82 FR 20331 - Certification Notice-247; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 82, Issue 82 (May 1, 2017)

Page Range20331-20332
FR Document2017-08737

On March 31, 2017, PSEG Power, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register.

Federal Register, Volume 82 Issue 82 (Monday, May 1, 2017)
[Federal Register Volume 82, Number 82 (Monday, May 1, 2017)]
[Notices]
[Pages 20331-20332]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-08737]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Certification Notice--247; Notice of Filing of Self-Certification 
of Coal Capability Under the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On March 31, 2017, PSEG Power, LLC, as owner and operator of a 
new baseload electric generating powerplant, submitted a coal 
capability self-certification to the Department of Energy (DOE) 
pursuant to Sec.  201(d) of the Powerplant and Industrial Fuel Use Act 
of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register.

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

[[Page 20332]]


SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to the FUA, in 
order to meet the requirement of coal capability, the owner or operator 
of such a facility proposing to use natural gas or petroleum as its 
primary energy source shall certify to the Secretary of Energy 
(Secretary) prior to construction, or prior to operation as a base load 
electric powerplant, that such powerplant has the capability to use 
coal or another alternate fuel. Such certification establishes 
compliance with FUA section 201(a) as of the date it is filed with the 
Secretary. 42 U.S.C. 8311.
    The following owner of a proposed new baseload electric generating 
powerplant has filed a self-certification of coal-capability with DOE 
pursuant to FUA section 201(d) and in accordance with DOE regulations 
in 10 CFR 501.60, 61:

Owner: PSEG Power, LLC
Capacity: 540 megawatts (MW)
Plant Location: PSEG Fossil Sewaren Generating Station, Sewaren, NJ
In-Service Date: April 2018

    Issued in Washington, DC, on April 11, 2017.
Brian Mills,
Office of Electricity Delivery and Energy Reliability.
[FR Doc. 2017-08737 Filed 4-28-17; 8:45 am]
 BILLING CODE 6450-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
DatesApril 2018
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation82 FR 20331 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR