82_FR_22631 82 FR 22538 - Maysville Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 22538 - Maysville Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 93 (May 16, 2017)

Page Range22538-22539
FR Document2017-09800

Federal Register, Volume 82 Issue 93 (Tuesday, May 16, 2017)
[Federal Register Volume 82, Number 93 (Tuesday, May 16, 2017)]
[Notices]
[Pages 22538-22539]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-09800]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14792-000]


Maysville Pumped Storage, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On July 1, 2016, Maysville Pumped Storage, LLC filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of a hydropower project 
located on the Ohio River in Mason County, Kentucky. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would be developed in three phases. In the 
final phase the following project would consist of: (1) A 15-foot-high, 
40-foot-long concrete intake structure on the Ohio River; (2) two 10-
foot-diameter, 1,050-foot-long steel pipes to supply water to the 
project; (3) a 135-foot-high, 500-foot-long earth fill or roller-
compacted, concrete embankment dam surrounding; (4) an upper reservoir 
with a surface area of 20 acres and a storage capacity of 875 acre-
feet; (5) five 12.5-foot to 18 foot-diameter, 2,800-foot-long 
penstocks; (6) a powerhouse 100-feet-below the lower reservoir 
containing five pump/generating units with a total capacity of 500 
megawatts; (7) a lower reservoir established within an existing 
underground mine space with a surface area of 212 acres and a storage 
capacity of 9,540 acre-feet; and (8) a 10,500-foot-long, 230 kilo-volt 
transmission line to a point of interconnection with the PJM system. 
The project would have an

[[Page 22539]]

estimated average annual generation of 1,296,480 megawatt-hours.
    Applicant Contact: Mr. Matthew Shapiro, Gridflex Energy, LLC, 1210 
W. Franklin St., Ste. 2, Boise ID 83702. (208) 246-9925.
    FERC Contact: Chris Casey, [email protected], (202) 502-
8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14792-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14792) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09800 Filed 5-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                22538                          Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices

                                                FERCOnlineSupport@ferc.gov or toll                      obtain legal status by becoming a party               should submit original and five copies
                                                free at (866) 208–3676, or TTY, contact                 to the proceedings for this project                   of the protest or intervention to the
                                                (202) 502–8659.                                         should, on or before the comment date                 Federal Energy Regulatory Commission,
                                                   Questions regarding this application                 stated below, file with the Federal                   888 First Street NE., Washington, DC
                                                may be directed to Kenneth Magyar,                      Energy Regulatory Commission, 888                     20426.
                                                DTE Midstream Appalachia, LLC, 333                      First Street NE., Washington, DC 20426,                 Comment Date: 5:00 p.m. Eastern
                                                Technology Drive, Suite 255,                            a motion to intervene in accordance                   Time on May 30, 2017.
                                                Canonsburg, PA 15317; Phone: (724)                      with the requirements of the
                                                                                                                                                                Dated: May 9, 2017.
                                                416–7263.                                               Commission’s Rules of Practice and
                                                   Specifically, DTE Midstream proposes                                                                       Kimberly D. Bose,
                                                                                                        Procedure (18 CFR 385.214 or 385.211)
                                                13.19 miles of 12-inch diameter                         and the Regulations under the NGA (18                 Secretary.
                                                pipeline; installation of a new pig                     CFR 157.10). A person obtaining party                 [FR Doc. 2017–09805 Filed 5–15–17; 8:45 am]
                                                receiver at the Birdsboro Facility;                     status will be placed on the service list             BILLING CODE 6717–01–P
                                                installation of one new meter site                      maintained by the Secretary of the
                                                adjacent to the Texas Eastern right-of-                 Commission and will receive copies of
                                                way, one new pig launcher at the Texas                  all documents filed by the applicant and              DEPARTMENT OF ENERGY
                                                Eastern interconnect; two new taps on                   by all other parties. A party must submit
                                                the Texas Eastern pipeline; and four                    five copies of filings made with the                  Federal Energy Regulatory
                                                valves along the pipeline route spaced                  Commission and must mail a copy to                    Commission
                                                to meet the requirements of the U.S.                    the applicant and to every other party in
                                                Department of Transportation’s Pipeline                 the proceeding. Only parties to the                   [Project No. 14792–000]
                                                and Hazardous Materials Safety                          proceeding can ask for court review of
                                                Administration. DTE Midstream                           Commission orders in the proceeding.                  Maysville Pumped Storage, LLC;
                                                requests Commission issue the                              However, a person does not have to                 Notice of Preliminary Permit
                                                requested authorizations by December                    intervene in order to have comments                   Application Accepted for Filing and
                                                15, 2017, in order to meet the June 30,                 considered. The second way to                         Soliciting Comments, Motions To
                                                2018, proposed in-service date. The                     participate is by filing with the                     Intervene, and Competing Applications
                                                total cost of the Project is estimated to               Secretary of the Commission, as soon as
                                                be approximately $47,276,982.                                                                                    On July 1, 2016, Maysville Pumped
                                                                                                        possible, an original and two copies of
                                                   On October 28, 2016, the Commission                                                                        Storage, LLC filed an application for a
                                                                                                        comments in support of or in opposition
                                                granted DTE Midstream’s request to                                                                            preliminary permit, pursuant to section
                                                                                                        to this project. The Commission will
                                                utilize the Commission’s Pre-Filing                                                                           4(f) of the Federal Power Act (FPA),
                                                                                                        consider these comments in
                                                Process and assigned Docket Number                                                                            proposing to study the feasibility of a
                                                                                                        determining the appropriate action to be
                                                PF17–1–000 to staff activities involved                                                                       hydropower project located on the Ohio
                                                                                                        taken, but the filing of a comment alone
                                                in the above referenced project. Now, as                                                                      River in Mason County, Kentucky. The
                                                                                                        will not serve to make the filer a party
                                                of the filing of the May 1, 2017                        to the proceeding. The Commission’s                   sole purpose of a preliminary permit, if
                                                application, the Pre-Filing Process for                 rules require that persons filing                     issued, is to grant the permit holder
                                                this project has ended. From this time                  comments in opposition to the project                 priority to file a license application
                                                forward, this proceeding will be                        provide copies of their protests only to              during the permit term. A preliminary
                                                conducted in Docket No. CP17–409–                       the party or parties directly involved in             permit does not authorize the permit
                                                000, as noted in the caption of this                    the protest.                                          holder to perform any land-disturbing
                                                Notice.                                                    Persons who wish to comment only                   activities or otherwise enter upon lands
                                                   Pursuant to section 157.9 of the                     on the environmental review of this                   or waters owned by others without the
                                                Commission’s rules, 18 CFR 157.9,                       project should submit an original and                 owners’ express permission.
                                                within 90 days of this Notice the                       two copies of their comments to the                      The proposed project would be
                                                Commission staff will either: Complete                  Secretary of the Commission.                          developed in three phases. In the final
                                                its environmental assessment (EA) and                   Environmental commentors will be                      phase the following project would
                                                place it into the Commission’s public                   placed on the Commission’s                            consist of: (1) A 15-foot-high, 40-foot-
                                                record (eLibrary) for this proceeding; or               environmental mailing list, will receive              long concrete intake structure on the
                                                issue a Notice of Schedule for                          copies of the environmental documents,                Ohio River; (2) two 10-foot-diameter,
                                                Environmental Review. If a Notice of                    and will be notified of meetings                      1,050-foot-long steel pipes to supply
                                                Schedule for Environmental Review is                    associated with the Commission’s                      water to the project; (3) a 135-foot-high,
                                                issued, it will indicate, among other                   environmental review process.                         500-foot-long earth fill or roller-
                                                milestones, the anticipated date for the                Environmental commentors will not be                  compacted, concrete embankment dam
                                                Commission staff’s issuance of the EA                   required to serve copies of filed                     surrounding; (4) an upper reservoir with
                                                for this proposal. The filing of the EA                 documents on all other parties.                       a surface area of 20 acres and a storage
                                                in the Commission’s public record for                   However, the non-party commentors                     capacity of 875 acre-feet; (5) five 12.5-
                                                this proceeding or the issuance of a                    will not receive copies of all documents              foot to 18 foot-diameter, 2,800-foot-long
                                                Notice of Schedule for Environmental                    filed by other parties or issued by the               penstocks; (6) a powerhouse 100-feet-
                                                Review will serve to notify federal and                 Commission (except for the mailing of                 below the lower reservoir containing
                                                state agencies of the timing for the                    environmental documents issued by the                 five pump/generating units with a total
                                                                                                                                                              capacity of 500 megawatts; (7) a lower
sradovich on DSK3GMQ082PROD with NOTICES




                                                completion of all necessary reviews, and                Commission) and will not have the right
                                                the subsequent need to complete all                     to seek court review of the                           reservoir established within an existing
                                                federal authorizations within 90 days of                Commission’s final order.                             underground mine space with a surface
                                                the date of issuance of the Commission                     The Commission strongly encourages                 area of 212 acres and a storage capacity
                                                staff’s EA.                                             electronic filings of comments, protests              of 9,540 acre-feet; and (8) a 10,500-foot-
                                                   There are two ways to become                         and interventions in lieu of paper using              long, 230 kilo-volt transmission line to
                                                involved in the Commission’s review of                  the eFiling link at http://www.ferc.gov.              a point of interconnection with the PJM
                                                this project. First, any person wishing to              Persons unable to file electronically                 system. The project would have an


                                           VerDate Sep<11>2014   16:42 May 15, 2017   Jkt 241001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\16MYN1.SGM   16MYN1


                                                                               Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices                                             22539

                                                estimated average annual generation of                  No. CP17–256–000, an application                      Energy Regulatory Commission, 888
                                                1,296,480 megawatt-hours.                               pursuant to Section 7(b) of the Natural               First Street NE., Washington, DC 20426,
                                                   Applicant Contact: Mr. Matthew                       Gas Act (NGA) and Part 157 of the                     a motion to intervene in accordance
                                                Shapiro, Gridflex Energy, LLC, 1210 W.                  Commission’s regulations, requesting                  with the requirements of the
                                                Franklin St., Ste. 2, Boise ID 83702.                   authorization to (i) abandon in place the             Commission’s Rules of Practice and
                                                (208) 246–9925.                                         Morgan City Compressor Station, which                 Procedure (18 CFR 385.214 or 385.211)
                                                   FERC Contact: Chris Casey,                           consists of one 9,100 horsepower (hp)                 and the Regulations under the NGA (18
                                                christiane.casey@ferc.gov, (202) 502–                   gas-fired turbine compressor unit, a                  CFR 157.10). A person obtaining party
                                                8577.                                                   compressor building, yard and station                 status will be placed on the service list
                                                   Deadline for filing comments, motions                piping, and appurtenant auxiliary                     maintained by the Secretary of the
                                                to intervene, competing applications                    facilities located in St. Mary Parish,                Commission and will receive copies of
                                                (without notices of intent), or notices of              Louisiana, (ii) abandon in place one                  all documents filed by the applicant and
                                                intent to file competing applications: 60               9,100 hp gas-fired turbine compressor                 by all other parties. A party must submit
                                                days from the issuance of this notice.                  unit and its compressor building at the               14 copies of filings made with the
                                                Competing applications and notices of                   Lafayette (also known as Youngsville)                 Commission and must mail a copy to
                                                intent must meet the requirements of 18                 Compressor Station, located in Lafayette              the applicant and to every other party in
                                                CFR 4.36.                                               Parish, Louisiana, and (iii) relinquish               the proceeding. Only parties to the
                                                   The Commission strongly encourages                   the firm design capacity associated with              proceeding can ask for court review of
                                                electronic filing. Please file comments,                the facilities, all as more fully set forth           Commission orders in the proceeding.
                                                motions to intervene, notices of intent,                in the application which is on file with                 However, a person does not have to
                                                and competing applications using the                    the Commission and open to public                     intervene in order to have comments
                                                Commission’s eFiling system at http://                  inspection. This filing may also be                   considered. The second way to
                                                www.ferc.gov/docs-filing/efiling.asp.                   viewed on the Commission’s Web site at                participate is by filing with the
                                                Commenters can submit brief comments                    http://www.ferc.gov using the                         Secretary of the Commission, as soon as
                                                up to 6,000 characters, without prior                   ‘‘eLibrary’’ link. Enter the docket                   possible, an original and two copies of
                                                registration, using the eComment system                 number, excluding the last three digits,              comments in support of or in opposition
                                                at http://www.ferc.gov/docs-filing/                     in the docket number field to access the              to this project. The Commission will
                                                ecomment.asp. You must include your                     document. For assistance, call (866)                  consider these comments in
                                                name and contact information at the end                 208–3676 or TTY, (202) 502–8659.                      determining the appropriate action to be
                                                of your comments. For assistance,                          Any questions regarding this                       taken, but the filing of a comment alone
                                                please contact FERC Online Support at                   application should be directed to Kathy               will not serve to make the filer a party
                                                FERCOnlineSupport@ferc.gov, (866)                       D. Fort, Manager, Certificates and                    to the proceeding. The Commission’s
                                                208–3676 (toll free), or (202) 502–8659                 Tariffs, Texas Gas Transmission, LLC,
                                                                                                                                                              rules require that persons filing
                                                (TTY). In lieu of electronic filing, please             610 West Second Street, Owensboro,
                                                                                                                                                              comments in opposition to the project
                                                send a paper copy to: Secretary, Federal                Kentucky 42301, or by calling (270)
                                                                                                                                                              provide copies of their protests only to
                                                Energy Regulatory Commission, 888                       688–6825 (telephone) or (270) 688–6896
                                                                                                                                                              the party or parties directly involved in
                                                First Street NE., Washington, DC 20426.                 (fax), kathy.fort@bwpmlp.com.
                                                                                                           Pursuant to Section 157.9 of the                   the protest.
                                                The first page of any filing should                                                                              Persons who wish to comment only
                                                                                                        Commission’s rules, 18 CFR 157.9,
                                                include docket number P–14792–000.                                                                            on the environmental review of this
                                                                                                        within 90 days of this Notice the
                                                   More information about this project,                                                                       project should submit an original and
                                                                                                        Commission staff will either: Complete
                                                including a copy of the application, can                                                                      two copies of their comments to the
                                                                                                        its environmental assessment (EA) and
                                                be viewed or printed on the ‘‘eLibrary’’                place it into the Commission’s public                 Secretary of the Commission.
                                                link of Commission’s Web site at http://                record (eLibrary) for this proceeding, or             Environmental commenters will be
                                                www.ferc.gov/docs-filing/elibrary.asp.                  issue a Notice of Schedule for                        placed on the Commission’s
                                                Enter the docket number (P–14792) in                    Environmental Review. If a Notice of                  environmental mailing list, will receive
                                                the docket number field to access the                   Schedule for Environmental Review is                  copies of the environmental documents,
                                                document. For assistance, contact FERC                  issued, it will indicate, among other                 and will be notified of meetings
                                                Online Support.                                         milestones, the anticipated date for the              associated with the Commission’s
                                                  Dated: May 9, 2017.                                   Commission staff’s issuance of the final              environmental review process.
                                                Kimberly D. Bose,                                       environmental impact statement (FEIS)                 Environmental commenters will not be
                                                Secretary.                                              or EA for this proposal. The filing of the            required to serve copies of filed
                                                                                                        EA in the Commission’s public record                  documents on all other parties.
                                                [FR Doc. 2017–09800 Filed 5–15–17; 8:45 am]
                                                                                                        for this proceeding or the issuance of a              However, the non-party commenters
                                                BILLING CODE 6717–01–P
                                                                                                        Notice of Schedule for Environmental                  will not receive copies of all documents
                                                                                                        Review will serve to notify federal and               filed by other parties or issued by the
                                                DEPARTMENT OF ENERGY                                    state agencies of the timing for the                  Commission (except for the mailing of
                                                                                                        completion of all necessary reviews, and              environmental documents issued by the
                                                Federal Energy Regulatory                               the subsequent need to complete all                   Commission) and will not have the right
                                                Commission                                              federal authorizations within 90 days of              to seek court review of the
                                                                                                        the date of issuance of the Commission                Commission’s final order.
                                                [Docket No. CP17–256–000]                                                                                        Motions to intervene, protests and
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        staff’s FEIS or EA.
                                                Texas Gas Transmission, LLC; Notice                        There are two ways to become                       comments may be filed electronically
                                                of Application                                          involved in the Commission’s review of                via the Internet in lieu of paper; see, 18
                                                                                                        this project. First, any person wishing to            CFR 385.2001(a)(1)(iii) and the
                                                  Take notice that on April 26, 2017,                   obtain legal status by becoming a party               instructions on the Commission’s Web
                                                Texas Gas Transmission, LLC (Texas                      to the proceedings for this project                   site under the e-Filing link. The
                                                Gas), 9 Greenway Plaza, Suite 2800,                     should, on or before the comment date                 Commission strongly encourages
                                                Houston, Texas 77046, filed in Docket                   stated below, file with the Federal                   electronic filings.


                                           VerDate Sep<11>2014   16:42 May 15, 2017   Jkt 241001   PO 00000   Frm 00063   Fmt 4703   Sfmt 4703   E:\FR\FM\16MYN1.SGM   16MYN1



Document Created: 2017-05-16 13:52:30
Document Modified: 2017-05-16 13:52:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 22538 