82_FR_26581 82 FR 26473 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 26473 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 108 (June 7, 2017)

Page Range26473-26473
FR Document2017-11766

Federal Register, Volume 82 Issue 108 (Wednesday, June 7, 2017)
[Federal Register Volume 82, Number 108 (Wednesday, June 7, 2017)]
[Notices]
[Page 26473]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-11766]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14828-000]


Merchant Hydro Developers, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 18, 2017, Merchant Hydro Developers, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Meyersdale Pumped Storage Hydroelectric Project to be located in 
Somerset County, Pennsylvania. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 45 acres and a storage capacity 
of 675 acre-feet at a surface elevation of approximately 2,790 feet 
above mean sea level (msl) created through construction of a new 
roller-compacted concrete or rock-filled dam and/or dike; (2) 
excavating a new lower reservoir with a surface area of 30 acres and a 
total storage capacity of 810 acre-feet at a surface elevation of 2,100 
feet msl; (3) a new 5,500-foot-long, 48-inch-diameter penstock 
connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50-
foot-wide powerhouse containing two turbine-generator units with a 
total rated capacity of 38 megawatts; (5) a new transmission line 
connecting the powerhouse to a nearby electric grid interconnection 
point at the Meyersdale Wind Farm; and (6) appurtenant facilities. 
Possible initial fill water and make-up water would come from the 
nearby Casselman River, including groundwater. The proposed project 
would have an annual generation of 139,369 megawatt-hours.
    Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14828-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14828) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 1, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-11766 Filed 6-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 82, No. 108 / Wednesday, June 7, 2017 / Notices                                                  26473

                                                  2. Determine the total battery power,                   Thank you in advance for your                        project would have an annual
                                                with the battery circuit connected and                  prompt consideration of this waiver                    generation of 139,369 megawatt-hours.
                                                fully charged before any measurements                   request.                                                  Applicant Contact: Adam Rousselle,
                                                are made.                                               Cheryl English                                         Merchant Hydro Developers, LLC, 5710
                                                total battery power = input                             VP, Government & Industry Relations                    Oak Crest Drive, Doylestown, PA 18902;
                                                     power¥rated wattage of light                       Acuity Brands Lighting, Inc., One                      phone: 267–254–6107.
                                                     source(s) for exit sign                              Lithonia Way, Conyers, GA 30012,                        FERC Contact: Monir Chowdhury;
                                                                                                          770–860–2660, Cheryl.English@                        phone: (202) 502–6736.
                                                  3. Determine the battery proration                                                                              Deadline for filing comments, motions
                                                factor:                                                   AcuityBrands.com.
                                                                                                                                                               to intervene, competing applications
                                                                                                        [FR Doc. 2017–11790 Filed 6–6–17; 8:45 am]
                                                Battery proration factor = rated wattage                                                                       (without notices of intent), or notices of
                                                     of light source(s) for exit sign (rated            BILLING CODE 6450–01–P                                 intent to file competing applications: 60
                                                     wattage of light sources(s) for egress                                                                    days from the issuance of this notice.
                                                     lighting + rated wattage of light                                                                         Competing applications and notices of
                                                     source(s) for exit sign)                           DEPARTMENT OF ENERGY
                                                                                                                                                               intent must meet the requirements of 18
                                                  4. Calculate the combo unit power:                    Federal Energy Regulatory                              CFR 4.36.
                                                                                                        Commission                                                The Commission strongly encourages
                                                Combo unit power = (Battery proration                                                                          electronic filing. Please file comments,
                                                     factor × total battery power) + rated              [Project No. 14828–000]                                motions to intervene, notices of intent,
                                                     wattage of light source(s) for exit                                                                       and competing applications using the
                                                     sign                                               Merchant Hydro Developers, LLC;                        Commission’s eFiling system at http://
                                                                                                        Notice of Preliminary Permit                           www.ferc.gov/docs-filing/efiling.asp.
                                                Conclusion
                                                                                                        Application Accepted for Filing and                    Commenters can submit brief comments
                                                   Acuity Brands is submitting this                     Soliciting Comments, Motions To                        up to 6,000 characters, without prior
                                                request for a test procedure waiver for                 Intervene, and Competing Applications                  registration, using the eComment system
                                                combo units that provide the dual                                                                              at http://www.ferc.gov/docs-filing/
                                                function of exit signage and emergency                     On January 18, 2017, Merchant Hydro
                                                                                                        Developers, LLC, filed an application for              ecomment.asp. You must include your
                                                egress lighting. The waiver request has                                                                        name and contact information at the end
                                                outlined that:                                          a preliminary permit, pursuant to
                                                                                                        section 4(f) of the Federal Power Act                  of your comments. For assistance,
                                                   1. The prescribed test procedures are                                                                       please contact FERC Online Support at
                                                                                                        (FPA), proposing to study the feasibility
                                                based on power intended only to                                                                                FERCOnlineSupport@ferc.gov, (866)
                                                                                                        of the Meyersdale Pumped Storage
                                                illuminate the face of the exit sign and                                                                       208–3676 (toll free), or (202) 502–8659
                                                                                                        Hydroelectric Project to be located in
                                                will evaluate the basic models of combo                                                                        (TTY). In lieu of electronic filing, please
                                                                                                        Somerset County, Pennsylvania. The
                                                units in a manner unrepresentative of                                                                          send a paper copy to: Secretary, Federal
                                                                                                        sole purpose of a preliminary permit, if
                                                their true energy consumption                                                                                  Energy Regulatory Commission, 888
                                                                                                        issued, is to grant the permit holder
                                                characteristics                                                                                                First Street NE., Washington, DC 20426.
                                                                                                        priority to file a license application
                                                   2. the prescribed test procedures will               during the permit term. A preliminary                  The first page of any filing should
                                                evaluate the basic models of combo                      permit does not authorize the permit                   include docket number P–14828–000.
                                                units in a manner that results in                       holder to perform any land-disturbing                     More information about this project,
                                                materially inaccurate comparative data,                 activities or otherwise enter upon lands               including a copy of the application, can
                                                and                                                     or waters owned by others without the                  be viewed or printed on the ‘‘eLibrary’’
                                                   3. there are no existing industry                    owners’ express permission.                            link of the Commission’s Web site at
                                                standards that define test procedures to                   The proposed project would consist of               http://www.ferc.gov/docs-filing/
                                                measure the energy consumption                          the following: (1) A new upper reservoir               elibrary.asp. Enter the docket number
                                                characteristics for a combo unit that is                with a surface area of 45 acres and a                  (P–14828) in the docket number field to
                                                associated with only the exit sign                      storage capacity of 675 acre-feet at a                 access the document. For assistance,
                                                face(s), and                                            surface elevation of approximately 2,790               contact FERC Online Support.
                                                   4. the alternate test procedure                      feet above mean sea level (msl) created                  Dated: June 1, 2017.
                                                proposed by Acuity Brands for combo                     through construction of a new roller-                  Kimberly D. Bose,
                                                units will accurately describe the power                compacted concrete or rock-filled dam                  Secretary.
                                                to illuminate the face of the exit and the              and/or dike; (2) excavating a new lower                [FR Doc. 2017–11766 Filed 6–6–17; 8:45 am]
                                                proportion of battery charging circuit                  reservoir with a surface area of 30 acres
                                                                                                                                                               BILLING CODE 6717–01–P
                                                power used to illuminate the face(s) of                 and a total storage capacity of 810 acre-
                                                the exit during a power outage.                         feet at a surface elevation of 2,100 feet
                                                   Based on DOE general counsel                         msl; (3) a new 5,500-foot-long, 48-inch-               DEPARTMENT OF ENERGY
                                                guidance on waivers issued December                     diameter penstock connecting the upper
                                                23, 2010, it is our understanding that                  and lower reservoirs; (4) a new 150-foot-              Federal Energy Regulatory
                                                DOE has made a commitment to (1) act                    long, 50-foot-wide powerhouse                          Commission
                                                promptly on waiver requests and to                      containing two turbine-generator units
                                                update its test procedures to address                   with a total rated capacity of 38                      [Docket No. ER17–1723–000]
                                                granted waivers going forward and (2)                   megawatts; (5) a new transmission line
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                               Green Power Solutions of Georgia,
                                                prevent the administrative waiver                       connecting the powerhouse to a nearby                  LLC; Supplemental Notice That Initial
                                                process from delaying or deterring the                  electric grid interconnection point at the             Market-Based Rate Filing Includes
                                                introduction of novel, innovative                       Meyersdale Wind Farm; and (6)                          Request for Blanket Section 204
                                                products into the marketplace and as a                  appurtenant facilities. Possible initial               Authorization
                                                matter of enforcement policy will                       fill water and make-up water would
                                                refrain from enforcement actions related                come from the nearby Casselman River,                    This is a supplemental notice in the
                                                to pending waiver requests.                             including groundwater. The proposed                    above-referenced proceeding of Green


                                           VerDate Sep<11>2014   16:37 Jun 06, 2017   Jkt 241001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\07JNN1.SGM   07JNN1



Document Created: 2017-06-07 02:01:17
Document Modified: 2017-06-07 02:01:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 26473 

2025 Federal Register | Disclaimer | Privacy Policy