82_FR_27636 82 FR 27522 - Draft Environmental Impact Statement for Shasta Dam Fish Passage Evaluation, California

82 FR 27522 - Draft Environmental Impact Statement for Shasta Dam Fish Passage Evaluation, California

DEPARTMENT OF THE INTERIOR
Bureau of Reclamation

Federal Register Volume 82, Issue 114 (June 15, 2017)

Page Range27522-27524
FR Document2017-12398

The Bureau of Reclamation intends to prepare an Environmental Impact Statement (EIS) for the Shasta Dam Fish Passage Evaluation. The document will evaluate the program that will be used to implement the near-term actions identified under Action V in the National Marine Fisheries Service's 2009 Biological Opinion and Conference Opinion on the Long-Term Operation of the Central Valley Project and State Water Project Reasonable and Prudent Alternative. This EIS will evaluate the near-term actions of reintroducing Federally-listed endangered winter- run Chinook salmon and potentially spring-run Chinook salmon to historical habitats.

Federal Register, Volume 82 Issue 114 (Thursday, June 15, 2017)
[Federal Register Volume 82, Number 114 (Thursday, June 15, 2017)]
[Notices]
[Pages 27522-27524]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12398]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Reclamation

[RR02800000, 17XR0680A3, RX178689471000000]


Draft Environmental Impact Statement for Shasta Dam Fish Passage 
Evaluation, California

AGENCY: Bureau of Reclamation, Interior.

ACTION: Notice of intent and scoping meetings.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Reclamation intends to prepare an Environmental 
Impact Statement (EIS) for the Shasta Dam Fish Passage Evaluation. The 
document will evaluate the program that will be used to implement the 
near-term actions identified under Action V in the National Marine 
Fisheries Service's 2009 Biological Opinion and Conference Opinion on 
the Long-Term Operation of the Central Valley Project and State Water 
Project Reasonable and Prudent Alternative. This EIS will evaluate the 
near-term actions of reintroducing Federally-listed endangered winter-
run Chinook salmon and potentially spring-run Chinook salmon to 
historical habitats.

DATES: Submit written comments on the scope of the EIS on or before 
July 21, 2017.
    Oral and written comments will also be accepted during two scoping 
meetings held to solicit public input on alternatives, concerns, and 
issues to be addressed in the EIS:
    1. Tuesday, June 27, 2017, 2-4 p.m., Sacramento, CA.
    2. Wednesday, June 28, 2017, 6-8 p.m., Lakehead, CA.

ADDRESSES: Send written comments to Carolyn Bragg, Natural Resources 
Specialist, Bureau of Reclamation, Bay-Delta Office, 801 I Street, 
Suite 140, Sacramento, CA 95814-2536; fax to (916) 414-2439; or email 
at cbragg@usbr.gov.
    The scoping meetings will be held at the following locations:
    1. Sacramento--Federal Building, Cafeteria Room C-1001, 2800 
Cottage Way, Sacramento, CA 95825.
    2. Lakehead--Lakehead Lions Club, 20814 Mammoth Drive, Lakehead, CA 
96051.

FOR FURTHER INFORMATION CONTACT: Carolyn Bragg, (916) 414-2433, fax 
(916) 414-2439, or email cbragg@usbr.gov.

SUPPLEMENTARY INFORMATION:

I. Agencies Involved

    The Bureau of Reclamation (Reclamation) will invite the following 
agencies to participate as cooperating agencies for the preparation of 
the EIS in accordance with the National Environmental Policy Act 
(NEPA): National Marine Fisheries Service, U.S. Fish and Wildlife 
Service, U.S. Forest Service, California Department of Fish and 
Wildlife, California Department of Water Resources, California State 
Water Resources Control Board, Shasta County, Siskiyou County, and 
additional Federal and State agencies with jurisdiction in the project 
area.

II. Why We Are Taking This Action

    The National Marine Fisheries Service's 2009 Biological Opinion and 
Conference Opinion on the Long-term Operation of the Central Valley 
Project and State Water Project (NMFS BO) concluded that the continued 
operation of the Central Valley Project and the State Water Project 
were likely to jeopardize the continued existence of four anadromous 
species listed under the federal Endangered Species Act: Sacramento 
River winter-run Chinook salmon (Oncorhynchus tshawytscha), Central 
Valley spring-run Chinook salmon (Oncorhynchus tshawytscha), California 
Central Valley steelhead (Oncorhynchus mykiss), and the Southern 
Distinct Population Segment of North American green sturgeon (Acipenser 
medirostris). The NMFS BO sets forth a Reasonable and Prudent

[[Page 27523]]

Alternative (RPA) that if implemented, will allow the Central Valley 
Project and State Water Project to operate in compliance with the 
Endangered Species Act.
    RPA Action V includes an evaluation of the potential reintroduction 
of Federally-listed Chinook salmon and steelhead to historical 
habitats. Shasta Dam Fish Passage Evaluation (SDFPE) is an effort to 
determine the feasibility of reintroducing winter-run and spring-run 
Chinook salmon and steelhead to tributaries above Shasta Dam. The SDFPE 
is separated into near-term and long-term actions. As part of the 
requirements of the RPA, Reclamation, in coordination with the 
Interagency Fish Passage Steering Committee, is developing the Pilot 
Program as an adaptive management process to evaluate the near-term 
reintroduction of Chinook salmon into historical habitat above Shasta 
Dam.
    Reclamation is focusing the initial near-term goals of re-
introducing winter-run and potentially spring-run Chinook salmon 
upstream of Shasta Dam as the location based on: a) the imperiled 
status of winter-run Chinook salmon and the resulting urgency to move 
these fish back into their historical habitats as a means of reducing 
extinction risk; and b) the good habitat conditions. NMFS requires the 
use of Federally-listed Sacramento River winter-run Chinook salmon, 
either from the wild in the Sacramento River and/or the Livingston 
Stone National Fish Hatchery conservation program in order to meet the 
goals of RPA Action V.
    Reclamation has prepared a Draft Pilot Implementation Plan and an 
unpublished Preliminary Draft Environmental Assessment for the proposed 
action, which can be found at https://www.usbr.gov/mp/BayDeltaOffice/shasta-dam-fish-pass.html. The initial analysis conducted indicated 
uncertainties associated with the resources analyzed. Given these 
uncertainties, Reclamation has decided to prepare an EIS. If the near-
term actions indicate that long-term fish passage of listed salmonids 
is feasible and practical to implement, then in accordance with RPA 
Action V, Reclamation will develop and implement a Long-Term Fish 
Passage Program, which would require additional environmental 
documentation.

III. Purpose and Need for Action

    The range of Sacramento River winter-run Chinook salmon has been 
reduced by Keswick and Shasta dams on the Sacramento River and by 
hydroelectric dam development on Battle Creek. Currently, Sacramento 
River winter-run Chinook salmon spawning is limited to the mainstem 
Sacramento River downstream of Shasta and Keswick dams where the 
naturally-spawning population is maintained by cool water releases from 
the dams. Central Valley spring-run Chinook salmon spawning occurs 
primarily in other Sacramento River tributaries. The need for the 
proposed action arises from projections of increased incidences of 
temperature related impacts to listed anadromous fish, and their 
resulting vulnerability below Shasta Dam. The purpose of the proposed 
action is to evaluate the feasibility of establishing self-sustaining 
populations of listed anadromous fish above Shasta Lake. The Pilot 
Program seeks to do this by evaluating various aspects of 
reintroduction including the biological and technological challenges.

IV. Project Area

    The project area includes Shasta Lake, the Sacramento River from 
Shasta Lake upstream to Box Canyon Dam, and the McCloud River from 
Shasta Lake upstream to McCloud Dam. The project area is within Shasta 
and Siskiyou Counties.

V. Alternatives To Be Considered

    The Preliminary Draft Environmental Assessment included analysis of 
reasonable alternatives that could potentially be considered to meet 
the purpose and need of the proposed near-term actions of this EIS 
under Action V for the reintroduction of Federally-listed Chinook 
salmon to historical habitats. A habitat assessment was conducted of 
the mainstem reaches of the Upper Sacramento River and McCloud River as 
part of the development of the Pilot Implementation Plan. The 
assessment found good habitat conditions in both watersheds. The Pilot 
Program includes multiple pilot studies intended to be conducted on a 
short-term basis to answer questions regarding feasibility of a Long-
term Fish Passage Program. The Preliminary Draft Environmental 
Assessment included analysis of two alternatives; introduction of 
Federally-listed endangered winter-run Chinook salmon and potentially 
spring-run Chinook salmon to the Upper Sacramento River and McCloud 
River in different years and the introduction of Federally-listed 
endangered winter-run Chinook salmon and potentially spring-run Chinook 
salmon to both the Upper Sacramento River and the McCloud River at the 
same time. Additional alternatives may be identified during the scoping 
process, and potential environmental effects of these alternatives will 
be evaluated in this EIS. The results of the proposed action will 
facilitate a determination by the Interagency Fish Passage Steering 
Committee as to whether it is feasible or practical to implement a 
full-scale and long-term reintroduction of listed anadromous fish in 
the watershed above Shasta Lake.

VI. Statutory Authority

    National Marine Fisheries Service's 2009 Biological Opinion and 
Conference Opinion on the Long-Term Operation of the Central Valley 
Project and State Water Project RPA Action V obligates the U.S. 
Department of Interior, Bureau of Reclamation, to evaluate the 
feasibility for the reintroduction of winter-run and spring-run Chinook 
salmon and steelhead upstream of Shasta, Folsom and New Melones dams. 
NEPA [42 U.S.C. 4321 et seq.] requires that Federal agencies conduct an 
environmental analysis of their proposed actions to determine if the 
actions may significantly affect the human environment. As required by 
NEPA, Reclamation will analyze in the EIS the potential direct, 
indirect, and cumulative environmental effects that may result from 
implementation of the proposed action and alternatives, which may 
include, but are not limited to, the following areas of potential 
impact: Surface Water Resources, Hazardous Materials, Fisheries and 
Aquatic Species, Wildlife, Botanical Resources, Visual, Scenic, or 
Aesthetic Resources, Air Quality, Noise, Transportation, Public 
Services, and Utilities, Recreation, Cultural Resources, 
Socioeconomics, Environmental Justice, Indian Trust Assets and Indian 
Sacred Sites, Global climate change/greenhouse gas emissions.

VII. Request for Comments

    The purposes of this notice are:
     To advise other agencies, potentially affected local 
governments, tribes, and the public of our intention to gather 
information to support the preparation of an EIS;
     To obtain suggestions and information from other agencies, 
interested parties, and the public on the scope of alternatives and 
issues to be addressed in the EIS; and.
     To identify important issues raised by the public related 
to the development and implementation of the proposed action.
    We invite written comments from interested parties to ensure that 
the full range of alternatives and issues related to the development of 
the proposed action are identified. Written comments may be submitted 
by mail, electronic

[[Page 27524]]

mail, facsimile transmission or in person listed in the ADDRESSES 
section of this notice. Comments and participation in the scoping 
process are encouraged.

VIII. Public Disclosure

    Before including your address, phone number, email address, or 
other personal identifying information in your comment, you should be 
aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

IX. How To Request Reasonable Accommodation

    If special assistance is required at one of the scoping meetings, 
please contact Carolyn Bragg at the information provided in the FOR 
FURTHER INFORMATION CONTACT section of this notice, or (TTY) 800-877-
8339, at least five working days before the meetings. Information 
regarding this proposed action is available in alternative formats upon 
request.

    Dated: June 9, 2017.
 Pablo R. Arroyave,
Deputy Regional Director, Mid-Pacific Region.
[FR Doc. 2017-12398 Filed 6-14-17; 8:45 am]
 BILLING CODE 4332-90-P



                                               27522                         Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices

                                               necessity of this information collection                  Respondents: Indian Tribes and Tribal                   Oral and written comments will also
                                               for the proper performance of the                       energy resource development                            be accepted during two scoping
                                               functions of the agency, including                      organizations under 25 U.S.C. 3502.                    meetings held to solicit public input on
                                               whether the information will have                         Number of Respondents: 27 per year,                  alternatives, concerns, and issues to be
                                               practical utility; (b) The accuracy of the              on average; 13 project participants each               addressed in the EIS:
                                               agency’s estimate of the burden (hours                  year, on average.                                         1. Tuesday, June 27, 2017, 2–4 p.m.,
                                               and cost) of the collection of                            Frequency of Response: Once per year                 Sacramento, CA.
                                               information, including the validity of                  for applications; 4 times per year for                    2. Wednesday, June 28, 2017, 6–8
                                               the methodology and assumptions used;                   progress reports.                                      p.m., Lakehead, CA.
                                               (c) Ways we could enhance the quality,                    Estimated Time per Response: 40                      ADDRESSES: Send written comments to
                                               utility, and clarity of the information to              hours per application; 1.5 hours per                   Carolyn Bragg, Natural Resources
                                               be collected; and (d) Ways we could                     progress report.                                       Specialist, Bureau of Reclamation, Bay-
                                               minimize the burden of the collection of                  Obligation to Respond: Response is                   Delta Office, 801 I Street, Suite 140,
                                               the information on the respondents.                     required to obtain a benefit.                          Sacramento, CA 95814–2536; fax to
                                                  Please note that an agency may not                     Estimated Total Annual Hour Burden:                  (916) 414–2439; or email at cbragg@
                                               conduct or sponsor, and an individual                   1,158 hours (1,080 for applications and                usbr.gov.
                                               need not respond to, a collection of                    78 for progress reports).                                 The scoping meetings will be held at
                                               information unless it has a valid OMB                     Estimated Total Annual Non-Hour                      the following locations:
                                               Control Number.                                         Dollar Cost: $0.                                          1. Sacramento—Federal Building,
                                                  It is our policy to make all comments                                                                       Cafeteria Room C–1001, 2800 Cottage
                                                                                                       Authority
                                               available to the public for review at the                                                                      Way, Sacramento, CA 95825.
                                               location listed in the ADDRESSES section.                 The authorities for this action are the                 2. Lakehead—Lakehead Lions Club,
                                               Before including your address, phone                    Energy Policy Act of 2005, 25 U.S.C.                   20814 Mammoth Drive, Lakehead, CA
                                               number, email address or other personal                 3502, and the Paperwork Reduction Act                  96051.
                                               identifying information in your                         of 1995, 44 U.S.C. 3501 et seq.                        FOR FURTHER INFORMATION CONTACT:
                                               comment, you should be aware that                       Elizabeth K. Appel,                                    Carolyn Bragg, (916) 414–2433, fax (916)
                                               your entire comment—including your                      Director, Office of Regulatory Affairs and             414–2439, or email cbragg@usbr.gov.
                                               personal identifying information—may                    Collaborative Action—Indian Affairs.                   SUPPLEMENTARY INFORMATION:
                                               be made publicly available at any time.                 [FR Doc. 2017–12444 Filed 6–14–17; 8:45 am]
                                               While you can ask us in your comment                                                                           I. Agencies Involved
                                                                                                       BILLING CODE 4337–15–P
                                               to withhold your personal identifying                                                                            The Bureau of Reclamation
                                               information from public review, we                                                                             (Reclamation) will invite the following
                                               cannot guarantee that we will be able to                DEPARTMENT OF THE INTERIOR                             agencies to participate as cooperating
                                               do so.                                                                                                         agencies for the preparation of the EIS
                                               III. Data                                               Bureau of Reclamation                                  in accordance with the National
                                                                                                       [RR02800000, 17XR0680A3,
                                                                                                                                                              Environmental Policy Act (NEPA):
                                                  OMB Control Number: 1076–0177.                                                                              National Marine Fisheries Service, U.S.
                                                                                                       RX178689471000000]
                                                  Title: Tribal Energy Development                                                                            Fish and Wildlife Service, U.S. Forest
                                               Capacity Program Grants.                                Draft Environmental Impact Statement                   Service, California Department of Fish
                                                  Brief Description of Collection: Indian              for Shasta Dam Fish Passage                            and Wildlife, California Department of
                                               Tribes and Tribal energy resource                       Evaluation, California                                 Water Resources, California State Water
                                               development organizations that would                                                                           Resources Control Board, Shasta
                                               like to apply for TEDC funding must                     AGENCY:   Bureau of Reclamation,                       County, Siskiyou County, and
                                               submit an application that includes                     Interior.                                              additional Federal and State agencies
                                               certain information. A complete                         ACTION: Notice of intent and scoping                   with jurisdiction in the project area.
                                               application must contain a formal                       meetings.
                                               signed resolution of the governing body                                                                        II. Why We Are Taking This Action
                                               of the Tribe or Tribal energy resource                  SUMMARY:   The Bureau of Reclamation                     The National Marine Fisheries
                                               development organization, a proposal                    intends to prepare an Environmental                    Service’s 2009 Biological Opinion and
                                               describing the planned activities and                   Impact Statement (EIS) for the Shasta                  Conference Opinion on the Long-term
                                               deliverable products; and a detailed                    Dam Fish Passage Evaluation. The                       Operation of the Central Valley Project
                                               budget estimate, including contracted                   document will evaluate the program                     and State Water Project (NMFS BO)
                                               personnel costs, travel estimates, data                 that will be used to implement the near-               concluded that the continued operation
                                               collection and analysis costs, and other                term actions identified under Action V                 of the Central Valley Project and the
                                               expenses. The IEED requires this                        in the National Marine Fisheries                       State Water Project were likely to
                                               information to ensure that it provides                  Service’s 2009 Biological Opinion and                  jeopardize the continued existence of
                                               funding only to those projects that meet                Conference Opinion on the Long-Term                    four anadromous species listed under
                                               the goals of the TEDC program and                       Operation of the Central Valley Project                the federal Endangered Species Act:
                                               purposes for which Congress provides                    and State Water Project Reasonable and                 Sacramento River winter-run Chinook
                                               the appropriation. Upon acceptance of                   Prudent Alternative. This EIS will                     salmon (Oncorhynchus tshawytscha),
                                                                                                       evaluate the near-term actions of
pmangrum on DSK3GDR082PROD with NOTICES




                                               an application, the successful applicant                                                                       Central Valley spring-run Chinook
                                               must then submit one- to two-page                       reintroducing Federally-listed                         salmon (Oncorhynchus tshawytscha),
                                               progress reports twice during the grant                 endangered winter-run Chinook salmon                   California Central Valley steelhead
                                               period summarizing events,                              and potentially spring-run Chinook                     (Oncorhynchus mykiss), and the
                                               accomplishments, problems and/or                        salmon to historical habitats.                         Southern Distinct Population Segment
                                               results in executing the project.                       DATES: Submit written comments on the                  of North American green sturgeon
                                                  Type of Review: Extension without                    scope of the EIS on or before July 21,                 (Acipenser medirostris). The NMFS BO
                                               change of currently approved collection.                2017.                                                  sets forth a Reasonable and Prudent


                                          VerDate Sep<11>2014   14:10 Jun 14, 2017   Jkt 241001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\15JNN1.SGM   15JNN1


                                                                             Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices                                            27523

                                               Alternative (RPA) that if implemented,                  Battle Creek. Currently, Sacramento                    alternatives will be evaluated in this
                                               will allow the Central Valley Project and               River winter-run Chinook salmon                        EIS. The results of the proposed action
                                               State Water Project to operate in                       spawning is limited to the mainstem                    will facilitate a determination by the
                                               compliance with the Endangered                          Sacramento River downstream of Shasta                  Interagency Fish Passage Steering
                                               Species Act.                                            and Keswick dams where the naturally-                  Committee as to whether it is feasible or
                                                  RPA Action V includes an evaluation                  spawning population is maintained by                   practical to implement a full-scale and
                                               of the potential reintroduction of                      cool water releases from the dams.                     long-term reintroduction of listed
                                               Federally-listed Chinook salmon and                     Central Valley spring-run Chinook                      anadromous fish in the watershed above
                                               steelhead to historical habitats. Shasta                salmon spawning occurs primarily in                    Shasta Lake.
                                               Dam Fish Passage Evaluation (SDFPE) is                  other Sacramento River tributaries. The
                                               an effort to determine the feasibility of                                                                      VI. Statutory Authority
                                                                                                       need for the proposed action arises from
                                               reintroducing winter-run and spring-run                 projections of increased incidences of                   National Marine Fisheries Service’s
                                               Chinook salmon and steelhead to                         temperature related impacts to listed                  2009 Biological Opinion and Conference
                                               tributaries above Shasta Dam. The                       anadromous fish, and their resulting                   Opinion on the Long-Term Operation of
                                               SDFPE is separated into near-term and                   vulnerability below Shasta Dam. The                    the Central Valley Project and State
                                               long-term actions. As part of the                       purpose of the proposed action is to                   Water Project RPA Action V obligates
                                               requirements of the RPA, Reclamation,                   evaluate the feasibility of establishing               the U.S. Department of Interior, Bureau
                                               in coordination with the Interagency                    self-sustaining populations of listed                  of Reclamation, to evaluate the
                                               Fish Passage Steering Committee, is                     anadromous fish above Shasta Lake. The                 feasibility for the reintroduction of
                                               developing the Pilot Program as an                      Pilot Program seeks to do this by                      winter-run and spring-run Chinook
                                               adaptive management process to                          evaluating various aspects of                          salmon and steelhead upstream of
                                               evaluate the near-term reintroduction of                reintroduction including the biological                Shasta, Folsom and New Melones dams.
                                               Chinook salmon into historical habitat                  and technological challenges.                          NEPA [42 U.S.C. 4321 et seq.] requires
                                               above Shasta Dam.                                                                                              that Federal agencies conduct an
                                                  Reclamation is focusing the initial                  IV. Project Area
                                                                                                                                                              environmental analysis of their
                                               near-term goals of re-introducing                         The project area includes Shasta Lake,               proposed actions to determine if the
                                               winter-run and potentially spring-run                   the Sacramento River from Shasta Lake                  actions may significantly affect the
                                               Chinook salmon upstream of Shasta                       upstream to Box Canyon Dam, and the                    human environment. As required by
                                               Dam as the location based on: a) the                    McCloud River from Shasta Lake                         NEPA, Reclamation will analyze in the
                                               imperiled status of winter-run Chinook                  upstream to McCloud Dam. The project                   EIS the potential direct, indirect, and
                                               salmon and the resulting urgency to                     area is within Shasta and Siskiyou                     cumulative environmental effects that
                                               move these fish back into their                         Counties.                                              may result from implementation of the
                                               historical habitats as a means of                                                                              proposed action and alternatives, which
                                                                                                       V. Alternatives To Be Considered
                                               reducing extinction risk; and b) the good                                                                      may include, but are not limited to, the
                                               habitat conditions. NMFS requires the                      The Preliminary Draft Environmental                 following areas of potential impact:
                                               use of Federally-listed Sacramento River                Assessment included analysis of                        Surface Water Resources, Hazardous
                                               winter-run Chinook salmon, either from                  reasonable alternatives that could                     Materials, Fisheries and Aquatic
                                               the wild in the Sacramento River and/                   potentially be considered to meet the                  Species, Wildlife, Botanical Resources,
                                               or the Livingston Stone National Fish                   purpose and need of the proposed near-                 Visual, Scenic, or Aesthetic Resources,
                                               Hatchery conservation program in order                  term actions of this EIS under Action V                Air Quality, Noise, Transportation,
                                               to meet the goals of RPA Action V.                      for the reintroduction of Federally-listed
                                                                                                                                                              Public Services, and Utilities,
                                                  Reclamation has prepared a Draft                     Chinook salmon to historical habitats. A
                                                                                                                                                              Recreation, Cultural Resources,
                                               Pilot Implementation Plan and an                        habitat assessment was conducted of the
                                                                                                                                                              Socioeconomics, Environmental Justice,
                                               unpublished Preliminary Draft                           mainstem reaches of the Upper
                                                                                                                                                              Indian Trust Assets and Indian Sacred
                                               Environmental Assessment for the                        Sacramento River and McCloud River as
                                                                                                                                                              Sites, Global climate change/greenhouse
                                               proposed action, which can be found at                  part of the development of the Pilot
                                                                                                                                                              gas emissions.
                                               https://www.usbr.gov/mp/                                Implementation Plan. The assessment
                                               BayDeltaOffice/shasta-dam-fish-                         found good habitat conditions in both                  VII. Request for Comments
                                               pass.html. The initial analysis                         watersheds. The Pilot Program includes                    The purposes of this notice are:
                                               conducted indicated uncertainties                       multiple pilot studies intended to be                     • To advise other agencies,
                                               associated with the resources analyzed.                 conducted on a short-term basis to                     potentially affected local governments,
                                               Given these uncertainties, Reclamation                  answer questions regarding feasibility of              tribes, and the public of our intention to
                                               has decided to prepare an EIS. If the                   a Long-term Fish Passage Program. The                  gather information to support the
                                               near-term actions indicate that long-                   Preliminary Draft Environmental                        preparation of an EIS;
                                               term fish passage of listed salmonids is                Assessment included analysis of two                       • To obtain suggestions and
                                               feasible and practical to implement,                    alternatives; introduction of Federally-               information from other agencies,
                                               then in accordance with RPA Action V,                   listed endangered winter-run Chinook                   interested parties, and the public on the
                                               Reclamation will develop and                            salmon and potentially spring-run                      scope of alternatives and issues to be
                                               implement a Long-Term Fish Passage                      Chinook salmon to the Upper                            addressed in the EIS; and.
                                               Program, which would require                            Sacramento River and McCloud River in                     • To identify important issues raised
                                               additional environmental                                different years and the introduction of                by the public related to the development
pmangrum on DSK3GDR082PROD with NOTICES




                                               documentation.                                          Federally-listed endangered winter-run                 and implementation of the proposed
                                                                                                       Chinook salmon and potentially spring-                 action.
                                               III. Purpose and Need for Action                        run Chinook salmon to both the Upper                      We invite written comments from
                                                  The range of Sacramento River                        Sacramento River and the McCloud                       interested parties to ensure that the full
                                               winter-run Chinook salmon has been                      River at the same time. Additional                     range of alternatives and issues related
                                               reduced by Keswick and Shasta dams                      alternatives may be identified during                  to the development of the proposed
                                               on the Sacramento River and by                          the scoping process, and potential                     action are identified. Written comments
                                               hydroelectric dam development on                        environmental effects of these                         may be submitted by mail, electronic


                                          VerDate Sep<11>2014   14:10 Jun 14, 2017   Jkt 241001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\15JNN1.SGM   15JNN1


                                               27524                         Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices

                                               mail, facsimile transmission or in                      Commencement of Final Phase                              The Commission made these
                                               person listed in the ADDRESSES section                  Investigations                                         determinations pursuant to sections
                                               of this notice. Comments and                                                                                   703(a) and 733(a) of the Act (19 U.S.C.
                                               participation in the scoping process are                   Pursuant to section 207.18 of the                   1671b(a) and 1673b(a)). It completed
                                               encouraged.                                             Commission’s rules, the Commission                     and filed its determinations in these
                                                                                                       also gives notice of the commencement                  investigations on June 12, 2017. The
                                               VIII. Public Disclosure                                 of the final phase of its investigations.              views of the Commission are contained
                                                 Before including your address, phone                  The Commission will issue a final phase                in USITC Publication 4702 (June 2017),
                                               number, email address, or other                         notice of scheduling, which will be                    entitled 100- to 150-Seat Large Civil
                                               personal identifying information in your                published in the Federal Register as                   Aircraft from Canada: Investigation Nos.
                                               comment, you should be aware that                       provided in section 207.21 of the                      701–TA–578 and 731–TA–1368
                                               your entire comment—including your                      Commission’s rules, upon notice from                   (Preliminary).
                                               personal identifying information—may                    the Department of Commerce
                                                                                                       (‘‘Commerce’’) of affirmative                            By order of the Commission.
                                               be made publicly available at any time.
                                                                                                       preliminary determinations in the                        Issued: June 12, 2017.
                                               While you can ask us in your comment
                                               to withhold your personal identifying                   investigations under sections 703(b) or                Lisa R. Barton,
                                               information from public review, we                      733(b) of the Act, or, if the preliminary              Secretary to the Commission.
                                               cannot guarantee that we will be able to                determinations are negative, upon                      [FR Doc. 2017–12436 Filed 6–14–17; 8:45 am]
                                               do so.                                                  notice of affirmative final                            BILLING CODE 7020–02–P
                                                                                                       determinations in those investigations
                                               IX. How To Request Reasonable                           under sections 705(a) or 735(a) of the
                                               Accommodation                                           Act. Parties that filed entries of                     INTERNATIONAL TRADE
                                                  If special assistance is required at one             appearance in the preliminary phase of                 COMMISSION
                                               of the scoping meetings, please contact                 the investigations need not enter a                    [Investigation No. 337–TA–1001]
                                               Carolyn Bragg at the information                        separate appearance for the final phase
                                               provided in the FOR FURTHER                             of the investigations. Industrial users,               Certain Digital Video Receivers and
                                               INFORMATION CONTACT section of this                     and, if the merchandise under                          Hardware and Software Components
                                               notice, or (TTY) 800–877–8339, at least                 investigation is sold at the retail level,             Thereof Notice of Request for
                                               five working days before the meetings.                  representative consumer organizations                  Statements on the Public Interest
                                               Information regarding this proposed                     have the right to appear as parties in
                                               action is available in alternative formats              Commission antidumping and                             AGENCY: U.S. International Trade
                                               upon request.                                           countervailing duty investigations. The                Commission.
                                                                                                       Secretary will prepare a public service                ACTION: Notice.
                                                 Dated: June 9, 2017.
                                                                                                       list containing the names and addresses
                                               Pablo R. Arroyave,                                                                                             SUMMARY:    Notice is hereby given that
                                                                                                       of all persons, or their representatives,
                                               Deputy Regional Director, Mid-Pacific Region.                                                                  the presiding administrative law judge
                                                                                                       who are parties to the investigations.
                                               [FR Doc. 2017–12398 Filed 6–14–17; 8:45 am]                                                                    (‘‘ALJ’’) has issued a recommended
                                               BILLING CODE 4332–90–P
                                                                                                       Background                                             determination on remedy and bonding
                                                                                                                                                              in the above-captioned investigation.
                                                                                                          On April 27, 2017, The Boeing                       The Commission is soliciting
                                                                                                       Company, Chicago, Illinois filed a                     submissions from the public on any
                                               INTERNATIONAL TRADE                                     petition with the Commission and                       public interest issues raised by the
                                               COMMISSION                                              Commerce, alleging that an industry in                 recommended relief. The ALJ
                                                                                                       the United States is threatened with                   recommended that a limited exclusion
                                               [Investigation Nos. 701–TA–578 and 731–                 material injury by reason of LTFV and                  order issue against certain digital video
                                               TA–1368 (Preliminary)]                                  subsidized imports of 100- to 150-seat                 receivers and hardware and software
                                                                                                       large civil aircraft from Canada.                      components thereof imported by the
                                               100- to 150-Seat Large Civil Aircraft                   Accordingly, effective April 27, 2017,                 respondents. The respondents are
                                               From Canada; Determinations                             the Commission, pursuant to sections                   Comcast Corporation of Philadelphia,
                                                                                                       703(a) and 733(a) of the Act (19 U.S.C.                PA; Comcast Cable Communications,
                                                  On the basis of the record 1 developed               1671b(a) and 1673b(a)), instituted
                                               in the subject investigations, the United                                                                      LLC of Philadelphia, PA; Comcast Cable
                                                                                                       countervailing duty investigation No.                  Communications Management, LLC of
                                               States International Trade Commission                   701–TA–578 and antidumping duty
                                               (‘‘Commission’’) determines, pursuant                                                                          Philadelphia, PA; Comcast Business
                                                                                                       investigation No. 731–TA–1368                          Communications, LLC of Philadelphia,
                                               to the Tariff Act of 1930 (‘‘the Act’’),                (Preliminary).
                                               that there is a reasonable indication that                                                                     PA; Comcast Holdings Corporation of
                                               an industry in the United States is                        Notice of the institution of the                    Philadelphia, PA; Comcast Shared
                                               threatened with material injury by                      Commission’s investigations and of a                   Services, LLC of Chicago, IL;
                                               reason of imports of 100- to 150-seat                   public conference to be held in                        Technicolor SA of Issy-les-Moulineaux,
                                               large civil aircraft from Canada,                       connection therewith was given by                      France; Technicolor USA, Inc. of
                                               provided for in subheading 8802.40.00                   posting copies of the notice in the Office             Indianapolis, IN; Technicolor
                                               of the Harmonized Tariff Schedule of                    of the Secretary, U.S. International                   Connected Home USA LLC of
pmangrum on DSK3GDR082PROD with NOTICES




                                               the United States, that are alleged to be               Trade Commission, Washington, DC,                      Indianapolis, IN; Pace Ltd. of Saltaire,
                                               sold in the United States at less than fair             and by publishing the notice in the                    England; Pace Americas, LLC of Boca
                                               value (‘‘LTFV’’) and to be subsidized by                Federal Register of May 3, 2017 (82 FR                 Raton, FL; Arris International plc of
                                               the government of Canada.                               20634). The conference was held in                     Suwanee, GA; Arris Group Inc. of
                                                                                                       Washington, DC, on May 18, 2017, and                   Suwanee, GA; Arris Technology, Inc. of
                                                 1 The record is defined in sec. 207.2(f) of the       all persons who requested the                          Horsham, PA; Arris Enterprises Inc. of
                                               Commission’s Rules of Practice and Procedure (19        opportunity were permitted to appear in                Suwanee, GA; and Arris Solutions, Inc.
                                               CFR 207.2(f)).                                          person or by counsel.                                  of Suwanee, GA. The ALJ also


                                          VerDate Sep<11>2014   14:10 Jun 14, 2017   Jkt 241001   PO 00000   Frm 00063   Fmt 4703   Sfmt 4703   E:\FR\FM\15JNN1.SGM   15JNN1



Document Created: 2017-06-15 01:03:53
Document Modified: 2017-06-15 01:03:53
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent and scoping meetings.
DatesSubmit written comments on the scope of the EIS on or before July 21, 2017.
ContactCarolyn Bragg, (916) 414-2433, fax (916) 414-2439, or email [email protected]