DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 5 (January 9, 2017)

Page Range2344-2345
FR Document2017-00073

Federal Register, Volume 82 Issue 5 (Monday, January 9, 2017)
[Federal Register Volume 82, Number 5 (Monday, January 9, 2017)]
[Notices]
[Pages 2344-2345]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-00073]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-138-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Availability of the Final Environmental Impact Statement for the 
Proposed Atlantic Sunrise Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a final environmental impact statement (EIS) 
for the Atlantic Sunrise Project, proposed by Transcontinental Gas Pipe 
Line Company, LLC (Transco) in the above-referenced docket. Transco 
requests authorization to expand its existing pipeline system from the 
Marcellus Shale production area in northern Pennsylvania to deliver an 
incremental 1.7 million dekatherms per day of year-round firm 
transportation capacity to its existing southeastern market areas.
    The final EIS assesses the potential environmental effects of the 
construction and operation of the project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). The FERC 
staff concludes that approval of the project would result in some 
adverse environmental impacts; however, most of these impacts would be 
reduced to less-than-significant levels with the implementation of 
Transco's proposed mitigation and the additional measures recommended 
in the final EIS.
    The U.S. Army Corps of Engineers and the U.S. Department of 
Agriculture's Natural Resources Conservation Service participated as 
cooperating agencies in the preparation of the final EIS. Cooperating 
agencies have jurisdiction by law or special expertise with respect to 
resources potentially affected by the proposal and participate in the 
NEPA analysis. Although the U.S. Army Corps of Engineers and the 
Natural Resources Conservation Service provided input to the 
conclusions and recommendations presented in the final EIS, the 
agencies will present their own conclusions and recommendations in 
their respective records of decision or determinations for the project.
    The final EIS addresses the potential environmental effects of the 
construction and operation of about 199.4 miles of pipeline composed of 
the following facilities:
     185.9 miles of new 30- and 42-inch-diameter natural gas 
pipeline in Pennsylvania;
     11.0 miles of new 36- and 42-inch-diameter pipeline 
looping in Pennsylvania;
     2.5 miles of 30-inch-diameter replacements in Virginia; 
and
     associated equipment and facilities.
    The project's proposed aboveground facilities include two new 
compressor stations in Pennsylvania; additional compression and related 
modifications to three existing compressor stations in Pennsylvania and 
Maryland; two new meter stations and three new regulator stations in 
Pennsylvania; and minor modifications at existing aboveground 
facilities at various locations in Pennsylvania, Virginia, Maryland, 
North Carolina, and South Carolina to allow for bi-directional flow and 
the installation of supplemental odorization, odor detection, and/or 
odor masking/deodorization equipment.
    The FERC staff mailed copies of the final EIS to federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; newspapers and libraries in the project area; and parties to 
this proceeding. Paper copy versions of this EIS were mailed to those 
specifically requesting them; all others received a CD version. In 
addition, the final EIS is available for public viewing on the FERC's 
Web site (www.ferc.gov) using the eLibrary link. A limited number of 
copies are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    In accordance with the Council on Environmental Quality's (CEQ) 
regulations implementing NEPA, no agency decision on a proposed action 
may be made until 30 days after the U.S. Environmental Protection 
Agency publishes a notice of availability of the final EIS in the 
Federal Register. However, the CEQ regulations provide an exception to 
this rule when an agency decision is subject to a formal internal 
appeal process that allows other agencies or the public to make their 
views known. In such cases, the agency decision may be made at the same 
time the notice of the final EIS is published, allowing both periods to 
run concurrently. The Commission decision for this proposed action is 
subject to a 30-day rehearing period.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP15-
138). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings

[[Page 2345]]

by automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: December 30, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-00073 Filed 1-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                2344                              Federal Register / Vol. 82, No. 5 / Monday, January 9, 2017 / Notices

                                                                 Docket No.                              File Date                                         Presenter or Requester

                                                     4. CP16–10–000 ..............................         12–13–2016       U.S. Senator Bill Nelson.
                                                     5. ER17–217–000 ............................          12–14–2016       U.S. House Representative Frank Pallone, Jr.
                                                     6. CP16–454–000, CP16–455–000                         12–19–2016       FERC Staff.2
                                                     7. CP15–138–000 ............................          12–20–2016       State of Pennsylvania House Representative Bryan      Cutler.
                                                     8. CP15–138–000 ............................          12–20–2016       State of Pennsylvania House Representative Bryan      Cutler.
                                                     9. CP15–138–000 ............................          12–20–2016       State of Pennsylvania House Representative Bryan      Cutler.
                                                     10. CP15–138–000 ..........................           12–20–2016       State of Pennsylvania House Representative Bryan      Cutler.
                                                     11. CP16–10–000 ............................          12–22–2016       FERC Staff.3
                                                   1 Threeletters have been sent to FERC Commissioners and staff under this docket number.
                                                   2 Conference  call notes from December 6, 2016 call with Rio Grande LNG, LLC and Rio Bravo Pipeline, LLC.
                                                   3 Memo forwarding letter dated December 21, 2016 from Advisory Council on Historic Preservation.




                                                  Dated: December 28, 2016.                               have jurisdiction by law or special                    them; all others received a CD version.
                                                Kimberly D. Bose,                                         expertise with respect to resources                    In addition, the final EIS is available for
                                                Secretary.                                                potentially affected by the proposal and               public viewing on the FERC’s Web site
                                                [FR Doc. 2017–00072 Filed 1–6–17; 8:45 am]                participate in the NEPA analysis.                      (www.ferc.gov) using the eLibrary link.
                                                BILLING CODE 6717–01–P
                                                                                                          Although the U.S. Army Corps of                        A limited number of copies are available
                                                                                                          Engineers and the Natural Resources                    for distribution and public inspection
                                                                                                          Conservation Service provided input to                 at: Federal Energy Regulatory
                                                DEPARTMENT OF ENERGY                                      the conclusions and recommendations                    Commission, Public Reference Room,
                                                                                                          presented in the final EIS, the agencies               888 First Street NE., Room 2A,
                                                Federal Energy Regulatory                                 will present their own conclusions and                 Washington, DC 20426, (202) 502–8371.
                                                Commission                                                recommendations in their respective                       In accordance with the Council on
                                                                                                          records of decision or determinations                  Environmental Quality’s (CEQ)
                                                [Docket No. CP15–138–000]
                                                                                                          for the project.                                       regulations implementing NEPA, no
                                                Transcontinental Gas Pipe Line                               The final EIS addresses the potential               agency decision on a proposed action
                                                Company, LLC; Notice of Availability                      environmental effects of the                           may be made until 30 days after the U.S.
                                                of the Final Environmental Impact                         construction and operation of about                    Environmental Protection Agency
                                                Statement for the Proposed Atlantic                       199.4 miles of pipeline composed of the                publishes a notice of availability of the
                                                Sunrise Project                                           following facilities:                                  final EIS in the Federal Register.
                                                                                                             • 185.9 miles of new 30- and 42-inch-               However, the CEQ regulations provide
                                                  The staff of the Federal Energy                         diameter natural gas pipeline in                       an exception to this rule when an
                                                Regulatory Commission (FERC or                            Pennsylvania;                                          agency decision is subject to a formal
                                                Commission) has prepared a final                             • 11.0 miles of new 36- and 42-inch-                internal appeal process that allows other
                                                environmental impact statement (EIS)                      diameter pipeline looping in                           agencies or the public to make their
                                                for the Atlantic Sunrise Project,                         Pennsylvania;                                          views known. In such cases, the agency
                                                proposed by Transcontinental Gas Pipe                        • 2.5 miles of 30-inch-diameter                     decision may be made at the same time
                                                Line Company, LLC (Transco) in the                        replacements in Virginia; and                          the notice of the final EIS is published,
                                                above-referenced docket. Transco                             • associated equipment and facilities.              allowing both periods to run
                                                requests authorization to expand its                         The project’s proposed aboveground                  concurrently. The Commission decision
                                                existing pipeline system from the                         facilities include two new compressor                  for this proposed action is subject to a
                                                Marcellus Shale production area in                        stations in Pennsylvania; additional                   30-day rehearing period.
                                                northern Pennsylvania to deliver an                       compression and related modifications                     Additional information about the
                                                incremental 1.7 million dekatherms per                    to three existing compressor stations in               project is available from the
                                                day of year-round firm transportation                     Pennsylvania and Maryland; two new                     Commission’s Office of External Affairs,
                                                capacity to its existing southeastern                     meter stations and three new regulator                 at (866) 208–FERC, or on the FERC Web
                                                market areas.                                             stations in Pennsylvania; and minor                    site (www.ferc.gov) using the eLibrary
                                                  The final EIS assesses the potential                    modifications at existing aboveground                  link. Click on the eLibrary link, click on
                                                environmental effects of the                              facilities at various locations in                     ‘‘General Search,’’ and enter the docket
                                                construction and operation of the                         Pennsylvania, Virginia, Maryland, North                number excluding the last three digits in
                                                project in accordance with the                            Carolina, and South Carolina to allow                  the Docket Number field (i.e., CP15–
                                                requirements of the National                              for bi-directional flow and the                        138). Be sure you have selected an
                                                Environmental Policy Act (NEPA). The                      installation of supplemental                           appropriate date range. For assistance,
                                                FERC staff concludes that approval of                     odorization, odor detection, and/or odor               please contact FERC Online Support at
                                                the project would result in some adverse                  masking/deodorization equipment.                       FercOnlineSupport@ferc.gov or toll free
                                                environmental impacts; however, most                         The FERC staff mailed copies of the                 at (866) 208–3676; for TTY, contact
                                                of these impacts would be reduced to                      final EIS to federal, state, and local                 (202) 502–8659. The eLibrary link also
                                                less-than-significant levels with the                     government representatives and                         provides access to the texts of formal
                                                implementation of Transco’s proposed                      agencies; elected officials;                           documents issued by the Commission,
                                                mitigation and the additional measures                    environmental and public interest                      such as orders, notices, and
sradovich on DSK3GMQ082PROD with NOTICES




                                                recommended in the final EIS.                             groups; Native American tribes;                        rulemakings.
                                                  The U.S. Army Corps of Engineers                        potentially affected landowners and                       In addition, the Commission offers a
                                                and the U.S. Department of                                other interested individuals and groups;               free service called eSubscription that
                                                Agriculture’s Natural Resources                           newspapers and libraries in the project                allows you to keep track of all formal
                                                Conservation Service participated as                      area; and parties to this proceeding.                  issuances and submittals in specific
                                                cooperating agencies in the preparation                   Paper copy versions of this EIS were                   dockets. This can reduce the amount of
                                                of the final EIS. Cooperating agencies                    mailed to those specifically requesting                time you spend researching proceedings


                                           VerDate Sep<11>2014    21:14 Jan 06, 2017   Jkt 241001    PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\09JAN1.SGM   09JAN1


                                                                               Federal Register / Vol. 82, No. 5 / Monday, January 9, 2017 / Notices                                                    2345

                                                by automatically providing you with                     Notice of Change in Status of the                         Filed Date: 1/3/17.
                                                notification of these filings, document                 Morgan Stanley Public Utilities, et al.                   Accession Number: 20170103–5150.
                                                summaries, and direct links to the                         Filed Date: 12/30/16.                                  Comments Due: 5 p.m. ET 1/24/17.
                                                documents. Go to www.ferc.gov/docs-                        Accession Number: 20161230–5237.                       Docket Numbers: ER17–738–000.
                                                filing/esubscription.asp.                                  Comments Due: 5 p.m. ET 2/28/17.                       Applicants: Southwest Power Pool,
                                                                                                           Docket Numbers: ER15–1952–003;                      Inc.
                                                  Dated: December 30, 2016.
                                                                                                        ER16–853–002; ER16–855–002; ER16–                         Description: § 205(d) Rate Filing:
                                                Kimberly D. Bose,                                       856–002; ER16–857–002; ER16–858–
                                                Secretary.                                                                                                     3125R4 Basin Electric Power
                                                                                                        002; ER16–860–002; ER16–861–002.                       Cooperative NITSA and NOA to be
                                                [FR Doc. 2017–00073 Filed 1–6–17; 8:45 am]                 Applicants: Pavant Solar, LLC,                      effective 12/1/2016.
                                                BILLING CODE 6717–01–P                                  Enterprise Solar, LLC, Escalante Solar I,                 Filed Date: 1/3/17.
                                                                                                        LLC, Escalante Solar II, LLC, Escalante                   Accession Number: 20170103–5186.
                                                                                                        Solar III, LLC, Granite Mountain Solar                    Comments Due: 5 p.m. ET 1/24/17.
                                                DEPARTMENT OF ENERGY                                    East, LLC, Granite Mountain Solar West,                   The filings are accessible in the
                                                                                                        LLC, Iron Springs Solar, LLC.                          Commission’s eLibrary system by
                                                Federal Energy Regulatory                                  Description: Triennial Market Power
                                                Commission                                                                                                     clicking on the links or querying the
                                                                                                        Analysis for the Northwest Region of
                                                                                                                                                               docket number.
                                                Combined Notice of Filings #2                           Pavant Solar, LLC, et al.
                                                                                                                                                                  Any person desiring to intervene or
                                                                                                           Filed Date: 12/30/16.
                                                   Take notice that the Commission                         Accession Number: 20161230–5240.                    protest in any of the above proceedings
                                                received the following electric rate                       Comments Due: 5 p.m. ET 2/28/17.                    must file in accordance with Rules 211
                                                filings:                                                                                                       and 214 of the Commission’s
                                                                                                           Docket Numbers: ER15–2351–002.
                                                                                                           Applicants: Southwest Power Pool,                   Regulations (18 CFR 385.211 and
                                                   Docket Numbers: ER10–2822–011;
                                                                                                        Inc.                                                   385.214) on or before 5:00 p.m. Eastern
                                                ER11–2196–008; ER11–2462–007;
                                                                                                           Description: Compliance filing:                     time on the specified comment date.
                                                ER11–2463–007; ER11–2464–007;
                                                                                                        Alliant Energy Corp. Serv. Att AH SA                   Protests may be considered, but
                                                ER11–2465–008; ER11–2466–007;
                                                                                                        3066SO/Att AO SA 3071SO to be                          intervention is necessary to become a
                                                ER11–2467–007; ER11–2468–007;
                                                                                                        effective 10/1/2015.                                   party to the proceeding.
                                                ER11–2469–007; ER11–2470–007;                                                                                     eFiling is encouraged. More detailed
                                                ER11–2471–007; ER11–2472–007;                              Filed Date: 1/3/17.
                                                                                                           Accession Number: 20170103–5090.                    information relating to filing
                                                ER11–2473–007; ER11–2474–009;                                                                                  requirements, interventions, protests,
                                                ER11–2475–007; ER16–1250–003.                              Comments Due: 5 p.m. ET 1/24/17.
                                                                                                           Docket Numbers: ER16–328–003;                       service, and qualifying facilities filings
                                                   Applicants: Atlantic Renewable
                                                                                                        ER10–2196–003; ER11–4027–008;                          can be found at: http://www.ferc.gov/
                                                Projects II LLC, Avangrid Renewables,
                                                                                                        ER12–1275–003; ER12–952–004; ER13–                     docs-filing/efiling/filing-req.pdf. For
                                                LLC, Big Horn Wind Project LLC, Big
                                                                                                        1141–003; ER13–1142–003; ER13–1143–                    other information, call (866) 208–3676
                                                Horn II Wind Project LLC, Colorado
                                                                                                        004; ER13–1144–004; ER15–1657–004;                     (toll free). For TTY, call (202) 502–8659.
                                                Green Holdings LLC, Hay Canyon Wind
                                                LLC, Juniper Canyon Wind Power LLC,                     ER16–918–002.                                            Dated: January 3, 2017.
                                                Klamath Energy LLC, Klamath                                Applicants: Cogentrix Virginia                      Nathaniel J. Davis, Sr.,
                                                Generation LLC, Klondike Wind Power                     Financing Holding Company, LLC,                        Deputy Secretary.
                                                LLC, Klondike Wind Power II LLC,                        Essential Power, LLC, Essential Power                  [FR Doc. 2017–00119 Filed 1–6–17; 8:45 am]
                                                Klondike Wind Power III LLC, Leaning                    Massachusetts, LLC, Essential Power                    BILLING CODE 6717–01–P
                                                Juniper Wind Power II LLC, Pebble                       Newington, LLC, Essential Power OPP,
                                                Springs Wind LLC, San Luis Solar LLC,                   LLC, Essential Power Rock Springs,
                                                Star Point Wind Project LLC, Twin                       LLC, James River Genco, LLC,                           DEPARTMENT OF ENERGY
                                                Buttes Wind LLC.                                        Lakewood Cogeneration, L.P., Red Oak
                                                   Description: Updated Market Power                    Power, LLC, Rhode Island State Energy                  Federal Energy Regulatory
                                                Analysis for the Northwest Region of                    Center, LP, SEPG Energy Marketing                      Commission
                                                AVANGRID Northwest MBR Sellers.                         Services, LLC.                                         [Docket No. PF16–10–000]
                                                   Filed Date: 12/30/16.                                   Description: Updated Market Power
                                                   Accession Number: 20161230–5239.                     Analysis for the Northeast Region of                   WBI Energy Transmission, Inc.;
                                                   Comments Due: 5 p.m. ET 2/28/17.                     Cogentrix Virginia Financing Holding                   Supplemental Notice of Intent To
                                                   Docket Numbers: ER10–2906–008;                       Company, LLC, et al.                                   Prepare an Environmental Assessment
                                                ER10–2908–008; ER10–2910–008;                              Filed Date: 12/30/16.                               for the Planned Valley Expansion
                                                ER10–2911–008; ER11–4666–002;                              Accession Number: 20161230–5230.                    Project and Request for Comments on
                                                ER11–4667–002; ER11–4669–002;                              Comments Due: 5 p.m. ET 2/28/17.                    Environmental Issues
                                                ER11–4670–002; ER12–295–001; ER12–                         Docket Numbers: ER17–736–000.
                                                709–001.                                                   Applicants: Quantum Power Corp.                       On November 23, 2016, the
                                                   Applicants: Morgan Stanley Capital                      Description: Compliance filing:                     Commission issued a ‘‘Notice of Intent
                                                Group Inc., MS Solar Solutions Corp.,                   Market Based Rate Tariff Baseline Filing               to Prepare an Environmental
                                                Naniwa Energy LLC, Power Contract                       to be effective 1/1/2017.                              Assessment for the Planned Valley
                                                Financing II, L.L.C., NaturEner Glacier                    Filed Date: 1/3/17.                                 Expansion Project and Request for
                                                                                                           Accession Number: 20170103–5095.                    Comments on Environmental Issues’’
sradovich on DSK3GMQ082PROD with NOTICES




                                                Wind Energy 1, LLC, NaturEner Glacier
                                                Wind Energy 2, LLC, NaturEner Rim                          Comments Due: 5 p.m. ET 1/24/17.                    (NOI) and an Errata Notice for the NOI
                                                Rock Wind Energy, LLC, NaturEner                           Docket Numbers: ER17–737–000.                       on November 28, 2016. It has come to
                                                Montana Wind Energy, LLC, NaturEner                        Applicants: Viridity Energy Solutions               our attention that the environmental
                                                Power Watch, LLC, NaturEner Wind                        Inc.                                                   mailing list was not provided copies of
                                                Watch, LLC.                                                Description: Baseline eTariff Filing:               the NOI or the Errata Notice; therefore,
                                                   Description: Updated Market Power                    VES MBR Application to be effective                    we are issuing this Supplemental NOI to
                                                Analysis for the Northwest Region and                   1/4/2017.                                              extend the scoping period and provide


                                           VerDate Sep<11>2014   21:14 Jan 06, 2017   Jkt 241001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\09JAN1.SGM   09JAN1



Document Created: 2018-10-24 11:09:01
Document Modified: 2018-10-24 11:09:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 2344 