82_FR_22228 82 FR 22137 - Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 22137 - Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 91 (May 12, 2017)

Page Range22137-22137
FR Document2017-09677

Federal Register, Volume 82 Issue 91 (Friday, May 12, 2017)
[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Page 22137]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09677]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14837-000]


Advanced Hydropower, Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 24, 2017, Advanced Hydropower, Inc. filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of the McNary Dam 
Advanced Hydropower Project (project) to be located at U.S. Corps of 
Engineer's (Corps) McNary Dam near Plymouth in Benton County, 
Washington and Umatilla in Umatilla County, Oregon. The purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would use the Corps' existing spillway bays 1 
and 2 at the McNary Dam, and would consist of the following new 
facilities: (1) A 110-foot-wide, 440-foot-high intake channel with 
gates and trash racks from the existing spillway bays 1 and 2 of the 
McNary Dam spillway; (2) a 38-foot-wide, 40-foot-high, 50-foot-long 
concrete penstock; (3) a 49-megawatt Alden turbine; (4) a draft tube 
discharging flows to the existing tailrace; (5) a 1.5-mile-long, 13.8- 
or 23-kilovolt transmission line interconnecting with the existing 
McNary Dam switchyard; and (6) appurtenant facilities.\1\ The estimated 
annual generation of the project would be 190 gigawatt-hours.
---------------------------------------------------------------------------

    \1\ In a letter filed on April 11, 2017, the Corps states it 
believes the Commission lacks jurisdiction over hydropower 
development at the McNary Dam. However, the Corps also states it 
does not oppose the issuance of a preliminary permit on operational 
grounds despite noting several potential concerns with the proposal. 
Compare Advanced Hydropower, Inc., 155 FERC ] 61,007 (2016) (denying 
preliminary permit application following Corps' February 8, 2016 
comments opposing the project) and Loxbridge Partners, LLC, 156 FERC 
] 62,163 (2016) (denying preliminary permit application following 
Corps' August 2, 2016 comments opposing the project and requesting 
that staff reject the permit application), with Rivertec Partners, 
LLC, 156 FERC ] 62,060 (2016) (issuing preliminary permit following 
Corps' April 13, 2016 comments that it has no objections to the 
permit application).
---------------------------------------------------------------------------

    Applicant Contact: Mr. Kurt Ross, Advanced Hydropower, Inc., 925 
Fairgrounds Road, Goldendale, Washington 98620; phone: (509) 773-5650.
    FERC Contact: Kim Nguyen; phone: (202) 502-6105.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14837-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14837) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09677 Filed 5-11-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices                                                    22137

                                                    Filed Date: 5/5/17.                                   DEPARTMENT OF ENERGY                                    Fairgrounds Road, Goldendale,
                                                    Accession Number: 20170505–5149.                                                                              Washington 98620; phone: (509) 773–
                                                                                                          Federal Energy Regulatory                               5650.
                                                    Comments Due: 5 p.m. ET 5/26/17.                      Commission                                                 FERC Contact: Kim Nguyen; phone:
                                                    Docket Numbers: ER17–1553–000.                                                                                (202) 502–6105.
                                                                                                          [Project No. 14837–000]
                                                    Applicants: Duke Energy Progress,                                                                                Deadline for filing comments, motions
                                                  LLC.                                                    Advanced Hydropower, Inc.; Notice of                    to intervene, competing applications
                                                    Description: § 205(d) Rate Filing: DEP-               Preliminary Permit Application                          (without notices of intent), or notices of
                                                  Fayetteville RS No. 184 Revised PPA to                  Accepted for Filing and Soliciting                      intent to file competing applications: 60
                                                  be effective 7/1/2017.                                  Comments, Motions To Intervene, and                     days from the issuance of this notice.
                                                                                                          Competing Applications                                  Competing applications and notices of
                                                    Filed Date: 5/5/17.                                                                                           intent must meet the requirements of 18
                                                    Accession Number: 20170505–5150.                         On January 24, 2017, Advanced                        CFR 4.36.
                                                                                                          Hydropower, Inc. filed an application                      The Commission strongly encourages
                                                    Comments Due: 5 p.m. ET 5/26/17.
                                                                                                          for a preliminary permit, pursuant to                   electronic filing. Please file comments,
                                                    Docket Numbers: ER17–1554–000.                        section 4(f) of the Federal Power Act                   motions to intervene, notices of intent,
                                                    Applicants: Puget Sound Energy, Inc.                  (FPA), proposing to study the feasibility               and competing applications using the
                                                                                                          of the McNary Dam Advanced                              Commission’s eFiling system at http://
                                                    Description: § 205(d) Rate Filing:                    Hydropower Project (project) to be
                                                  Open Access Transmission Tariff                                                                                 www.ferc.gov/docs-filing/efiling.asp.
                                                                                                          located at U.S. Corps of Engineer’s                     Commenters can submit brief comments
                                                  Housekeeping Revisions to be effective                  (Corps) McNary Dam near Plymouth in
                                                  5/8/2017.                                                                                                       up to 6,000 characters, without prior
                                                                                                          Benton County, Washington and                           registration, using the eComment system
                                                    Filed Date: 5/5/17.                                   Umatilla in Umatilla County, Oregon.                    at http://www.ferc.gov/docs-filing/
                                                    Accession Number: 20170505–5152.                      The purpose of a preliminary permit, if                 ecomment.asp. You must include your
                                                    Comments Due: 5 p.m. ET 5/26/17.                      issued, is to grant the permit holder                   name and contact information at the end
                                                                                                          priority to file a license application                  of your comments. For assistance,
                                                    Take notice that the Commission                       during the permit term. A preliminary                   please contact FERC Online Support at
                                                  received the following qualifying                       permit does not authorize the permit                    FERCOnlineSupport@ferc.gov, (866)
                                                  facility filings:                                       holder to perform any land-disturbing                   208–3676 (toll free), or (202) 502–8659
                                                    Docket Numbers: QF16–823–000.                         activities or otherwise enter upon lands                (TTY). In lieu of electronic filing, please
                                                                                                          or waters owned by others without the                   send a paper copy to: Secretary, Federal
                                                    Applicants: Gloversville-Johnstown                    owners’ express permission.
                                                  Joint Wastewater.                                                                                               Energy Regulatory Commission, 888
                                                                                                             The proposed project would use the                   First Street NE., Washington, DC 20426.
                                                    Description: Refund Report of                         Corps’ existing spillway bays 1 and 2 at                The first page of any filing should
                                                  Gloversville-Johnstown Joint                            the McNary Dam, and would consist of                    include docket number P–14837–000.
                                                  Wastewater Treatment Facility.                          the following new facilities: (1) A 110-                   More information about this project,
                                                    Filed Date: 5/1/17.                                   foot-wide, 440-foot-high intake channel                 including a copy of the application, can
                                                                                                          with gates and trash racks from the                     be viewed or printed on the ‘‘eLibrary’’
                                                    Accession Number: 20170501–5492.
                                                                                                          existing spillway bays 1 and 2 of the                   link of Commission’s Web site at http://
                                                    Comments Due: 5 p.m. ET 5/22/17.                      McNary Dam spillway; (2) a 38-foot-                     www.ferc.gov/docs-filing/elibrary.asp.
                                                     The filings are accessible in the                    wide, 40-foot-high, 50-foot-long                        Enter the docket number (P–14837) in
                                                  Commission’s eLibrary system by                         concrete penstock; (3) a 49-megawatt                    the docket number field to access the
                                                  clicking on the links or querying the                   Alden turbine; (4) a draft tube                         document. For assistance, contact FERC
                                                  docket number.                                          discharging flows to the existing                       Online Support.
                                                                                                          tailrace; (5) a 1.5-mile-long, 13.8- or 23-
                                                     Any person desiring to intervene or                                                                            Dated: May 8, 2017.
                                                                                                          kilovolt transmission line
                                                  protest in any of the above proceedings                                                                         Kimberly D. Bose,
                                                                                                          interconnecting with the existing
                                                  must file in accordance with Rules 211                                                                          Secretary.
                                                                                                          McNary Dam switchyard; and (6)
                                                  and 214 of the Commission’s
                                                                                                          appurtenant facilities.1 The estimated                  [FR Doc. 2017–09677 Filed 5–11–17; 8:45 am]
                                                  Regulations (18 CFR 385.211 and
                                                                                                          annual generation of the project would                  BILLING CODE 6717–01–P
                                                  385.214) on or before 5:00 p.m. Eastern
                                                                                                          be 190 gigawatt-hours.
                                                  time on the specified comment date.                        Applicant Contact: Mr. Kurt Ross,
                                                  Protests may be considered, but                         Advanced Hydropower, Inc., 925                          DEPARTMENT OF ENERGY
                                                  intervention is necessary to become a
                                                  party to the proceeding.                                  1 In a letter filed on April 11, 2017, the Corps      Federal Energy Regulatory
                                                     eFiling is encouraged. More detailed                 states it believes the Commission lacks jurisdiction    Commission
                                                  information relating to filing                          over hydropower development at the McNary Dam.
                                                                                                          However, the Corps also states it does not oppose       [Project No. 2684–010]
                                                  requirements, interventions, protests,                  the issuance of a preliminary permit on operational
                                                  service, and qualifying facilities filings              grounds despite noting several potential concerns       Flambeau Hydro, LLC; Notice of
                                                  can be found at: http://www.ferc.gov/                   with the proposal. Compare Advanced Hydropower,         Application Tendered for Filing With
                                                  docs-filing/efiling/filing-req.pdf. For                 Inc., 155 FERC ¶ 61,007 (2016) (denying
                                                                                                          preliminary permit application following Corps’
                                                                                                                                                                  the Commission and Establishing
mstockstill on DSK30JT082PROD with NOTICES




                                                  other information, call (866) 208–3676                  February 8, 2016 comments opposing the project)         Procedural Schedule for Licensing and
                                                  (toll free). For TTY, call (202) 502–8659.              and Loxbridge Partners, LLC, 156 FERC ¶ 62,163          Deadline for Submission of Final
                                                                                                          (2016) (denying preliminary permit application          Amendments
                                                    Dated: May 5, 2017.                                   following Corps’ August 2, 2016 comments
                                                  Kimberly D. Bose,                                       opposing the project and requesting that staff reject     Take notice that the following
                                                  Secretary.                                              the permit application), with Rivertec Partners, LLC,
                                                                                                          156 FERC ¶ 62,060 (2016) (issuing preliminary
                                                                                                                                                                  hydroelectric application has been filed
                                                  [FR Doc. 2017–09622 Filed 5–11–17; 8:45 am]             permit following Corps’ April 13, 2016 comments         with the Commission and is available
                                                  BILLING CODE 6717–01–P                                  that it has no objections to the permit application).   for public inspection.


                                             VerDate Sep<11>2014   17:41 May 11, 2017   Jkt 241001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\12MYN1.SGM    12MYN1



Document Created: 2017-05-12 01:09:03
Document Modified: 2017-05-12 01:09:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 22137 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR