82_FR_21626 82 FR 21538 - Commission Information Collection Activities (FERC-725E); Comment Request; Revision and Extension

82 FR 21538 - Commission Information Collection Activities (FERC-725E); Comment Request; Revision and Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 88 (May 9, 2017)

Page Range21538-21541
FR Document2017-09341

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on revisions to the information collection, FERC-725E (Mandatory Reliability Standards for the Western Electric Coordinating Council) and will be submitting FERC-725E to the Office of Management and Budget (OMB) for review of the information collection requirements.

Federal Register, Volume 82 Issue 88 (Tuesday, May 9, 2017)
[Federal Register Volume 82, Number 88 (Tuesday, May 9, 2017)]
[Notices]
[Pages 21538-21541]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09341]



[[Page 21538]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RD17-5-000 and IC17-6-000]


Commission Information Collection Activities (FERC-725E); Comment 
Request; Revision and Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of revised information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on revisions to the information 
collection, FERC-725E (Mandatory Reliability Standards for the Western 
Electric Coordinating Council) and will be submitting FERC-725E to the 
Office of Management and Budget (OMB) for review of the information 
collection requirements.

DATES: Comments on the collection of information are due July 10, 2017.

ADDRESSES: You may submit comments identified by Docket Nos. RD17-5-000 
and IC17-6-000 by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.

Instructions: All submissions must be formatted and filed in accordance 
with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support by email at 
[email protected], or by phone at: (866) 208-3676 (toll-free), 
or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725E, Mandatory Reliability Standards for the Western 
Electric Coordinating Council.
    OMB Control No.: 1902-0246.
    Type of Request: Three-year approval of the FERC-725E information 
collection requirements, as modified by Docket No. RD17-5-000.
    Abstract: The information collected by the FERC-725E is required to 
implement the statutory provisions of section 215 of the Federal Power 
Act (FPA) (16 U.S.C. 824o). Section 215 of the FPA buttresses the 
Commission's efforts to strengthen the reliability of the interstate 
grid through the grant of new authority by providing for a system of 
mandatory Reliability Standards developed by the Electric Reliability 
Organization (ERO). Reliability Standards that the ERO proposes to the 
Commission may include Reliability Standards that are proposed to the 
ERO by a Regional Entity.\1\ A Regional Entity is an entity that has 
been approved by the Commission to enforce Reliability Standards under 
delegated authority from the ERO.\2\ On June 8, 2008, the Commission 
approved eight regional Reliability Standards submitted by the ERO that 
were proposed by the Western Electricity Coordinating Council 
(WECC).\3\
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824o(e)(4).
    \2\ 16 U.S.C. 824o(a)(7) and (e)(4).
    \3\ North American Electric Reliability Corp., 119 FERC 61,260 
(2007).
---------------------------------------------------------------------------

    WECC promotes bulk electric system reliability in the Western 
Interconnection. WECC is the Regional Entity responsible for compliance 
monitoring and enforcement. In addition, WECC provides an environment 
for the development of Reliability Standards and the coordination of 
the operating and planning activities of its members as set forth in 
the WECC Bylaws.
    There are several regional Reliability Standards in the WECC 
region. These regional Reliability Standards generally require entities 
to document compliance with substantive requirements, retain 
documentation, and submit reports to WECC.
    BAL-002-WECC-2a (Contingency Reserve) \4\ requires balancing 
authorities and reserve sharing groups to document compliance with the 
contingency reserve requirements described in the standard.
---------------------------------------------------------------------------

    \4\ BAL-002-WECC-2 is included in the OMB-approved inventory for 
FERC-725E. On November 9, 2016, NERC and WECC submitted a joint 
petition for approval of an interpretation of BAL-002-WECC-2, to be 
designated BAL-002-WECC-2a. BAL-002-WECC-2a was approved by order in 
Docket No. RD17-3-000 on January 24, 2017. The Order determined: The 
proposed interpretation provides clarification regarding the types 
of resources that may be used to satisfy Contingency Reserve 
requirements in regional Reliability Standard BAL-002-WECC-2. BAL-
002-WECC-2a did not trigger the Paperwork Reduction Act and did not 
affect the burden estimate. BAL-002-WECC-2a is being included in 
this Notice and the Commission's submittal to OMB as part of the 
FERC-725E.
---------------------------------------------------------------------------

     BAL-004-WECC-02 (Automatic Time Error Correction) requires 
balancing authorities to document that time error corrections and 
primary inadvertent interchange payback were conducted according the 
requirements in the standard.
     FAC-501-WECC-1 (Transmission Maintenance) requires 
transmission owners with certain transmission paths to have a 
transmission maintenance and inspection plan and to document 
maintenance and inspection activities according to the plan.
     IRO-006-WECC-2 (Qualified Transfer Path Unscheduled Flow 
(USF) Relief) \5\ requires balancing authorities and reliability 
coordinators document actions taken to mitigate unscheduled flow.
---------------------------------------------------------------------------

    \5\ On December 20, 2013, NERC and WECC submitted a joint 
petition for approval of IRO-006-WECC-2 and retirement of IRO-006-
WECC-1. IRO-006-WECC-2 was approved by order in Docket No. RD14-9-
000 on May 13, 2014. Because the reporting burden for IRO-006-WECC-2 
did not increase for entities that operate within the Western 
Interconnection, FERC submitted the order to OMB for information 
only. The burden related to IRO-006-WECC-2 does not differ from the 
burden of IRO-006-WECC-1, which is included in the OMB-approved 
inventory. IRO-006-WECC-2 is being included in this Notice and the 
Commission's submittal to OMB as part of FERC-725E.
---------------------------------------------------------------------------

     PRC-004-WECC-2 (Protection System and Remedial Action 
Scheme Misoperation) \6\ requires transmission owners, generator owners 
and transmission operators to document their analysis and/or mitigation 
due to certain misoperations on major transfer

[[Page 21539]]

paths. This standard requires that documentation be kept for six years.
---------------------------------------------------------------------------

    \6\ Order No. 818, issued on November 19, 2015 in Docket Nos. 
RM15-7, RM15-12, and RM15-13, stated in part: ``NERC requested 
approval of the following Reliability Standards to incorporate the 
proposed definition of Remedial Action Scheme and eliminate use of 
the term Special Protection System: . . . PRC-004-WECC-2, . . . NERC 
did not propose any changes to the Violation Risk Factors or 
Violation Severity Levels for the modified standards.'' Revisions to 
Emergency Operations Reliability Standards; Revisions to 
Undervoltage Load Shedding Reliability Standards; Revisions to the 
Definition of ``Remedial Action Scheme'' and Related Reliability 
Standards, Order No. 818, 153 FERC ] 61,228, at P 23 n.31 (2015). In 
addition, Order No. 818 stated: ``The Commission approved the 
definition of Special Protection System (Remedial Action Scheme) in 
Order No. 693. We approve a revision to the previously approved 
definition. The revisions to the Remedial Action Scheme definition 
and related Reliability Standards are not expected to result in 
changes to the scope of systems covered by the Reliability Standards 
and other Reliability Standards that include the term Remedial 
Action Scheme. Therefore, the Commission does not expect the 
revisions to affect applicable entities' current reporting burden.'' 
Id. P 67. The change to the definition did not affect the burden of 
PRC-004-WECC-1 (which is included in the current OMB-approved 
inventory). PRC-004-WECC-2 (the current version of the standard) is 
being included in this Notice and the Commission's submittal to OMB 
as part of the FERC-725E.
---------------------------------------------------------------------------

     VAR-002-WECC-2 (Automatic Voltage Regulators (AVR)) \7\ 
requires generator operators and transmission operators to provide 
quarterly reports to the compliance monitor and have evidence related 
to their synchronous generators, synchronous condensers, and automatic 
voltage regulators.
---------------------------------------------------------------------------

    \7\ VAR-002-WECC-2 was approved by order in Docket No. RD15-1 on 
March 3, 2015. Regional Reliability Standard VAR-002-WECC-2 made a 
non-material or non-substantive change to the reporting and 
recordkeeping requirements associated with VAR-002-WECC-1 (currently 
included in the OMB-approved inventory). VAR-002-WECC-2 (the current 
version of the standard) is being included in this Notice and the 
Commission's submittal to OMB as part of FERC-725E.
---------------------------------------------------------------------------

    The associated reporting and recordkeeping requirements included in 
the standards above are not being revised, and the Commission will be 
submitting a request to OMB to extend these requirements for three 
years. The Commission's request to OMB will also reflect the following:
     Eliminating the burden associated with regional 
Reliability Standard TOP-007-WECC-1a, which is being retired (addressed 
in Docket No. RD16-10); \8\ and
---------------------------------------------------------------------------

    \8\ The Commission approved the retirement of regional 
Reliability Standard TOP-007-WECC-1a (System Operating Limits (SOL)) 
by order in Docket No. RD16-10-000 on March 10, 2017. On March 31, 
2017, the Commission issued a 60-day Notice requesting public 
comment on the effect on burden. The Notice is available at 82 FR 
16823 (April 6, 2017). Comments are due in Docket No. RD16-10-000 by 
June 5, 2017. See Docket No. RD16-10-000 for additional information 
(including the estimated annual burden reduction of 1,188 hours).
---------------------------------------------------------------------------

     Implementing the regional Reliability Standard VAR-501-
WECC-3 and the retirement of regional Reliability Standard VAR-501-
WECC-2 (addressed in Docket No. RD17-5 and discussed below).
    On March 10, 2017, NERC and WECC filed a joint petition in Docket 
No. RD17-5-000 \9\ requesting Commission approval of: (a) Regional 
Reliability Standard VAR-501-WECC-3 (Power System Stabilizers), and (b) 
the retirement of then-existing regional Reliability Standard VAR-501-
WECC-2. The petition states: ``Regional Reliability Standard VAR-501-
WECC-3 establishes the performance criteria for power system 
stabilizers to help ensure the Western Interconnection is operated in a 
coordinated manner under normal and abnormal conditions.'' VAR-501-
WECC-3 was approved by order in Docket No. RD17-5-000 on April 28, 
2017. In this document, we provide estimates of the burden and cost 
related to those revisions to FERC-725E.
---------------------------------------------------------------------------

    \9\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD17-5-000.
---------------------------------------------------------------------------

    Type of Respondents: Balancing authorities, reserve sharing groups, 
transmission owners, reliability coordinators, transmission operators, 
generator operators, and generator owners.
    Estimate of Annual Burden \10\: Details follow on the changes in 
Docket No. RD17-5-000, and on the continuing burdens, which will be 
submitted to OMB for approval in a consolidated package under FERC-
725E.
---------------------------------------------------------------------------

    \10\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
---------------------------------------------------------------------------

    Estimate of Changes to Burden Due to Docket No. RD17-5: The joint 
petition requested Commission approval of regional Reliability Standard 
VAR-501-WECC-3 and retirement of then-existing regional Reliability 
Standard VAR-501-WECC-2. The estimated effects on burden and cost \11\ 
are as follow:
---------------------------------------------------------------------------

    \11\ For VAR-501-WECC-3, the hourly cost (for salary plus 
benefits) uses the figures from the Bureau of Labor Statistics for 
three positions involved in the reporting and recordkeeping 
requirements. These figures include salary (http://bls.gov/oes/current/naics2_22.htm) and benefits (http://www.bls.gov/news.release/ecec.nr0.htm) and are:
     Manager: $89.07/hour
     Engineer: $64.91/hour
     File Clerk: $31.19/hour
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.

                                   FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Changes in Docket No. RD17-5-000
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual  number
                                           Number of     of  responses   Annual  number   Average burden hrs. &  cost per      Total annual  burden hours &
                Entity                    respondents         per        of  responses             response  ($)                  total annual cost  ($)            Cost per respondent  ($)
                                             \12\         respondent
                                                   (1)             (2)  (1) * (2) = (3)  (4)..............................  (3) * (4) = (5)..................  (5) / (1) = (6)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Retirement Of Former Standard VAR-501-WECC-2 and Associated Reductions
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements (Annually)
Generator Operators...................             249               4              996  1 hr.; $76.22....................  996 hrs.; $75,915.12 (reduction).  $304.88 (reduction)
Recordkeeping Requirements (Annually)
Generator Operators...................             249               4              996  0.5 hrs.; $31.19.................  498 hrs.; $15,532.62 (reduction).  $62.38 (reduction)
Reductions (Annually).................  ..............  ..............  ...............  .................................  1,494 hrs.; $91,447.74             .................................
                                                                                                                             (reduction).
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   New Standard VAR-501-WECC-3
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements................
Generator Owners and/or Operators, in              291               3              873  1 hr.; $76.99....................  873 hrs.; $67,212.27.............  $230.97
 Year 1.
Generator Owners and/or Operators, in              291               2              582  1 hr.; $76.99....................  582 hrs.; $44,808.18.............  $153.98
 Year 2 and Ongoing.
Recordkeeping Requirements
Generator Owners and/or Operators, in              291               3              873  1 hr.; $31.19....................  873 hrs.; $27,228.87.............  $93.57
 Year 1.
Generator Owners and/or Operators, in              291               2              582  0.5 hrs.; $15.595................  291 hrs.; $9,076.29..............  $31.19
 Year 2 and Ongoing.
New Burden, in Year 1.................  ..............  ..............  ...............  .................................  1,746 hrs.; $94,441.14...........  .................................
New Burden, in Year 2 & Ongoing.......  ..............  ..............  ...............  .................................  873 hrs.; $53,884.47.............  .................................
Net Burden Change in Year 1...........  ..............  ..............  ...............  .................................  +252 hrs (increase)..............  .................................

[[Page 21540]]

 
Net Burden Change in Year 2 and         ..............  ..............  ...............  .................................  -621 hrs. (decrease).............  .................................
 Ongoing.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Estimate of Continuing Annual Burden for Renewal and New 
Reliability Standard VAR-501-WECC-3: \13\ The Commission estimates the 
annual public reporting burden and cost \14\ as follows for FERC-725E. 
(This information will be submitted to OMB for approval.) These 
estimates reflect:
---------------------------------------------------------------------------

    \12\ The number of respondents is derived from the NERC 
Compliance Registry as of March 10, 2017.
    \13\ The Commission is also removing 36 one-time burden hours 
associated with the requirements in Docket No. RM13-13. The one-time 
burden has been completed and will now be administratively removed 
on submittal to OMB. Those hours are not included in the table.
    \14\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (http://bls.gov/oes/current/naics2_22.htm) and other 
associated benefits (http://www.bls.gov/news.release/ecec.nr0.htm) 
and are:
     Manager: $89.07/hour
     Engineer: $64.91/hour
     File Clerk: $31.19/hour
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.
---------------------------------------------------------------------------

     Reliability Standards in FERC-725E which continue and 
remain unchanged (BAL-002-WECC-2a, BAL-004-WECC-02, FAC-501-WECC-1, 
IRO-006-WECC-2, PRC-004-WECC-2, and VAR-002-WECC-2);
     Removal of burden due to the retirement of TOP-007-WECC-1a 
(discussed in Docket No. RD16-10-000)
     Additional burden due to VAR-501-WECC-3, and removal of 
burden due to the retirement of VAR-501-WECC-2 (detailed above and in 
Docket No. RD17-5-000).
    (The burdens and costs related to TOP-007-WECC-1a and VAR-501-WECC-
2 [the standards being retired] are omitted from the table below, which 
describes the new and continuing information collection requirements.)

                                                    FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council
                                                                    [New and Continuing Information Collection Requirements]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                           Number of     Annual number
                Entity                    respondents    of responses    Annual number     Average burden hrs. & cost per      Total annual  burden hours &         Cost per respondent  ($)
                                             \15\       per respondent    of responses             response  ($)                  total annual cost  ($)
                                                   (1)             (2)    (1)*(2) = (3)  (4)..............................  (3)*(4) = (5)....................  (5)/(1) = (6)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                     Reporting Requirements
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Balancing Authorities.................              34               1               34  21 hrs., $1,616.79...............  714 hrs., $54,970.86.............  $1,616.79
Generator Operators...................             228               1              228  10 hrs., $769.90.................  2,280 hrs., $175,537.20..........  $769.90
Transmission Operators applicable to                86               4              344  10 hrs., $769.90.................  3,440 hrs., $264,845.60..........  $769.90
 standard VAR-002.
Transmission Owners that operate                     5               3               15  40 hrs., $3,079.60...............  600 hrs., $46,194.00.............  $3,079.60
 qualified transfer paths.
Reliability Coordinators..............               1               1                1  1 hr., $76.99....................  1 hr., $76.99....................  $76.99
Reserve Sharing Group.................               3               1                3  1 hr., $76.99....................  3 hrs., $230.97..................  $76.99
Generator Owners and/or Operators , in             291               3              873  1 hr.; $76.99....................  873 hrs.; $67,212.27.............  $230.97
 Year 1, per RD17-5 for VAR-501-WECC-3.
Generator Owners and/or Operators, in              291               2              582  1 hr.; $76.99....................  582 hrs.; $44,808.18.............  $153.98
 Year 2 and Ongoing, per RD17-5 for
 VAR-501-WECC-3.
    Sub-Total for Reporting             ..............  ..............  ...............  .................................  7,911 hrs.; $609,067.89..........  .................................
     Requirement in Year 1.
    Sub-Total for Reporting             ..............  ..............  ...............  .................................  7,620 hrs.; $586,663.80..........  .................................
     Requirement Burden in Year 2 &
     ongoing.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   Recordkeeping Requirements
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Balancing Authorities.................              34               1               34  2.1 hrs., $65.50.................  71.4 hrs., $2,226.97.............  $65.50
Balancing Authorities (IRO-006).......              34               1               34  1 hr., $31.19....................  34 hrs., $1,060.46...............  $31.19
Generator Operators...................             228               1              228  1 hr., $31.19....................  228 hrs., $7,111.32..............  $31.19
Transmission Operator (VAR-002).......              86               1               86  4 hrs., $124.76..................  344 hrs., $10,729.36.............  $124.76
Transmission Owner that operate                      5               1                5  12 hrs., $374.28.................  60 hrs., $1,871.40...............  $374.28
 qualified transfer paths.
Reliability Coordinator...............               1               1                1  1 hr.; $31.19....................  1 hr.; $31.19....................  $31.19
Generator Owners and/or Operators, in              291               3              873  1 hr.; $31.19....................  873 hrs.; $27,228.87.............  $93.57
 Year 1, per RD17-5 for VAR-501-WECC-3.

[[Page 21541]]

 
Generator Owners and/or Operators, in              291               2              582  0.5 hrs.; $15.595................  291 hrs.; $9,076.29..............  $31.19
 Year 2 and Ongoing, per RD17-5 for
 VAR-501-WECC-3.
                                       ---------------------------------------------------------------------------------------------------------------------------------------------------------
    Sub-Total for Recordkeeping         ..............  ..............  ...............  .................................  1,611.4 hrs.; $50,259.57.........  .................................
     Requirements in Yr. 1.
    Sub-Total for Recordkeeping         ..............  ..............  ...............  .................................  1,029.4 hrs.; $32,106.99.........  .................................
     Requirements in Yr. 2 & ongoing.
        TOTAL FOR FERC-725E, IN YR. 1.  ..............  ..............  ...............  .................................  9,522.4 hrs.; $659,327.46........  .................................
        TOTAL FOR FERC-725E, IN YR. 2   ..............  ..............  ...............  .................................  8,649.4 hrs.; $618,770.79........  .................................
         & ONGOING.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: May 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09341 Filed 5-8-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  21538                           Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices

                                                  DEPARTMENT OF ENERGY                                    collection requirements, as modified by               reserve requirements described in the
                                                                                                          Docket No. RD17–5–000.                                standard.
                                                  Federal Energy Regulatory                                  Abstract: The information collected                   • BAL–004–WECC–02 (Automatic
                                                  Commission                                              by the FERC–725E is required to                       Time Error Correction) requires
                                                  [Docket Nos. RD17–5–000 and IC17–6–000]                 implement the statutory provisions of                 balancing authorities to document that
                                                                                                          section 215 of the Federal Power Act                  time error corrections and primary
                                                  Commission Information Collection                       (FPA) (16 U.S.C. 824o). Section 215 of                inadvertent interchange payback were
                                                  Activities (FERC–725E); Comment                         the FPA buttresses the Commission’s                   conducted according the requirements
                                                  Request; Revision and Extension                         efforts to strengthen the reliability of the          in the standard.
                                                                                                          interstate grid through the grant of new                 • FAC–501–WECC–1 (Transmission
                                                  AGENCY:  Federal Energy Regulatory                                                                            Maintenance) requires transmission
                                                                                                          authority by providing for a system of
                                                  Commission.                                                                                                   owners with certain transmission paths
                                                                                                          mandatory Reliability Standards
                                                  ACTION: Notice of revised information                   developed by the Electric Reliability                 to have a transmission maintenance and
                                                  collection and request for comments.                    Organization (ERO). Reliability                       inspection plan and to document
                                                                                                          Standards that the ERO proposes to the                maintenance and inspection activities
                                                  SUMMARY:    In compliance with the
                                                                                                          Commission may include Reliability                    according to the plan.
                                                  requirements of the Paperwork
                                                  Reduction Act of 1995, the Federal                      Standards that are proposed to the ERO                   • IRO–006–WECC–2 (Qualified
                                                  Energy Regulatory Commission                            by a Regional Entity.1 A Regional Entity              Transfer Path Unscheduled Flow (USF)
                                                  (Commission or FERC) is soliciting                      is an entity that has been approved by                Relief) 5 requires balancing authorities
                                                  public comment on revisions to the                      the Commission to enforce Reliability                 and reliability coordinators document
                                                  information collection, FERC–725E                       Standards under delegated authority                   actions taken to mitigate unscheduled
                                                  (Mandatory Reliability Standards for the                from the ERO.2 On June 8, 2008, the                   flow.
                                                  Western Electric Coordinating Council)                  Commission approved eight regional                       • PRC–004–WECC–2 (Protection
                                                  and will be submitting FERC–725E to                     Reliability Standards submitted by the                System and Remedial Action Scheme
                                                  the Office of Management and Budget                     ERO that were proposed by the Western                 Misoperation) 6 requires transmission
                                                  (OMB) for review of the information                     Electricity Coordinating Council                      owners, generator owners and
                                                  collection requirements.                                (WECC).3                                              transmission operators to document
                                                                                                             WECC promotes bulk electric system                 their analysis and/or mitigation due to
                                                  DATES: Comments on the collection of
                                                                                                          reliability in the Western                            certain misoperations on major transfer
                                                  information are due July 10, 2017.
                                                                                                          Interconnection. WECC is the Regional
                                                  ADDRESSES: You may submit comments
                                                                                                          Entity responsible for compliance                       5 On December 20, 2013, NERC and WECC
                                                  identified by Docket Nos. RD17–5–000                                                                          submitted a joint petition for approval of IRO–006–
                                                                                                          monitoring and enforcement. In
                                                  and IC17–6–000 by either of the                                                                               WECC–2 and retirement of IRO–006–WECC–1.
                                                                                                          addition, WECC provides an                            IRO–006–WECC–2 was approved by order in
                                                  following methods:
                                                     • eFiling at Commission’s Web site:                  environment for the development of                    Docket No. RD14–9–000 on May 13, 2014. Because
                                                  http://www.ferc.gov/docs-filing/                        Reliability Standards and the                         the reporting burden for IRO–006–WECC–2 did not
                                                                                                          coordination of the operating and                     increase for entities that operate within the Western
                                                  efiling.asp.                                                                                                  Interconnection, FERC submitted the order to OMB
                                                     • Mail/Hand Delivery/Courier:                        planning activities of its members as set             for information only. The burden related to IRO–
                                                  Federal Energy Regulatory Commission,                   forth in the WECC Bylaws.                             006–WECC–2 does not differ from the burden of
                                                                                                             There are several regional Reliability             IRO–006–WECC–1, which is included in the OMB-
                                                  Secretary of the Commission, 888 First                                                                        approved inventory. IRO–006–WECC–2 is being
                                                  Street NE., Washington, DC 20426.                       Standards in the WECC region. These                   included in this Notice and the Commission’s
                                                  Instructions: All submissions must be                   regional Reliability Standards generally              submittal to OMB as part of FERC–725E.
                                                  formatted and filed in accordance with                  require entities to document compliance                 6 Order No. 818, issued on November 19, 2015 in

                                                                                                          with substantive requirements, retain                 Docket Nos. RM15–7, RM15–12, and RM15–13,
                                                  submission guidelines at: http://                                                                             stated in part: ‘‘NERC requested approval of the
                                                  www.ferc.gov/help/submission-                           documentation, and submit reports to                  following Reliability Standards to incorporate the
                                                  guide.asp. For user assistance, contact                 WECC.                                                 proposed definition of Remedial Action Scheme
                                                                                                             BAL–002–WECC–2a (Contingency                       and eliminate use of the term Special Protection
                                                  FERC Online Support by email at                                                                               System: . . . PRC–004–WECC–2, . . . NERC did not
                                                  ferconlinesupport@ferc.gov, or by phone                 Reserve) 4 requires balancing authorities             propose any changes to the Violation Risk Factors
                                                  at: (866) 208–3676 (toll-free), or (202)                and reserve sharing groups to document                or Violation Severity Levels for the modified
                                                  502–8659 for TTY.                                       compliance with the contingency                       standards.’’ Revisions to Emergency Operations
                                                                                                                                                                Reliability Standards; Revisions to Undervoltage
                                                     Docket: Users interested in receiving                                                                      Load Shedding Reliability Standards; Revisions to
                                                  automatic notification of activity in this                1 16 U.S.C. 824o(e)(4).                             the Definition of ‘‘Remedial Action Scheme’’ and
                                                                                                            2 16 U.S.C. 824o(a)(7) and (e)(4).
                                                  docket or in viewing/downloading                                                                              Related Reliability Standards, Order No. 818, 153
                                                                                                             3 North American Electric Reliability Corp., 119
                                                  comments and issuances in this docket                                                                         FERC ¶ 61,228, at P 23 n.31 (2015). In addition,
                                                                                                          FERC 61,260 (2007).                                   Order No. 818 stated: ‘‘The Commission approved
                                                  may do so at http://www.ferc.gov/docs-                     4 BAL–002–WECC–2 is included in the OMB-           the definition of Special Protection System
                                                  filing/docs-filing.asp.                                 approved inventory for FERC–725E. On November         (Remedial Action Scheme) in Order No. 693. We
                                                  FOR FURTHER INFORMATION CONTACT:                        9, 2016, NERC and WECC submitted a joint petition     approve a revision to the previously approved
                                                  Ellen Brown may be reached by email                     for approval of an interpretation of BAL–002–         definition. The revisions to the Remedial Action
                                                                                                          WECC–2, to be designated BAL–002–WECC–2a.             Scheme definition and related Reliability Standards
                                                  at DataClearance@FERC.gov, telephone                    BAL–002–WECC–2a was approved by order in              are not expected to result in changes to the scope
                                                  at (202) 502–8663, and fax at (202) 273–                Docket No. RD17–3–000 on January 24, 2017. The        of systems covered by the Reliability Standards and
                                                  0873.                                                   Order determined: The proposed interpretation         other Reliability Standards that include the term
mstockstill on DSK30JT082PROD with NOTICES




                                                                                                          provides clarification regarding the types of         Remedial Action Scheme. Therefore, the
                                                  SUPPLEMENTARY INFORMATION:                              resources that may be used to satisfy Contingency     Commission does not expect the revisions to affect
                                                     Title: FERC–725E, Mandatory                          Reserve requirements in regional Reliability          applicable entities’ current reporting burden.’’ Id. P
                                                  Reliability Standards for the Western                   Standard BAL–002–WECC–2. BAL–002–WECC–2a              67. The change to the definition did not affect the
                                                  Electric Coordinating Council.                          did not trigger the Paperwork Reduction Act and       burden of PRC–004–WECC–1 (which is included in
                                                                                                          did not affect the burden estimate. BAL–002–          the current OMB-approved inventory). PRC–004–
                                                     OMB Control No.: 1902–0246.                          WECC–2a is being included in this Notice and the      WECC–2 (the current version of the standard) is
                                                     Type of Request: Three-year approval                 Commission’s submittal to OMB as part of the          being included in this Notice and the Commission’s
                                                  of the FERC–725E information                            FERC–725E.                                            submittal to OMB as part of the FERC–725E.



                                             VerDate Sep<11>2014   18:19 May 08, 2017   Jkt 241001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\09MYN1.SGM   09MYN1


                                                                                          Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices                                                                                                        21539

                                                  paths. This standard requires that                                            • Implementing the regional                                                          2017. In this document, we provide
                                                  documentation be kept for six years.                                       Reliability Standard VAR–501–WECC–3                                                     estimates of the burden and cost related
                                                    • VAR–002–WECC–2 (Automatic                                              and the retirement of regional                                                          to those revisions to FERC–725E.
                                                  Voltage Regulators (AVR)) 7 requires                                       Reliability Standard VAR–501–WECC–2                                                        Type of Respondents: Balancing
                                                  generator operators and transmission                                       (addressed in Docket No. RD17–5 and                                                     authorities, reserve sharing groups,
                                                  operators to provide quarterly reports to                                  discussed below).                                                                       transmission owners, reliability
                                                  the compliance monitor and have                                               On March 10, 2017, NERC and WECC                                                     coordinators, transmission operators,
                                                  evidence related to their synchronous                                      filed a joint petition in Docket No.                                                    generator operators, and generator
                                                  generators, synchronous condensers,                                        RD17–5–000 9 requesting Commission                                                      owners.
                                                  and automatic voltage regulators.                                          approval of: (a) Regional Reliability                                                      Estimate of Annual Burden 10: Details
                                                    The associated reporting and                                             Standard VAR–501–WECC–3 (Power                                                          follow on the changes in Docket No.
                                                  recordkeeping requirements included in                                     System Stabilizers), and (b) the                                                        RD17–5–000, and on the continuing
                                                  the standards above are not being                                          retirement of then-existing regional                                                    burdens, which will be submitted to
                                                  revised, and the Commission will be                                        Reliability Standard VAR–501–WECC–                                                      OMB for approval in a consolidated
                                                  submitting a request to OMB to extend                                      2. The petition states: ‘‘Regional                                                      package under FERC–725E.
                                                  these requirements for three years. The                                    Reliability Standard VAR–501–WECC–3                                                        Estimate of Changes to Burden Due to
                                                  Commission’s request to OMB will also                                      establishes the performance criteria for                                                Docket No. RD17–5: The joint petition
                                                  reflect the following:                                                     power system stabilizers to help ensure                                                 requested Commission approval of
                                                    • Eliminating the burden associated                                      the Western Interconnection is operated                                                 regional Reliability Standard VAR–501–
                                                  with regional Reliability Standard TOP–                                    in a coordinated manner under normal                                                    WECC–3 and retirement of then-existing
                                                  007–WECC–1a, which is being retired                                        and abnormal conditions.’’ VAR–501–                                                     regional Reliability Standard VAR–501–
                                                  (addressed in Docket No. RD16–10); 8                                       WECC–3 was approved by order in                                                         WECC–2. The estimated effects on
                                                  and                                                                        Docket No. RD17–5–000 on April 28,                                                      burden and cost 11 are as follow:
                                                   FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, CHANGES IN
                                                                                         DOCKET NO. RD17–5–000
                                                                                                                                 Annual                                                                                           Total annual
                                                                                                                                                              Annual                 Average burden hrs. &
                                                                                                    Number of                   number of                                                                                        burden hours &          Cost per respondent
                                                                    Entity                                                                                  number of                  cost per response
                                                                                                  respondents 12             responses per                  responses                         ($)                               total annual cost                ($)
                                                                                                                               respondent                                                                                               ($)

                                                                                                           (1)                        (2)                 (1) * (2) = (3)                            (4)                          (3) * (4) = (5)           (5) ÷ (1) = (6)

                                                                                                    Retirement Of Former Standard VAR–501–WECC–2 and Associated Reductions

                                                  Reporting Requirements (Annually)
                                                  Generator Operators ........................                      249                            4                       996       1 hr.; $76.22 ...............           996 hrs.; $75,915.12       $304.88 (reduction)
                                                                                                                                                                                                                               (reduction).
                                                  Recordkeeping Requirements (An-
                                                    nually)
                                                  Generator Operators ........................                      249                            4                       996       0.5 hrs.; $31.19 ..........             498 hrs.; $15,532.62       $62.38 (reduction)
                                                                                                                                                                                                                               (reduction).
                                                  Reductions (Annually) ......................    ........................   ........................   ..........................   .....................................   1,494 hrs.; $91,447.74
                                                                                                                                                                                                                               (reduction).

                                                                                                                                           New Standard VAR–501–WECC–3

                                                  Reporting Requirements.
                                                  Generator Owners and/or Opera-                                    291                            3                        873      1 hr.; $76.99 ...............           873 hrs.; $67,212.27 ..    $230.97
                                                    tors, in Year 1.
                                                  Generator Owners and/or Opera-                                    291                            2                       582       1 hr.; $76.99 ...............           582 hrs.; $44,808.18 ..    $153.98
                                                    tors, in Year 2 and Ongoing.
                                                  Recordkeeping Requirements
                                                  Generator Owners and/or Opera-                                    291                            3                        873      1 hr.; $31.19 ...............           873 hrs.; $27,228.87 ..    $93.57
                                                    tors, in Year 1.
                                                  Generator Owners and/or Opera-                                    291                            2                       582       0.5 hrs.; $15.595 ........              291 hrs.; $9,076.29 ....   $31.19
                                                    tors, in Year 2 and Ongoing.
                                                  New Burden, in Year 1 ....................      ........................   ........................   ..........................   .....................................   1,746 hrs.; $94,441.14
                                                  New Burden, in Year 2 & Ongoing ..              ........................   ........................   ..........................   .....................................   873 hrs.; $53,884.47 ..
                                                  Net Burden Change in Year 1 .........           ........................   ........................   ..........................   .....................................   +252 hrs (increase) ....

                                                     7 VAR–002–WECC–2 was approved by order in                               requesting public comment on the effect on burden.                                        11 For VAR–501–WECC–3, the hourly cost (for

                                                  Docket No. RD15–1 on March 3, 2015. Regional                               The Notice is available at 82 FR 16823 (April 6,                                        salary plus benefits) uses the figures from the
                                                  Reliability Standard VAR–002–WECC–2 made a                                 2017). Comments are due in Docket No. RD16–10–                                          Bureau of Labor Statistics for three positions
                                                  non-material or non-substantive change to the                              000 by June 5, 2017. See Docket No. RD16–10–000                                         involved in the reporting and recordkeeping
                                                  reporting and recordkeeping requirements                                   for additional information (including the estimated                                     requirements. These figures include salary (http://
                                                  associated with VAR–002–WECC–1 (currently                                  annual burden reduction of 1,188 hours).                                                bls.gov/oes/current/naics2_22.htm) and benefits
                                                  included in the OMB-approved inventory). VAR–                                 9 The joint petition and exhibits are posted in the
                                                                                                                                                                                                                     (http://www.bls.gov/news.release/ecec.nr0.htm) and
mstockstill on DSK30JT082PROD with NOTICES




                                                  002–WECC–2 (the current version of the standard)                           Commission’s eLibrary system in Docket No. RD17–                                        are:
                                                  is being included in this Notice and the                                   5–000.
                                                                                                                                                                                                                       • Manager: $89.07/hour
                                                  Commission’s submittal to OMB as part of FERC–                                10 Burden is defined as the total time, effort, or
                                                  725E.                                                                                                                                                                • Engineer: $64.91/hour
                                                                                                                             financial resources expended by persons to
                                                     8 The Commission approved the retirement of                             generate, maintain, retain, or disclose or provide                                        • File Clerk: $31.19/hour
                                                  regional Reliability Standard TOP–007–WECC–1a                              information to or for a Federal agency. For further                                       The hourly cost for the reporting requirements
                                                  (System Operating Limits (SOL)) by order in Docket                         explanation of what is included in the information                                      ($76.99) is an average of the cost of a manager and
                                                  No. RD16–10–000 on March 10, 2017. On March 31,                            collection burden, refer to 5 Code of Federal                                           engineer. The hourly cost for recordkeeping
                                                  2017, the Commission issued a 60-day Notice                                Regulations 1320.3.                                                                     requirements uses the cost of a file clerk.



                                             VerDate Sep<11>2014       18:19 May 08, 2017        Jkt 241001         PO 00000         Frm 00038          Fmt 4703          Sfmt 4703         E:\FR\FM\09MYN1.SGM                  09MYN1


                                                  21540                                     Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices

                                                   FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, CHANGES IN
                                                                                    DOCKET NO. RD17–5–000—Continued
                                                                                                                                   Annual                                                                                            Total annual
                                                                                                                                                                Annual                 Average burden hrs. &
                                                                                                      Number of                   number of                                                                                         burden hours &              Cost per respondent
                                                                     Entity                                                                                   number of                  cost per response
                                                                                                    respondents 12             responses per                                                                                       total annual cost                    ($)
                                                                                                                                                              responses                         ($)
                                                                                                                                 respondent                                                                                                ($)

                                                                                                             (1)                        (2)                 (1) * (2) = (3)                            (4)                           (3) * (4) = (5)               (5) ÷ (1) = (6)

                                                  Net Burden Change in Year 2 and                   ........................   ........................   ..........................   .....................................   ¥621 hrs. (decrease)
                                                    Ongoing.



                                                    Estimate of Continuing Annual                                              (BAL–002–WECC–2a, BAL–004–WECC–                                                         WECC–2 (detailed above and in Docket
                                                  Burden for Renewal and New Reliability                                       02, FAC–501–WECC–1, IRO–006–                                                            No. RD17–5–000).
                                                  Standard VAR–501–WECC–3: 13 The                                              WECC–2, PRC–004–WECC–2, and VAR–                                                          (The burdens and costs related to
                                                  Commission estimates the annual public                                       002–WECC–2);                                                                            TOP–007–WECC–1a and VAR–501–
                                                  reporting burden and cost 14 as follows                                        • Removal of burden due to the
                                                                                                                                                                                                                       WECC–2 [the standards being retired]
                                                  for FERC–725E. (This information will                                        retirement of TOP–007–WECC–1a
                                                                                                                                                                                                                       are omitted from the table below, which
                                                  be submitted to OMB for approval.)                                           (discussed in Docket No. RD16–10–000)
                                                                                                                                 • Additional burden due to VAR–                                                       describes the new and continuing
                                                  These estimates reflect:
                                                    • Reliability Standards in FERC–725E                                       501–WECC–3, and removal of burden                                                       information collection requirements.)
                                                  which continue and remain unchanged                                          due to the retirement of VAR–501–
                                                              FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL
                                                                                                                    [New and Continuing Information Collection Requirements]

                                                                                                                                   Annual                                                                                            Total annual
                                                                                                                                                                Annual                 Average burden hrs. &
                                                                                                      Number of                   number of                                                                                         burden hours &              Cost per respondent
                                                                     Entity                                                                                   number of                  cost per response
                                                                                                    respondents 15             responses per                                                                                       total annual cost                    ($)
                                                                                                                                                              responses                         ($)
                                                                                                                                 respondent                                                                                                ($)

                                                                                                             (1)                        (2)                  (1)*(2) = (3)                             (4)                            (3)*(4) = (5)                (5)÷(1) = (6)

                                                                                                                                                    Reporting Requirements

                                                  Balancing Authorities .......................                        34                           1                         34       21 hrs., $1,616.79 ......               714 hrs., $54,970.86 ..         $1,616.79
                                                  Generator Operators ........................                        228                           1                        228       10 hrs., $769.90 .........              2,280 hrs.,                     $769.90
                                                                                                                                                                                                                                 $175,537.20.
                                                  Transmission Operators applicable                                     86                           4                       344       10 hrs., $769.90 .........              3,440 hrs.,                     $769.90
                                                    to standard VAR–002.                                                                                                                                                         $264,845.60.
                                                  Transmission Owners that operate                                        5                          3                         15      40 hrs., $3,079.60 ......               600 hrs., $46,194.00 ..         $3,079.60
                                                    qualified transfer paths.
                                                  Reliability Coordinators ....................                         1                           1                          1       1 hr., $76.99 ...............           1 hr., $76.99 ...............   $76.99
                                                  Reserve Sharing Group ...................                             3                           1                          3       1 hr., $76.99 ...............           3 hrs., $230.97 ...........     $76.99
                                                  Generator Owners and/or Operators                                   291                           3                        873       1 hr.; $76.99 ...............           873 hrs.; $67,212.27 ..         $230.97
                                                    , in Year 1, per RD17–5 for VAR–
                                                    501–WECC–3.
                                                  Generator Owners and/or Opera-                                      291                            2                       582       1 hr.; $76.99 ...............           582 hrs.; $44,808.18 ..         $153.98
                                                    tors, in Year 2 and Ongoing, per
                                                    RD17–5 for VAR–501–WECC–3.
                                                       Sub-Total for Reporting Re-                  ........................   ........................   ..........................   .....................................   7,911 hrs.;
                                                         quirement in Year 1.                                                                                                                                                    $609,067.89.
                                                       Sub-Total for Reporting Re-                  ........................   ........................   ..........................   .....................................   7,620 hrs.;
                                                         quirement Burden in Year 2                                                                                                                                              $586,663.80.
                                                         & ongoing.

                                                                                                                                                Recordkeeping Requirements

                                                  Balancing Authorities .......................                        34                           1                         34       2.1 hrs., $65.50 ..........             71.4 hrs., $2,226.97 ...        $65.50
                                                  Balancing Authorities (IRO–006) .....                                34                           1                         34       1 hr., $31.19 ...............           34 hrs., $1,060.46 ......       $31.19
                                                  Generator Operators ........................                        228                           1                        228       1 hr., $31.19 ...............           228 hrs., $7,111.32 ....        $31.19
                                                  Transmission Operator (VAR–002) ..                                   86                           1                         86       4 hrs., $124.76 ...........             344 hrs., $10,729.36 ..         $124.76
                                                  Transmission Owner that operate                                       5                           1                          5       12 hrs., $374.28 .........              60 hrs., $1,871.40 ......       $374.28
                                                    qualified transfer paths.
                                                  Reliability Coordinator ......................                        1                           1                          1       1 hr.; $31.19 ...............           1 hr.; $31.19 ...............   $31.19
                                                  Generator Owners and/or Opera-                                      291                           3                        873       1 hr.; $31.19 ...............           873 hrs.; $27,228.87 ..         $93.57
                                                    tors, in Year 1, per RD17–5 for
                                                    VAR–501–WECC–3.
mstockstill on DSK30JT082PROD with NOTICES




                                                    12 The number of respondents is derived from the                             14 The hourly cost (for salary plus benefits) uses                                      • Engineer: $64.91/hour
                                                  NERC Compliance Registry as of March 10, 2017.                               the figures from the Bureau of Labor Statistics for                                       • File Clerk: $31.19/hour
                                                    13 The Commission is also removing 36 one-time                             three positions involved in the reporting and
                                                                                                                                                                                                                         The hourly cost for the reporting requirements
                                                  burden hours associated with the requirements in                             recordkeeping requirements. These figures include
                                                                                                                               salary (http://bls.gov/oes/current/naics2_22.htm)                                       ($76.99) is an average of the cost of a manager and
                                                  Docket No. RM13–13. The one-time burden has
                                                  been completed and will now be administratively                              and other associated benefits (http://www.bls.gov/                                      engineer. The hourly cost for recordkeeping
                                                  removed on submittal to OMB. Those hours are not                             news.release/ecec.nr0.htm) and are:                                                     requirements uses the cost of a file clerk.
                                                  included in the table.                                                         • Manager: $89.07/hour



                                             VerDate Sep<11>2014        19:20 May 08, 2017         Jkt 241001         PO 00000         Frm 00039          Fmt 4703          Sfmt 4703         E:\FR\FM\09MYN1.SGM                   09MYN1


                                                                                    Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices                                                                                                      21541

                                                   FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL—Continued
                                                                                                           [New and Continuing Information Collection Requirements]

                                                                                                                          Annual                                                                                           Total annual
                                                                                                                                                       Annual                 Average burden hrs. &
                                                                                             Number of                   number of                                                                                        burden hours &          Cost per respondent
                                                                   Entity                                                                            number of                  cost per response
                                                                                           respondents 15             responses per                  responses                         ($)                               total annual cost                ($)
                                                                                                                        respondent                                                                                               ($)

                                                                                                    (1)                        (2)                  (1)*(2) = (3)                             (4)                          (3)*(4) = (5)             (5)÷(1) = (6)

                                                  Generator Owners and/or Opera-                             291                            2                       582       0.5 hrs.; $15.595 ........              291 hrs.; $9,076.29 ....   $31.19
                                                   tors, in Year 2 and Ongoing, per
                                                   RD17–5 for VAR–501–WECC–3.

                                                      Sub-Total for Recordkeeping          ........................   ........................   ..........................   .....................................   1,611.4 hrs.;
                                                        Requirements in Yr. 1.                                                                                                                                          $50,259.57.
                                                      Sub-Total for Recordkeeping          ........................   ........................   ..........................   .....................................   1,029.4 hrs.;
                                                        Requirements in Yr. 2 & on-                                                                                                                                     $32,106.99.
                                                        going.
                                                          TOTAL FOR FERC–725E,             ........................   ........................   ..........................   .....................................   9,522.4 hrs.;
                                                            IN YR. 1.                                                                                                                                                   $659,327.46.
                                                          TOTAL FOR FERC–725E,             ........................   ........................   ..........................   .....................................   8,649.4 hrs.;
                                                            IN YR. 2 & ONGOING.                                                                                                                                         $618,770.79.



                                                    Comments: Comments are invited on:                                which were damaged as a result of                                                       authorization pursuant to section 7 of
                                                  (1) Whether the collection of                                       undermining activity that took place in                                                 the NGA.
                                                  information is necessary for the proper                             2010 and are at risk for gas loss. The                                                     Pursuant to section 157.9 of the
                                                  performance of the functions of the                                 abandonment will have no effect on the                                                  Commission’s rules, 18 CFR 157.9,
                                                  Commission, including whether the                                   certificated physical parameters of the                                                 within 90 days of this Notice the
                                                  information will have practical utility;                            field, and there will be no effect on                                                   Commission staff will either: Complete
                                                  (2) the accuracy of the agency’s estimate                           service to any of Equitrans’ customers,                                                 its environmental assessment (EA) and
                                                  of the burden and cost of the collection                            all as more fully set forth in the                                                      place it into the Commission’s public
                                                  of information, including the validity of                           application which is on file with the                                                   record (eLibrary) for this proceeding; or
                                                  the methodology and assumptions used;                               Commission and open to public                                                           issue a Notice of Schedule for
                                                  (3) ways to enhance the quality, utility                            inspection. The filing may also be                                                      Environmental Review. If a Notice of
                                                  and clarity of the information collection;                          viewed on the web at http://                                                            Schedule for Environmental Review is
                                                  and (4) ways to minimize the burden of                              www.ferc.gov using the ‘‘eLibrary’’ link.                                               issued, it will indicate, among other
                                                  the collection of information on those                              Enter the docket number excluding the                                                   milestones, the anticipated date for the
                                                  who are to respond, including the use                               last three digits in the docket number                                                  Commission staff’s issuance of the final
                                                  of automated collection techniques or                               field to access the document. For                                                       environmental impact statement (FEIS)
                                                  other forms of information technology.                              assistance, contact FERC at                                                             or EA for this proposal. The filing of the
                                                    Dated: May 3, 2017.                                               FERCOnlineSupport@ferc.gov or call                                                      EA in the Commission’s public record
                                                  Kimberly D. Bose,
                                                                                                                      toll-free, (866) 208–3676 or TTY, (202)                                                 for this proceeding or the issuance of a
                                                                                                                      502–8659.                                                                               Notice of Schedule for Environmental
                                                  Secretary.
                                                  [FR Doc. 2017–09341 Filed 5–8–17; 8:45 am]
                                                                                                                         Any questions regarding this                                                         Review will serve to notify federal and
                                                                                                                      Application should be directed to Paul                                                  state agencies of the timing for the
                                                  BILLING CODE 6717–01–P
                                                                                                                      W. Diehl, Counsel, Midstream at                                                         completion of all necessary reviews, and
                                                                                                                      Equitrans, L.P., 625 Liberty Avenue,                                                    the subsequent need to complete all
                                                  DEPARTMENT OF ENERGY                                                Suite 1700, Pittsburgh, Pennsylvania                                                    federal authorizations within 90 days of
                                                                                                                      15222, by phone (412) 395–5540, or by                                                   the date of issuance of the Commission
                                                  Federal Energy Regulatory                                           fax (412) 553–7781, or by email at                                                      staff’s FEIS or EA.
                                                  Commission                                                          pdiehl@eqt.com.                                                                            Persons who wish to comment only
                                                                                                                         Any person may, within 60 days after                                                 on the environmental review of this
                                                  [Docket No. CP17–239–000]                                           the issuance of the instant notice by the                                               project should submit an original and
                                                  Equitrans, L.P.; Notice of Request                                  Commission, file pursuant to Rule 214                                                   two copies of their comments to the
                                                  Under Blanket Authorization                                         of the Commission’s Procedural Rules                                                    Secretary of the Commission.
                                                                                                                      (18 CFR 385.214) a motion to intervene                                                  Environmental commenter’s will be
                                                    Take notice that on April 25, 2017,                               or notice of intervention. Any person                                                   placed on the Commission’s
                                                  Equitrans, L.P. (Equitrans), 625 Liberty                            filing to intervene or the Commission’s                                                 environmental mailing list, will receive
                                                  Avenue, Suite 1700, Pittsburgh,                                     staff may, pursuant to section 157.205 of                                               copies of the environmental documents,
                                                  Pennsylvania 15222 filed a prior notice                             the Commission’s Regulations under the                                                  and will be notified of meetings
                                                  request pursuant to sections 157.205                                NGA (18 CFR 157.205) file a protest to                                                  associated with the Commission’s
                                                  and 157.216(b) of the Commission’s                                  the request. If no protest is filed within                                              environmental review process.
                                                  regulations under the Natural Gas Act                               the time allowed therefore, the proposed                                                Environmental commenter’s will not be
mstockstill on DSK30JT082PROD with NOTICES




                                                  for authorization to abandon two wells                              activity shall be deemed to be                                                          required to serve copies of filed
                                                  in Equitrans’ Logansport Storage Field                              authorized effective the day after the                                                  documents on all other parties.
                                                  located in Marion County, West                                      time allowed for protest. If a protest is                                               However, the non-party commentary,
                                                  Virginia. Specifically, Equitrans seeks to                          filed and not withdrawn within 30 days                                                  will not receive copies of all documents
                                                  plug and abandon two natural gas                                    after the time allowed for filing a                                                     filed by other parties or issued by the
                                                  storage injection and withdrawal wells,                             protest, the instant request shall be                                                   Commission (except for the mailing of
                                                  Logansport 6188 and Logansport 8271,                                treated as an application for                                                           environmental documents issued by the


                                             VerDate Sep<11>2014     18:19 May 08, 2017   Jkt 241001         PO 00000         Frm 00040          Fmt 4703          Sfmt 4703         E:\FR\FM\09MYN1.SGM                  09MYN1



Document Created: 2018-11-08 08:41:26
Document Modified: 2018-11-08 08:41:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of revised information collection and request for comments.
DatesComments on the collection of information are due July 10, 2017.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.