DEPARTMENT OF ENERGY

Federal Register Volume 82, Issue 82 (May 1, 2017)

Page Range20331-20332
FR Document2017-08737

On March 31, 2017, PSEG Power, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register.

Federal Register, Volume 82 Issue 82 (Monday, May 1, 2017)
[Federal Register Volume 82, Number 82 (Monday, May 1, 2017)]
[Notices]
[Pages 20331-20332]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-08737]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Certification Notice--247; Notice of Filing of Self-Certification 
of Coal Capability Under the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On March 31, 2017, PSEG Power, LLC, as owner and operator of a 
new baseload electric generating powerplant, submitted a coal 
capability self-certification to the Department of Energy (DOE) 
pursuant to Sec.  201(d) of the Powerplant and Industrial Fuel Use Act 
of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register.

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

[[Page 20332]]


SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to the FUA, in 
order to meet the requirement of coal capability, the owner or operator 
of such a facility proposing to use natural gas or petroleum as its 
primary energy source shall certify to the Secretary of Energy 
(Secretary) prior to construction, or prior to operation as a base load 
electric powerplant, that such powerplant has the capability to use 
coal or another alternate fuel. Such certification establishes 
compliance with FUA section 201(a) as of the date it is filed with the 
Secretary. 42 U.S.C. 8311.
    The following owner of a proposed new baseload electric generating 
powerplant has filed a self-certification of coal-capability with DOE 
pursuant to FUA section 201(d) and in accordance with DOE regulations 
in 10 CFR 501.60, 61:

Owner: PSEG Power, LLC
Capacity: 540 megawatts (MW)
Plant Location: PSEG Fossil Sewaren Generating Station, Sewaren, NJ
In-Service Date: April 2018

    Issued in Washington, DC, on April 11, 2017.
Brian Mills,
Office of Electricity Delivery and Energy Reliability.
[FR Doc. 2017-08737 Filed 4-28-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                 Federal Register / Vol. 82, No. 82 / Monday, May 1, 2017 / Notices                                                   20331

                                                impacts on cultural resources or eligible               EIS, adoption of this alternative would               environmental harm from the GPP
                                                historic properties; (5) presence of                    not meet the GPP Export Project and                   Export Project have been adopted.
                                                known contamination due to industrial                   Pipeline Expansion Project objectives.
                                                                                                                                                              Floodplain Statement of Findings
                                                activities; (6) presence of natural visual
                                                                                                        Decision                                                 DOE prepared this Floodplain
                                                screening; and (7) accessibility. For each
                                                of the three proposed compressor                          DOE has decided to issue Order No.                  Statement of Findings in accordance
                                                stations and their proposed sites, the                  3978 authorizing GPP to export                        with DOE’s regulations, entitled
                                                EIS determined the alternative either                   domestically produced LNG by vessel                   ‘‘Compliance with Floodplain and
                                                offered no significant environmental                    from the GPP Export Project located                   Wetland Environmental Review
                                                advantage or would have a more                          near Sabine Pass, Jefferson County,                   Requirements’’ (10 CFR part 1022). The
                                                substantial impact on wetlands                          Texas to non-FTA countries, in a                      required floodplain assessment was
                                                compared to the proposed site.                          volume up to the equivalent to 808 Bcf/               conducted during development and
                                                   Regarding the associated aboveground                 yr of natural gas for a term of 20 years              preparation of the EIS (see Section
                                                facilities for the pipeline expansion, the              to commence on the earlier of the date                4.1.4.1 of the EIS). The EIS determined
                                                proposed aboveground facilities were all                of first commercial export or seven years             that the proposed Golden Pass LNG
                                                within the existing GPPL pipeline right-                from the date that the Order is issued.               export terminal site is within the 100-
                                                of-way. As a result, the EIS did not                      Concurrently with this Record of                    year floodplain, as are some portions of
                                                identify any environmental concerns                     Decision, DOE is issuing Order No.                    the pipeline expansion facilities and
                                                that indicated the need to evaluate                     3978, in which it finds that the                      one compressor station. While the
                                                alternative sites.                                      requested authorization has not been                  placement of these facilities within
                                                   For alternative sites for pipe storage                                                                     floodplains would be unavoidable, DOE
                                                                                                        shown to be inconsistent with the
                                                and contractor yard, the EIS considered                                                                       has determined that the current design
                                                                                                        public interest, and that the Application
                                                one alternative to the proposed site. The                                                                     for the GPP Export Project minimizes
                                                                                                        should be granted subject to compliance
                                                alternative site consisted of land with                                                                       floodplain impacts to the extent
                                                                                                        with the terms and conditions set forth
                                                varying commercial/industrial and                                                                             practicable.
                                                                                                        in the Order, including the 83
                                                agricultural uses. If the alternative site
                                                was selected, the agricultural use would                environmental conditions                                Issued in Washington, DC, on April 25,
                                                be displaced. The proposed site, in                     recommended in the EIS and adopted in                 2017.
                                                comparison, is already previously                       the FERC Order at Appendix A.                         Douglas W. Hollett,
                                                distributed industrial-use land used for                Additionally, this authorization is                   Assistant Secretary (Acting), Office of Fossil
                                                the construction of the existing GPPL                   conditioned on GPP’s compliance with                  Energy.
                                                pipeline. As a result, the alternative site             any other mitigation measures imposed                 [FR Doc. 2017–08744 Filed 4–28–17; 8:45 am]
                                                did not offer a significant environmental               by other federal or state agencies.                   BILLING CODE 6450–01–P
                                                advantage over the proposed site.                       Basis of Decision
                                                   Finally, the EIS included an
                                                alternative compressor station design.                    DOE’s decision is based upon the                    DEPARTMENT OF ENERGY
                                                Instead of the proposed gas-fired                       analysis of potential environmental
                                                compressors, the alternative design                     impacts presented in the EIS, and DOE’s               Certification Notice—247; Notice of
                                                evaluated the use of electric-powered                   determination in Order No. 3978 that                  Filing of Self-Certification of Coal
                                                compressors. When comparing the two                     the opponents of GPP’s Application                    Capability Under the Powerplant and
                                                designs, the EIS focused on the issue of                have failed to overcome the statutory                 Industrial Fuel Use Act
                                                additional infrastructure needed to                     presumption that the proposed export
                                                                                                                                                              AGENCY: Office of Electricity Delivery
                                                power the electric-power compressor                     authorization is not inconsistent with
                                                                                                                                                              and Energy Reliability, DOE.
                                                stations. Use of electricity would require              the public interest. Although not
                                                                                                        required by NEPA, DOE/FE also                         ACTION: Notice of filing.
                                                each station to install varying lengths of
                                                distribution lines to the compressor                    considered the Addendum, which
                                                                                                                                                              SUMMARY:    On March 31, 2017, PSEG
                                                stations and a substation and/or switch                 summarizes available information on
                                                                                                                                                              Power, LLC, as owner and operator of a
                                                station to meet power requirements.                     potential upstream impacts associated
                                                                                                                                                              new baseload electric generating
                                                Additionally, the electrical power could                with unconventional natural gas
                                                                                                                                                              powerplant, submitted a coal capability
                                                come from existing electrical generation                activities, such as hydraulic fracturing.
                                                                                                                                                              self-certification to the Department of
                                                plants with varying fuel uses. However,                 Mitigation                                            Energy (DOE) pursuant to § 201(d) of the
                                                overall emissions reductions resulting                                                                        Powerplant and Industrial Fuel Use Act
                                                from the use of electric-powered versus                    As a condition of its decision to issue
                                                                                                                                                              of 1978 (FUA), as amended, and DOE
                                                gas-powered compressor stations will                    Order No. 3978 authorizing GPP to
                                                                                                                                                              regulations. The FUA and regulations
                                                vary depending on the fuel used. As a                   export LNG to non-FTA countries, DOE
                                                                                                                                                              thereunder require DOE to publish a
                                                result, the EIS concluded the alternative               is imposing requirements that will avoid
                                                                                                                                                              notice of filing of self-certification in the
                                                did not offer a significant environmental               or minimize the environmental impacts
                                                                                                                                                              Federal Register.
                                                advantage over the proposed                             of the GPP Export Project. These
                                                                                                        conditions include the 83                             ADDRESSES: Copies of coal capability
                                                compressor station design.
                                                                                                        environmental conditions                              self-certification filings are available for
                                                Environmentally Preferred Alternative                   recommended in the EIS and adopted in                 public inspection, upon request, in the
                                                  When compared against the other                       the FERC Order at Appendix A.                         Office of Electricity Delivery and Energy
srobinson on DSK5SPTVN1PROD with NOTICES




                                                action alternatives assessed in the EIS,                Mitigation measures beyond those                      Reliability, Mail Code OE–20, Room
                                                as discussed above, the proposed GPP                    included in Order No. 3978 that are                   8G–024, Forrestal Building, 1000
                                                Export Project and Pipeline Expansion                   enforceable by other Federal and state                Independence Avenue SW.,
                                                Project are the environmentally                         agencies are additional conditions of                 Washington, DC 20585.
                                                preferred alternatives. While the No-                   Order No. 3978. With these conditions,                FOR FURTHER INFORMATION CONTACT:
                                                Action Alternative would avoid the                      DOE/FE has determined that all                        Christopher Lawrence at (202) 586–
                                                environmental impacts identified in the                 practicable means to avoid or minimize                5260.


                                           VerDate Sep<11>2014   20:35 Apr 28, 2017   Jkt 241001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\01MYN1.SGM   01MYN1


                                                20332                            Federal Register / Vol. 82, No. 82 / Monday, May 1, 2017 / Notices

                                                SUPPLEMENTARY INFORMATION:       Title II of            Washington, DC 20585–0350. Because                    be clearly marked with OE Docket No.
                                                FUA, as amended (42 U.S.C. 8301 et                      of delays in handling conventional mail,              EA–328–B. An additional copy is to be
                                                seq.), provides that no new base load                   it is recommended that documents be                   provided directly to both Chantal
                                                electric powerplant may be constructed                  transmitted by overnight mail, by                     Marchese, Royal Bank of Canada, 200
                                                or operated without the capability to use               electronic mail to Electricity.Exports@               Bay Street, 30th Floor, North Tower,
                                                coal or another alternate fuel as a                     hq.doe.gov, or by facsimile to 202–586–               Toronto, Ontario Canada M5J 2J5 and
                                                primary energy source. Pursuant to the                  8008.                                                 Marcus Chun, RBC Capital Markets, 200
                                                FUA, in order to meet the requirement                   SUPPLEMENTARY INFORMATION: Exports of                 Bay Street, 9th Floor, South Tower,
                                                of coal capability, the owner or operator               electricity from the United States to a               Toronto, Ontario Canada M5J 2J2.
                                                of such a facility proposing to use                     foreign country are regulated by the                     A final decision will be made on this
                                                natural gas or petroleum as its primary                 Department of Energy (DOE) pursuant to                application after the environmental
                                                energy source shall certify to the                      sections 301(b) and 402(f) of the                     impacts have been evaluated pursuant
                                                Secretary of Energy (Secretary) prior to                Department of Energy Organization Act                 to DOE’s National Environmental Policy
                                                construction, or prior to operation as a                (42 U.S.C. 7151(b), 7172(f)) and require              Act Implementing Procedures (10 CFR
                                                base load electric powerplant, that such                authorization under section 202(e) of                 part 1021) and after a determination is
                                                powerplant has the capability to use                    the Federal Power Act (16 U.S.C.                      made by DOE that the proposed action
                                                coal or another alternate fuel. Such                    824a(e)).                                             will not have an adverse impact on the
                                                certification establishes compliance                       On September 28, 2012, DOE issued                  sufficiency of supply or reliability of the
                                                with FUA section 201(a) as of the date                  Order No. EA–328–A to RBC Energy,                     U.S. electric power supply system.
                                                it is filed with the Secretary. 42 U.S.C.               which authorized the Applicant to                        Copies of this application will be
                                                8311.                                                   transmit electric energy from the United              made available, upon request, for public
                                                   The following owner of a proposed                    States to Canada as a power marketer for              inspection and copying at the address
                                                new baseload electric generating                        a five-year term using existing                       provided above, by accessing the
                                                powerplant has filed a self-certification               international transmission facilities.                program Web site at http://energy.gov/
                                                of coal-capability with DOE pursuant to                 That authority expires on September 26,               node/11845, or by emailing Angela Troy
                                                FUA section 201(d) and in accordance                    2017. On March 24, 2017, RBC Energy                   at Angela.Troy@hq.doe.gov.
                                                with DOE regulations in 10 CFR 501.60,                  filed an application with DOE for                       Issued in Washington, DC, on April 11,
                                                61:                                                     renewal of the export authority                       2017.
                                                Owner: PSEG Power, LLC                                  contained in Order No. EA–328 for an                  Brian Mills,
                                                Capacity: 540 megawatts (MW)                            additional five-year term.                            Senior Planning Advisor, Office of Electricity
                                                Plant Location: PSEG Fossil Sewaren                        In its application, RBC Energy states              Delivery and Energy Reliability.
                                                   Generating Station, Sewaren, NJ                      that it does not own or operate any                   [FR Doc. 2017–08735 Filed 4–28–17; 8:45 am]
                                                In-Service Date: April 2018                             electric generation or transmission                   BILLING CODE 6450–01–P
                                                  Issued in Washington, DC, on April 11,                facilities, and it does not have a
                                                2017.                                                   franchised service area. The electric
                                                Brian Mills,                                            energy that RBC Energy proposes to                    DEPARTMENT OF ENERGY
                                                Office of Electricity Delivery and Energy               export to Canada would be surplus
                                                Reliability.                                            energy purchased from third parties                   Office of Energy Efficiency and
                                                [FR Doc. 2017–08737 Filed 4–28–17; 8:45 am]             such as electric utilities and Federal                Renewable Energy
                                                BILLING CODE 6450–01–P                                  power marketing agencies pursuant to
                                                                                                        voluntary agreements. The existing                    Proposed Agency Information
                                                                                                        international transmission facilities to              Collection Extension
                                                DEPARTMENT OF ENERGY                                    be utilized by RBC Energy have                        AGENCY: Office of Energy Efficiency and
                                                                                                        previously been authorized by                         Renewable Energy, U.S. Department of
                                                [OE Docket No. EA–328–B]
                                                                                                        Presidential Permits issued pursuant to               Energy.
                                                Application To Export Electric Energy;                  Executive Order 10485, as amended,                    ACTION: Notice and request for
                                                RBC Energy Services LP                                  and are appropriate for open access                   comments.
                                                                                                        transmission by third parties.
                                                AGENCY: Office of Electricity Delivery                     Procedural Matters: Any person                     SUMMARY:    The Department of Energy’s
                                                and Energy Reliability, DOE.                            desiring to be heard in this proceeding               (DOE) Office of Energy Efficiency and
                                                ACTION: Notice of application.                          should file a comment or protest to the               Renewable Energy (EERE), pursuant to
                                                                                                        application at the address provided                   the Paperwork Reduction Act of 1995,
                                                SUMMARY:   RBC Energy Services LP                       above. Protests should be filed in                    intends to extend for three years with
                                                (Applicant or RBC Energy) has applied                   accordance with Rule 211 of the Federal               the Office of Management and Budget
                                                to renew its authority to transmit                      Energy Regulatory Commission’s (FERC)                 (OMB), the EERE Environmental
                                                electric energy from the United States to               Rules of Practice and Procedures (18                  Questionnaire (OMB No. 1910–5175).
                                                Canada pursuant to section 202(e) of the                CFR 385.211). Any person desiring to                  Comments are invited on: (a) Whether
                                                Federal Power Act.                                      become a party to these proceedings                   the proposed collection of information
                                                DATES: Comments, protests, or motions                   should file a motion to intervene at the              is necessary for the proper performance
                                                to intervene must be submitted on or                    above address in accordance with FERC                 of the functions of DOE, including
                                                before May 31, 2017.                                    Rule 214 (18 CFR 385.214). Five copies                whether the information shall have
srobinson on DSK5SPTVN1PROD with NOTICES




                                                ADDRESSES: Comments, protests,                          of such comments, protests, or motions                practical utility; (b) the accuracy of
                                                motions to intervene, or requests for                   to intervene should be sent to the                    DOE’s estimate of the burden of the
                                                more information should be addressed                    address provided above on or before the               proposed collection of information,
                                                to: Office of Electricity Delivery and                  date listed above.                                    including the validity of the
                                                Energy Reliability, Mail Code: OE–20,                      Comments and other filings                         methodology and assumptions used; (c)
                                                U.S. Department of Energy, 1000                         concerning RBC Energy’s application to                ways to enhance the quality, utility, and
                                                Independence Avenue SW.,                                export electric energy to Canada should               clarity of the information to be


                                           VerDate Sep<11>2014   20:35 Apr 28, 2017   Jkt 241001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\01MYN1.SGM   01MYN1



Document Created: 2017-04-29 03:16:17
Document Modified: 2017-04-29 03:16:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
DatesApril 2018
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation82 FR 20331 