NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 113 (June 14, 2017)

Page Range27294-27295
FR Document2017-12337

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 73 to Combined Licenses (COLs), NPF-93 and NPF- 94. The COLs were issued to South Carolina Electric & Gas Company, (SCE&G); for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 82 Issue 113 (Wednesday, June 14, 2017)
[Federal Register Volume 82, Number 113 (Wednesday, June 14, 2017)]
[Notices]
[Pages 27294-27295]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12337]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; 
Boric Acid Storage Tank Changes

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment No. 73 to Combined Licenses (COLs), NPF-93 and NPF-
94. The COLs were issued to South Carolina Electric & Gas Company, 
(SCE&G); for construction and operation of the Virgil C. Summer Nuclear 
Station (VCSNS) Units 2 and 3, located in Fairfield County, South 
Carolina.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on May 24, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated September 29, 2016, and is available in ADAMS under 
Accession No. ML16273A557.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from Paragraph B of Section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment No. 73 to COLs, NPF-93 and NPF-
94, to SCE&G. The exemption is required by Paragraph A.4 of Section 
VIII, ``Processes for Changes and Departures,'' appendix D, to 10 CFR 
part 52 to allow SCE&G to depart from Tier 1 information. With the 
requested amendment, SCE&G sought proposed changes that would revise 
the Updated Final Safety Analysis Report (UFSAR) in the form of 
departures from the incorporated plant-specific DCD Tier 2 information. 
The proposed amendment also involves related changes to plant-specific 
Tier 1 information, with corresponding changes to the associated COL 
Appendix C information. Specifically, the license amendment request 
revises the inspections, tests, analyses, and acceptance criteria 
(ITAAC) in COL Appendix C Table 2.3.2-4, ITAAC No. 2.3.02.8a.ii to 
state that the volume in the BAST is at least 70,000 gallons between 
the tank suction point and the tank overflow; and COL Appendix C Table 
2.3.2-4, ITAAC No. 2.3.02.8a.iii to state that the total CVS makeup 
flow to the RCS is less than or equal to 175 gpm.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather

[[Page 27295]]

than in sequence. This included issuing a combined safety evaluation 
containing the NRC staff's review of both the exemption request and the 
license amendment. The exemption met all applicable regulatory criteria 
set forth in Sec. Sec.  50.12, 52.7, and Section VIII.A.4 of appendix D 
to 10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML17072A125.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to SCE&G for VCSNS Units 2 and 3 (COLs 
NPF-93 and NPF-94). The exemption documents for VCSNS Units 2 and 3 can 
be found in ADAMS under Accession Nos. ML17072A117 and ML17072A118, 
respectively. The exemption is reproduced (with the exception of 
abbreviated titles and additional citations) in Section II of this 
document. The amendment documents for COLs NPF-93 and NPF-94 are 
available in ADAMS under Accession Nos. ML17072A111 and ML17072A114, 
respectively. A summary of the amendment documents is provided in 
Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VCSNS Units 2 
and Unit 3. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In an application dated September 29, 2016, SCE&G requested from 
the Commission an exemption to allow departures from Tier 1 information 
in the certified DCD incorporated by reference in 10 CFR part 52, 
appendix D, as part of license amendment request 15-11, ``Boric Acid 
Storage Tank Suction Point ITAAC Changes.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML17072A125, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, SCE&G is granted an exemption from the certified 
DCD Tier 1 information related to the boric acid storage tank (BAST) 
available volume at the suction point, chemical and volume control 
system (CVS) makeup flow rate, and BAST installation, as described in 
SCE&G's request dated September 29, 2016. This exemption is related to, 
and necessary for the granting of License Amendment No. 73, which is 
being issued concurrently with this exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML17072A125), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated September 29, 2016 (ADAMS Accession No. 
ML16273A557), SCE&G requested that the NRC amend the COLs for VCSNS, 
Units 2 and 3, COLs NPF-93 and NPF-94. The proposed amendment is 
described in Section I of this Federal Register Notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed no 
significant hazards consideration determination, and opportunity for a 
hearing in connection with these actions, was published in the Federal 
Register on December 20, 2016 (81 FR 92872). No comments were received 
during the 30-day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that SCE&G 
requested on September 29, 2016.
    The exemption and amendment were issued on May 24, 2017, as part of 
a combined package to SCE&G (ADAMS Accession No. ML17072A069).

    Dated at Rockville, Maryland, this 5th day of June 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-12337 Filed 6-13-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                  27294                        Federal Register / Vol. 82, No. 113 / Wednesday, June 14, 2017 / Notices

                                                  CFR 51.22(c)(9). Therefore, pursuant to                 NUCLEAR REGULATORY                                     Document Room (PDR) reference staff at
                                                  10 CFR 51.22(b), no environmental                       COMMISSION                                             1–800–397–4209, 301–415–4737, or by
                                                  impact statement or environmental                                                                              email to pdr.resource@nrc.gov. The
                                                                                                          [Docket Nos. 52–027 and 52–028; NRC–
                                                  assessment needs to be prepared in                      2008–0441]
                                                                                                                                                                 ADAMS accession number for each
                                                  connection with the issuance of the                                                                            document referenced (if it is available in
                                                  exemption.                                              South Carolina Electric & Gas                          ADAMS) is provided the first time that
                                                    4. This exemption is effective as of the              Company, South Carolina Public                         it is mentioned in this document. The
                                                  date of its issuance.                                   Service Authority; Virgil C. Summer                    request for the amendment and
                                                                                                          Nuclear Station, Units 2 and 3; Boric                  exemption was submitted by letter
                                                  III. License Amendment Request                          Acid Storage Tank Changes                              dated September 29, 2016, and is
                                                                                                                                                                 available in ADAMS under Accession
                                                     By letter dated October 26, 2016                     AGENCY:  Nuclear Regulatory                            No. ML16273A557.
                                                  (ADAMS Accession No. ML16300A325),                      Commission.                                               • NRC’s PDR: You may examine and
                                                  the licensee requested that the NRC                                                                            purchase copies of public documents at
                                                                                                          ACTION: Exemption and combined
                                                  amend the COLs for VEGP, Units 3 and                                                                           the NRC’s PDR, Room O1–F21, One
                                                                                                          license amendment; issuance.
                                                  4, COLs NPF–91 and NPF–92. The                                                                                 White Flint North, 11555 Rockville
                                                  proposed amendment is described in                      SUMMARY:    The U.S. Nuclear Regulatory                Pike, Rockville, Maryland 20852.
                                                  Section I of this Federal Register Notice.              Commission (NRC) is granting an                        FOR FURTHER INFORMATION CONTACT:
                                                     The Commission has determined for                    exemption to allow a departure from the                Billy Gleaves, Office of New Reactors,
                                                  these amendments that the application                   certification information of Tier 1 of the             U.S. Nuclear Regulatory Commission,
                                                  complies with the standards and                         generic design control document (DCD)                  Washington, DC 20555–0001; telephone:
                                                  requirements of the Atomic Energy Act                   and is issuing License Amendment No.                   301–415–5848; email: Bill.Gleaves@
                                                  of 1954, as amended (the Act), and the                  73 to Combined Licenses (COLs), NPF–                   nrc.gov.
                                                  Commission’s rules and regulations.                     93 and NPF–94. The COLs were issued
                                                                                                          to South Carolina Electric & Gas                       SUPPLEMENTARY INFORMATION:
                                                  The Commission has made appropriate
                                                  findings as required by the Act and the                 Company, (SCE&G); for construction                     I. Introduction
                                                  Commission’s rules and regulations in                   and operation of the Virgil C. Summer
                                                                                                          Nuclear Station (VCSNS) Units 2 and 3,                    The NRC is granting an exemption
                                                  10 CFR chapter I, which are set forth in
                                                                                                          located in Fairfield County, South                     from Paragraph B of Section III, ‘‘Scope
                                                  the license amendment.
                                                                                                          Carolina.                                              and Contents,’’ of appendix D, ‘‘Design
                                                     A notice of consideration of issuance                                                                       Certification Rule for the AP1000,’’ to
                                                  of amendment to facility operating                        The granting of the exemption allows
                                                                                                          the changes to Tier 1 information asked                part 52 of title 10 of the Code of Federal
                                                  license or combined license, as                                                                                Regulations (10 CFR), and issuing
                                                  applicable, proposed no significant                     for in the amendment. Because the
                                                                                                          acceptability of the exemption was                     License Amendment No. 73 to COLs,
                                                  hazards consideration determination,                                                                           NPF–93 and NPF–94, to SCE&G. The
                                                  and opportunity for a hearing in                        determined in part by the acceptability
                                                                                                          of the amendment, the exemption and                    exemption is required by Paragraph A.4
                                                  connection with these actions, was                                                                             of Section VIII, ‘‘Processes for Changes
                                                  published in the Federal Register on                    amendment are being issued
                                                                                                          concurrently.                                          and Departures,’’ appendix D, to 10 CFR
                                                  December 20, 2016 (81 FR 92872). No                                                                            part 52 to allow SCE&G to depart from
                                                  comments were received during the 30-                   DATES:   The exemption and amendment                   Tier 1 information. With the requested
                                                  day comment period.                                     were issued on May 24, 2017.                           amendment, SCE&G sought proposed
                                                     The Commission has determined that                   ADDRESSES: Please refer to Docket ID                   changes that would revise the Updated
                                                  these amendments satisfy the criteria for               NRC–2008–0441 when contacting the                      Final Safety Analysis Report (UFSAR)
                                                  categorical exclusion in accordance                     NRC about the availability of                          in the form of departures from the
                                                  with 10 CFR 51.22. Therefore, pursuant                  information regarding this document.                   incorporated plant-specific DCD Tier 2
                                                  to 10 CFR 51.22(b), no environmental                    You may obtain publicly-available                      information. The proposed amendment
                                                  impact statement or environmental                       information related to this document                   also involves related changes to plant-
                                                  assessment need be prepared for these                   using any of the following methods:                    specific Tier 1 information, with
                                                  amendments.                                                • Federal Rulemaking Web site: Go to                corresponding changes to the associated
                                                                                                          http://www.regulations.gov and search                  COL Appendix C information.
                                                  IV. Conclusion                                          for Docket ID NRC–2008–0441. Address                   Specifically, the license amendment
                                                    Using the reasons set forth in the                    questions about NRC dockets to Carol                   request revises the inspections, tests,
                                                  combined safety evaluation, the staff                   Gallagher; telephone: 301–415–3463;                    analyses, and acceptance criteria
                                                  granted the exemption and issued the                    email: Carol.Gallagher@nrc.gov. For                    (ITAAC) in COL Appendix C Table
                                                  amendment that the licensee requested                   technical questions, contact the                       2.3.2–4, ITAAC No. 2.3.02.8a.ii to state
                                                  on October 26, 2016. The exemption                      individual listed in the FOR FURTHER                   that the volume in the BAST is at least
                                                                                                          INFORMATION CONTACT section of this                    70,000 gallons between the tank suction
                                                  and amendment were issued on May 25,
                                                  2017, as part of a combined package to                  document.                                              point and the tank overflow; and COL
                                                  the licensee (ADAMS Accession No.                          • NRC’s Agencywide Documents                        Appendix C Table 2.3.2–4, ITAAC No.
                                                  ML17072A312).                                           Access and Management System                           2.3.02.8a.iii to state that the total CVS
                                                                                                          (ADAMS): You may obtain publicly-                      makeup flow to the RCS is less than or
                                                    Dated at Rockville, Maryland, this 5th day            available documents online in the                      equal to 175 gpm.
mstockstill on DSK30JT082PROD with NOTICES




                                                  of June 2017.                                           ADAMS Public Documents collection at                      Part of the justification for granting
                                                    For the Nuclear Regulatory Commission.                http://www.nrc.gov/reading-rm/                         the exemption was provided by the
                                                  Jennifer Dixon-Herrity,                                 adams.html. To begin the search, select                review of the amendment. Because the
                                                  Chief, Licensing Branch 4, Division of New              ‘‘ADAMS Public Documents’’ and then                    exemption is necessary in order to issue
                                                  Reactor Licensing, Office of New Reactors.              select ‘‘Begin Web-based ADAMS                         the requested license amendment, the
                                                  [FR Doc. 2017–12335 Filed 6–13–17; 8:45 am]             Search.’’ For problems with ADAMS,                     NRC granted the exemption and issued
                                                  BILLING CODE 7590–01–P                                  please contact the NRC’s Public                        the amendment concurrently, rather


                                             VerDate Sep<11>2014   17:36 Jun 13, 2017   Jkt 241001   PO 00000   Frm 00071   Fmt 4703   Sfmt 4703   E:\FR\FM\14JNN1.SGM   14JNN1


                                                                               Federal Register / Vol. 82, No. 113 / Wednesday, June 14, 2017 / Notices                                                  27295

                                                  than in sequence. This included issuing                    F. the exemption will not result in a               IV. Conclusion
                                                  a combined safety evaluation containing                 significant decrease in the level of safety               Using the reasons set forth in the
                                                  the NRC staff’s review of both the                      otherwise provided by the design.                      combined safety evaluation, the staff
                                                  exemption request and the license                          2. Accordingly, SCE&G is granted an                 granted the exemption and issued the
                                                  amendment. The exemption met all                        exemption from the certified DCD Tier                  amendment that SCE&G requested on
                                                  applicable regulatory criteria set forth in             1 information related to the boric acid                September 29, 2016.
                                                  §§ 50.12, 52.7, and Section VIII.A.4 of                 storage tank (BAST) available volume at                   The exemption and amendment were
                                                  appendix D to 10 CFR part 52. The                       the suction point, chemical and volume                 issued on May 24, 2017, as part of a
                                                  license amendment was found to be                       control system (CVS) makeup flow rate,                 combined package to SCE&G (ADAMS
                                                  acceptable as well. The combined safety                 and BAST installation, as described in                 Accession No. ML17072A069).
                                                  evaluation is available in ADAMS under                  SCE&G’s request dated September 29,                      Dated at Rockville, Maryland, this 5th day
                                                  Accession No. ML17072A125.                              2016. This exemption is related to, and                of June 2017.
                                                     Identical exemption documents                        necessary for the granting of License                    For the Nuclear Regulatory Commission.
                                                  (except for referenced unit numbers and                 Amendment No. 73, which is being                       Jennifer Dixon-Herrity,
                                                  license numbers) were issued to SCE&G                   issued concurrently with this
                                                                                                                                                                 Chief, Licensing Branch 4, Division of New
                                                  for VCSNS Units 2 and 3 (COLs NPF–                      exemption.                                             Reactor Licensing, Office of New Reactors.
                                                  93 and NPF–94). The exemption                              3. As explained in Section 5.0 of the
                                                                                                                                                                 [FR Doc. 2017–12337 Filed 6–13–17; 8:45 am]
                                                  documents for VCSNS Units 2 and 3 can                   NRC staff’s Safety Evaluation (ADAMS
                                                                                                                                                                 BILLING CODE 7590–01–P
                                                  be found in ADAMS under Accession                       Accession No. ML17072A125), this
                                                  Nos. ML17072A117 and ML17072A118,                       exemption meets the eligibility criteria
                                                  respectively. The exemption is                          for categorical exclusion set forth in 10              NUCLEAR REGULATORY
                                                  reproduced (with the exception of                       CFR 51.22(c)(9). Therefore, pursuant to                COMMISSION
                                                  abbreviated titles and additional                       10 CFR 51.22(b), no environmental
                                                  citations) in Section II of this document.              impact statement or environmental                      Advisory Committee on Reactor
                                                  The amendment documents for COLs                        assessment needs to be prepared in                     Safeguards (ACRS); Meeting of the
                                                  NPF–93 and NPF–94 are available in                      connection with the issuance of the                    ACRS Subcommittee on APR1400;
                                                  ADAMS under Accession Nos.                              exemption.                                             Notice of Meeting
                                                  ML17072A111 and ML17072A114,                               4. This exemption is effective as of the
                                                  respectively. A summary of the                          date of its issuance.                                     The ACRS Subcommittee on APR1400
                                                  amendment documents is provided in                                                                             will hold a meeting on June 20–21,
                                                  Section III of this document.                           III. License Amendment Request                         2017, at 11545 Rockville Pike, Room T–
                                                                                                             By letter dated September 29, 2016                  2B1, Rockville, Maryland 20852.
                                                  II. Exemption                                                                                                     The meeting will be open to public
                                                                                                          (ADAMS Accession No. ML16273A557),
                                                     Reproduced below is the exemption                                                                           attendance with the exception of
                                                                                                          SCE&G requested that the NRC amend
                                                  document issued to VCSNS Units 2 and                                                                           portions that may be closed to protect
                                                                                                          the COLs for VCSNS, Units 2 and 3,
                                                  Unit 3. It makes reference to the                                                                              information that is proprietary pursuant
                                                                                                          COLs NPF–93 and NPF–94. The
                                                  combined safety evaluation that                                                                                to 5 U.S.C. 552b(c)(4). The agenda for
                                                                                                          proposed amendment is described in
                                                  provides the reasoning for the findings                                                                        the subject meeting shall be as follows:
                                                                                                          Section I of this Federal Register Notice.
                                                  made by the NRC (and listed under Item                     The Commission has determined for                   Tuesday, June 20, 2017, 8:30 a.m. Until
                                                  1) in order to grant the exemption:                     these amendments that the application                  5:00 p.m. and Wednesday, June 21,
                                                     1. In an application dated September                 complies with the standards and                        2017, 8:30 a.m. Until 12:00 p.m.
                                                  29, 2016, SCE&G requested from the                      requirements of the Atomic Energy Act                    The Subcommittee will review the
                                                  Commission an exemption to allow                        of 1954, as amended (the Act), and the                 APR1400 design control document
                                                  departures from Tier 1 information in                   Commission’s rules and regulations.                    review, Chapter 7, ‘‘Instrumentation and
                                                  the certified DCD incorporated by                       The Commission has made appropriate                    Controls’’ and Chapter 18, ‘‘Human
                                                  reference in 10 CFR part 52, appendix                   findings as required by the Act and the                Factors Engineering.’’ The
                                                  D, as part of license amendment request                 Commission’s rules and regulations in                  Subcommittee will hear presentations
                                                  15–11, ‘‘Boric Acid Storage Tank                        10 CFR Chapter I, which are set forth in               by and hold discussions with the NRC
                                                  Suction Point ITAAC Changes.’’                          the license amendment.                                 staff and Korea Hydro & Nuclear Power
                                                     For the reasons set forth in Section 3.1                A notice of consideration of issuance               Company regarding this matter. The
                                                  of the NRC staff’s Safety Evaluation,                   of amendment to facility operating                     Subcommittee will gather information,
                                                  which can be found in ADAMS under                       license or combined license, as                        analyze relevant issues and facts, and
                                                  Accession No. ML17072A125, the                          applicable, proposed no significant                    formulate proposed positions and
                                                  Commission finds that:                                  hazards consideration determination,                   actions, as appropriate, for deliberation
                                                     A. The exemption is authorized by                    and opportunity for a hearing in                       by the Full Committee.
                                                  law;                                                    connection with these actions, was                       Members of the public desiring to
                                                     B. the exemption presents no undue                   published in the Federal Register on                   provide oral statements and/or written
                                                  risk to public health and safety;                       December 20, 2016 (81 FR 92872). No                    comments should notify the Designated
                                                     C. the exemption is consistent with                  comments were received during the 30-                  Federal Official (DFO), Christopher
                                                  the common defense and security;                        day comment period.                                    Brown (Telephone 301–415–7111 or
                                                     D. special circumstances are present                    The Commission has determined that                  Email: Christopher.Brown@nrc.gov) five
mstockstill on DSK30JT082PROD with NOTICES




                                                  in that the application of the rule in this             these amendments satisfy the criteria for              days prior to the meeting, if possible, so
                                                  circumstance is not necessary to serve                  categorical exclusion in accordance                    that appropriate arrangements can be
                                                  the underlying purpose of the rule;                     with 10 CFR 51.22. Therefore, pursuant                 made. Thirty-five hard copies of each
                                                     E. the special circumstances outweigh                to 10 CFR 51.22(b), no environmental                   presentation or handout should be
                                                  any decrease in safety that may result                  impact statement or environmental                      provided to the DFO thirty minutes
                                                  from the reduction in standardization                   assessment need be prepared for these                  before the meeting. In addition, one
                                                  caused by the exemption; and                            amendments.                                            electronic copy of each presentation


                                             VerDate Sep<11>2014   17:36 Jun 13, 2017   Jkt 241001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\14JNN1.SGM   14JNN1



Document Created: 2017-06-14 01:23:27
Document Modified: 2017-06-14 01:23:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on May 24, 2017.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 27294 