[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Page 22135]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09676]



[[Page 22135]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-10773-030]


Southern Southeast Regional Aquaculture Association; Notice of 
Application Accepted for Filing, Ready for Environmental Analysis, 
Soliciting Motions To Intervene and Protests, Comments, 
Recommendations, Terms and Conditions, and Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of License.
    b. Project No.: 10773-030.
    c. Date Filed: October 27, 2016.
    d. Applicant: Southern Southeast Regional Aquaculture Association.
    e. Name of Project: Burnett River Hatchery Hydroelectric Project.
    f. Location: The project is located on the Burnett River in the 
Wrangell Borough of Alaska.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Bill Gass, Production Manager, Southern 
Southeast Regional Aquaculture Association, 14 Borch Street, Ketchikan, 
AK 99901, (907) 228-4390, [email protected].
    i. FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 60 days from the issuance of this notice by the Commission; reply 
comments are due 105 days from the issuance date of this notice by the 
Commission. The Commission strongly encourages electronic filing. 
Please file any comments, motions to intervene, protests, 
recommendations, terms and conditions, and/or fishway prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-10773-030.
    k. Description of Request: The licensee is proposing to install at 
the powerhouse an additional 140-kilowatt (kW) generating unit coupled 
to the existing 80-kW unit, for a combined project installed capacity 
of 220 kW. The new unit will result in an increase of the project's 
hydraulic capacity from 6 to 15 cubic feet per second. The installation 
of the new unit will not require any physical changes to the project 
features since the powerhouse was designed to accommodate an additional 
generating unit. All work will occur within the existing powerhouse. 
The licensee is requesting the amendment to increase hatchery 
production at the project.
    l. Locations of the Applications: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. The filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document (i.e., P-10773). You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email [email protected], for TTY, call (202) 502-
8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, motions to 
intervene, or protests must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``MOTION TO 
INTERVENE'', ``PROTEST'', ``TERMS AND CONDITIONS'' or ``FISHWAY 
PRESCRIPTIONS'', as applicable; (2) set forth in the heading the name 
of the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, protests, recommendations, terms and conditions, 
or prescriptions should relate to project works which are the subject 
of the amendment request. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: May 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09676 Filed 5-11-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices                                                  22135

                                                  DEPARTMENT OF ENERGY                                    The first page of any filing should                   forth in the heading the name of the
                                                                                                          include docket number P–10773–030.                    applicant and the project number of the
                                                  Federal Energy Regulatory                                  k. Description of Request: The                     application to which the filing
                                                  Commission                                              licensee is proposing to install at the               responds; (3) furnish the name, address,
                                                                                                          powerhouse an additional 140-kilowatt                 and telephone number of the person
                                                  [P–10773–030]
                                                                                                          (kW) generating unit coupled to the                   protesting or intervening; and (4)
                                                  Southern Southeast Regional                             existing 80-kW unit, for a combined                   otherwise comply with the requirements
                                                  Aquaculture Association; Notice of                      project installed capacity of 220 kW.                 of 18 CFR 385.2001 through 385.2005.
                                                  Application Accepted for Filing, Ready                  The new unit will result in an increase               All comments, motions to intervene, or
                                                  for Environmental Analysis, Soliciting                  of the project’s hydraulic capacity from              protests must set forth their evidentiary
                                                  Motions To Intervene and Protests,                      6 to 15 cubic feet per second. The                    basis and otherwise comply with the
                                                  Comments, Recommendations, Terms                        installation of the new unit will not                 requirements of 18 CFR 4.34(b). All
                                                  and Conditions, and Fishway                             require any physical changes to the                   comments, motions to intervene,
                                                  Prescriptions                                           project features since the powerhouse                 protests, recommendations, terms and
                                                                                                          was designed to accommodate an                        conditions, or prescriptions should
                                                    Take notice that the following                        additional generating unit. All work will             relate to project works which are the
                                                  hydroelectric application has been filed                occur within the existing powerhouse.                 subject of the amendment request.
                                                  with the Commission and is available                    The licensee is requesting the                        Agencies may obtain copies of the
                                                  for public inspection:                                  amendment to increase hatchery                        application directly from the applicant.
                                                    a. Type of Application: Amendment                     production at the project.                            A copy of any protest or motion to
                                                  of License.                                                l. Locations of the Applications: A                intervene must be served upon each
                                                    b. Project No.: 10773–030.                            copy of the application is available for              representative of the applicant specified
                                                    c. Date Filed: October 27, 2016.                      inspection and reproduction at the                    in the particular application. If an
                                                    d. Applicant: Southern Southeast                      Commission’s Public Reference Room,                   intervener files comments or documents
                                                  Regional Aquaculture Association.                       located at 888 First Street NE., Room
                                                    e. Name of Project: Burnett River                                                                           with the Commission relating to the
                                                                                                          2A, Washington, DC 20426, or by calling               merits of an issue that may affect the
                                                  Hatchery Hydroelectric Project.                         (202) 502–8371. The filing may also be
                                                    f. Location: The project is located on                                                                      responsibilities of a particular resource
                                                                                                          viewed on the Commission’s Web site at                agency, they must also serve a copy of
                                                  the Burnett River in the Wrangell                       http://www.ferc.gov/docs-filing/
                                                  Borough of Alaska.                                                                                            the document on that resource agency.
                                                                                                          elibrary.asp. Enter the docket number                 A copy of all other filings in reference
                                                    g. Filed Pursuant to: Federal Power                   excluding the last three digits in the
                                                  Act, 16 U.S.C. 791(a)–825(r).                                                                                 to this application must be accompanied
                                                                                                          docket number field to access the                     by proof of service on all persons listed
                                                    h. Applicant Contact: Mr. Bill Gass,                  document (i.e., P–10773). You may also
                                                  Production Manager, Southern                                                                                  in the service list prepared by the
                                                                                                          register online at http://www.ferc.gov/
                                                  Southeast Regional Aquaculture                                                                                Commission in this proceeding, in
                                                                                                          docs-filing/esubscription.asp to be
                                                  Association, 14 Borch Street, Ketchikan,                                                                      accordance with 18 CFR 4.34(b) and
                                                                                                          notified via email of new filings and
                                                  AK 99901, (907) 228–4390, gass@                                                                               385.2010.
                                                                                                          issuances related to this or other
                                                  ssraa.org.                                              pending projects. For assistance, call 1–               Dated: May 8, 2017.
                                                    i. FERC Contact: Anumzziatta                          866–208–3676 or email                                 Kimberly D. Bose,
                                                  Purchiaroni, (202) 502–6191,                            FERCOnlineSupport@ferc.gov, for TTY,                  Secretary.
                                                  anumzziatta.purchiaroni@ferc.gov.                       call (202) 502–8659.                                  [FR Doc. 2017–09676 Filed 5–11–17; 8:45 am]
                                                    j. Deadline for filing comments,                         m. Individuals desiring to be included             BILLING CODE 6717–01–P
                                                  motions to intervene, and protests is 60                on the Commission’s mailing list should
                                                  days from the issuance of this notice by                so indicate by writing to the Secretary
                                                  the Commission; reply comments are                      of the Commission.                                    DEPARTMENT OF ENERGY
                                                  due 105 days from the issuance date of                     n. Comments, Motions to Intervene or
                                                  this notice by the Commission. The                      Protests: Anyone may submit                           Federal Energy Regulatory
                                                  Commission strongly encourages                          comments, a motion to intervene, or a                 Commission
                                                  electronic filing. Please file any                      protest in accordance with the
                                                                                                                                                                [Project No. 14818–000]
                                                  comments, motions to intervene,                         requirements of Rules of Practice and
                                                  protests, recommendations, terms and                    Procedure, 18 CFR 385.210, .211, .214.                Watterra Energy, LLC; Notice of
                                                  conditions, and/or fishway                              In determining the appropriate action to              Preliminary Permit Application
                                                  prescriptions using the Commission’s                    take, the Commission will consider all                Accepted for Filing and Soliciting
                                                  eFiling system at http://www.ferc.gov/                  protests or other comments filed, but                 Comments and Motions To Intervene
                                                  docs-filing/efiling.asp. Commenters can                 only those who file a motion to
                                                  submit brief comments up to 6,000                       intervene in accordance with the                         On January 17, 2017, Watterra Energy,
                                                  characters, without prior registration,                 Commission’s Rules may become a                       LLC filed an application for a
                                                  using the eComment system at http://                    party to the proceeding. Any comments,                preliminary permit, pursuant to section
                                                  www.ferc.gov/doc-sfiling/                               motions to intervene, or protests must                4(f) of the Federal Power Act (FPA),
                                                  ecomment.asp. You must include your                     be received on or before the specified                proposing to study the feasibility of the
                                                  name and contact information at the end                 comment date for the particular                       Green River Lake Dam Hydroelectric
                                                  of your comments. For assistance,                       application.                                          Project (project), to be located at the
mstockstill on DSK30JT082PROD with NOTICES




                                                  please contact FERC Online Support at                      o. Filing and Service of Responsive                existing U.S. Army Corps of Engineers’
                                                  FERCOnlineSupport@ferc.gov, (866)                       Documents: Any filing must (1) bear in                Green River Lake Dam on the Green
                                                  208–3676 (toll free), or (202) 502–8659                 all capital letters the title                         River near the City of Campbellsville,
                                                  (TTY). In lieu of electronic filing, please             ‘‘COMMENTS’’, ‘‘MOTION TO                             Taylor County, Kentucky. The sole
                                                  send a paper copy to: Secretary, Federal                INTERVENE’’, ‘‘PROTEST’’, ‘‘TERMS                     purpose of a preliminary permit, if
                                                  Energy Regulatory Commission, 888                       AND CONDITIONS’’ or ‘‘FISHWAY                         issued, is to grant the permit holder
                                                  First Street NE., Washington, DC 20426.                 PRESCRIPTIONS’’, as applicable; (2) set               priority to file a license application


                                             VerDate Sep<11>2014   17:41 May 11, 2017   Jkt 241001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\12MYN1.SGM   12MYN1



Document Created: 2017-05-12 01:08:57
Document Modified: 2017-05-12 01:08:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 22135 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR