with                        reservations throughout the United
                                                (OMB) for the information collection                    acceptable building standards and that
                                                described below. In accordance with the                                                                       States. We are required to establish
                                                                                                        deficiencies found in newly constructed               irrigation assessment rates to recover the
                                                Paperwork Reduction Act, HUD is                         and existing dwellings are corrected.
                                                requesting comment from all interested                                                                        costs to administer, operate, maintain,
                                                                                                          Respondents: Business or other-for-                 and rehabilitate these projects. We
                                                parties on the proposed collection of                   profit.
                                                information. The purpose of this notice                                                                       request your comments on the proposed
                                                                                                          Estimated Number of Respondents:
                                                is to allow for 60 days of public                                                                             rate adjustments.
                                                                                                        4,674.
                                                comment.                                                  Estimated Number of Responses:                      DATES: Interested parties may submit
                                                                                                        26,969.                                               comments on the proposed rate
                                                DATES:   Comments Due Date: June 20,                                                                          adjustments on or before June 20, 2017.
                                                2017.                                                     Frequency of Response: On occasion.
                                                                                                          Average Hours per Response: .175.                   ADDRESSES: All comments on the
                                                ADDRESSES:    Interested persons are                      Total Estimated Burdens: 4,720.                     proposed rate adjustments must be in
                                                invited to submit comments regarding                                                                          writing and addressed to: Yulan Jin,
                                                                                                        B. Solicitation of Public Comment
                                                this proposal. Comments should refer to                                                                       Chief, Division of Water and Power,
                                                the proposal by name and/or OMB                            This notice is soliciting comments                 Office of Trust Services, Mail Stop
                                                Control Number and should be sent to:                   from members of the public and affected               4637–MIB, 1849 C Street NW.,
                                                Colette Pollard, Reports Management                     parties concerning the collection of                  Washington, DC 20240, Telephone (202)
                                                Officer, QDAM, Department of Housing                    information described in Section A on                 219–0941.
                                                and Urban Development, 451 7th Street                   the following: (1) Whether the proposed               FOR FURTHER INFORMATION CONTACT: For
                                                SW., Room 4176, Washington, DC                          collection of information is necessary                details about a particular irrigation
                                                20410–5000; telephone 202–402–3400                      for the proper performance of the                     project, please use the tables in the
                                                (this is not a toll-free number) or email               functions of the agency, including                    SUPPLEMENTARY INFORMATION section to
                                                at Colette.Pollard@hud.gov for a copy of                whether the information will have                     contact the regional or local office
                                                the proposed forms or other available                   practical utility; (2) The accuracy of the            where the project is located.
                                                information. Persons with hearing or                    agency’s estimate of the burden of the
                                                                                                                                                              SUPPLEMENTARY INFORMATION: The first
                                                speech impairments may access this                      proposed collection of information; (3)
                                                                                                                                                              table in this notice provides contact
                                                number through TTY by calling the toll-                 Ways to enhance the quality, utility, and
                                                                                                                                                              information for individuals who can
                                                free Federal Relay Service at (800) 877–                clarity of the information to be
                                                                                                                                                              give further information about the
                                                8339.                                                   collected; and (4) Ways to minimize the
                                                                                                                                                              irrigation projects covered by this
                                                                                                        burden of the collection of information
                                                FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                              notice. The second table provides the
                                                                                                        on those who are to respond; including
                                                Cheryl Walker, Director, Home                                                                                 current 2016 irrigation assessment rates,
                                                                                                        through the use of appropriate
                                                Valuation Policy Division, Department                                                                         the proposed rates for Calendar Year
                                                                                                        automated collection techniques or
                                                of Housing and Urban Development,                                                                             (CY) 2017, and proposed rates for
                                                                                                        other forms of information technology,
                                                451 7th Street SW., Washington, DC                                                                            subsequent years where these rates are
                                                                                                        e.g., permitting electronic submission of
                                                20410; email at Cheryl.B.Walker@                                                                              available.
                                                                                                        responses.
                                                hud.gov or telephone 202–708–2121,                         HUD encourages interested parties to               What is the meaning of the key terms
                                                x6880. This is not a toll-free number.                  submit comment in response to these                   used in this notice?
                                                Persons with hearing or speech                          questions.
                                                                                                                                                                In this notice:
                                                impairments may access this number
                                                                                                        C. Authority                                            Administrative costs mean all costs
                                                through TTY by calling the toll-free
                                                                                                          Section 3507 of the Paperwork                       we incur to administer our irrigation
                                                Federal Relay Service at (800) 877–8339.
                                                                                                        Reduction Act of 1995, 44 U.S.C.                      projects at the local project level and is
                                                Copies of available documents
                                                                                                                                                              a cost factor included in calculating
sradovich on DSK3GMQ082PROD with NOTICES




                                                submitted to OMB may be obtained                        Chapter 35.
                                                                                                                                                              your operation and maintenance
                                                from Ms. Pollard.                                         Dated: March 23, 2017.                              assessment. Costs incurred at the local
                                                SUPPLEMENTARY INFORMATION:    This                      Genger Charles,                                       project level do not normally include
                                                notice informs the public that HUD is                   General Deputy Assistant Secretary for                Agency, Region, or Central Office costs
                                                seeking approval from OMB for the                       Housing.                                              unless we state otherwise in writing.
                                                information collection described in                     [FR Doc. 2017–08131 Filed 4–20–17; 8:45 am]             Assessable acre means lands
                                                Section A.                                              BILLING CODE 4210–67–P                                designated by us to be served by one of


                                           VerDate Sep<11>2014   17:30 Apr 20, 2017   Jkt 241001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1


                                                                                 Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices                                          18771

                                                our irrigation projects, for which we                      Rehabilitation costs means costs we                8.1A, of the Department of the Interior’s
                                                collect assessments in order to recover                 incur to restore our irrigation projects or           Departmental Manual.
                                                costs for the provision of irrigation                   features to original operating condition
                                                                                                                                                              When will you put the rate adjustments
                                                service. (See total assessable acres.)                  or to the nearest state which can be
                                                    BIA means the Bureau of Indian                                                                            into effect?
                                                                                                        achieved using current technology and
                                                Affairs.                                                is a cost factor included in calculating                 We will put the rate adjustments into
                                                    Bill means our statement to you of the              your O&M assessment.                                  effect for the CY 2017 and subsequent
                                                assessment charges and/or fees you owe                     Responsible party means an                         years where applicable.
                                                the United States for administration,                   individual or entity that owns or leases
                                                operation, maintenance, and/or                                                                                How do you calculate irrigation rates?
                                                                                                        land within the assessable acreage of
                                                rehabilitation. The date we mail or                     one of our irrigation projects and is                    We calculate annual irrigation
                                                hand-deliver your bill will be stated on                responsible for providing accurate                    assessment rates in accordance with 25
                                                it.                                                     information to our billing office and                 CFR part 171.500 by estimating the
                                                    Costs means the costs we incur for                  paying a bill for an annual irrigation rate           annual costs of operation and
                                                administration, operation, maintenance,                 assessment.                                           maintenance at each of our irrigation
                                                and rehabilitation to provide direct                       Total assessable acres means the total             projects and then dividing by the total
                                                support or benefit to an irrigation                     acres served by one of our irrigation                 assessable acres for that particular
                                                facility. (See administrative costs,                    projects.                                             irrigation project. The result of this
                                                operation costs, maintenance costs, and                    Water delivery is an activity that is              calculation for each project is stated in
                                                rehabilitation costs).                                  part of the irrigation service we provide             the rate table in this notice.
                                                    Customer means any person or entity
                                                                                                        our customers when water is available.                What kinds of expenses do you
                                                to whom or to which we provide
                                                irrigation service.                                        We, us, and our means the United                   consider in determining the estimated
                                                    Due date is the date on which your                  States Government, the Secretary of the               annual costs of operation and
                                                bill is due and payable. This date will                 Interior, the BIA, and all who are                    maintenance?
                                                be stated on your bill.                                 authorized to represent us in matters
                                                                                                                                                                 Consistent with 25 CFR part 171.500,
                                                    I, me, my, you and your means all                   covered under this notice.
                                                                                                                                                              these expenses include the following:
                                                persons or entities that are affected by                Does this notice affect me?                              (a) Salary and benefits for the project
                                                this notice.                                                                                                  engineer/manager and project
                                                    Irrigation project means a facility or                This notice affects you if you own or
                                                                                                        lease land within the assessable acreage              employees under the project engineer/
                                                portion thereof for the delivery,                                                                             manager’s management or control;
                                                diversion, and storage of irrigation water              of one of our irrigation projects or if you
                                                                                                        have a carriage agreement with one of                    (b) Materials and supplies;
                                                that we own or have an interest in,                                                                              (c) Vehicle and equipment repairs;
                                                including all appurtenant works. The                    our irrigation projects.
                                                                                                                                                                 (d) Equipment costs, including lease
                                                term ‘‘irrigation project’’ is used                     Where can I get information on the                    fees;
                                                interchangeably with irrigation facility,               regulatory and legal citations in this                   (e) Depreciation;
                                                irrigation system, and irrigation area.                 notice?
                                                    Irrigation service means the full range                                                                      (f) Acquisition costs;
                                                of services we provide customers of our                    You can contact the appropriate                       (g) Maintenance of a reserve fund
                                                irrigation projects. This includes our                  office(s) stated in the tables for the                available for contingencies or
                                                activities to administer, operate,                      irrigation project that serves you, or you            emergency costs needed for the reliable
                                                maintain, and rehabilitate our projects                 can use the Internet site for the                     operation of the irrigation facility
                                                in order to deliver water.                              Government Printing Office at http://                 infrastructure;
                                                    Maintenance costs means costs we                    www.gpo.gov.                                             (h) Maintenance of a vehicle and
                                                incur to maintain and repair our                                                                              heavy equipment replacement fund;
                                                                                                        Why are you publishing this notice?                      (i) Systematic rehabilitation and
                                                irrigation projects and associated
                                                equipment and is a cost factor included                   We are publishing this notice to                    replacement of project facilities;
                                                in calculating your operation and                       inform you that we propose to adjust                     (j) Carriage Agreements for the
                                                maintenance assessment.                                 our irrigation assessment rates. This                 transfer of project water through
                                                    Operation and maintenance (O&M)                     notice is published in accordance with                irrigation facilities owned by others.
                                                assessment means the periodic charge                    the BIA’s regulations governing its                      (k) Any water storage fees for non-
                                                you must pay us to reimburse costs of                   operation and maintenance of irrigation               BIA-owned reservoirs, as applicable,
                                                administering, operating, maintaining,                  projects, found at 25 CFR part 171. This                 (l) Contingencies for unknown costs
                                                and rehabilitating irrigation projects                  regulation provides for the                           and omitted budget items; and
                                                consistent with this notice and our                     establishment and publication of the                     (m) Other expenses we determine
                                                supporting policies, manuals, and                       proposed rates for annual irrigation                  necessary to properly perform the
                                                handbooks.                                              assessments as well as related                        activities and functions characteristic of
                                                    Operation or operating costs means                  information about our irrigation                      an irrigation project.
                                                costs we incur to operate our irrigation                projects.
                                                                                                                                                              When should I pay my irrigation
                                                projects and equipment and is a cost
                                                                                                        What authorizes you to issue this                     assessment?
                                                factor included in calculating your O&M
                                                                                                        notice?
                                                                                                                                                                 We will mail or hand-deliver your bill
sradovich on DSK3GMQ082PROD with NOTICES




                                                assessment.
                                                    Past due bill means a bill that has not               Our authority to issue this notice is               notifying you (a) the amount you owe to
                                                been paid by the close of business on                   vested in the Secretary of the Interior by            the United States and (b) when such
                                                the 30th day after the due date as stated               5 U.S.C. 301 and the Act of August 14,                amount is due. If we mail your bill, we
                                                on the bill. Beginning on the 31st day                  1914 (38 Stat. 583; 25 U.S.C. 385). The               will consider it as being delivered no
                                                after the due date, we begin assessing                  Secretary has in turn delegated this                  later than 5 business days after the day
                                                additional charges accruing from the                    authority to the Assistant Secretary—                 we mail it. You should pay your bill by
                                                due date.                                               Indian Affairs under Part 209, Chapter                the due date stated on the bill.


                                           VerDate Sep<11>2014   17:30 Apr 20, 2017   Jkt 241001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1


                                                18772                              Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices

                                                What information must I provide for                       required information listed above, you                assessed. You will not be assessed this
                                                billing purposes?                                         will be assessed interest and penalties               charge until your bill is past due.
                                                   All responsible parties are required to                as provided below, and your failure to                However, if you allow your bill to
                                                provide the following information to the                  provide the required information will                 become past due, interest will accrue
                                                billing office associated with the                        not provide grounds for you to appeal                 from the original due date, not the past
                                                irrigation project where you own or                       your bill or any penalties assessed.                  due date. Also, you will be charged an
                                                lease land within the project’s                                                                                 administrative fee of $12.50 for each
                                                                                                          What can happen if I do not provide the
                                                assessable acreage or to the billing office                                                                     time we try to collect your past due bill.
                                                                                                          information required for billing
                                                associated with the irrigation project                                                                          If your bill becomes more than 90 days
                                                                                                          purposes?
                                                with which you have a carriage                                                                                  past due, you will be assessed a penalty
                                                agreement:                                                   We can refuse to provide you                       charge of 6 percent per year, which will
                                                   (1) The full legal name of person or                   irrigation service.                                   accrue from the date your bill initially
                                                entity responsible for paying the bill;                   If I allow my bill to become past due,                became past due. Pursuant to 31 CFR
                                                   (2) An adequate and correct address                    could this affect my water delivery?                  901.9, ‘‘Interest, penalties and
                                                for mailing or hand delivering our bill;                                                                        administrative costs,’’ as a Federal
                                                and                                                          Yes. 25 CFR 171.545(a) states: ‘‘We                agency, we are required to charge
                                                   (3) The taxpayer identification                        will not provide you irrigation service               interest, penalties, and administrative
                                                number or social security number of the                   until: (1) Your bill is paid; or (2) You              costs in accordance with 31 U.S.C. 3717.
                                                person or entity responsible for paying                   make arrangement for payment pursuant
                                                the bill.                                                 to § 171.550 of this part.’’ If we do not             What else will happen to my past due
                                                                                                          receive your payment before the close of              bill?
                                                Why are you collecting my taxpayer                        business on the 30th day after the due
                                                identification number or social security                  date stated on your bill, we will send                  If you do not pay your bill or make
                                                number?                                                   you a past due notice. This past due                  payment arrangements to which we
                                                                                                          notice will have additional information               agree, we are required to send your past
                                                  Public Law 104–134, the Debt
                                                                                                          concerning your rights. We will                       due bill to the Treasury for further
                                                Collection Improvement Act of 1996,
                                                                                                          consider your past due notice as                      action. Under the provisions of 31 CFR
                                                requires that we collect the taxpayer
                                                                                                          delivered no later than 5 business days               901.1, ‘‘Aggressive agency collection
                                                identification number or social security
                                                                                                          after the day we mail it. We follow the               activity,’’ Federal agencies should
                                                number before billing a responsible
                                                                                                          procedures provided in 31 CFR 901.2,                  consider referring debts that are less
                                                party and as a condition to servicing the
                                                                                                          ‘‘Demand for Payment,’’ when                          than 180 days delinquent, and we must
                                                account.
                                                                                                          demanding payment of your past due                    send any unpaid annual irrigation
                                                What happens if I am a responsible                        bill.                                                 assessment bill to Treasury no later than
                                                party but I fail to furnish the                                                                                 180 days after the original due date of
                                                information required to the billing                       Are there any additional charges if I am              the bill.
                                                office responsible for the irrigation                     late paying my bill?
                                                project within which I own or lease                                                                             Who can I contact for further
                                                                                                            Yes. We will assess you interest on                 information?
                                                assessable land or for which I have a                     the amount owed, using the rate of
                                                carriage agreement?                                       interest established annually by the                     The following tables are the regional
                                                  If you are late paying your bill                        Secretary of the United States Treasury               and project/agency contacts for our
                                                because of your failure to furnish the                    (Treasury) to calculate what you will be              irrigation facilities.



                                                             Project name                                                                    Project/agency contacts

                                                                                                                    Northwest Region Contacts

                                                Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest Regional Office, 911 N.E. 11th Avenue, Portland, OR 97232–4169,
                                                  Telephone: (503) 231–6702.

                                                Flathead Irrigation Project ...............    Peter Plant, Acting Superintendent, Pete Plant, Irrigation Project Manager, P.O. Box 40, Pablo, MT 59855,
                                                                                                 Telephones: (406) 675–2700 ext. 1300 Superintendent, (406) 745–2661 ext. 2 Project Manager.
                                                Fort Hall Irrigation Project ...............   David Bollinger, Irrigation Project Manager, Building #2 Bannock Ave, Fort Hall, ID 83203–0220, Tele-
                                                                                                 phone: (208) 238–6264.
                                                Wapato Irrigation Project ................     David Shaw, Superintendent, Larry Nelson, Acting Project Administrator, P.O. Box 220, Wapato, WA
                                                                                                 98951–0220, Telephone: (509) 865–2421 Superintendent, (509) 877–3155 Acting Project Administrator.

                                                                                                                 Rocky Mountain Region Contacts

                                                Darryl LaCounte, Regional Director, Bureau of Indian Affairs, Rocky Mountain Regional Office, 2021 4th Avenue North, Billings, MT 59101,
                                                  Telephone: (406) 247–7943.

                                                Blackfeet Irrigation Project ..............    Thedis Crowe, Superintendent, Greg Tatsey, Irrigation Project Manager, Box 880, Browning, MT 59417,
                                                                                                 Telephones: (406) 338–7544, Superintendent, (406) 338–7519, Irrigation Project Manager.
sradovich on DSK3GMQ082PROD with NOTICES




                                                Crow Irrigation Project ....................   Vianna Stewart, Superintendent, John Anevski, Acting Irrigation Project Manager, P.O. Box 69, Crow
                                                                                                 Agency, MT 59022, Telephones: (406) 638–2672, Superintendent, (406) 247–7998, Acting Irrigation
                                                                                                 Project Manager.
                                                Fort Belknap Irrigation Project ........       John St. Pierre, Superintendent, Vacant, Irrigation Project Manager, (Project operations & maintenance
                                                                                                 contracted to Tribes), R.R.1, Box 980, Harlem, MT 59526, Telephones: (406) 353–2901, Superintendent,
                                                                                                 (406) 353–8454, Irrigation Project Manager (Tribal Office).
                                                Fort Peck Irrigation Project .............     Howard Beemer, Superintendent, Huber Wright, Acting Irrigation Project Manager, P.O. Box 637, Poplar,
                                                                                                 MT 59255, Telephones: (406) 768–5312, Superintendent, (406) 653–1752, Irrigation Project Manager.




                                           VerDate Sep<11>2014    17:30 Apr 20, 2017    Jkt 241001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1


                                                                                         Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices                                                                 18773



                                                                Project name                                                                                     Project/agency contacts

                                                Wind River Irrigation Project ...........             Norma Gourneau, Superintendent, John Anevski, Acting Irrigation Project Manager, P.O. Box 158, Fort
                                                                                                        Washakie, WY 82514, Telephones: (307) 332–7810, Superintendent, (406) 247–7998, Acting Irrigation
                                                                                                        Project Manager.
                                                                                                                                  Southwest Region Contacts
                                                William T. Walker, Regional Director, Bureau of Indian Affairs, Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM 87104,
                                                 Telephone: (505) 563–3100.
                                                Pine River Irrigation Project ............            Priscilla Bancroft, Superintendent, Vickie Begay, Irrigation Project Manager, P.O. Box 315, Ignacio, CO
                                                                                                        81137–0315, Telephones: (970) 563–4511, Superintendent, (970) 563–9484, Irrigation Project Manager.
                                                                                                                                    Western Region Contacts
                                                Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ
                                                  85004, Telephone: (602) 379–6600.
                                                Colorado River Irrigation Project ....                Kellie Youngbear, Superintendent, Gary Colvin, Irrigation Project Manager, 12124 1st Avenue, Parker, AZ
                                                                                                        85344, Telephone: (928) 669–7111.
                                                Duck Valley Irrigation Project .........              Joseph McDade, Superintendent, (Project operations & management compacted to Tribes), 2719 Argent
                                                                                                        Ave., Suite 4, Gateway Plaza, Elko, NV 89801, Telephone: (775) 738–5165, (208) 759–3100, (Tribal Of-
                                                                                                        fice).
                                                Yuma Project, Indian Unit ...............             Denni Shields, Superintendent, 256 South Second Avenue, Suite D, Yuma, AZ 85364, Telephone: (928)
                                                                                                        782–1202.
                                                San Carlos Irrigation Project, Indian                 Ferris Begay, Project Manager, Clarence Begay, Irrigation Manager, 13805 N. Arizona Boulevard, Coo-
                                                  Works and Joint Works.                                lidge, AZ 85128, Telephone: (520) 723–6225.
                                                Uintah Irrigation Project ..................          Bart Stevens Superintendent, Ken Asay, Irrigation System Manager, P.O. Box 130, Fort Duchesne, UT
                                                                                                        84026, Telephone: (435) 722–4300, (435) 722–4344.
                                                Walker River Irrigation Project ........              Robert Eben, Superintendent, 311 E. Washington Street, Carson City, NV 89701, Telephone: (775) 887–
                                                                                                        3500.



                                                What irrigation assessments or charges                                where we recover costs of                                          applicable. An asterisk immediately
                                                are proposed for adjustment by this                                   administering, operating, maintaining,                             following the rate category notes the
                                                notice?                                                               and rehabilitating them. The table also                            irrigation projects where rates are
                                                  The rate table below contains the                                   contains the proposed rates for the CY                             proposed for adjustment.
                                                current rates for all irrigation projects                             2017 and subsequent years where

                                                                                                                                                                                           Final               Final        Proposed
                                                                                 Project name                                                        Rate category                       2016 rate           2017 rate     2018 rate **

                                                                                                                                 Northwest Region Rate Table
                                                Flathead Irrigation Project (See Note #1) ...............................                Basic per acre—A ..................                    $26.00            $26.00         $33.50
                                                                                                                                         Basic per acre—B ..................                     13.00             13.00          16.75
                                                                                                                                         Minimum Charge per tract .....                          75.00             75.00          75.00

                                                                                                                                                                                                               Final        Proposed
                                                                                          Project name                                                                  Rate category
                                                                                                                                                                                                             2016 rate      2017 rate

                                                Fort Hall Irrigation Project ..........................................................................   Basic per acre * ...............................        $52.00         $54.00
                                                                                                                                                          Minimum Charge per tract * ............                  37.00          38.50
                                                Fort Hall Irrigation Project—Minor Units ....................................................             Basic per acre * ...............................         31.00          32.50
                                                                                                                                                          Minimum Charge per tract * ............                  37.00          38.50
                                                Fort Hall Irrigation Project—Michaud ........................................................             Basic per acre * ...............................         55.00          57.50
                                                                                                                                                          Pressure per acre * ..........................           83.00          88.50
                                                                                                                                                          Minimum Charge per tract * ............                  37.00          38.50
                                                Wapato Irrigation Project—Toppenish/Simcoe Units ................................                         Minimum Charge per bill .................                25.00          25.00
                                                                                                                                                          Basic per acre .................................         25.00          25.00
                                                Wapato Irrigation Project—Ahtanum Units ................................................                  Minimum Charge per bill .................                30.00          30.00
                                                                                                                                                          Basic per acre .................................         30.00          30.00
                                                Wapato Irrigation Project—Satus Unit .......................................................              Minimum Charge per bill .................                79.00          79.00
                                                                                                                                                          ‘‘A’’ Basic per acre ..........................          79.00          79.00
                                                                                                                                                          ‘‘B’’ Basic per acre ..........................          85.00          85.00
                                                Wapato Irrigation Project—Additional Works ............................................                   Minimum Charge per bill .................                78.00          80.00
                                                                                                                                                          Basic per acre * ...............................         78.00          80.00
                                                Wapato Irrigation Project—Water Rental ..................................................                 Minimum Charge .............................             86.00          86.00
                                                                                                                                                          Basic per acre .................................         86.00          86.00
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                            Rocky Mountain Region Rate Table
                                                Blackfeet Irrigation Project .........................................................................    Basic-per acre .................................         20.00          20.00
                                                Crow Irrigation Project—Willow Creek O&M (includes Agency, Lodge                                          Basic-per acre * ...............................         26.00          28.00
                                                  Grass #1, Lodge Grass #2, Reno, Upper Little Horn, and Forty Mile
                                                  Units).
                                                Crow Irrigation Project—All Others (includes Bighorn, Soap Creek, and                                     Basic-per acre * ...............................         26.00          28.00
                                                  Pryor Units).



                                           VerDate Sep<11>2014       17:30 Apr 20, 2017       Jkt 241001     PO 00000       Frm 00046      Fmt 4703       Sfmt 4703   E:\FR\FM\21APN1.SGM          21APN1


                                                18774                                    Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices

                                                                                                                                                                                                                     Final           Proposed
                                                                                          Project name                                                                    Rate category                            2016 rate         2017 rate

                                                Crow Irrigation Project—Two Leggins Unit ...............................................                   Basic-per    acre .................................             14.00              14.00
                                                Crow Irrigation Two Leggins Drainage District ..........................................                   Basic-per    acre .................................              2.00               2.00
                                                Fort Belknap Irrigation Project ...................................................................        Basic-per    acre .................................             16.00              16.00
                                                Fort Peck Irrigation Project ........................................................................      Basic-per    acre * ...............................             26.00              26.50
                                                Wind River Irrigation Project—Units 2, 3 and 4 ........................................                    Basic-per    acre * ...............................             22.50              23.50
                                                Wind River Irrigation Project—Unit 6 ........................................................              Basic-per    acre .................................             21.00              21.00
                                                Wind River Irrigation Project—LeClair District (See Note #2) ..................                            Basic-per    acre .................................             47.00              47.00
                                                Wind River Irrigation Project—Crow Heart Unit ........................................                     Basic-per    acre * ...............................             15.50              15.75
                                                Wind River Irrigation Project—A Canal Unit .............................................                   Basic-per    acre * ...............................             15.50              15.75
                                                Wind River Irrigation Project—Riverton Valley Irrigation District ..............                           Basic-per    acre * ...............................             26.00              30.65
                                                                                                                                Southwest Region Rate Table
                                                Pine River Irrigation Project .......................................................................      Minimum Charge per tract ..............                         50.00              50.00
                                                                                                                                                           Basic-per acre * ...............................                18.00              19.00
                                                                                                                                  Western Region Rate Table
                                                Colorado River Irrigation Project ...............................................................          Basic per acre up to 5.75 acre-feet                             54.00              54.00
                                                                                                                                                           Excess Water per acre-foot over                                 17.00              17.00
                                                                                                                                                             5.75 acre-feet.
                                                Duck Valley Irrigation Project ....................................................................        Basic per acre .................................                 5.30               5.30
                                                Yuma Project, Indian Unit (See Note #3) ..................................................                 Basic per acre up to 5.0 acre-feet *                           113.00                 (1)
                                                                                                                                                           Excess Water per acre-foot over                                 24.50              27.50
                                                                                                                                                             5.0 acre-feet *.
                                                                                                                                                           Basic per acre up to 5.0 acre-feet                             113.00                  ( 1)
                                                                                                                                                             (Ranch 5) *.
                                                   1 To   be determined.

                                                                                                                                                            Final                               Final                           Proposed
                                                               Project name                                  Rate category                                2016 rate                           2017 rate                        2018 rate **

                                                San Carlos Irrigation Project (Joint                 Basic per acre * ..............        $30.00 ............................    $25.00 ............................   $27.90.
                                                  Works) (See Note #4).
                                                                                                                                              Proposed 2017 Construction Water Rate Schedule
                                                                                                                                              Off project construction                     On project                          On project
                                                                                                                                                                                      construction—gravity                 construction—pump
                                                                                                                                                                                             water                                water
                                                                                                     Administrative Fee .........           $300.00 ..........................     $300.00 ..........................    $300.00.
                                                                                                     Usage Fee .....................        $250.00 per month ........             No Fee ...........................    $100.00 per acre foot.
                                                                                                     Excess Water Rate † .....              $5.00 per 1,000 gal .......            No Charge .....................       No Charge.
                                                   † The excess water rate applies to all water used in excess of 50,000 gallons in any one month.

                                                                                                                                                                                                                     Final           Proposed
                                                                                          Project name                                                                    Rate category                            2016 rate         2017 rate

                                                San Carlos Irrigation Project (Indian Works) (See Note #5) .....................                           Basic per acre .................................               $81.00           $81.00
                                                Uintah Irrigation Project .............................................................................    Basic per acre .................................                18.00            18.00
                                                                                                                                                           Minimum Bill ....................................               25.00            25.00
                                                Walker River Irrigation Project ...................................................................        Basic per acre .................................                31.00            31.00
                                                  * Notes irrigation projects where rates are proposed for adjustment.
                                                  ** The requirement for a proposed 2018 Rate is only applicable to the Flathead and San Carlos Irrigation Projects due to their specific billing
                                                requirements.
                                                  Note #1: Federal Register Notice published August 5, 2016 established the proposed 2017 rate for the Flathead Irrigation Project (81 FR
                                                51927) (no comments were received to the proposed notice, proposed rate will be issued as final). This notice proposes the 2018 rate for the
                                                Flathead Irrigation Project.
                                                  Note #2: The O&M rate varies yearly based upon the budget submitted by the LeClair District.
                                                  Note #3: The O&M rate for the Yuma Project, Indian Unit has two components. The first component is the O&M rate established by the Bu-
                                                reau of Reclamation (BOR), the owner and operator of the Project. The BOR rate for 2017 is to be determined. The second component is for the
                                                O&M rate established by BIA to cover administrative costs including billing and collections for the Project. The 2017 BIA rate is proposed to be
                                                $3.50/acre.
                                                  Note #4: The construction water rate schedule proposes the fees assessed for use of irrigation water for non-irrigation purposes.
                                                  A separate proposed Federal Register Notice will establish the final 2017 rate for the SCIP–JW. This notice proposes the 2018 rate for the
                                                SCIP–JW.
                                                  Note #5: The proposed 2017 O&M rate for the San Carlos Irrigation Project—Indian Works has three components. The first component is the
                                                O&M rate established by the San Carlos Irrigation Project—Indian Works, the owner and operator of the Project; this rate is proposed to be $50
                                                per acre. The second component is for the O&M rate established by the San Carlos Irrigation Project—Joint Works and is determined to be
sradovich on DSK3GMQ082PROD with NOTICES




                                                $25.00 per acre. The third component is the O&M rate established by the San Carlos Irrigation Project Joint Control Board and is proposed to be
                                                $6 per acre.




                                           VerDate Sep<11>2014       17:30 Apr 20, 2017       Jkt 241001     PO 00000       Frm 00047      Fmt 4703       Sfmt 4703    E:\FR\FM\21APN1.SGM            21APN1


                                                                                 Federal Register / Vol. 82, No. 76 / Friday, April 21, 2017 / Notices                                                18775

                                                Consultation and Coordination With                      Regulatory Planning and Review                        Paperwork Reduction Act of 1995
                                                Tribal Governments (Executive Order                     (Executive Order 12866)                                  These proposed rate adjustments do
                                                13175)                                                                                                        not affect the collections of information
                                                                                                          These rate adjustments are not a
                                                   To fulfill its consultation                          significant regulatory action and do not              which have been approved by the Office
                                                responsibility to tribes and tribal                     need to be reviewed by the Office of                  of Information and Regulatory Affairs,
                                                organizations, BIA communicates,                        Management and Budget under                           Office of Management and Budget
                                                coordinates, and consults on a                          Executive Order 12866.                                (OMB), under the Paperwork Reduction
                                                                                                                                                              Act of 1995. The OMB Control Number
                                                continuing basis with these entities on                 Regulatory Flexibility Act                            is 1076–0141 and expires June 30, 2019.
                                                issues of water delivery, water
                                                availability, and costs of administration,                These proposed rate adjustments are                 National Environmental Policy Act
                                                operation, maintenance, and                             not a rule for the purposes of the                      The Department has determined that
                                                rehabilitation of projects that concern                 Regulatory Flexibility Act because they               these proposed rate adjustments do not
                                                them. This is accomplished at the                       establish ‘‘a rule of particular                      constitute a major Federal action
                                                individual irrigation project by project,               applicability relating to rates.’’ 5 U.S.C.           significantly affecting the quality of the
                                                agency, and regional representatives, as                601(2).                                               human environment and that no
                                                appropriate, in accordance with local                                                                         detailed statement is required under the
                                                protocol and procedures. This notice is                 Unfunded Mandates Reform Act of
                                                                                                        1995                                                  National Environmental Policy Act of
                                                one component of our overall                                                                                  1969 (42 U.S.C. 4321–4370(d)).
                                                coordination and consultation process                     These proposed rate adjustments do
                                                to provide notice to, and request                                                                             Data Quality Act
                                                                                                        not impose an unfunded mandate on
                                                comments from, these entities when we                   state, local, or tribal governments in the              In developing this notice, we did not
                                                adjust irrigation assessment rates. The                 aggregate, or on the private sector, of               conduct or use a study, experiment, or
                                                Department of the Interior strives to                   more than $130 million per year. The                  survey requiring peer review under the
                                                strengthen its government-to-                           rule does not have a significant or                   Data Quality Act (Pub. L. 106–554).
                                                government relationship with Indian                     unique effect on state, local, or tribal               Dated: April 12, 2017.
                                                Tribes through a commitment to                          governments or the private sector. A                  Michael S. Black,
                                                consultation with Indian Tribes and                     statement containing the information                  Acting Assistant Secretary—Indian Affairs.
                                                recognition of their right to self-                     required by the Unfunded Mandates
                                                                                                                                                              [FR Doc. 2017–08202 Filed 4–20–17; 8:45 am]
                                                governance and Tribal sovereignty. We                   Reform Act (2 U.S.C. 1531 et seq.) is not
                                                                                                                                                              BILLING CODE 4337–15–P
                                                have evaluated this notice under the                    required.
                                                Department’s consultation policy and
                                                under the criteria of Executive Order                   Takings (Executive Order 12630)
                                                                                                                                                              DEPARTMENT OF THE INTERIOR
                                                13175 and have determined there to be                     These proposed rate adjustments do
                                                substantial direct effects on federally                 not effect a taking of private property or            Bureau of Land Management
                                                recognized Tribes because the irrigation                otherwise have ‘‘takings’’ implications               [LLOR936000.L14400000.ET0000 FUND:
                                                projects are located on or associated                   under Executive Order 12630. The                      16XL1109AF; HAG–16–0071 OR17791]
                                                with Indian reservations. To fulfill its                proposed rate adjustments do not
                                                consultation responsibility to Tribes and               deprive the public, state, or local                   Notice of Application for Extension of
                                                Tribal organizations, BIA                               governments of rights or property.                    Public Land Order No. 4145, as
                                                communicates, coordinates, and                                                                                Modified, Correction of Legal
                                                consults on a continuing basis with                     Federalism (Executive Order 13132)
                                                                                                                                                              Description, and Opportunity for
                                                these entities on issues of water                          Under the criteria in section 1 of                 Public Comment and Meeting; West
                                                delivery, water availability, and costs of              Executive Order 13132, these proposed                 Eagle Meadow Campground; Oregon
                                                administration, operation, maintenance,                 rate adjustments do not have sufficient
                                                and rehabilitation of projects that                                                                           AGENCY:   Bureau of Land Management,
                                                                                                        federalism implications to warrant the                Interior.
                                                concern them. This is accomplished at                   preparation of a federalism summary
                                                the individual irrigation project by                                                                          ACTION: Notice.
                                                                                                        impact statement because they will not
                                                project, agency, and regional                           affect the States, the relationship
                                                representatives, as appropriate, in                                                                           SUMMARY:   The United States Forest
                                                                                                        between the national government and                   Service (USFS) has filed an application
                                                accordance with local protocol and                      the States, or the distribution of power              with the Bureau of Land Management
                                                procedures. This notice is one                          and responsibilities among various                    (BLM) requesting that the Secretary of
                                                component of our overall coordination                   levels of government. A federalism                    the Interior extend the duration of
                                                and consultation process to provide                     summary impact statement is not                       Public Land Order (PLO) No. 4145, as
                                                notice to, and request comments from,                   required.                                             modified by PLO No. 7322, for an
                                                these entities when we adjust irrigation                                                                      additional 20-year term. PLO No. 4145,
                                                assessment rates.                                       Civil Justice Reform (Executive Order
                                                                                                        12988)                                                as modified by PLO No. 7322, withdrew
                                                Actions Concerning Regulations That                                                                           approximately 32 acres of National
                                                Significantly Affect Energy Supply,                        This notice complies with the                      Forest System lands in the Wallowa-
                                                                                                        requirements of Executive Order 12988.                Whitman National Forest from location
sradovich on DSK3GMQ082PROD with NOTICES




                                                Distribution, or Use (Executive Order
                                                13211)                                                  Specifically, in issuing this notice, the             and entry under the United States
                                                                                                        Department has taken the necessary                    mining laws. The purpose of the
                                                   The proposed rate adjustments are not                steps to eliminate drafting errors and                proposed extension is to continue to
                                                a significant energy action under the                   ambiguity, minimize potential litigation,             protect the recreational values of the
                                                definition in Executive Order 13211. A                  and provide a clear legal standard for                USFS West Eagle Meadow Campground.
                                                Statement of Energy Effects is not                      affected conduct, is required by section              The withdrawal created by PLO No.
                                                required.                                               3 of Executive Order 12988.                           4145, as modified by PLO No. 7322, will


                                           VerDate Sep<11>2014   17:30 Apr 20, 2017   Jkt 241001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1



Document Created: 2017-04-21 01:19:10
Document Modified: 2017-04-21 01:19:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed rate adjustments.
DatesInterested parties may submit comments on the proposed rate adjustments on or before June 20, 2017.
ContactFor details about a particular irrigation project, please use the tables in the SUPPLEMENTARY INFORMATION section to contact the regional or local office where the project is located.
FR Citation82 FR 18770 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR