[Federal Register Volume 82, Number 114 (Thursday, June 15, 2017)]
[Notices]
[Pages 27476-27477]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12390]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC17-128-000.
    Applicants: Beech Ridge Energy LLC, Beech Ridge Energy II LLC, 
Beech Ridge Energy Storage LLC, Bishop Hill Energy III LLC, Bishop Hill 
Interconnection LLC, Buckeye Wind Energy LLC, Forward Energy LLC, Grand 
Ridge Energy LLC, Grand Ridge Energy II LLC, Grand Ridge Energy III 
LLC, Grand Ridge Energy IV LLC, Grand Ridge Energy V LLC, Grand Ridge 
Energy Storage LLC, Gratiot County Wind LLC, Gratiot County Wind II 
LLC, Invenergy TN LLC, Judith Gap Energy LLC, Prairie Breeze Wind 
Energy II LLC, Prairie Breeze Wind Energy III LLC, Sheldon Energy LLC, 
Spring Canyon Energy LLC, Stony Creek Energy LLC, Vantage Wind Energy 
LLC, Willow Creek Energy LLC, Wolverine Creek Energy LLC, Wolverine 
Creek Goshen Interconnection LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act and Request for Waivers and Expedited Action of Beech 
Ridge Energy LLC, et al.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5182.
    Comments Due: 5 p.m. ET 6/29/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-1167-001.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: NYISO filing re: Effective date 
notice--MST Attachment K revisions to be effective 6/22/2017.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5149.
    Comments Due: 5 p.m. ET 6/29/17.

    Docket Numbers: ER17-1226-001.
    Applicants: Midcontinent Independent System Operator, Inc., Entergy 
Services, Inc.
    Description: Compliance filing: 2017-06-08_Filing to update Entergy 
New Orleans (ENO) Attachment O to be effective 6/1/2017.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5119.

[[Page 27477]]

    Comments Due: 5 p.m. ET 6/29/17.

    Docket Numbers: ER17-1778-000.
    Applicants: HD Project One LLC.
    Description: Baseline eTariff Filing: MBRA Tariff to be effective 
6/9/2017.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5120.
    Comments Due: 5 p.m. ET 6/29/17.

    Docket Numbers: ER17-1779-000.
    Applicants: The Connecticut Light and Power Company.
    Description: Notice of Cancellation of The Connecticut Light and 
Power Company Interconnection Service Agreement No. 101.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5143.
    Comments Due: 5 p.m. ET 6/29/17.

    Docket Numbers: ER17-1780-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2017-06-09_SA 1677 Illinois 
Power-Ameren Amended GIA (G436 G983 G984) to be effective 5/25/2017.
    Filed Date: 6/9/17.
    Accession Number: 20170609-5039.
    Comments Due: 5 p.m. ET 6/30/17.

    Docket Numbers: ER17-1781-000.
    Applicants: ArcLight Energy Marketing, LLC.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 6/30/2017.
    Filed Date: 6/9/17.
    Accession Number: 20170609-5054.
    Comments Due: 5 p.m. ET 6/30/17.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES17-34-000.
    Applicants: Central Maine Power Company.
    Description: Application of Central Maine Power Company for 
Authorization to Issue Short-Term Debt Under Section 204 of the Federal 
Power Act.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5184.
    Comments Due: 5 p.m. ET 6/29/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12390 Filed 6-14-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               27476                         Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices

                                               interested parties; and local libraries                 accordance with the planning                             Dated: June 9, 2017.
                                               and newspapers. This list also includes                 regulations at 36 CFR 219 (2012).                      Kimberly D. Bose,
                                               all affected landowners (as defined in                  Decisions by the Forest Service to                     Secretary.
                                               the Commission’s regulations), whose                    approve ‘‘plan level’’ amendments to                   [FR Doc. 2017–12393 Filed 6–14–17; 8:45 am]
                                               property may be used temporarily for                    Land Management Plans (proposed                        BILLING CODE 6717–01–P
                                               project purposes, or who own homes                      amendments UNF–4 and RRNF–7 in
                                               within certain distances of aboveground                 this Notice) are subject to the Pre-
                                               facilities, and anyone who submits                      Decisional Administrative Review                       DEPARTMENT OF ENERGY
                                               comments on the Project. The FERC will                  Process Regulations at 36 CFR 219
                                               update the environmental mailing list as                Subpart B. The term ‘‘plan level’’ refers              Federal Energy Regulatory
                                               the analysis proceeds to ensure that the                to plan amendments that would apply                    Commission
                                               information related to this                             to future management actions.
                                               environmental review is sent to all                       Decisions by the Forest Service to                   Combined Notice of Filings #1
                                               individuals, organizations, and                         approve ‘‘project-specific’’ plan                         Take notice that the Commission
                                               government entities interested in and/or                amendments (proposed amendments                        received the following electric corporate
                                               potentially affected by the planned                     UNF–1 thru 3, RRNF–2 thru 6, and                       filings:
                                               project.                                                WNF–1 thru 5 in this Notice) are subject
                                                  Copies of the draft EIS will be sent to                                                                        Docket Numbers: EC17–128–000.
                                                                                                       to the Administrative Review Process of                   Applicants: Beech Ridge Energy LLC,
                                               the environmental mailing list for                      36 CFR 218 Subpart A and B, in
                                               public review and comment. If you                                                                              Beech Ridge Energy II LLC, Beech Ridge
                                                                                                       accordance with 36 CFR 219.59 (b). The                 Energy Storage LLC, Bishop Hill Energy
                                               would prefer to receive a paper copy of                 term ‘‘project specific’’ refers to
                                               the document instead of a compact disc                                                                         III LLC, Bishop Hill Interconnection
                                                                                                       amendments that would only apply to                    LLC, Buckeye Wind Energy LLC,
                                               or would like to remove your name from                  the proposed project and would not
                                               the mailing list, please return the                                                                            Forward Energy LLC, Grand Ridge
                                                                                                       apply to any future management                         Energy LLC, Grand Ridge Energy II LLC,
                                               attached Information Request                            actions.
                                               (Appendix 2).                                                                                                  Grand Ridge Energy III LLC, Grand
                                                                                                         The Forest Service concurrence to                    Ridge Energy IV LLC, Grand Ridge
                                               Becoming an Intervenor                                  BLM to issue a right-of-way grant would                Energy V LLC, Grand Ridge Energy
                                                                                                       not be a decision subject to the NEPA                  Storage LLC, Gratiot County Wind LLC,
                                                  Once JCEP and PCGP file applications
                                                                                                       and, therefore, would not be subject to                Gratiot County Wind II LLC, Invenergy
                                               with the Commission, you may want to
                                                                                                       the Forest Service administrative review               TN LLC, Judith Gap Energy LLC, Prairie
                                               become an ‘‘intervenor,’’ which is an
                                                                                                       procedures.                                            Breeze Wind Energy II LLC, Prairie
                                               official party to the Commission’s
                                               proceeding. Intervenors play a more                     Additional Information                                 Breeze Wind Energy III LLC, Sheldon
                                               formal role in the process and are able                                                                        Energy LLC, Spring Canyon Energy LLC,
                                                                                                          Additional information about the                    Stony Creek Energy LLC, Vantage Wind
                                               to file briefs, appear at hearings, and be
                                                                                                       Project is available from the                          Energy LLC, Willow Creek Energy LLC,
                                               heard by the courts if they choose to
                                                                                                       Commission’s Office of External Affairs,               Wolverine Creek Energy LLC, Wolverine
                                               appeal the Commission’s final ruling.
                                                                                                       at (866) 208–FERC, or on the FERC Web                  Creek Goshen Interconnection LLC.
                                               An intervenor formally participates in
                                                                                                       site (www.ferc.gov) using the eLibrary                    Description: Application for
                                               the proceeding by filing a request to
                                                                                                       link. Click on the eLibrary link, click on             Authorization Under Section 203 of the
                                               intervene. Motions to intervene are
                                                                                                       ‘‘General Search’’ and enter the docket                Federal Power Act and Request for
                                               more fully described at http://
                                                                                                       number, excluding the last three digits                Waivers and Expedited Action of Beech
                                               www.ferc.gov/resources/guides/how-to/
                                                                                                       in the Docket Number field (i.e., PF17–                Ridge Energy LLC, et al.
                                               intervene.asp. Instructions for becoming
                                                                                                       4). Be sure you have selected an                          Filed Date: 6/8/17.
                                               an intervenor are in the ‘‘Document-less
                                                                                                       appropriate date range. For assistance,                   Accession Number: 20170608–5182.
                                               Intervention Guide’’ under the ‘‘e-filing’’
                                                                                                       please contact FERC Online Support at                     Comments Due: 5 p.m. ET 6/29/17.
                                               link on the Commission’s Web site.
                                                                                                       FercOnlineSupport@ferc.gov or toll free                   Take notice that the Commission
                                               Please note that the Commission will
                                                                                                       at (866) 208–3676, or for TTY, contact                 received the following electric rate
                                               not accept requests for intervenor status
                                                                                                       (202) 502–8659. The eLibrary link also                 filings:
                                               at this time. You must wait until the
                                                                                                       provides access to the texts of formal                    Docket Numbers: ER17–1167–001.
                                               Commission receives a formal
                                                                                                       documents issued by the Commission,                       Applicants: New York Independent
                                               application for the project.
                                                                                                       such as orders, notices, and                           System Operator, Inc.
                                               BLM Administrative Remedy Process                       rulemakings.                                              Description: Compliance filing:
                                                 Under the provisions of 43 CFR                           In addition, the Commission offers a                NYISO filing re: Effective date notice—
                                               1610.5–2, proposed decision(s) of the                   free service called eSubscription which                MST Attachment K revisions to be
                                               BLM to amend land management plans                      allows you to keep track of all formal                 effective 6/22/2017.
                                               are subject to protest with the Director                issuances and submittals in specific                      Filed Date: 6/8/17.
                                               of the BLM following publication of the                 dockets. This can reduce the amount of                    Accession Number: 20170608–5149.
                                               Final EIS. In accordance with 43 CFR,                   time you spend researching proceedings                    Comments Due: 5 p.m. ET 6/29/17.
                                               Part 4, the BLM’s decision on the                       by automatically providing you with                       Docket Numbers: ER17–1226–001.
                                               application for a right-of-way grant will               notification of these filings, document                   Applicants: Midcontinent
pmangrum on DSK3GDR082PROD with NOTICES




                                               be subject to appeal to the Interior Board              summaries, and direct links to the                     Independent System Operator, Inc.,
                                               of Land Appeals.                                        documents. Go to www.ferc.gov/docs-                    Entergy Services, Inc.
                                                                                                       filing/esubscription.asp.                                 Description: Compliance filing: 2017–
                                               Administrative Review of Forest                            Finally, public meetings or site visits             06–08_Filing to update Entergy New
                                               Service Decisions To Amend Land                         will be posted on the Commission’s                     Orleans (ENO) Attachment O to be
                                               Management Plans                                        calendar located at www.ferc.gov/                      effective 6/1/2017.
                                                 The proposed Forest Service plan                      EventCalendar/EventsList.aspx along                       Filed Date: 6/8/17.
                                               amendments are being developed in                       with other related information.                           Accession Number: 20170608–5119.


                                          VerDate Sep<11>2014   14:10 Jun 14, 2017   Jkt 241001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\15JNN1.SGM   15JNN1


                                                                             Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices                                                  27477

                                                  Comments Due: 5 p.m. ET 6/29/17.                     requirements, interventions, protests,                 foot-long, 42-inch-diameter, natural gas
                                                  Docket Numbers: ER17–1778–000.                       service, and qualifying facilities filings             transmission pipeline segment across
                                                  Applicants: HD Project One LLC.                      can be found at: http://www.ferc.gov/                  the international boundary between the
                                                  Description: Baseline eTariff Filing:                docs-filing/efiling/filing-req.pdf. For                United States and Mexico that is under
                                               MBRA Tariff to be effective 6/9/2017.                   other information, call (866) 208–3676                 the Commission’s jurisdiction. The
                                                  Filed Date: 6/8/17.                                  (toll free). For TTY, call (202) 502–8659.             Border Crossing Project would connect
                                                  Accession Number: 20170608–5120.                       Dated: June 9, 2017.                                 the non-jurisdictional Valley Crossing
                                                  Comments Due: 5 p.m. ET 6/29/17.                     Kimberly D. Bose,                                      System with the Mexican Marina
                                                  Docket Numbers: ER17–1779–000.                       Secretary.                                             Pipeline. The international boundary
                                                  Applicants: The Connecticut Light                                                                           crossing would occur in Texas state
                                                                                                       [FR Doc. 2017–12390 Filed 6–14–17; 8:45 am]
                                               and Power Company.                                                                                             waters, approximately 30 miles east of
                                                                                                       BILLING CODE 6717–01–P
                                                  Description: Notice of Cancellation of                                                                      Brownsville, Texas.
                                               The Connecticut Light and Power                                                                                Background
                                               Company Interconnection Service                         DEPARTMENT OF ENERGY
                                               Agreement No. 101.                                                                                                On January 27, 2017, the Commission
                                                  Filed Date: 6/8/17.                                  Federal Energy Regulatory                              issued a Notice of Intent to Prepare an
                                                  Accession Number: 20170608–5143.                     Commission                                             Environmental Assessment for the
                                                  Comments Due: 5 p.m. ET 6/29/17.                                                                            Proposed Border Crossing Project and
                                                                                                       [Docket No. CP17–19–000]
                                                  Docket Numbers: ER17–1780–000.                                                                              Request for Comments on
                                                  Applicants: Midcontinent                             Valley Crossing Pipeline, LLC; Notice                  Environmental Issues (NOI). The NOI
                                               Independent System Operator, Inc.                       of Schedule for Environmental Review                   was sent to federal, state, and local
                                                  Description: § 205(d) Rate Filing:                   of the Border Crossing Project                         government agencies; elected officials;
                                               2017–06–09_SA 1677 Illinois Power-                                                                             and other interested parties. In response
                                                                                                          On November 21, 2016, Valley                        to the NOI, commenters expressed
                                               Ameren Amended GIA (G436 G983                           Crossing Pipeline, LLC (Valley Crossing)
                                               G984) to be effective 5/25/2017.                                                                               concerns regarding water quality,
                                                                                                       filed an application in Docket No.                     methane pollution, aquatic/marine life
                                                  Filed Date: 6/9/17.                                  CP17–19–000 pursuant to Section 3 of
                                                  Accession Number: 20170609–5039.                                                                            including threatened and endangered
                                                                                                       the Natural Gas Act seeking                            species, pipeline integrity, climate
                                                  Comments Due: 5 p.m. ET 6/30/17.                     authorization and the issuance of a                    change, and cumulative impacts.
                                                  Docket Numbers: ER17–1781–000.                       Presidential Permit to construct and
                                                  Applicants: ArcLight Energy                          operate certain natural gas transmission               Additional Information
                                               Marketing, LLC.                                         facilities for the purpose of exporting
                                                  Description: Tariff Cancellation:                                                                              In order to receive notification of the
                                                                                                       natural gas between the United States                  issuance of the EA and to keep track of
                                               Notice of Cancellation to be effective                  and Mexico. The proposed project is
                                               6/30/2017.                                                                                                     all formal issuances and submittals in
                                                                                                       known as the Border Crossing Project                   specific dockets, the Commission offers
                                                  Filed Date: 6/9/17.                                  (Project). The Project would deliver/
                                                  Accession Number: 20170609–5054.                                                                            a free service called eSubscription. This
                                                                                                       export up to 2.6 billion cubic feet per                can reduce the amount of time you
                                                  Comments Due: 5 p.m. ET 6/30/17.                     day of natural gas to Mexico to serve                  spend researching proceedings by
                                                  Take notice that the Commission                      electrical generation plants.                          automatically providing you with
                                               received the following electric securities                 On December 2, 2016, the Federal
                                                                                                                                                              notification of these filings, document
                                               filings:                                                Energy Regulatory Commission
                                                                                                                                                              summaries, and direct links to the
                                                  Docket Numbers: ES17–34–000.                         (Commission or FERC) issued its Notice
                                                                                                                                                              documents. Go to www.ferc.gov/docs-
                                                  Applicants: Central Maine Power                      of Application for the Project. Among
                                                                                                                                                              filing/esubscription.asp.
                                               Company.                                                other things, that notice alerted agencies
                                                                                                       issuing federal authorizations of the                     Additional information about the
                                                  Description: Application of Central
                                                                                                       requirement to complete all necessary                  Project is available from the
                                               Maine Power Company for
                                                                                                       reviews and to reach a final decision on               Commission’s Office of External Affairs
                                               Authorization to Issue Short-Term Debt
                                                                                                       a request for a federal authorization                  at (866) 208–FERC or on the FERC Web
                                               Under Section 204 of the Federal Power
                                                                                                       within 90 days of the date of issuance                 site (www.ferc.gov). Using the
                                               Act.
                                                                                                       of the Commission staff’s Environmental                ‘‘eLibrary’’ link, select ‘‘General Search’’
                                                  Filed Date: 6/8/17.
                                                                                                       Assessment (EA) for the Project. This                  from the eLibrary menu, enter the
                                                  Accession Number: 20170608–5184.
                                                                                                       instant notice identifies the FERC staff’s             selected date range and ‘‘Docket
                                                  Comments Due: 5 p.m. ET 6/29/17.
                                                                                                       planned schedule for the completion of                 Number’’ excluding the last three digits
                                                  The filings are accessible in the                                                                           (i.e., CP17–19), and follow the
                                               Commission’s eLibrary system by                         the EA for the Project.
                                                                                                                                                              instructions. For assistance with access
                                               clicking on the links or querying the                   Schedule for Environmental Review                      to eLibrary, the helpline can be reached
                                               docket number.                                            Issuance of EA June 30, 2017.                        at (866) 208–3676, TTY (202) 502–8659,
                                                  Any person desiring to intervene or                    90-day Federal Authorization                         or at FERCOnlineSupport@ferc.gov. The
                                               protest in any of the above proceedings                 Decision Deadline September 28,                        eLibrary link on the FERC Web site also
                                               must file in accordance with Rules 211                  2017.                                                  provides access to the texts of formal
                                               and 214 of the Commission’s                               If a schedule change becomes                         documents issued by the Commission,
pmangrum on DSK3GDR082PROD with NOTICES




                                               Regulations (18 CFR 385.211 and                         necessary, additional notice will be                   such as orders, notices, and rule
                                               385.214) on or before 5:00 p.m. Eastern                 provided so that the relevant agencies                 makings.
                                               time on the specified comment date.                     are kept informed of the Project’s
                                               Protests may be considered, but                                                                                  Dated: June 9, 2017.
                                                                                                       progress.
                                               intervention is necessary to become a                                                                          Kimberly D. Bose,
                                               party to the proceeding.                                Project Description                                    Secretary.
                                                  eFiling is encouraged. More detailed                   Valley Crossing proposes to construct                [FR Doc. 2017–12392 Filed 6–14–17; 8:45 am]
                                               information relating to filing                          and operate an approximately 1,000-                    BILLING CODE 6717–01–P




                                          VerDate Sep<11>2014   17:27 Jun 14, 2017   Jkt 241001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\15JNN1.SGM   15JNN1



Document Created: 2017-06-15 01:03:48
Document Modified: 2017-06-15 01:03:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates6/8/17.
FR Citation82 FR 27476 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR