82_FR_25069 82 FR 24966 - State Policies and Wholesale Markets Operated by ISO New England Inc., New York Independent System Operator, Inc., and PJM Interconnection, L.L.C.; Notice Inviting Post-Technical Conference Comments

82 FR 24966 - State Policies and Wholesale Markets Operated by ISO New England Inc., New York Independent System Operator, Inc., and PJM Interconnection, L.L.C.; Notice Inviting Post-Technical Conference Comments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 103 (May 31, 2017)

Page Range24966-24967
FR Document2017-11199

Federal Register, Volume 82 Issue 103 (Wednesday, May 31, 2017)
[Federal Register Volume 82, Number 103 (Wednesday, May 31, 2017)]
[Notices]
[Pages 24966-24967]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-11199]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD17-11-000]


State Policies and Wholesale Markets Operated by ISO New England 
Inc., New York Independent System Operator, Inc., and PJM 
Interconnection, L.L.C.; Notice Inviting Post-Technical Conference 
Comments

    On May 1 and May 2, 2017, Federal Energy Regulatory Commission 
(Commission) staff convened a technical conference to discuss the 
interplay between state policy goals and the wholesale markets \1\ 
operated by ISO New England Inc., New York Independent System Operator, 
Inc., and PJM Interconnection, L.L.C. (Eastern RTOs/ISOs).
---------------------------------------------------------------------------

    \1\ Unless otherwise indicated, all references herein to 
wholesale markets refer to the capacity, energy, and ancillary 
services markets.
---------------------------------------------------------------------------

    All interested persons are invited to file initial and reply post-
technical conference comments on the topics discussed during the 
technical

[[Page 24967]]

conference, including the questions listed in the Supplemental Notice 
issued in this proceeding on April 28, 2017.
    In order to provide structure to the technical conference 
discussion, staff identified the following potential paths forward with 
respect to the interplay between state policy goals and the wholesale 
markets:
     Path 1--Limited or No Minimum Offer Price Rule: An 
approach that would either not apply the minimum offer price rule to 
state-supported resources, or limit application of the minimum offer 
price rule to only state-supported resources where federal law preempts 
the state action providing that support.
     Path 2--Accommodation of State Actions: An approach that 
would accommodate state policies that provide out-of-market support 
with the operation of the wholesale markets by allowing state-supported 
resources to participate in those markets and, when relevant, obtain 
capacity supply obligations, subject to adjustments necessary to 
maintain certain wholesale market prices consistent with the market 
results that would have been produced had those resources not been 
state-supported.
     Path 3--Status Quo: An approach that would rely on 
existing tariff provisions applying the minimum offer price rule to 
some state-supported resources, and continuing case-by-case litigation 
over the specific line to be drawn between categories of state actions 
that may, or may not, result in a state-supported resource being 
subject to the minimum offer price rule.
     Path 4--Pricing State Policy Choices: An approach in which 
state policies, to the extent possible, would value the attributes 
(e.g., resilience) or externalities (e.g., carbon emissions) that 
states are targeting in a manner that can be readily integrated into 
the wholesale markets in a resource-neutral way. For those state 
policies that cannot be readily valued and integrated into the 
wholesale markets, Path 4 would also require consideration of what, if 
anything, the Commission should do to address the market impacts of 
these state policies. For instance, other approaches for these state 
policies may include accommodation, application of the minimum offer 
price rule, or an exemption from the minimum offer price rule.
     Path 5--Expanded Minimum Offer Price Rule: An approach 
that would minimize the impact of state-supported resources on 
wholesale market prices by expanding the existing scope of the minimum 
offer price rule to apply to both new and existing capacity resources 
that participate in the capacity market and receive state support.
    Commenters are invited to address these paths, to describe 
alternative potential paths forward in the wholesale markets, or to 
describe individual solutions. Commenters are encouraged to discuss the 
following with regard to any approach: (1) Any centralized wholesale 
market changes (at a conceptual level) that would need to accompany 
implementation of a particular approach; (2) the feasibility of 
implementation; (3) the implications for market participants' ability 
to make long-term decisions; and (4) the near-term and long-term 
sustainability.
    In addition, Commission staff is interested in comments on the 
following topics:
    1. The principles and objectives that should guide the selection of 
a path forward, as well as the principles and objectives that should 
guide rule changes that would be required by their suggested approach.
    2. The degree of urgency for reconciling wholesale markets and 
state policies and if that urgency necessitates both a near-term (e.g., 
next one to three years) approach and a different long-term approach. 
To the extent commenters advocate for different near-term and long-term 
solutions, please explain what type of transition is needed and why, 
and how the suggested near-term approach will facilitate achievement of 
the suggested long-term approach.
    3. Long-term expectations regarding the relative roles of wholesale 
energy and capacity markets and state policies in the Eastern RTOs/ISOs 
in shaping the quantity and composition of resources needed to cost-
effectively meet future reliability and operational needs.
    4. What procedural steps the Commission should take, if any, to 
reconcile the competitive market framework with the increasing interest 
by states to support particular resources and resource attributes that 
might facilitate such reconciliation.
    Commenters may reference material previously filed in this docket, 
including the technical conference transcript, but are encouraged to 
avoid repetition or replication of previous material. Initial and reply 
comments must be submitted on or before 30 days and 45 days, 
respectively, from the date of this notice. Initial comments should not 
exceed 15 pages and reply comments should not exceed 10 pages.
    For further information please contact individuals identified for 
each topic:
    Technical Information: Amr Ibrahim, Office of Energy Policy and 
Innovation, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426, (202) 502-6746, [email protected].
    Legal Information: Gretchen Kershaw, Office of the General Counsel, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, (202) 502-8213, [email protected].

    Dated: May 23, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-11199 Filed 5-30-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               24966                       Federal Register / Vol. 82, No. 103 / Wednesday, May 31, 2017 / Notices

                                               DEPARTMENT OF ENERGY                                    at: (866) 208–3676 (toll-free), or (202)                Reliability Standard COM–001–3 and
                                                                                                       502–8659 for TTY.                                       the retirement of the currently-effective
                                               Federal Energy Regulatory                                  Docket: Users interested in receiving                Reliability Standard COM–001–2.1, the
                                               Commission                                              automatic notification of activity in this              Commission estimates that there will be
                                                                                                       docket or in viewing/downloading                        no material change in industry
                                               [Docket No. RD16–9–000]
                                                                                                       comments and issuances in this docket                   information collection obligations
                                               Commission Information Collection                       may do so at http://www.ferc.gov/docs-                  because the Requirements R12 and R13
                                               Activities (FERC–725v); Comment                         filing/docs-filing.asp.                                 (which are additions to COM–001–3) do
                                               Request; Revision                                       FOR FURTHER INFORMATION: Ellen Brown                    not impact the paperwork burden of
                                                                                                       may be reached by email at                              impacted registered entities.
                                               AGENCY:  Federal Energy Regulatory                      DataClearance@FERC.gov, telephone at                      Comments: Comments are invited on:
                                               Commission.                                             (202) 502–8663, and fax at (202) 273–                   (1) Whether the collection of
                                               ACTION: Notice of revised information                   0873.                                                   information is necessary for the proper
                                               collection and request for comments.                                                                            performance of the functions of the
                                                                                                       SUPPLEMENTARY INFORMATION:                              Commission, including whether the
                                               SUMMARY:    The Federal Energy                             Title: FERC–725V, Mandatory                          information will have practical utility;
                                               Regulatory Commission (Commission or                    Reliability Standards: COM Reliability                  (2) the accuracy of the agency’s estimate
                                               FERC) on December 1, 2016 issued a 60-                  Standards.                                              of the burden and cost of the collection
                                                                                                          OMB Control No.: 1902–0277.
                                               day Notice in the Federal Register                                                                              of information, including the validity of
                                                                                                          Type of Request: Extension of the
                                               requesting public comments on FERC–                                                                             the methodology and assumptions used;
                                                                                                       FERC–725V information collection
                                               725V (Mandatory Reliability Standards:                                                                          (3) ways to enhance the quality, utility
                                                                                                       requirements.
                                               COM Reliability Standards) which will                                                                           and clarity of the information collection;
                                                                                                          Abstract: On August 15, 2016, the
                                               be submitted to the Office of                                                                                   and (4) ways to minimize the burden of
                                                                                                       North American Electric Reliability
                                               Management and Budget (OMB) for a                                                                               the collection of information on those
                                                                                                       Corporation (NERC) filed a petition for
                                               review of the information collection                                                                            who are to respond, including the use
                                                                                                       Commission approval, pursuant to
                                               requirements. The Commission received                                                                           of automated collection techniques or
                                                                                                       section 215(d)(1) of the Federal Power
                                               no comments on the FERC–725V and is                                                                             other forms of information technology.
                                                                                                       Act (‘‘FPA’’) 1 and Section 39.5 2 of the
                                               making this notation in its submittal to                Federal Energy Regulatory                                 Dated: May 24, 2017 .
                                               OMB.                                                    Commission’s regulations, for approval                  Kimberly D. Bose,
                                                  In compliance with the requirements                  of proposed Reliability Standard COM–                   Secretary.
                                               of the Paperwork Reduction Act of 1995,                 001–3 (Communications), the associated                  [FR Doc. 2017–11198 Filed 5–30–17; 8:45 am]
                                               the Commission is submitting the                        Implementation Plan, retirement of                      BILLING CODE 6717–01–P
                                               FERC–725V to the Office of                              currently-effective Reliability Standard
                                               Management and Budget (OMB) for                         COM–001–2.1, and Violation Risk
                                               review of the information collection                    Factors (‘‘VRFs’’) and Violation Severity               DEPARTMENT OF ENERGY
                                               requirements. Any interested person                     Levels (‘‘VSLs’’) associated with new
                                               may file comments directly with OMB                     Requirements R12 and R13 proposed in                    Federal Energy Regulatory
                                               and should address a copy of those                      Reliability Standard COM–001–3.                         Commission
                                               comments to the Commission as                           Proposed Reliability Standard COM–                      [Docket No. AD17–11–000]
                                               explained below.                                        001–3 reflects revisions developed
                                               DATES: Comments on the FERC–725V                        under Project 2015–07 Internal                          State Policies and Wholesale Markets
                                               are due by June 30, 2017.                               Communications Capabilities, in                         Operated by ISO New England Inc.,
                                               ADDRESSES: Comments filed with OMB,                     compliance with the Commission’s                        New York Independent System
                                               identified by the OMB Control No.                       directive in Order No. 888 that NERC                    Operator, Inc., and PJM
                                               1902–0277 (FERC–725V), should be sent                   ‘‘develop modifications to COM–001–2,                   Interconnection, L.L.C.; Notice Inviting
                                               via email to the Office of Information                  or develop a new standard, to address                   Post-Technical Conference Comments
                                               and Regulatory Affairs at: oira_                        [the Commission’s] concerns regarding
                                                                                                                                                                  On May 1 and May 2, 2017, Federal
                                               submission@omb.gov, Attention:                          ensuring the adequacy of internal
                                                                                                                                                               Energy Regulatory Commission
                                               Federal Energy Regulatory Commission                    communications capability whenever
                                                                                                                                                               (Commission) staff convened a technical
                                               Desk Officer.                                           internal communications could directly
                                                                                                                                                               conference to discuss the interplay
                                                  A copy of the comments should also                   affect the reliability operations of the
                                                                                                                                                               between state policy goals and the
                                               be sent to the Commission, in Docket                    Bulk-Power System.
                                                                                                                                                               wholesale markets 1 operated by ISO
                                               No. RD16–9–000, by either of the                           On October 28, 2016, NERC’s
                                                                                                                                                               New England Inc., New York
                                               following methods:                                      uncontested petition was approved
                                                                                                                                                               Independent System Operator, Inc., and
                                                  • eFiling at Commission’s Web site:                  pursuant to the relevant authority
                                                                                                                                                               PJM Interconnection, L.L.C. (Eastern
                                               http://www.ferc.gov/docs-filing/                        delegated to the Director, Office of
                                                                                                                                                               RTOs/ISOs).
                                               efiling.asp                                             Electric Reliability under 18 CFR                          All interested persons are invited to
                                                  • Mail/Hand Delivery/Courier:                        375.303(2016), effective as of July 1,                  file initial and reply post-technical
                                               Federal Energy Regulatory Commission,                   2016.3                                                  conference comments on the topics
                                               Secretary of the Commission, 888 First                     Type of Respondents: Public utilities.
                                                                                                                                                               discussed during the technical
                                               Street NE., Washington, DC 20426.                          Estimate of Annual Burden 4: With
nlaroche on DSK30NT082PROD with NOTICES




                                                  Instructions: All submissions must be                respect to the proposed revisions to
                                                                                                                                                               generate, maintain, retain, or disclose or provide
                                               formatted and filed in accordance with                                                                          information to or for a Federal agency. For further
                                                                                                         1 16  U.S.C. 824o (2012).
                                               submission guidelines at: http://                          2 18 CFR 39.5 (2011).
                                                                                                                                                               explanation of what is included in the information
                                               www.ferc.gov/help/submission-                                                                                   collection burden, refer to 5 Code of Federal
                                                                                                          3 https://elibrary-backup.ferc.gov/IDMWS/            Regulations 1320.3.
                                               guide.asp. For user assistance contact                  common/opennat.asp?fileID=14386228                        1 Unless otherwise indicated, all references herein
                                               FERC Online Support by email at                            4 Burden is defined as the total time, effort, or    to wholesale markets refer to the capacity, energy,
                                               ferconlinesupport@ferc.gov, or by phone                 financial resources expended by persons to              and ancillary services markets.



                                          VerDate Sep<11>2014   14:54 May 30, 2017   Jkt 241001   PO 00000   Frm 00033    Fmt 4703   Sfmt 4703    E:\FR\FM\31MYN1.SGM   31MYN1


                                                                           Federal Register / Vol. 82, No. 103 / Wednesday, May 31, 2017 / Notices                                                   24967

                                               conference, including the questions                     both new and existing capacity                        Federal Energy Regulatory Commission,
                                               listed in the Supplemental Notice                       resources that participate in the capacity            888 First Street NE., Washington, DC
                                               issued in this proceeding on April 28,                  market and receive state support.                     20426, (202) 502–6746, amr.ibrahim@
                                               2017.                                                      Commenters are invited to address                  ferc.gov.
                                                  In order to provide structure to the                 these paths, to describe alternative                    Legal Information: Gretchen Kershaw,
                                               technical conference discussion, staff                  potential paths forward in the wholesale              Office of the General Counsel, Federal
                                               identified the following potential paths                markets, or to describe individual                    Energy Regulatory Commission, 888
                                               forward with respect to the interplay                   solutions. Commenters are encouraged                  First Street NE., Washington, DC 20426,
                                               between state policy goals and the                      to discuss the following with regard to               (202) 502–8213, gretchen.kershaw@
                                               wholesale markets:                                      any approach: (1) Any centralized                     ferc.gov.
                                                  • Path 1—Limited or No Minimum                       wholesale market changes (at a
                                                                                                                                                               Dated: May 23, 2017.
                                               Offer Price Rule: An approach that                      conceptual level) that would need to
                                               would either not apply the minimum                                                                            Kimberly D. Bose,
                                                                                                       accompany implementation of a
                                               offer price rule to state-supported                     particular approach; (2) the feasibility of           Secretary.
                                               resources, or limit application of the                  implementation; (3) the implications for              [FR Doc. 2017–11199 Filed 5–30–17; 8:45 am]
                                               minimum offer price rule to only state-                 market participants’ ability to make                  BILLING CODE 6717–01–P
                                               supported resources where federal law                   long-term decisions; and (4) the near-
                                               preempts the state action providing that                term and long-term sustainability.
                                               support.                                                   In addition, Commission staff is                   EXPORT-IMPORT BANK OF THE
                                                  • Path 2—Accommodation of State                      interested in comments on the following               UNITED STATES
                                               Actions: An approach that would                         topics:
                                               accommodate state policies that provide                    1. The principles and objectives that              [Public Notice: 2017–6002]
                                               out-of-market support with the                          should guide the selection of a path
                                               operation of the wholesale markets by                   forward, as well as the principles and                Agency Information Collection
                                               allowing state-supported resources to                   objectives that should guide rule                     Activities: Comment Request
                                               participate in those markets and, when                  changes that would be required by their
                                               relevant, obtain capacity supply                        suggested approach.                                   AGENCY:  Export-Import Bank of the
                                               obligations, subject to adjustments                        2. The degree of urgency for                       United States.
                                               necessary to maintain certain wholesale                 reconciling wholesale markets and state               ACTION: Submission for OMB review and
                                               market prices consistent with the                       policies and if that urgency necessitates             comments request.
                                               market results that would have been                     both a near-term (e.g., next one to three
                                               produced had those resources not been                   years) approach and a different long-                 SUMMARY:    The Export-Import Bank of
                                               state-supported.                                        term approach. To the extent                          the United States (Ex-Im Bank), as part
                                                  • Path 3—Status Quo: An approach                     commenters advocate for different near-               of its continuing effort to reduce
                                               that would rely on existing tariff                      term and long-term solutions, please                  paperwork and respondent burden,
                                               provisions applying the minimum offer                   explain what type of transition is                    invites the general public and other
                                               price rule to some state-supported                      needed and why, and how the suggested                 Federal Agencies to comment on the
                                               resources, and continuing case-by-case                  near-term approach will facilitate                    proposed information collection, as
                                               litigation over the specific line to be                 achievement of the suggested long-term                required by the Paperwork Reduction
                                               drawn between categories of state                       approach.                                             Act of 1995.
                                               actions that may, or may not, result in                    3. Long-term expectations regarding                   By neutralizing the effect of export
                                               a state-supported resource being subject                the relative roles of wholesale energy                credit support offered by foreign
                                               to the minimum offer price rule.                        and capacity markets and state policies               governments and by absorbing credit
                                                  • Path 4—Pricing State Policy                        in the Eastern RTOs/ISOs in shaping the               risks that the private sector will not
                                               Choices: An approach in which state                     quantity and composition of resources                 accept, Ex-Im Bank enables U.S.
                                               policies, to the extent possible, would                 needed to cost-effectively meet future                exporters to compete fairly in foreign
                                               value the attributes (e.g., resilience) or              reliability and operational needs.                    markets on the basis of price and
                                               externalities (e.g., carbon emissions)                     4. What procedural steps the                       product. Under the Working Capital
                                               that states are targeting in a manner that              Commission should take, if any, to                    Guarantee Program, Ex-Im Bank
                                               can be readily integrated into the                      reconcile the competitive market                      provides repayment guarantees to
                                               wholesale markets in a resource-neutral                 framework with the increasing interest                lenders on secured, short-term working
                                               way. For those state policies that cannot               by states to support particular resources             capital loans made to qualified
                                               be readily valued and integrated into the               and resource attributes that might                    exporters. The guarantee may be
                                               wholesale markets, Path 4 would also                    facilitate such reconciliation.                       approved for a single loan or a revolving
                                               require consideration of what, if                          Commenters may reference material                  line of credit. In the event that a
                                               anything, the Commission should do to                   previously filed in this docket,                      borrower defaults on a transaction
                                               address the market impacts of these                     including the technical conference                    guaranteed by Ex-Im Bank the
                                               state policies. For instance, other                     transcript, but are encouraged to avoid               guaranteed lender may seek payment by
                                               approaches for these state policies may                 repetition or replication of previous                 the submission of a claim.
                                               include accommodation, application of                   material. Initial and reply comments                     This collection of information is
                                               the minimum offer price rule, or an                     must be submitted on or before 30 days                necessary to determine if such claim
                                               exemption from the minimum offer                        and 45 days, respectively, from the date              complies with the terms and conditions
nlaroche on DSK30NT082PROD with NOTICES




                                               price rule.                                             of this notice. Initial comments should               of the relevant working capital
                                                  • Path 5—Expanded Minimum Offer                      not exceed 15 pages and reply                         guarantee. The Notice of Claim and
                                               Price Rule: An approach that would                      comments should not exceed 10 pages.                  Proof of Loss, Working Capital
                                               minimize the impact of state-supported                     For further information please contact             Guarantee is used to determine
                                               resources on wholesale market prices by                 individuals identified for each topic:                compliance with the terms of the
                                               expanding the existing scope of the                        Technical Information: Amr Ibrahim,                guarantee and the appropriateness of
                                               minimum offer price rule to apply to                    Office of Energy Policy and Innovation,               paying a claim. Export-Import Bank


                                          VerDate Sep<11>2014   14:54 May 30, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\31MYN1.SGM   31MYN1



Document Created: 2017-05-31 05:59:45
Document Modified: 2017-05-31 05:59:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionAn approach that would accommodate state policies that provide out-of-market support with the operation of the wholesale markets by allowing state-supported resources to participate in those markets and, when relevant, obtain capacity supply obligations, subject to adjustments necessary to maintain certain wholesale market prices consistent with the market results that would have been produced had those resources not been state-supported.
FR Citation82 FR 24966 