82_FR_21396 82 FR 21309 - Drawbridge Operation Regulation; Mill River, New Haven, CT

82 FR 21309 - Drawbridge Operation Regulation; Mill River, New Haven, CT

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 82, Issue 87 (May 8, 2017)

Page Range21309-21309
FR Document2017-09212

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Chapel Street Bridge across the Mill River, mile 0.4 at New Haven, Connecticut. This deviation is necessary to complete mortar and fender repairs as well as structural steel work. This deviation allows the bridge to open for the passage of vessels upon 2 hours of advance notice as well as a four day closure of the draw to all vessel traffic.

Federal Register, Volume 82 Issue 87 (Monday, May 8, 2017)
[Federal Register Volume 82, Number 87 (Monday, May 8, 2017)]
[Rules and Regulations]
[Page 21309]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09212]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0360]


Drawbridge Operation Regulation; Mill River, New Haven, CT

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Chapel Street Bridge across the 
Mill River, mile 0.4 at New Haven, Connecticut. This deviation is 
necessary to complete mortar and fender repairs as well as structural 
steel work. This deviation allows the bridge to open for the passage of 
vessels upon 2 hours of advance notice as well as a four day closure of 
the draw to all vessel traffic.

DATES: This deviation is effective from 12:01 a.m. on May 8, 2017, 
through 11:59 p.m. on May 30, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0360 is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email James M. Moore, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4334, email [email protected].

SUPPLEMENTARY INFORMATION: The City of New Haven, the owner of the 
bridge, requested a temporary deviation from the normal operating 
schedule to facilitate rehabilitation of the bridge. The Chapel Street 
Bridge, across the Mill River, mile 0.4 at New Haven, Connecticut 
offers mariners a vertical clearance of 7.9 feet at mean high water and 
14 feet at mean low water in the closed position. The existing 
drawbridge operating regulations are listed at 33 CFR 117.213(d).
    Under this temporary deviation, the Chapel Street Bridge will open 
for the passage of vessels requiring an opening provided 2 hours of 
advance notice is furnished to the owner of the bridge; except that, 
from 7:30 a.m. to 8:30 a.m. and 4:45 p.m. to 5:45 p.m., Monday through 
Friday, except Federal holidays, the draw need not open for the passage 
of vessel traffic. The bridge will remain closed to all vessels from 
12:01 a.m. May 11, 2017 to 11:59 p.m. May 14, 2017.
    The bridge routinely opens for commercial vessels. Nevertheless, 
outreach with mariners has indicated the requirement for 2 hours of 
advance notice will not impede routine waterway operations. Mariners 
also offered no objection to a four day closure of the draw in order to 
complete the necessary repair work to the bridge.
    Vessels that can pass under the bridge without an opening may do so 
at all times except during the full channel closure between May 11, 
2017 and May 14, 2017. The bridge will be able to open for emergencies. 
There is no alternate route for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: May 3, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-09212 Filed 5-5-17; 8:45 am]
 BILLING CODE 9110-04-P



                                                                       Federal Register / Vol. 82, No. 87 / Monday, May 8, 2017 / Rules and Regulations                                                 21309

                                                     4. Meet the requirements of § 25.863.                ADDRESSES:    The docket for this                     temporary deviation. This deviation
                                                     5. Not damage surrounding structure                  deviation, USCG–2017–0360 is available                from the operating regulations is
                                                  or adjacent systems, equipment, or                      at http://www.regulations.gov. Type the               authorized under 33 CFR 117.35.
                                                  electrical wiring from corrosive fluids or              docket number in the ‘‘SEARCH’’ box                     Dated: May 3, 2017.
                                                  gases that may escape in such a way as                  and click ‘‘SEARCH’’. Click on Open                   C.J. Bisignano,
                                                  to cause a major or more severe failure                 Docket Folder on the line associated
                                                                                                                                                                Supervisory Bridge Management Specialist,
                                                  condition.                                              with this deviation.                                  First Coast Guard District.
                                                     6. Have provisions to prevent any                    FOR FURTHER INFORMATION CONTACT: If                   [FR Doc. 2017–09212 Filed 5–5–17; 8:45 am]
                                                  hazardous effect on airplane structure or               you have questions on this temporary                  BILLING CODE 9110–04–P
                                                  systems caused by the maximum                           deviation, call or email James M. Moore,
                                                  amount of heat it can generate due to                   Bridge Management Specialist, First
                                                  any failure of it or its individual cells.              District Bridge Branch, U.S. Coast
                                                     7. Have a failure sensing and warning                                                                      ENVIRONMENTAL PROTECTION
                                                                                                          Guard; telephone 212–514–4334, email
                                                  system to alert the flightcrew if its                                                                         AGENCY
                                                                                                          james.m.moore2@uscg.mil.
                                                  failure affects safe operation of the                   SUPPLEMENTARY INFORMATION: The City
                                                  airplane.                                                                                                     40 CFR Part 52
                                                                                                          of New Haven, the owner of the bridge,
                                                     8. Have a means for the flightcrew or                requested a temporary deviation from                  [EPA–R03–OAR–2016–0562; FRL–9961–17–
                                                  maintenance personnel to determine the                  the normal operating schedule to
                                                                                                                                                                Region 3]
                                                  battery charge state if the battery’s                   facilitate rehabilitation of the bridge.
                                                  function is required for safe operation of                                                                    Approval and Promulgation of Air
                                                                                                          The Chapel Street Bridge, across the                  Quality Implementation Plans;
                                                  the airplane.                                           Mill River, mile 0.4 at New Haven,                    Maryland; 2016 Nitrogen Oxides
                                                     Note: A battery system consists of the               Connecticut offers mariners a vertical                Averaging Plan Consent Agreement
                                                  battery and any protective, monitoring, and             clearance of 7.9 feet at mean high water
                                                  alerting circuitry or hardware inside or                                                                      With Raven Power
                                                                                                          and 14 feet at mean low water in the
                                                  outside of the battery. It also includes vents                                                                AGENCY:  Environmental Protection
                                                                                                          closed position. The existing
                                                  (where necessary) and packaging. For the                                                                      Agency (EPA).
                                                  purpose of these special conditions, a                  drawbridge operating regulations are
                                                  ‘‘battery’’ and ‘‘battery system’’ are referred to      listed at 33 CFR 117.213(d).                          ACTION: Final rule.
                                                  as a battery.                                              Under this temporary deviation, the
                                                                                                          Chapel Street Bridge will open for the                SUMMARY:    The Environmental Protection
                                                    Issued in Renton, Washington, on April 24,            passage of vessels requiring an opening               Agency (EPA) is approving a state
                                                  2017.                                                   provided 2 hours of advance notice is                 implementation plan (SIP) revision
                                                  Michael Kaszycki,                                       furnished to the owner of the bridge;                 submitted by the State of Maryland. The
                                                  Assistant Manager, Transport Airplane                   except that, from 7:30 a.m. to 8:30 a.m.              revision pertains to a Consent
                                                  Directorate, Aircraft Certification Service.            and 4:45 p.m. to 5:45 p.m., Monday                    Agreement between Maryland and
                                                  [FR Doc. 2017–09202 Filed 5–5–17; 8:45 am]              through Friday, except Federal holidays,              Raven Power concerning an inter-
                                                                                                          the draw need not open for the passage                facility averaging plan for emissions of
                                                  BILLING CODE 4910–13–P
                                                                                                          of vessel traffic. The bridge will remain             nitrogen oxides (NOX) at facilities
                                                                                                          closed to all vessels from 12:01 a.m.                 located in Maryland and owned by
                                                                                                          May 11, 2017 to 11:59 p.m. May 14,                    Raven Power. The Consent Agreement
                                                  DEPARTMENT OF HOMELAND                                                                                        allows Raven Power to use system-wide
                                                  SECURITY                                                2017.
                                                                                                             The bridge routinely opens for                     emissions averaging to comply with the
                                                  Coast Guard                                             commercial vessels. Nevertheless,                     applicable NOX emission limits for six
                                                                                                          outreach with mariners has indicated                  units located at two electric generating
                                                  33 CFR Part 117                                         the requirement for 2 hours of advance                facilities, Brandon Shores and H.A.
                                                                                                          notice will not impede routine                        Wagner, owned by Raven Power. EPA is
                                                  [Docket No. USCG–2017–0360]                                                                                   approving this revision in accordance
                                                                                                          waterway operations. Mariners also
                                                                                                          offered no objection to a four day                    with the requirements of the Clean Air
                                                  Drawbridge Operation Regulation; Mill                                                                         Act (CAA).
                                                  River, New Haven, CT                                    closure of the draw in order to complete
                                                                                                          the necessary repair work to the bridge.              DATES: This final rule is effective on
                                                  AGENCY: Coast Guard, DHS.                                  Vessels that can pass under the bridge             June 7, 2017.
                                                  ACTION:Notice of deviation from                         without an opening may do so at all                   ADDRESSES: EPA has established a
                                                  drawbridge regulation.                                  times except during the full channel                  docket for this action under Docket ID
                                                                                                          closure between May 11, 2017 and May                  Number EPA–R03–OAR–2016–0562. All
                                                  SUMMARY:  The Coast Guard has issued a                  14, 2017. The bridge will be able to                  documents in the docket are listed on
                                                  temporary deviation from the operating                  open for emergencies. There is no                     the http://www.regulations.gov Web
                                                  schedule that governs the Chapel Street                 alternate route for vessels to pass.                  site. Although listed in the index, some
                                                  Bridge across the Mill River, mile 0.4 at                  The Coast Guard will also inform the               information is not publicly available,
                                                  New Haven, Connecticut. This deviation                  users of the waterways through our                    e.g., confidential business information
                                                  is necessary to complete mortar and                     Local and Broadcast Notices to Mariners               (CBI) or other information whose
                                                  fender repairs as well as structural steel              of the change in operating schedule for               disclosure is restricted by statute.
asabaliauskas on DSK3SPTVN1PROD with RULES




                                                  work. This deviation allows the bridge                  the bridge so that vessel operators can               Certain other material, such as
                                                  to open for the passage of vessels upon                 arrange their transits to minimize any                copyrighted material, is not placed on
                                                  2 hours of advance notice as well as a                  impact caused by the temporary                        the Internet and will be publicly
                                                  four day closure of the draw to all vessel              deviation.                                            available only in hard copy form.
                                                  traffic.                                                   In accordance with 33 CFR 117.35(e),               Publicly available docket materials are
                                                  DATES: This deviation is effective from                 the drawbridge must return to its regular             available through http://
                                                  12:01 a.m. on May 8, 2017, through                      operating schedule immediately at the                 www.regulations.gov, or please contact
                                                  11:59 p.m. on May 30, 2017.                             end of the effective period of this                   the person identified in the FOR FURTHER


                                             VerDate Sep<11>2014   14:41 May 05, 2017   Jkt 241001   PO 00000   Frm 00007   Fmt 4700   Sfmt 4700   E:\FR\FM\08MYR1.SGM   08MYR1



Document Created: 2017-05-06 02:21:36
Document Modified: 2017-05-06 02:21:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 12:01 a.m. on May 8, 2017, through 11:59 p.m. on May 30, 2017.
ContactIf you have questions on this temporary deviation, call or email James M. Moore, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 212-514-4334, email [email protected]
FR Citation82 FR 21309 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR