82_FR_25100 82 FR 24997 - Shipping, Receiving, and Internal Transfer of Special Nuclear Material

82 FR 24997 - Shipping, Receiving, and Internal Transfer of Special Nuclear Material

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 103 (May 31, 2017)

Page Range24997-24998
FR Document2017-11224

The U.S. Nuclear Regulatory Commission (NRC) is issuing Regulatory Guide (RG) 5.41, ``Shipping, Receiving, and Internal Transfer of Special Nuclear Material.'' This new RG consolidates in one document NRC guidance concerning the material control and accounting requirements pertaining to shipments, receipts, and internal transfers of special nuclear material. In addition, this guide provides updated guidance for source material (SM) and depleted uranium (DU) at uranium enrichment facilities.

Federal Register, Volume 82 Issue 103 (Wednesday, May 31, 2017)
[Federal Register Volume 82, Number 103 (Wednesday, May 31, 2017)]
[Notices]
[Pages 24997-24998]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-11224]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

National Marine Fisheries Service

[NRC-2016-0189]


Shipping, Receiving, and Internal Transfer of Special Nuclear 
Material

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Regulatory Guide (RG) 5.41, ``Shipping, Receiving, and Internal 
Transfer of Special Nuclear Material.'' This new RG consolidates in one 
document NRC guidance concerning the material control and accounting 
requirements pertaining to shipments, receipts, and internal transfers 
of special nuclear material. In addition, this guide provides updated 
guidance for source material (SM) and depleted uranium (DU) at uranium 
enrichment facilities.

DATES: Revision 0 to RG 5.41 is available on May 31, 2017.

ADDRESSES: Please refer to Docket ID NRC-2016-0189 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0189. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Document collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced. RG 5.41 may be found in ADAMS under 
Accession No. ML16348A213. The regulatory analysis supporting this RG 
may be found in ADAMS under Accession No. ML14181B214.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Glenn Tuttle, Office of Nuclear 
Material Safety and Safeguards, telephone: 301-415-7230, email: 
[email protected], or Mekonen Bayssie, Office of Nuclear Regulatory 
Research, telephone: 301-415-1699, email: [email protected]. Both 
are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.

SUPPLEMENTARY INFORMATION:

I. Discussion

    The NRC is issuing a new guide in the NRC's ``Regulatory Guide'' 
series. This series was developed to describe and make available to the 
public information regarding methods that are acceptable to the NRC 
staff for implementing specific parts of the agency's regulations, 
techniques that the NRC staff uses in evaluating specific issues or 
postulated events, and data that the NRC staff needs in its review of 
applications for permits and licenses.
    The RG 5.41 is entitled, ``Shipping, Receiving, and Internal 
Transfer of Special Nuclear Material,'' and provides guidance for 
meeting the nuclear material control and accounting (MC&A) requirements 
in part 74 of title 10 of the Code of Federal Regulations (10 CFR part 
74), ``Material Control and Accounting of Special Nuclear Material,'' 
that cover these topics.
    RG 5.41 updates and combines in one document guidance previously 
provided by:
     RG 5.28, ``Evaluation of Shipper-Receiver Differences in 
the Transfer of Special Nuclear Material,'' published in June 1974 
(ADAMS Accession No. ML003740063);
     RG 5.49, ``Internal Transfers of Special Nuclear 
Material,'' published in March 1975 (ADAMS Accession No. ML003739222); 
and
     RG 5.57, ``Shipping and Receiving Control of Strategic 
Special Nuclear Material,'' published in June 1980 (ADAMS Accession No. 
ML003739260).

[[Page 24998]]

    Due to several rulemakings that occurred from 1985 to 2002, which 
significantly amended the MC&A requirements, the above regulatory 
guides became outdated as they no longer cite the correct sections of 
the regulations. Accordingly, RG 5.28, RG 5.49, and RG 5.57 are being 
withdrawn concurrent with the issuance of RG 5.41, which provides the 
correct citations to the 10 CFR part 74 regulations.
    NRC guidance on the MC&A requirements pertaining to shipments, 
receipts, and internal transfers of special nuclear material is also 
provided in the following NUREGs that were issued in conjunction with 
the 1985-2002 MC&A rulemakings:
     NUREG-1280, ``Standard Format and Content Acceptance 
Criteria for the Material Control and Accounting (MC&A) Reform 
Amendment,'' applicable to facilities using formula quantities of 
strategic special nuclear material (ADAMS Accession No. ML031340295).
     NUREG-1065, ``Acceptable Standard Format and Content for 
the Fundamental Nuclear Material Control (FNMC) Plan Required for Low-
Enriched Uranium Facilities,'' applicable to fuel fabrication 
facilities using low-enriched uranium (ADAMS Accession No. 
ML031340288).
     NUREG/CR-5734, ``Recommendations to the NRC on Acceptable 
Standard Format and Content for the Fundamental Nuclear Material 
Control (FNMC) Plan Required for Low-Enriched Uranium Enrichment 
Facilities,'' applicable to uranium enrichment plants (ADAMS Accession 
No. ML15120A354).
    RG 5.41 incorporates guidance from these NUREGs that relates to the 
monitoring of shipments, receipts, and internal transfers of SNM. In 
addition to providing guidance on these topics, the NUREGs listed above 
cover other MC&A requirements as well. Therefore, these NUREGs are not 
being withdrawn.

II. Additional Information

    The draft of RG 5.41 was issued with a temporary identification of 
Draft Regulatory Guide, DG-5051, ``Shipping, Receiving, and Internal 
Transfer of Special Nuclear Material.'' The NRC published a notice of 
the availability of DG-5051 in the Federal Register on September 21, 
2016 (81 FR 64955) for a 30-day public comment period. The public 
comment period closed on October 21, 2016. Public comments on DG-5051 
and the staff responses to the public comments are available in ADAMS 
under Accession No. ML16348A218.

III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

IV. Backfitting and Issue Finality

    Issuance of RG 5.41 does not constitute backfitting as defined in 
10 CFR 70.76. As discussed in the ``Implementation'' section of RG 
5.41, the NRC has no current intention to impose this guidance on 
holders of 10 CFR part 70 licenses. Additionally, RG 5.41 incorporates 
relevant guidance from NUREG-1280, NUREG-1065, and NUREG/CR-5734 
without making substantive changes to that guidance. RG 5.41 updates 
the outdated NRC guidance provided in RG 5.28, RG 5.49, and RG 5.57 by 
providing the correct citations to the existing 10 CFR part 74 
regulations. Accordingly, the issuance of RG 5.41 does not constitute a 
``new'' or ``different'' staff position within the definition of 
``backfitting'' in 10 CFR 70.76.

    Dated at Rockville, Maryland, this 25th day of May 2017.

    For the Nuclear Regulatory Commission.

Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2017-11224 Filed 5-30-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                           Federal Register / Vol. 82, No. 103 / Wednesday, May 31, 2017 / Notices                                             24997

                                               Plants,’’ is proposed revision 1 to RG                     Dated at Rockville, Maryland, this 25th day        1–800–397–4209, 301–415–4737, or by
                                               1.158. The proposed revised RG is                       of May 2017.                                          email to pdr.resource@nrc.gov. The
                                               temporarily identified by its task                         For the Nuclear Regulatory Commission.             ADAMS accession number for each
                                               number, DG–1338. The proposed                           Thomas H. Boyce,                                      document referenced in this document
                                               revised RG provides more current                        Chief, Regulatory Guidance and Generic                (if that document is available in
                                               guidance on the methods and type-test                   Issues Branch, Division of Engineering, Office        ADAMS) is provided the first time that
                                               procedures for two different battery                    of Nuclear Regulatory Research.                       a document is referenced. RG 5.41 may
                                               applications. One application is for                    [FR Doc. 2017–11223 Filed 5–30–17; 8:45 am]           be found in ADAMS under Accession
                                               batteries with duty cycles equal to or                  BILLING CODE 7590–01–P                                No. ML16348A213. The regulatory
                                               less than 8 hours and the other                                                                               analysis supporting this RG may be
                                               application is for batteries with duty                                                                        found in ADAMS under Accession No.
                                               cycles longer than 8 hours. The 2013                    NUCLEAR REGULATORY                                    ML14181B214.
                                               revision of IEEE Std. 535 provides a                    COMMISSION                                               • NRC’s PDR: You may examine and
                                               qualification process for both                                                                                purchase copies of public documents at
                                               applications to ensure battery                          National Marine Fisheries Service                     the NRC’s PDR, Room O1–F21, One
                                               performance and provides a normative                    [NRC–2016–0189]                                       White Flint North, 11555 Rockville
                                               annex with example testing regimens.                                                                          Pike, Rockville, Maryland 20852.
                                               The NRC staff determined that RG 1.158                  Shipping, Receiving, and Internal                     FOR FURTHER INFORMATION CONTACT:
                                               should be revised to endorse the 2013                   Transfer of Special Nuclear Material                  Glenn Tuttle, Office of Nuclear Material
                                               version of IEEE Std. 535 to support new                                                                       Safety and Safeguards, telephone: 301–
                                               reactor license applications, design                    AGENCY:  Nuclear Regulatory
                                                                                                       Commission.                                           415–7230, email: Glenn.Tuttle@nrc.gov,
                                               certifications, and applications for                                                                          or Mekonen Bayssie, Office of Nuclear
                                               license amendments.                                     ACTION: Regulatory guide; issuance.
                                                                                                                                                             Regulatory Research, telephone: 301–
                                                  Copies of IEEE documents may be                      SUMMARY:   The U.S. Nuclear Regulatory                415–1699, email: Mekonen.Bayssie@
                                               purchased from the Institute of                         Commission (NRC) is issuing Regulatory                nrc.gov. Both are staff of the U.S.
                                               Electrical and Electronics Engineers                    Guide (RG) 5.41, ‘‘Shipping, Receiving,               Nuclear Regulatory Commission,
                                               Service Center, 445 Hoes Lane, PO Box                   and Internal Transfer of Special Nuclear              Washington, DC 20555–0001.
                                               1331, Piscataway, NJ 08855 or through
                                                                                                       Material.’’ This new RG consolidates in               SUPPLEMENTARY INFORMATION:
                                               the IEEE’s public Web site at http://
                                                                                                       one document NRC guidance
                                               www.ieee.org/publications_standards/                                                                          I. Discussion
                                                                                                       concerning the material control and
                                               index.html.
                                                                                                       accounting requirements pertaining to                   The NRC is issuing a new guide in the
                                               III. Backfitting and Issue Finality                     shipments, receipts, and internal                     NRC’s ‘‘Regulatory Guide’’ series. This
                                                  Draft regulatory guide DG–1338, if                   transfers of special nuclear material. In             series was developed to describe and
                                               finalized as revision 1 to RG 1.158,                    addition, this guide provides updated                 make available to the public information
                                               would endorse, with certain                             guidance for source material (SM) and                 regarding methods that are acceptable to
                                               clarifications, the 2013 revision of IEEE               depleted uranium (DU) at uranium                      the NRC staff for implementing specific
                                               Std. 535 which refines the methods and                  enrichment facilities.                                parts of the agency’s regulations,
                                               type-test procedures for two different                  DATES: Revision 0 to RG 5.41 is available             techniques that the NRC staff uses in
                                               battery applications. One application is                on May 31, 2017.                                      evaluating specific issues or postulated
                                               for batteries with duty cycles equal to or              ADDRESSES: Please refer to Docket ID                  events, and data that the NRC staff
                                               less than 8 hours and the other                         NRC–2016–0189 when contacting the                     needs in its review of applications for
                                               application is for batteries with duty                  NRC about the availability of                         permits and licenses.
                                               cycles longer than 8 hours. The 2013                    information regarding this document.                    The RG 5.41 is entitled, ‘‘Shipping,
                                               revision of IEEE Std. 535 demonstrates                  You may obtain publicly-available                     Receiving, and Internal Transfer of
                                               and outlines the qualifying process for                 information related to this document                  Special Nuclear Material,’’ and provides
                                               both applications to ensure battery                     using any of the following methods:                   guidance for meeting the nuclear
                                               performance. It also provides a                            • Federal Rulemaking Web site: Go to               material control and accounting (MC&A)
                                               comprehensive document for qualifying                   http://www.regulations.gov and search                 requirements in part 74 of title 10 of the
                                               batteries with additional normative                     for Docket ID NRC–2016–0189. Address                  Code of Federal Regulations (10 CFR
                                               annexes. The draft regulatory guide, if                 questions about NRC dockets to Carol                  part 74), ‘‘Material Control and
                                               finalized, would not constitute                         Gallagher; telephone: 301–415–3463;                   Accounting of Special Nuclear
                                               backfitting as defined in 10 CFR 50.109                 email: Carol.Gallagher@nrc.gov. For                   Material,’’ that cover these topics.
                                               (the Backfit Rule) and is not otherwise                 technical questions, contact the                        RG 5.41 updates and combines in one
                                               inconsistent with the issue finality                    individuals listed in the FOR FURTHER                 document guidance previously provided
                                               provisions in 10 CFR part 52, ‘‘Licenses,               INFORMATION CONTACT section of this                   by:
                                               Certifications and Approvals for Nuclear                document.                                               • RG 5.28, ‘‘Evaluation of Shipper-
                                               Power Plants.’’ The subject of this draft                  • NRC’s Agencywide Documents                       Receiver Differences in the Transfer of
                                               regulatory guide, as described above, is                Access and Management System                          Special Nuclear Material,’’ published in
                                               an NRC-defined process which does not                   (ADAMS): You may obtain publicly-                     June 1974 (ADAMS Accession No.
                                               fall within the purview of subjects                     available documents online in the                     ML003740063);
                                               covered by either the Backfit Rule or the               ADAMS Public Document collection at                     • RG 5.49, ‘‘Internal Transfers of
nlaroche on DSK30NT082PROD with NOTICES




                                               issue finality provision in 10 CFR part                 http://www.nrc.gov/reading-rm/                        Special Nuclear Material,’’ published in
                                               52. Issuance of the draft regulatory                    adams.html. To begin the search, select               March 1975 (ADAMS Accession No.
                                               guide, in final form, would not                         ‘‘ADAMS Public Documents’’ and then                   ML003739222); and
                                               constitute backfitting, and no further                  select ‘‘Begin Web-based ADAMS                          • RG 5.57, ‘‘Shipping and Receiving
                                               consideration of backfitting is required                Search.’’ For problems with ADAMS,                    Control of Strategic Special Nuclear
                                               in order to issue the draft or final                    please contact the NRC’s Public                       Material,’’ published in June 1980
                                               regulatory guide in final form.                         Document Room (PDR) reference staff at                (ADAMS Accession No. ML003739260).


                                          VerDate Sep<11>2014   14:54 May 30, 2017   Jkt 241001   PO 00000   Frm 00064   Fmt 4703   Sfmt 4703   E:\FR\FM\31MYN1.SGM   31MYN1


                                               24998                       Federal Register / Vol. 82, No. 103 / Wednesday, May 31, 2017 / Notices

                                                  Due to several rulemakings that                      III. Congressional Review Act                         power uprate (EPU), represents an
                                               occurred from 1985 to 2002, which                          This RG is a rule as defined in the                increase of approximately 14.3 percent
                                               significantly amended the MC&A                          Congressional Review Act (5 U.S.C.                    above the current licensed thermal
                                               requirements, the above regulatory                      801–808). However, the Office of                      power limit. The NRC is issuing a final
                                               guides became outdated as they no                       Management and Budget has not found                   environmental assessment (EA) and
                                               longer cite the correct sections of the                 it to be a major rule as defined in the               final finding of no significant impact
                                               regulations. Accordingly, RG 5.28, RG                   Congressional Review Act.                             (FONSI) associated with the proposed
                                               5.49, and RG 5.57 are being withdrawn                                                                         EPU.
                                               concurrent with the issuance of RG 5.41,                IV. Backfitting and Issue Finality                    DATES: The final EA and final FONSI are
                                               which provides the correct citations to                    Issuance of RG 5.41 does not                       available on May 31, 2017.
                                               the 10 CFR part 74 regulations.                         constitute backfitting as defined in 10               ADDRESSES: Please refer to Docket ID
                                                  NRC guidance on the MC&A                             CFR 70.76. As discussed in the                        NRC–2016–0244 when contacting the
                                               requirements pertaining to shipments,                   ‘‘Implementation’’ section of RG 5.41,                NRC about the availability of
                                               receipts, and internal transfers of special             the NRC has no current intention to                   information regarding this document.
                                               nuclear material is also provided in the                impose this guidance on holders of 10                 You may obtain publicly-available
                                               following NUREGs that were issued in                    CFR part 70 licenses. Additionally, RG                information related to this document
                                               conjunction with the 1985–2002 MC&A                     5.41 incorporates relevant guidance                   using any of the following methods:
                                               rulemakings:                                            from NUREG–1280, NUREG–1065, and                         • Federal Rulemaking Web Site: Go to
                                                  • NUREG–1280, ‘‘Standard Format                      NUREG/CR–5734 without making                          http://www.regulations.gov and search
                                               and Content Acceptance Criteria for the                 substantive changes to that guidance.                 for Docket ID NRC–2016–0244. Address
                                               Material Control and Accounting                         RG 5.41 updates the outdated NRC                      questions about NRC dockets to Carol
                                               (MC&A) Reform Amendment,’’                              guidance provided in RG 5.28, RG 5.49,                Gallagher; telephone: 301–415–3463;
                                               applicable to facilities using formula                  and RG 5.57 by providing the correct                  email: Carol.Gallagher@nrc.gov. For
                                               quantities of strategic special nuclear                 citations to the existing 10 CFR part 74              technical questions, contact the
                                               material (ADAMS Accession No.                           regulations. Accordingly, the issuance                individual listed in the FOR FURTHER
                                               ML031340295).                                           of RG 5.41 does not constitute a ‘‘new’’              INFORMATION CONTACT section of this
                                                  • NUREG–1065, ‘‘Acceptable                           or ‘‘different’’ staff position within the            document.
                                               Standard Format and Content for the                     definition of ‘‘backfitting’’ in 10 CFR                  • NRC’s Agencywide Documents
                                               Fundamental Nuclear Material Control                    70.76.                                                Access and Management System
                                               (FNMC) Plan Required for Low-                             Dated at Rockville, Maryland, this 25th day         (ADAMS): You may obtain publicly-
                                               Enriched Uranium Facilities,’’                          of May 2017.                                          available documents online in the
                                               applicable to fuel fabrication facilities                 For the Nuclear Regulatory Commission.              ADAMS Public Documents collection at
                                               using low-enriched uranium (ADAMS                                                                             http://www.nrc.gov/reading-rm/
                                               Accession No. ML031340288).                             Thomas H. Boyce,
                                                                                                                                                             adams.html. To begin the search, select
                                                  • NUREG/CR–5734,                                     Chief, Regulatory Guidance and Generic                ‘‘ADAMS Public Documents’’ and then
                                                                                                       Issues Branch, Division of Engineering, Office
                                               ‘‘Recommendations to the NRC on                                                                               select ‘‘Begin Web-based ADAMS
                                                                                                       of Nuclear Regulatory Research.
                                               Acceptable Standard Format and                                                                                Search.’’ For problems with ADAMS,
                                                                                                       [FR Doc. 2017–11224 Filed 5–30–17; 8:45 am]
                                               Content for the Fundamental Nuclear                                                                           please contact the NRC’s Public
                                                                                                       BILLING CODE 7590–01–P
                                               Material Control (FNMC) Plan Required                                                                         Document Room (PDR) reference staff at
                                               for Low-Enriched Uranium Enrichment                                                                           1–800–397–4209, 301–415–4737, or by
                                               Facilities,’’ applicable to uranium                                                                           email to pdr.resource@nrc.gov. For the
                                                                                                       NUCLEAR REGULATORY
                                               enrichment plants (ADAMS Accession                                                                            convenience of the reader, the ADAMS
                                                                                                       COMMISSION
                                               No. ML15120A354).                                                                                             accession numbers are provided in a
                                                  RG 5.41 incorporates guidance from                   [Docket Nos. 50–259, 50–260, and 50–296;              table in the ‘‘Availability of Documents’’
                                               these NUREGs that relates to the                        NRC–2016–0244]                                        section of this document.
                                               monitoring of shipments, receipts, and                                                                           • NRC’s PDR: You may examine and
                                               internal transfers of SNM. In addition to               Tennessee Valley Authority; Browns                    purchase copies of public documents at
                                               providing guidance on these topics, the                 Ferry Nuclear Plant, Units 1, 2, and 3                the NRC’s PDR, Room O1–F21, One
                                               NUREGs listed above cover other MC&A                    AGENCY:  Nuclear Regulatory                           White Flint North, 11555 Rockville
                                               requirements as well. Therefore, these                  Commission.                                           Pike, Rockville, Maryland 20852.
                                               NUREGs are not being withdrawn.                         ACTION: Environmental assessment and                  FOR FURTHER INFORMATION CONTACT: Siva
                                                                                                       finding of no significant impact;                     P. Lingam, telephone: 301–415–1564;
                                               II. Additional Information
                                                                                                       issuance.                                             email: Siva.Lingam@nrc.gov; or Briana
                                                  The draft of RG 5.41 was issued with                                                                       Grange, telephone: 301–415–1042;
                                               a temporary identification of Draft                     SUMMARY:   The U.S. Nuclear Regulatory                email: Briana.Grange@nrc.gov. Both are
                                               Regulatory Guide, DG–5051, ‘‘Shipping,                  Commission (NRC) is considering                       staff members of the Office of Nuclear
                                               Receiving, and Internal Transfer of                     issuance of amendments to Renewed                     Reactor Regulation, U.S. Nuclear
                                               Special Nuclear Material.’’ The NRC                     Facility Operating License Nos. DPR–33,               Regulatory Commission, Washington,
                                               published a notice of the availability of               DPR–52, and DPR–68 issued to                          DC 20555–0001.
                                               DG–5051 in the Federal Register on                      Tennessee Valley Authority (TVA, the                  SUPPLEMENTARY INFORMATION:
                                               September 21, 2016 (81 FR 64955) for a                  licensee) for operation of Browns Ferry
nlaroche on DSK30NT082PROD with NOTICES




                                               30-day public comment period. The                       Nuclear Plant, Units 1, 2, and 3 (BFN)                I. Introduction
                                               public comment period closed on                         located in Limestone County, Alabama.                    The NRC is considering issuance of
                                               October 21, 2016. Public comments on                    The proposed amendments would                         amendments to Renewed Facility
                                               DG–5051 and the staff responses to the                  increase the maximum licensed thermal                 Operating License Nos. DPR–33, DPR–
                                               public comments are available in                        power level for each reactor from 3,458               52, and DPR–68 issued to TVA for
                                               ADAMS under Accession No.                               megawatts thermal (MWt) to 3,952 MWt.                 operation of BFN located in Limestone
                                               ML16348A218.                                            This change, referred to as an extended               County, Alabama. TVA submitted its


                                          VerDate Sep<11>2014   14:54 May 30, 2017   Jkt 241001   PO 00000   Frm 00065   Fmt 4703   Sfmt 4703   E:\FR\FM\31MYN1.SGM   31MYN1



Document Created: 2017-05-31 05:59:36
Document Modified: 2017-05-31 05:59:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory guide; issuance.
DatesRevision 0 to RG 5.41 is available on May 31, 2017.
ContactGlenn Tuttle, Office of Nuclear Material Safety and Safeguards, telephone: 301-415-7230, email: [email protected], or Mekonen Bayssie, Office of Nuclear Regulatory Research, telephone: 301-415-1699, email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation82 FR 24997 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR