82 FR 22536 - WBI Energy Transmission, Inc.; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 93 (May 16, 2017)

Page Range22536-22537
FR Document2017-09804

Federal Register, Volume 82 Issue 93 (Tuesday, May 16, 2017)
[Federal Register Volume 82, Number 93 (Tuesday, May 16, 2017)]
[Notices]
[Pages 22536-22537]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09804]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-257-000; PF16-10-000]


WBI Energy Transmission, Inc.; Notice of Application

    Take notice that on April 26, 2017, WBI Energy Transmission, Inc. 
(WBI Energy), 1250 West Century Avenue, Bismarck, North Dakota 58503 
filed an application pursuant to section 7 (c) of the Natural Gas Act 
requesting authorization to construct, install, operate and maintain 
the Valley Expansion Project (Project). Specifically, WBI proposes to 
construct, install, operate and maintain: (i) Interconnect facilities 
with Viking Gas Transmission Company in Clay County, Minnesota; (ii) 
approximately 37.3 miles of 16-inch diameter pipeline in Clay County, 
Minnesota and Cass County, North Dakota; (iii) approximately 3,000 
horsepower electric compressor station in Cass County, North Dakota; 
and to (iv) replace two existing town border stations and construct a 
regulator station in Burleigh, Stutsman and Barnes Counties, North 
Dakota. WBI Energy states that the Project will provide an

[[Page 22537]]

additional source of natural gas to eastern North Dakota and western 
Minnesota and enhance system reliability for existing and new 
customers, all as more fully set forth in the application. The filing 
is available for review at the Commission in the Public Reference Room 
or may be viewed on the Commission's Web site at http://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. There 
is an ``eSubscription'' link on the Web site that enables subscribers 
to receive email notification when a document is added to a subscribed 
docket(s). For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Lori Myerchin, Manager, Regulatory Affairs, WBI Energy Transmission, 
Inc., 1250 West Century Avenue, Bismarck, North Dakota 58503, or at 
(701) 530-1563, or [email protected].
    On October 17, 2016, the Commission staff granted WBI Energy's 
request to utilize the National Environmental Policy Act (NEPA) Pre-
Filing Process and assigned Docket No. PF16-10-000 to staff activities 
involving the project. Now, as of the filing of this application on 
April 26, 2017, the NEPA Pre-Filing Process for this project has ended. 
From this time forward, this proceeding will be conducted in Docket No. 
CP17-257-000, as noted in the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental impact statement (EIS) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EIS for this proposal. The filing of the EIS in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EIS.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on May 30, 2017.

     Dated: May 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09804 Filed 5-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                22536                          Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices

                                                DEPARTMENT OF ENERGY                                    with an additional six new laterals of                Commission’s Rules may become a
                                                                                                        perforated pipe and a collection box; (2)             party to the proceeding. Any comments,
                                                Federal Energy Regulatory                               two small pumps to bring water to the                 protests, or motions to intervene must
                                                Commission                                              spring house; (3) an overflow drain and               be received on or before the specified
                                                [Docket No. DI17–6–000]                                 a cut off wall bringing water into the                comment date for the particular
                                                                                                        City’s existing collection system; (4) a              application.
                                                City of Hailey; Notice of Declaration of                Cipoletti weir; (5) a 2.5-mile-long, 12-                 o. Filing and Service of Responsive
                                                Intention and Soliciting Comments,                      inch-diameter penstock; (6) a                         Documents: All filings must bear in all
                                                Protests, and Motions To Intervene                      powerhouse containing one generator                   capital letters the title COMMENTS,
                                                                                                        with a rated capacity of 69 kilowatts; (7)            PROTESTS, and MOTIONS TO
                                                   Take notice that the following                       an 800-foot-longtransmission line                     INTERVENE, as applicable, and the
                                                application has been filed with the                     connecting the power from the                         Docket Number of the particular
                                                Commission and is available for public                  powerhouse to a point of                              application to which the filing refers. A
                                                inspection:                                             interconnection with the existing utility             copy of any Motion to Intervene must
                                                   a. Application Type: Declaration of                  system; and (8) appurtenant facilities.               also be served upon each representative
                                                Intention.                                                 When a Declaration of Intention is                 of the Applicant specified in the
                                                   b. Docket No: DI17–6–000.                            filed with the Federal Energy Regulatory              particular application.
                                                   c. Date Filed: April 10, 2017.                       Commission, the Federal Power Act                        p. Agency Comments: Federal, state,
                                                   d. Applicant: City of Hailey.                        requires the Commission to investigate                and local agencies are invited to file
                                                   e. Name of Project: Indian Creek                     and determine if the project would                    comments on the described application.
                                                Spring Hydroelectric Project.                           affect the interests of interstate or
                                                   f. Location: The proposed Indian                                                                           A copy of the application may be
                                                                                                        foreign commerce. The Commission also                 obtained by agencies directly from the
                                                Creek Spring Hydroelectric Project                      determines whether or not the project:
                                                would be located on Indian Creek, near                                                                        Applicant. If an agency does not file
                                                                                                        (1) Would be located on a navigable                   comments within the time specified for
                                                the Town of Hailey, in Blaine County,                   waterway; (2) would occupy public
                                                Idaho.                                                                                                        filing comments, it will be presumed to
                                                                                                        lands or reservations of the United                   have no comments. One copy of an
                                                   g. Filed Pursuant to: Section 23(b)(1)               States; (3) would utilize surplus water
                                                of the Federal Power Act, 16 U.S.C.                                                                           agency’s comments must also be sent to
                                                                                                        or water power from a government dam;                 the Applicant’s representatives.
                                                817(b) (2012).                                          or (4) would be located on a non-
                                                   h. Applicant Contact: Mariel Miller,                 navigable stream over which Congress                    Dated: May 9, 2017.
                                                Public Works Director, City of Hailey,                  has Commerce Clause jurisdiction and                  Kimberly D. Bose,
                                                115 Main Street South, Hailey, ID                       would be constructed or enlarged after                Secretary.
                                                83333, telephone: (208) 788–9815, ext.                  1935.                                                 [FR Doc. 2017–09797 Filed 5–15–17; 8:45 am]
                                                24; email: mariel.miller@                                  l. Locations of the Application: This              BILLING CODE 6717–01–P
                                                haileycityhall.org.                                     filing may be viewed on the
                                                   i. FERC Contact: Any questions on                    Commission’s Web site at http://
                                                this notice should be addressed to                      www.ferc.gov/docs-filing/elibrary.asp.                DEPARTMENT OF ENERGY
                                                Jennifer Polardino, (202) 502–6437, or                  Enter the docket number excluding the
                                                email: Jennifer.Polardino@ferc.gov.                     last three digits in the docket number                Federal Energy Regulatory
                                                   j. Deadline for filing comments,                     field to access the document. You may                 Commission
                                                protests, and motions to intervene is: 30               also register online at http://                       [Docket Nos. CP17–257–000; PF16–10–000]
                                                days from the issuance date of this                     www.ferc.gov/docs-filing/
                                                notice by the Commission.                               esubscription.asp to be notified via                  WBI Energy Transmission, Inc.; Notice
                                                   The Commission strongly encourages                   email of new filings and issuances                    of Application
                                                electronic filing. Please file comments,                related to this or other pending projects.
                                                protests, and motions to intervene using                For assistance, call 1–866–208–3676 or                   Take notice that on April 26, 2017,
                                                the Commission’s eFiling system at                      email FERCOnlineSupport@ferc.gov, for                 WBI Energy Transmission, Inc. (WBI
                                                http://www.ferc.gov/docs-filing/                        TTY, call (202) 502–8659. A copy is also              Energy), 1250 West Century Avenue,
                                                efiling.asp. Commenters can submit                      available for inspection and                          Bismarck, North Dakota 58503 filed an
                                                brief comments up to 6,000 characters,                  reproduction at the address in item (h)               application pursuant to section 7 (c) of
                                                without prior registration, using the                   above and in the Commission’s Public                  the Natural Gas Act requesting
                                                eComment system at http://                              Reference Room located at 888 First                   authorization to construct, install,
                                                www.ferc.gov/docs-filing/                               Street NE., Room 2A, Washington, DC                   operate and maintain the Valley
                                                ecomment.asp. You must include your                     20426, or by calling (202) 502–8371.                  Expansion Project (Project). Specifically,
                                                name and contact information at the end                    m. Individuals desiring to be included             WBI proposes to construct, install,
                                                of your comments. For assistance,                       on the Commission’s mailing list should               operate and maintain: (i) Interconnect
                                                please contact FERC Online Support at                   so indicate by writing to the Secretary               facilities with Viking Gas Transmission
                                                FERCOnlineSupport@ferc.gov, (866)                       of the Commission.                                    Company in Clay County, Minnesota;
                                                208–3676 (toll free), or (202) 502–8659                    n. Comments, Protests, or Motions to               (ii) approximately 37.3 miles of 16-inch
                                                (TTY). In lieu of electronic filing, please             Intervene: Anyone may submit                          diameter pipeline in Clay County,
                                                send a paper copy to: Secretary, Federal                comments, a protest, or a motion to                   Minnesota and Cass County, North
                                                                                                        intervene in accordance with the                      Dakota; (iii) approximately 3,000
sradovich on DSK3GMQ082PROD with NOTICES




                                                Energy Regulatory Commission, 888
                                                First Street NE., Washington, DC 20426.                 requirements of Rules of Practice and                 horsepower electric compressor station
                                                The first page of any filing should                     Procedure, 18 CFR 385.210, .211, and                  in Cass County, North Dakota; and to
                                                include docket number DI17–4–000.                       .214. In determining the appropriate                  (iv) replace two existing town border
                                                   k. Description of Project: The                       action to take, the Commission will                   stations and construct a regulator station
                                                proposed Indian Creek Spring                            consider all protests or other comments               in Burleigh, Stutsman and Barnes
                                                Hydroelectric Project would consist of:                 filed, but only those who file a motion               Counties, North Dakota. WBI Energy
                                                (1) An existing spring collection system                to intervene in accordance with the                   states that the Project will provide an


                                           VerDate Sep<11>2014   16:42 May 15, 2017   Jkt 241001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\16MYN1.SGM   16MYN1


                                                                               Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices                                                   22537

                                                additional source of natural gas to                     this project. First, any person wishing to            Persons unable to file electronically
                                                eastern North Dakota and western                        obtain legal status by becoming a party               should submit an original and 7 copies
                                                Minnesota and enhance system                            to the proceedings for this project                   of the protest or intervention to the
                                                reliability for existing and new                        should, on or before the comment date                 Federal Energy Regulatory Commission,
                                                customers, all as more fully set forth in               stated below, file with the Federal                   888 First Street NE., Washington, DC
                                                the application. The filing is available                Energy Regulatory Commission, 888                     20426.
                                                for review at the Commission in the                     First Street NE., Washington, DC 20426,                 Comment Date: 5:00 p.m. Eastern
                                                Public Reference Room or may be                         a motion to intervene in accordance                   Time on May 30, 2017.
                                                viewed on the Commission’s Web site at                  with the requirements of the                            Dated: May 9, 2017.
                                                http://www.ferc.gov using the eLibrary                  Commission’s Rules of Practice and
                                                                                                                                                              Kimberly D. Bose,
                                                link. Enter the docket number excluding                 Procedure (18 CFR 385.214 or 385.211)
                                                the last three digits in the docket                     and the Regulations under the NGA (18                 Secretary.
                                                number field to access the document.                    CFR 157.10). A person obtaining party                 [FR Doc. 2017–09804 Filed 5–15–17; 8:45 am]
                                                There is an ‘‘eSubscription’’ link on the               status will be placed on the service list             BILLING CODE 6717–01–P
                                                Web site that enables subscribers to                    maintained by the Secretary of the
                                                receive email notification when a                       Commission and will receive copies of
                                                document is added to a subscribed                       all documents filed by the applicant and              DEPARTMENT OF ENERGY
                                                docket(s). For assistance, please contact               by all other parties. A party must submit
                                                                                                                                                              Federal Energy Regulatory
                                                FERC Online Support at                                  7 copies of filings made with the
                                                                                                                                                              Commission
                                                FERCOnlineSupport@ferc.gov or toll                      Commission and must mail a copy to
                                                free at (866) 208–3676, or for TTY,                     the applicant and to every other party in             [Docket No. CP17–409–000; PF17–1–000]
                                                contact (202) 502–8659.                                 the proceeding. Only parties to the
                                                   Any questions regarding the proposed                 proceeding can ask for court review of                DTE Midstream Appalachia, LLC;
                                                project should be directed to Lori                      Commission orders in the proceeding.                  Notice of Application for Certificate of
                                                Myerchin, Manager, Regulatory Affairs,                     However, a person does not have to                 Public Convenience and Necessity
                                                WBI Energy Transmission, Inc., 1250                     intervene in order to have comments
                                                                                                                                                                 Take notice that on May 1, 2017, DTE
                                                West Century Avenue, Bismarck, North                    considered. The second way to
                                                                                                                                                              Midstream Appalachia, LLC (DTE
                                                Dakota 58503, or at (701) 530–1563, or                  participate is by filing with the
                                                                                                        Secretary of the Commission, as soon as               Midstream), 333 Technology Drive,
                                                lori.myerchin@wbienergy.com.
                                                   On October 17, 2016, the Commission                  possible, an original and two copies of               Suite 255, Canonsburg, Pennsylvania
                                                staff granted WBI Energy’s request to                   comments in support of or in opposition               15317, filed with the Federal Energy
                                                utilize the National Environmental                      to this project. The Commission will                  Regulatory Commission an abbreviated
                                                Policy Act (NEPA) Pre-Filing Process                    consider these comments in                            application under Section 7 of the
                                                and assigned Docket No. PF16–10–000                     determining the appropriate action to be              Natural Gas Act requesting a Certificate
                                                to staff activities involving the project.              taken, but the filing of a comment alone              of Public Convenience and Necessity
                                                Now, as of the filing of this application               will not serve to make the filer a party              authorizing DTE Midstream to
                                                on April 26, 2017, the NEPA Pre-Filing                  to the proceeding. The Commission’s                   construct, install, own, operate and
                                                Process for this project has ended. From                rules require that persons filing                     maintain a new interstate natural gas
                                                this time forward, this proceeding will                 comments in opposition to the project                 pipeline known as the Birdsboro
                                                be conducted in Docket No. CP17–257–                    provide copies of their protests only to              Pipeline Project. DTE Midstream
                                                000, as noted in the caption of this                    the party or parties directly involved in             requests issuance of blanket certificates
                                                Notice.                                                 the protest.                                          Pursuant to Part 284, Subpart G and Part
                                                   Pursuant to section 157.9 of the                        Persons who wish to comment only                   157, Subpart F of the Commission’s
                                                Commission’s rules (18 CFR 157.9),                      on the environmental review of this                   regulations.
                                                within 90 days of this Notice, the                      project should submit an original and                    The project will have an initial design
                                                Commission staff will either: Complete                  two copies of their comments to the                   capacity of 79,000 Dekatherms per day
                                                its environmental impact statement                      Secretary of the Commission.                          (Dth/d) and will transport natural gas
                                                (EIS) and place it into the Commission’s                Environmental commentors will be                      from a single receipt point at an
                                                public record (eLibrary) for this                       placed on the Commission’s                            interconnection with a Texas Eastern
                                                proceeding; or issue a Notice of                        environmental mailing list, will receive              Transmission LP (Texas Eastern)
                                                Schedule for Environmental Review. If                   copies of the environmental documents,                interstate pipeline to a single delivery
                                                a Notice of Schedule for Environmental                  and will be notified of meetings                      point at a new gas-fired generating
                                                Review is issued, it will indicate, among               associated with the Commission’s                      facility (Birdsboro Facility), all in Berks
                                                other milestones, the anticipated date                  environmental review process.                         County, Pennsylvania. DTE Midstream
                                                for the Commission staff’s issuance of                  Environmental commentors will not be                  proposes initial recourse rates and
                                                the EIS for this proposal. The filing of                required to serve copies of filed                     requests approval of its pro forma Tariff
                                                the EIS in the Commission’s public                      documents on all other parties.                       as well as approval of certain non-
                                                record for this proceeding or the                       However, the non-party commentors                     conforming terms in the proposed
                                                issuance of a Notice of Schedule for                    will not receive copies of all documents              negotiated rate agreement, all as more
                                                Environmental Review will serve to                      filed by other parties or issued by the               fully set forth in the application which
                                                notify federal and state agencies of the                Commission (except for the mailing of                 is on file with the Commission and open
                                                                                                                                                              to public inspection.
sradovich on DSK3GMQ082PROD with NOTICES




                                                timing for the completion of all                        environmental documents issued by the
                                                necessary reviews, and the subsequent                   Commission) and will not have the right                  The filing may also be viewed on the
                                                need to complete all federal                            to seek court review of the                           Web at http://www.ferc.gov using the
                                                authorizations within 90 days of the                    Commission’s final order.                             ‘‘e-Library’’ link. Enter the docket
                                                date of issuance of the Commission                         The Commission strongly encourages                 number excluding the last three digits in
                                                staff’s EIS.                                            electronic filings of comments, protests              the docket number field to access the
                                                   There are two ways to become                         and interventions in lieu of paper using              document. For assistance, please contact
                                                involved in the Commission’s review of                  the eFiling link at http://www.ferc.gov.              FERC Online Support at


                                           VerDate Sep<11>2014   16:42 May 15, 2017   Jkt 241001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\16MYN1.SGM   16MYN1



Document Created: 2017-05-16 13:52:33
Document Modified: 2017-05-16 13:52:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on May 30, 2017.
FR Citation82 FR 22536 