DEPARTMENT OF DEFENSE
Department of the Army, U.S. Army Corps of Engineers

Federal Register Volume 82, Issue 95 (May 18, 2017)

Page Range22814-22815
FR Document2017-10075

The U.S. Army Corps of Engineers (Corps) intends to prepare a General Reevaluation Report and Supplemental Environmental Impact Statement (GRR/SEIS). This is in compliance with the National Environmental Policy Act (NEPA), for the Middle Rio Grande Flood Protection Bernalillo to Belen, New Mexico Project (Project). This also is the implementation of actions to avoid or minimize potential effects to Endangered Species Act (ESA) listed species and/or associated critical habitat. The GRR/SEIS will supplement the May 1979, Middle Rio Grande Flood Protection Bernalillo to Belen, New Mexico, Final Environmental Impact Statement (FEIS). That document assessed impacts from alternatives to reduce flood risk to structures, infrastructure and life safety. The previously proposed alternative included reconstructing the existing spoil bank system maintained by the Middle Rio Grande Conservancy District (MRGCD) with structurally competent levee system.

Federal Register, Volume 82 Issue 95 (Thursday, May 18, 2017)
[Federal Register Volume 82, Number 95 (Thursday, May 18, 2017)]
[Notices]
[Pages 22814-22815]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-10075]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, U.S. Army Corps of Engineers


Notice of Intent To Prepare a Draft Integrated General 
Reevaluation Report and Supplemental Environmental Impact Statement, 
Middle Rio Grande Flood Protection Bernalillo to Belen, New Mexico: 
Mountain View, Isleta and Belen Units

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers (Corps) intends to prepare a 
General Reevaluation Report and Supplemental Environmental Impact 
Statement (GRR/SEIS). This is in compliance with the National 
Environmental Policy Act (NEPA), for the Middle Rio Grande Flood 
Protection Bernalillo to Belen, New Mexico Project (Project). This also 
is the implementation of actions to avoid or minimize potential effects 
to Endangered Species Act (ESA) listed species and/or associated 
critical habitat. The GRR/SEIS will supplement the May 1979, Middle Rio 
Grande Flood Protection Bernalillo to Belen, New Mexico, Final 
Environmental Impact Statement (FEIS). That document assessed impacts 
from alternatives to reduce flood risk to structures, infrastructure 
and life safety. The

[[Page 22815]]

previously proposed alternative included reconstructing the existing 
spoil bank system maintained by the Middle Rio Grande Conservancy 
District (MRGCD) with structurally competent levee system.

ADDRESSES: Comments should be mailed to Albuquerque District, U.S. Army 
Corps of Engineers, CESPA-PM-LE, Bernalillo to Belen Levee GRR/SEIS, 
4101 Jefferson Plaza NE., Albuquerque, NM 87109, or submitted via email 
to [email protected], designated by inserting 
``Bernalillo to Belen Levee SEIS'' in the subject line. Comments may 
also be submitted at public meetings that will be scheduled at a later 
date.

FOR FURTHER INFORMATION CONTACT: Questions about the proposed action 
and SEIS can be answered by contacting Dr. Michael D. Porter, Fishery 
Biologist, Albuquerque District, U.S. Army Corps of Engineers, CESPA-
PM-LE, 4101 Jefferson Plaza NE., Albuquerque, NM 87109, by phone at 
(505) 342-3264; or via email to [email protected] 
designated by including ``Bernalillo to Belen Levee SEIS'' in the 
subject line.

SUPPLEMENTARY INFORMATION: The original spoil banks were constructed by 
MRGCD as part of their authority to drain wetlands and deliver 
irrigation water.
    Preparation of this GRR/SEIS became necessary due to the changes 
that have occurred since the project was authorized as described below. 
A longer period of record for hydrological data is now available to 
allow improved and updated hydrological analysis. New levee design 
criteria that address long duration flows have also been adopted by the 
Corps in 1993. Any proposed plan now has to incorporate new design 
features that prevent seepage through the levee or its foundation due 
to prolonged flow against the riverward toe. The Corps has adopted a 
probabilistic determination of flood risk to perform levee design. 
Three species that have been listed as threatened or endangered since 
1994 occur within the study area (two with critical habitat). These 
include the Western Yellow-billed Cuckoo, the Southwestern Willow 
Flycatcher, and the Rio Grande Silvery Minnow.
    The GRR/SEIS will investigate and determine the extent of Federal 
interest in a range of alternative plans designed to reduce the risk of 
flooding in the communities between Albuquerque and Belen. The GRR/SEIS 
will describe the risk of flooding in the communities between 
Albuquerque and Belen; evaluate a range of alternatives to reduce flood 
risk and potential environmental impacts; and describe measures to 
minimize or mitigate for potential environmental impacts.
    On November 27, 1995, the Corps published the notice of intent 
(NOI) to prepare the SEIS for the MRG GRR study in the Federal Register 
(Vol. 60, No. 227).
    Previously Proposed Action: The Corps has previously proposed a 
Tentatively Selected Plan for the Project to rehabilitate the spoil 
bank system with an engineered levee in four Middle Rio Grande Units. 
The levee for the Mountain View (4.4 miles), Isleta West (3.2 miles), 
Belen East (18.1 miles), and Belen West Units (22.1 miles) are designed 
to provide protection for the 0.1% probability flood. The Corps 
initiated consultation with the U.S. Fish and Wildlife Service 
(Service) on the effects of the Project on species listed under the 
ESA. As part of that consultation, the Corps has proposed several 
conservation measures that would modify structures or operation and 
maintenance of the Project. The Service is preparing a Biological 
Opinion (BiOp) and the Corps expects that the Service may incorporate 
the conservation measures as part of the BiOp. The Corps will need to 
complete applicable environmental compliance, including evaluation 
under NEPA, prior to adopting and implementing any terms and conditions 
in the BiOp. The proposed GRR/SEIS would constitute that evaluation 
under NEPA. The Corps has proposed several measures to improve 
conditions for listed species, including the actions described in the 
Public Involvement Process section below, subject to authority and 
funding:
    Public Involvement Process: Coordination has been ongoing since 
2008 with both public and private entities that have jurisdiction or an 
interest in land and resources in the Middle Rio Grande Valley of New 
Mexico. These entities include the general public, local governments, 
the Pueblo of Isleta, the U.S. Bureau of Reclamation, the Service, the 
MRGCD, the New Mexico Department of Game and Fish, and the Interstate 
Stream Commission. Coordination will continue throughout the 
development of the SEIS through comment letters, public meetings and 
field visits. All interested parties, including federal, state, tribal, 
and public entities, will be invited to submit comments on the draft 
SEIS when it is circulated for review.
    The planning effort is also being coordinated with the Service 
pursuant to the requirements of the Fish and Wildlife Coordination Act 
of 1972 and the ESA of 1973, as amended. Consultation with the Advisory 
Council on Historic Preservation and the New Mexico State Historic 
Preservation Officer is ongoing pursuant to the National Historic 
Preservation Act of 1966.
    Significant Issues To Be Analyzed: Significant issues to be 
analyzed in the development of the SEIS include the effect of the 
alternatives on endangered or threatened species and their critical 
habitat; floodplain development; water quality; riparian ecological 
systems; social welfare; human safety; cultural resources; and 
aesthetic qualities. Development of mitigation measures will be 
undertaken for any unavoidable impacts.
    Request for Review Comments: The Corps invites affected federal, 
state, and local agencies, affected Native American tribes, and other 
interested organizations and persons to participate in the review of 
the GRR/SEIS. The Corps invites interested parties to provide specific 
comments on issues and the preferred alternative in the GRR/SEIS 
related to the construction of the Project. Comments, requests to be 
placed on the GRR/SEIS mailing list, and requests for information may 
be submitted to the address above. All comments and materials received, 
including names and addresses, will become part of the administrative 
record and may be released to the public. Interested parties should not 
submit confidential business or otherwise sensitive or protected 
information.
    Public Scoping Meeting: The Corps currently plans to conduct public 
review meetings for this GRR/SEIS in 2017. The exact date, time, and 
location of the public meetings has not yet been determined. The Corps 
will publicize this information once the meeting arrangements have been 
made. The draft GRR/SEIS is currently scheduled to be available for 
public review in summer 2017. The final GRR/SEIS is currently scheduled 
to be available for public review in spring 2018.

James L. Booth,
Lieutenant Colonel, U.S. Army, District Commander.
[FR Doc. 2017-10075 Filed 5-17-17; 8:45 am]
BILLING CODE P



                                                  22814                          Federal Register / Vol. 82, No. 95 / Thursday, May 18, 2017 / Notices

                                                  DEPARTMENT OF DEFENSE                                      Public’s Accessibility to the Meeting:             (3) days in advance to the Committee’s
                                                                                                          Pursuant to 5 U.S.C. 552b and 41 CFR                  Designated Federal Officer, via
                                                  Department of the Army, Corps of                        102–3.140 through 102–3.165, and the                  electronic mail, the preferred mode of
                                                  Engineers                                               availability of space, this meeting is                submission, at the addresses listed in
                                                                                                          open to the public. Seating is on a first-            the FOR FURTHER INFORMATION CONTACT
                                                  Lake Eufaula Advisory Committee                         come basis. Legacy on Main Street is                  section. The Designated Federal Officer
                                                  Meeting Notice                                          readily accessible to and usable by                   will log each request, in the order
                                                  AGENCY:  Department of the Army, U.S.                   persons with disabilities. For additional             received, and in consultation with the
                                                  Army Corps of Engineers, DoD.                           information about public access                       Committee Chair determine whether the
                                                  ACTION: Notice of open committee                        procedures, contact Mr. Jeff Knack, the               subject matter of each comment is
                                                  meeting.                                                Committee’s Designated Federal Officer,               relevant to the Committee’s mission
                                                                                                          at the email address or telephone                     and/or the topics to be addressed in this
                                                  SUMMARY:   The Department of the Army                   number listed in the FOR FURTHER                      public meeting. A 15-minute period
                                                  is publishing this notice to announce                   INFORMATION CONTACT section.                          near the end of meeting will be available
                                                  the following Federal advisory                             Written Comments and Statements:                   for verbal public comments. Members of
                                                  committee meeting of the Lake Eufaula                   Pursuant to 41 CFR 102–3.105(j) and                   the public who have requested to make
                                                  Advisory Committee (LEAC). The                          102–3.140 and section 10(a)(3) of the                 a verbal comment and whose comments
                                                  meeting is open to the public.                          Federal Advisory Committee Act, the                   have been deemed relevant under the
                                                  DATES: The Committee will meet from                     public or interested organizations may                process described above, will be allotted
                                                  10:00 a.m.–12:00 p.m. on Friday, June                   submit written comments or statements                 no more than three (3) minutes during
                                                  16, 2017.                                               to the Committee, in response to the                  this period, and will be invited to speak
                                                  ADDRESSES: The meeting will be held at
                                                                                                          stated agenda of the open meeting or in               in the order in which their requests
                                                  Legacy on Main Street, 224 North Main                   regard to the Committee’s mission in                  were received by the Designated Federal
                                                  Street, Eufaula, OK 74432.                              general. Written comments or                          Officer.
                                                                                                          statements should be submitted to Mr.
                                                  FOR FURTHER INFORMATION CONTACT: Mr.                                                                          Brenda S. Bowen,
                                                                                                          Knack, the Committee’s Designated
                                                  Jeff Knack; Designated Federal Officer                  Federal Officer, via electronic mail, the             Army Federal Register Liaison Officer.
                                                  (DFO) for the Committee, in writing at                  preferred mode of submission, at the                  [FR Doc. 2017–10052 Filed 5–17–17; 8:45 am]
                                                  Eufaula Lake Office, 102 E. BK 200 Rd.,                 address listed in the FOR FURTHER                     BILLING CODE 3720–58–P
                                                  Stigler, OK 74462–1829, or by email at                  INFORMATION CONTACT section. Each page
                                                  Jeff.Knack@usace.army.mil, or by phone                  of the comment or statement must
                                                  at 1–918–484–5135.                                      include the author’s name, title or                   DEPARTMENT OF DEFENSE
                                                  SUPPLEMENTARY INFORMATION: This                         affiliation, address, and daytime phone
                                                  meeting is being held under the                         number. Written comments or                           Department of the Army, U.S. Army
                                                  provisions of the Federal Advisory                      statements being submitted in response                Corps of Engineers
                                                  Committee Act of 1972 (5 U.S.C.,                        to the agenda set forth in this notice
                                                  Appendix, as amended), the Sunshine                                                                           Notice of Intent To Prepare a Draft
                                                                                                          must be received by the Designated                    Integrated General Reevaluation
                                                  in the Government Act of 1976 (U.S.C.                   Federal Officer at least seven business
                                                  552b, as amended) and 41 Code of the                                                                          Report and Supplemental
                                                                                                          days prior to the meeting to be                       Environmental Impact Statement,
                                                  Federal Regulations (CFR 102–3.150).                    considered by the Committee. The
                                                     Purpose of the Meeting: The Lake                                                                           Middle Rio Grande Flood Protection
                                                                                                          Designated Federal Officer and the                    Bernalillo to Belen, New Mexico:
                                                  Eufaula Advisory Committee is an                        Committee Chair will review all timely
                                                  independent Federal advisory                                                                                  Mountain View, Isleta and Belen Units
                                                                                                          submitted written comments or
                                                  committee established as directed by                    statements and ensure the comments are                AGENCY: Department of the Army, U.S.
                                                  Section 3133(b) of the Water Resources                  provided to all members of the                        Army Corps of Engineers, DOD.
                                                  Development Act of 2007 (WRDA 2007)                     Committee before the meeting. Written                 ACTION: Notice of intent.
                                                  (Pub. L. 110–114). The committee is                     comments or statements received after
                                                  advisory in nature only with duties to                  this date may not be provided to the                  SUMMARY:    The U.S. Army Corps of
                                                  include providing information and                       Committee until its next meeting. Please              Engineers (Corps) intends to prepare a
                                                  recommendations to the Corps of                         note that because the LEAC operates                   General Reevaluation Report and
                                                  Engineers regarding operations of                       under the provisions of the Federal                   Supplemental Environmental Impact
                                                  Eufaula Lake, Oklahoma for project                      Advisory Committee Act, as amended,                   Statement (GRR/SEIS). This is in
                                                  purposes. In accordance with Sections                   all written comments will be treated as               compliance with the National
                                                  3133(c)(2) and 3133(d)(1) of WRDA                       public documents and will be made                     Environmental Policy Act (NEPA), for
                                                  2007, the committee will also provide                   available for public inspection.                      the Middle Rio Grande Flood Protection
                                                  recommendations on a reallocation                          Pursuant to 41 CFR 102–3.140d, the                 Bernalillo to Belen, New Mexico Project
                                                  study concerning current and future use                 Committee is not obligated to allow a                 (Project). This also is the
                                                  of the Lake Eufaula storage capacity for                member of the public to speak or                      implementation of actions to avoid or
                                                  authorized project purposes as well as a                otherwise address the Committee during                minimize potential effects to
                                                  subsequent pool management plan.                        the meeting. Members of the public will               Endangered Species Act (ESA) listed
                                                     Agenda: This will be the third                       be permitted to make verbal comments                  species and/or associated critical
                                                  meeting of the LEAC. The committee                      during the Committee meeting only at                  habitat. The GRR/SEIS will supplement
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  will have a question and answer session                 the time and in the manner described                  the May 1979, Middle Rio Grande Flood
                                                  with U.S. Army Corps of Engineers                       below. If a member of the public is                   Protection Bernalillo to Belen, New
                                                  representatives about reallocation                      interested in making a verbal comment                 Mexico, Final Environmental Impact
                                                  studies and lake level manipulation                     at the open meeting, that individual                  Statement (FEIS). That document
                                                  plans, discuss proposals for                            must submit a request, with a brief                   assessed impacts from alternatives to
                                                  recommendations about reallocation                      statement of the subject matter to be                 reduce flood risk to structures,
                                                  studies, and discuss future direction.                  addressed by the comment, at least three              infrastructure and life safety. The


                                             VerDate Sep<11>2014   13:43 May 17, 2017   Jkt 241001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\18MYN1.SGM   18MYN1


                                                                                 Federal Register / Vol. 82, No. 95 / Thursday, May 18, 2017 / Notices                                                  22815

                                                  previously proposed alternative                         reduce flood risk and potential                       Consultation with the Advisory Council
                                                  included reconstructing the existing                    environmental impacts; and describe                   on Historic Preservation and the New
                                                  spoil bank system maintained by the                     measures to minimize or mitigate for                  Mexico State Historic Preservation
                                                  Middle Rio Grande Conservancy District                  potential environmental impacts.                      Officer is ongoing pursuant to the
                                                  (MRGCD) with structurally competent                        On November 27, 1995, the Corps                    National Historic Preservation Act of
                                                  levee system.                                           published the notice of intent (NOI) to               1966.
                                                  ADDRESSES: Comments should be                           prepare the SEIS for the MRG GRR
                                                                                                          study in the Federal Register (Vol. 60,                  Significant Issues To Be Analyzed:
                                                  mailed to Albuquerque District, U.S.                                                                          Significant issues to be analyzed in the
                                                  Army Corps of Engineers, CESPA–PM–                      No. 227).
                                                                                                             Previously Proposed Action: The                    development of the SEIS include the
                                                  LE, Bernalillo to Belen Levee GRR/SEIS,
                                                                                                          Corps has previously proposed a                       effect of the alternatives on endangered
                                                  4101 Jefferson Plaza NE., Albuquerque,
                                                  NM 87109, or submitted via email to                     Tentatively Selected Plan for the Project             or threatened species and their critical
                                                  Michael.D.Porter@usace.army.mil,                        to rehabilitate the spoil bank system                 habitat; floodplain development; water
                                                  designated by inserting ‘‘Bernalillo to                 with an engineered levee in four Middle               quality; riparian ecological systems;
                                                  Belen Levee SEIS’’ in the subject line.                 Rio Grande Units. The levee for the                   social welfare; human safety; cultural
                                                  Comments may also be submitted at                       Mountain View (4.4 miles), Isleta West                resources; and aesthetic qualities.
                                                  public meetings that will be scheduled                  (3.2 miles), Belen East (18.1 miles), and             Development of mitigation measures
                                                  at a later date.                                        Belen West Units (22.1 miles) are                     will be undertaken for any unavoidable
                                                                                                          designed to provide protection for the                impacts.
                                                  FOR FURTHER INFORMATION CONTACT:
                                                                                                          0.1% probability flood. The Corps
                                                  Questions about the proposed action                     initiated consultation with the U.S. Fish                Request for Review Comments: The
                                                  and SEIS can be answered by contacting                  and Wildlife Service (Service) on the                 Corps invites affected federal, state, and
                                                  Dr. Michael D. Porter, Fishery Biologist,               effects of the Project on species listed              local agencies, affected Native American
                                                  Albuquerque District, U.S. Army Corps                   under the ESA. As part of that                        tribes, and other interested
                                                  of Engineers, CESPA–PM–LE, 4101                         consultation, the Corps has proposed                  organizations and persons to participate
                                                  Jefferson Plaza NE., Albuquerque, NM                    several conservation measures that                    in the review of the GRR/SEIS. The
                                                  87109, by phone at (505) 342–3264; or                   would modify structures or operation                  Corps invites interested parties to
                                                  via email to Michael.D.Porter@                          and maintenance of the Project. The                   provide specific comments on issues
                                                  usace.army.mil designated by including                  Service is preparing a Biological                     and the preferred alternative in the
                                                  ‘‘Bernalillo to Belen Levee SEIS’’ in the               Opinion (BiOp) and the Corps expects                  GRR/SEIS related to the construction of
                                                  subject line.                                           that the Service may incorporate the                  the Project. Comments, requests to be
                                                  SUPPLEMENTARY INFORMATION: The                          conservation measures as part of the                  placed on the GRR/SEIS mailing list,
                                                  original spoil banks were constructed by                BiOp. The Corps will need to complete                 and requests for information may be
                                                  MRGCD as part of their authority to                     applicable environmental compliance,                  submitted to the address above. All
                                                  drain wetlands and deliver irrigation                   including evaluation under NEPA, prior                comments and materials received,
                                                  water.                                                  to adopting and implementing any
                                                     Preparation of this GRR/SEIS became                                                                        including names and addresses, will
                                                                                                          terms and conditions in the BiOp. The                 become part of the administrative record
                                                  necessary due to the changes that have                  proposed GRR/SEIS would constitute
                                                  occurred since the project was                                                                                and may be released to the public.
                                                                                                          that evaluation under NEPA. The Corps
                                                  authorized as described below. A longer                                                                       Interested parties should not submit
                                                                                                          has proposed several measures to
                                                  period of record for hydrological data is               improve conditions for listed species,                confidential business or otherwise
                                                  now available to allow improved and                     including the actions described in the                sensitive or protected information.
                                                  updated hydrological analysis. New                      Public Involvement Process section                       Public Scoping Meeting: The Corps
                                                  levee design criteria that address long                 below, subject to authority and funding:              currently plans to conduct public
                                                  duration flows have also been adopted                      Public Involvement Process:                        review meetings for this GRR/SEIS in
                                                  by the Corps in 1993. Any proposed                      Coordination has been ongoing since                   2017. The exact date, time, and location
                                                  plan now has to incorporate new design                  2008 with both public and private                     of the public meetings has not yet been
                                                  features that prevent seepage through                   entities that have jurisdiction or an                 determined. The Corps will publicize
                                                  the levee or its foundation due to                      interest in land and resources in the                 this information once the meeting
                                                  prolonged flow against the riverward                    Middle Rio Grande Valley of New                       arrangements have been made. The draft
                                                  toe. The Corps has adopted a                            Mexico. These entities include the                    GRR/SEIS is currently scheduled to be
                                                  probabilistic determination of flood risk               general public, local governments, the
                                                                                                                                                                available for public review in summer
                                                  to perform levee design. Three species                  Pueblo of Isleta, the U.S. Bureau of
                                                                                                                                                                2017. The final GRR/SEIS is currently
                                                  that have been listed as threatened or                  Reclamation, the Service, the MRGCD,
                                                  endangered since 1994 occur within the                  the New Mexico Department of Game                     scheduled to be available for public
                                                  study area (two with critical habitat).                 and Fish, and the Interstate Stream                   review in spring 2018.
                                                  These include the Western Yellow-                       Commission. Coordination will                         James L. Booth,
                                                  billed Cuckoo, the Southwestern Willow                  continue throughout the development of                Lieutenant Colonel, U.S. Army, District
                                                  Flycatcher, and the Rio Grande Silvery                  the SEIS through comment letters,                     Commander.
                                                  Minnow.                                                 public meetings and field visits. All                 [FR Doc. 2017–10075 Filed 5–17–17; 8:45 am]
                                                     The GRR/SEIS will investigate and                    interested parties, including federal,
                                                                                                                                                                BILLING CODE P
                                                  determine the extent of Federal interest
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          state, tribal, and public entities, will be
                                                  in a range of alternative plans designed                invited to submit comments on the draft
                                                  to reduce the risk of flooding in the                   SEIS when it is circulated for review.
                                                  communities between Albuquerque and                        The planning effort is also being
                                                  Belen. The GRR/SEIS will describe the                   coordinated with the Service pursuant
                                                  risk of flooding in the communities                     to the requirements of the Fish and
                                                  between Albuquerque and Belen;                          Wildlife Coordination Act of 1972 and
                                                  evaluate a range of alternatives to                     the ESA of 1973, as amended.


                                             VerDate Sep<11>2014   13:43 May 17, 2017   Jkt 241001   PO 00000   Frm 00014   Fmt 4703   Sfmt 9990   E:\FR\FM\18MYN1.SGM   18MYN1



Document Created: 2017-05-18 01:20:36
Document Modified: 2017-05-18 01:20:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
ContactQuestions about the proposed action and SEIS can be answered by contacting Dr. Michael D. Porter, Fishery Biologist, Albuquerque District, U.S. Army Corps of Engineers, CESPA- PM-LE, 4101 Jefferson Plaza NE., Albuquerque, NM 87109, by phone at (505) 342-3264; or via email to [email protected] designated by including ``Bernalillo to Belen Levee SEIS'' in the subject line.
FR Citation82 FR 22814 