Western Area Power Administration (WAPA) is proposing to update the rate-setting formulas for electric service for the Boulder Canyon Project (BCP) under proposed Rate Schedule BCP-F10, and adjust the annual calculation for the fiscal year (FY) 2018 base charge and rates. The expiration of the current base charge and rates on September 30, 2017, and beginning of the new 50-year marketing period on October 1, 2018, require these actions. The current base charge under Rate Schedule BCP-F9 is not sufficient to cover all annual costs including operation and maintenance, replacements, and interest expense; and repay investment obligations within the allowable period. After collaborating with the BCP contractors, WAPA proposes an FY 2018 base charge that includes a one-time $15 million working capital fund primarily for the Bureau of Reclamation (Reclamation) for the new marketing period. The FY 2019 base charge is expected to decrease by $15 million after the collection of working capital in FY 2018. The proposed base charge will provide sufficient revenue to cover all annual costs and repay investment obligations within the allowable period. WAPA will post proposed Rate Schedule BCP-F10 and a detailed rate package that identifies the reasons for the base charge and rates adjustment on its Web site during the consultation and comment period. The proposed base charge and rates are scheduled to become effective on October 1, 2017, and will remain in effect through September 30, 2018. Publication of this Federal Register notice initiates the formal public process to implement the proposed rate-setting formulas and the FY 2018 base charge and rates.

Federal Register, Volume 82 Issue 116 (Monday, June 19, 2017)
[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Pages 27813-27814]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12700]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration


Boulder Canyon Project--Rate Order No. WAPA-178

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of proposed rate-setting formulas for electric service 
and adjustment of fiscal year 2018 base charge and rates.

-----------------------------------------------------------------------

SUMMARY: Western Area Power Administration (WAPA) is proposing to 
update the rate-setting formulas for electric service for the Boulder 
Canyon Project (BCP) under proposed Rate Schedule BCP-F10, and adjust 
the annual calculation for the fiscal year (FY) 2018 base charge and 
rates. The expiration of the current base charge and rates on September 
30, 2017, and beginning of the new 50-year marketing period on October 
1, 2018, require these actions.
    The current base charge under Rate Schedule BCP-F9 is not 
sufficient to cover all annual costs including operation and 
maintenance, replacements, and interest expense; and repay investment 
obligations within the allowable period. After collaborating with the 
BCP contractors, WAPA proposes an FY 2018 base charge that includes a 
one-time $15 million working capital fund primarily for the Bureau of 
Reclamation (Reclamation) for the new marketing period. The FY 2019 
base charge is expected to decrease by $15 million after the collection 
of working capital in FY 2018. The proposed base charge will provide 
sufficient revenue to cover all annual costs and repay investment 
obligations within the allowable period. WAPA will post proposed Rate 
Schedule BCP-F10 and a detailed rate package that identifies the 
reasons for the base charge and rates adjustment on its Web site during 
the consultation and comment period. The proposed base charge and rates 
are scheduled to become effective on October 1, 2017, and will remain 
in effect through September 30, 2018. Publication of this Federal 
Register notice initiates the formal public process to implement the 
proposed rate-setting formulas and the FY 2018 base charge and rates.

DATES: The consultation and comment period begins today and will end 
September 18, 2017. WAPA will present a detailed explanation of the 
proposed rate-setting formulas and the FY 2018 base charge and rates at 
a public information forum that will be held on July 19, 2017, at 10:00 
a.m. Mountain Standard Time (MST) in Phoenix, Arizona. WAPA will accept 
oral and written comments at a public comment forum that will be held 
on August 18, 2017, at 10:00 a.m. MST in Phoenix, Arizona. WAPA will 
accept written comments any time during the consultation and comment 
period.

ADDRESSES: The public information forum and public comment forum will 
be held at WAPA's Desert Southwest Customer Service Regional Office 
located at 615 South 43rd Avenue, Phoenix, Arizona 85009. Send written 
comments to Mr. Ronald E. Moulton, Regional Manager, Desert Southwest 
Customer Service Region, Western Area Power Administration, P.O. Box 
6457, Phoenix, Arizona 85005-6457, email [email protected]. WAPA will 
post information about the rate process, as well as comments received 
via letter and email on its Web site at: http://www.wapa.gov/regions/DSW/Rates/Pages/boulder-canyon-rates.aspx. Written comments must be 
received by the end of the consultation and comment period to be 
considered by WAPA in its decision process.
    United States (U.S.) citizens who want to attend a forum must 
present an official form of picture identification (ID) such as a U.S. 
driver's license, U.S. passport, U.S. government ID, or U.S. military 
ID. Foreign nationals who want to attend a forum must contact Mr. Scott 
Lund, Rates Manager, at (602) 605-2442 or email [email protected] 30 days 
in advance of a forum to obtain the necessary clearance.

FOR FURTHER INFORMATION CONTACT: Mr. Scott Lund, Rates Manager, Desert 
Southwest Customer Service Region, Western Area Power Administration, 
P.O. Box 6457, Phoenix, Arizona 85005-6457, (602) 605-2442, or email 
[email protected].

SUPPLEMENTARY INFORMATION: BCP's base charge and rates for electric 
service are calculated annually based on formulas that are set for a 
five-year period. Since BCP begins a new 50-year marketing period in FY 
2018, WAPA is proposing to update the rate-setting formulas effective 
October 1, 2017 through September 30, 2022. Proposed Rate Schedule BCP-
F10 will update the existing forecast capacity rate formula to reflect 
BCP's current generating capacity of 2,074 megawatts. No other changes 
to the existing rate-setting formulas are proposed.
    The proposed FY 2018 base charge and rates for BCP electric service 
are designed to recover an annual revenue requirement that includes 
operation and maintenance and replacements costs, interest expense, 
investment repayments, payments to states, and visitor services 
expenses. The total costs are offset by the projected revenue from 
water sales, visitor services, ancillary services, and late fees. The 
annual revenue requirement is the base charge for electric service 
divided equally between capacity and energy. The annual composite rate 
is the base charge divided by annual energy sales.
    The proposed Rate Schedule BCP-F10 requires updated financial and 
hydrology data to calculate the annual base charge and rates. The 
proposed base charge for FY 2018 is $85,094,786 and the proposed 
composite rate is 24.39 mills/kilowatt-hour. The following table 
compares the existing and proposed base charge and composite rate:

[[Page 27814]]



                       Comparison of Existing and Proposed Base Charge and Composite Rate
----------------------------------------------------------------------------------------------------------------
                                                  Existing  October 1,     Proposed  October 1,
                                                     2016  through            2017  through       Percent change
                                                   September 30, 2017       September 30, 2018
----------------------------------------------------------------------------------------------------------------
Base Charge ($)...............................               69,662,289               85,094,786              22
Composite Rate (mills/kWh)....................                    19.63                    24.39              24
----------------------------------------------------------------------------------------------------------------

    The proposed FY 2018 base charge includes a one-time $15 million 
working capital fund primarily for Reclamation, which is an increase of 
approximately 22 percent compared to the FY 2017 base charge. Under the 
BCP Electric Service Contracts and Amended and Restated Implementation 
Agreements, Reclamation worked collaboratively with BCP contractors to 
establish the $15 million working capital fund for the new marketing 
period, to be collected in the FY 2018 base charge. The FY 2019 base 
charge is expected to decrease by $15 million after the collection of 
working capital in FY 2018 (subject to Reclamation's annual working 
capital evaluation). The working capital fund accounts for nearly all 
of the increase to the base charge. Increases in annual operation and 
maintenance and replacement costs, and decreases in debt service, 
uprating credits, non-power revenue, and carryover revenue account for 
the remaining increase to the base charge.
    The proposed FY 2018 composite rate represents an increase of 
approximately 24 percent compared to the FY 2017 composite rate. The 
increase in the proposed base charge accounts for the composite rate 
increase.
    This proposal, to be effective October 1, 2017, is preliminary and 
is subject to change upon publication of the final base charge and 
rates.

Legal Authority

    In establishing rate-setting formulas for electric service and the 
base charge and rates for BCP, WAPA will follow the formal public 
process set forth in 10 CFR parts 903 and 904, and review all comments 
it receives on the proposed base charge and rates before taking action.
    WAPA is proposing this action under the Department of Energy (DOE) 
Organization Act (42 U.S.C. 7101-7352); the Reclamation Act of 1902 
(ch. 1093, 32 Stat. 388), as amended and supplemented by subsequent 
enactments; and other acts that specifically apply to the project 
involved.
    By Delegation Order No. 00-037.00B effective November 19, 2016, the 
Secretary of Energy delegated: (1) The authority to develop power and 
transmission rates to WAPA's Administrator; (2) the authority to 
confirm, approve, and place such rates into effect on an interim basis 
to the Deputy Secretary of Energy; and (3) the authority to confirm, 
approve, and place into effect on a final basis, to remand, or to 
disapprove such rates to the Federal Energy Regulatory Commission.

Availability of Information

    All brochures, studies, comments, letters, memorandums, or other 
documents WAPA initiates or uses to develop the proposed rate-setting 
formulas and the base charge and rates will be available for inspection 
and copying at the Desert Southwest Customer Service Regional Office, 
Western Area Power Administration, located at 615 South 43rd Avenue, 
Phoenix, Arizona 85009. Many of these documents and supporting 
information are available on WAPA's Web site at: http://www.wapa.gov/regions/DSW/Rates/Pages/boulder-canyon-rates.aspx.

Ratemaking Procedure Requirements

Environmental Compliance

    In compliance with the National Environmental Policy Act (NEPA) of 
1969, 42 U.S.C. 4321-4347; the Council on Environmental Quality 
Regulations for implementing NEPA (40 CFR parts 1500-1508); and DOE 
NEPA Implementing Procedures and Guidelines (10 CFR part 1021), WAPA is 
in the process of determining whether an environmental assessment or an 
environmental impact statement should be prepared or if this action can 
be categorically excluded from those requirements.

Determination Under Executive Order 12866

    WAPA has an exemption from centralized regulatory review under 
Executive Order 12866; accordingly, no clearance of this notice by the 
Office of Management and Budget is required.

    Dated: May 4, 2017.
Mark A. Gabriel,
Administrator.
[FR Doc. 2017-12700 Filed 6-16-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                   Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices                                             27813

                                                       Applicants: North American Electric                  period on October 1, 2018, require these               and email on its Web site at: http://
                                                    Reliability Corporation.                                actions.                                               www.wapa.gov/regions/DSW/Rates/
                                                       Description: Petition of the North                      The current base charge under Rate                  Pages/boulder-canyon-rates.aspx.
                                                    American Electric Reliability                           Schedule BCP–F9 is not sufficient to                   Written comments must be received by
                                                    Corporation for Approval of                             cover all annual costs including                       the end of the consultation and
                                                    Amendments to the Western Electricity                   operation and maintenance,                             comment period to be considered by
                                                    Coordinating Council Regional                           replacements, and interest expense; and                WAPA in its decision process.
                                                    Reliability Standards Development                       repay investment obligations within the                   United States (U.S.) citizens who
                                                    Procedures.                                             allowable period. After collaborating                  want to attend a forum must present an
                                                       Filed Date: 6/8/17.                                  with the BCP contractors, WAPA                         official form of picture identification
                                                       Accession Number: 20170608–5107.                     proposes an FY 2018 base charge that                   (ID) such as a U.S. driver’s license, U.S.
                                                       Comments Due: 5 p.m. ET 6/29/17.                     includes a one-time $15 million                        passport, U.S. government ID, or U.S.
                                                                                                            working capital fund primarily for the                 military ID. Foreign nationals who want
                                                       The filings are accessible in the
                                                                                                            Bureau of Reclamation (Reclamation) for                to attend a forum must contact Mr. Scott
                                                    Commission’s eLibrary system by
                                                                                                            the new marketing period. The FY 2019                  Lund, Rates Manager, at (602) 605–2442
                                                    clicking on the links or querying the
                                                                                                            base charge is expected to decrease by                 or email slund@wapa.gov 30 days in
                                                    docket number.
                                                                                                            $15 million after the collection of                    advance of a forum to obtain the
                                                       Any person desiring to intervene or
                                                                                                            working capital in FY 2018. The                        necessary clearance.
                                                    protest in any of the above proceedings
                                                                                                            proposed base charge will provide                      FOR FURTHER INFORMATION CONTACT: Mr.
                                                    must file in accordance with Rules 211
                                                                                                            sufficient revenue to cover all annual                 Scott Lund, Rates Manager, Desert
                                                    and 214 of the Commission’s
                                                                                                            costs and repay investment obligations                 Southwest Customer Service Region,
                                                    Regulations (18 CFR 385.211 and
                                                                                                            within the allowable period. WAPA will                 Western Area Power Administration,
                                                    385.214) on or before 5:00 p.m. Eastern
                                                                                                            post proposed Rate Schedule BCP–F10                    P.O. Box 6457, Phoenix, Arizona 85005–
                                                    time on the specified comment date.
                                                                                                            and a detailed rate package that                       6457, (602) 605–2442, or email slund@
                                                    Protests may be considered, but
                                                                                                            identifies the reasons for the base charge             wapa.gov.
                                                    intervention is necessary to become a
                                                                                                            and rates adjustment on its Web site                   SUPPLEMENTARY INFORMATION: BCP’s base
                                                    party to the proceeding.
                                                                                                            during the consultation and comment                    charge and rates for electric service are
                                                       eFiling is encouraged. More detailed                 period. The proposed base charge and
                                                    information relating to filing                                                                                 calculated annually based on formulas
                                                                                                            rates are scheduled to become effective                that are set for a five-year period. Since
                                                    requirements, interventions, protests,                  on October 1, 2017, and will remain in
                                                    service, and qualifying facilities filings                                                                     BCP begins a new 50-year marketing
                                                                                                            effect through September 30, 2018.                     period in FY 2018, WAPA is proposing
                                                    can be found at: http://www.ferc.gov/                   Publication of this Federal Register
                                                    docs-filing/efiling/filing-req.pdf. For                                                                        to update the rate-setting formulas
                                                                                                            notice initiates the formal public                     effective October 1, 2017 through
                                                    other information, call (866) 208–3676                  process to implement the proposed rate-
                                                    (toll free). For TTY, call (202) 502–8659.                                                                     September 30, 2022. Proposed Rate
                                                                                                            setting formulas and the FY 2018 base                  Schedule BCP–F10 will update the
                                                      Dated: June 8, 2017.                                  charge and rates.                                      existing forecast capacity rate formula to
                                                    Kimberly D. Bose,                                       DATES: The consultation and comment                    reflect BCP’s current generating capacity
                                                    Secretary.                                              period begins today and will end                       of 2,074 megawatts. No other changes to
                                                    [FR Doc. 2017–12676 Filed 6–16–17; 8:45 am]             September 18, 2017. WAPA will present                  the existing rate-setting formulas are
                                                    BILLING CODE 6717–01–P                                  a detailed explanation of the proposed                 proposed.
                                                                                                            rate-setting formulas and the FY 2018                     The proposed FY 2018 base charge
                                                                                                            base charge and rates at a public                      and rates for BCP electric service are
                                                    DEPARTMENT OF ENERGY                                    information forum that will be held on                 designed to recover an annual revenue
                                                                                                            July 19, 2017, at 10:00 a.m. Mountain                  requirement that includes operation and
                                                    Western Area Power Administration                       Standard Time (MST) in Phoenix,                        maintenance and replacements costs,
                                                                                                            Arizona. WAPA will accept oral and                     interest expense, investment
                                                    Boulder Canyon Project—Rate Order
                                                                                                            written comments at a public comment                   repayments, payments to states, and
                                                    No. WAPA–178
                                                                                                            forum that will be held on August 18,                  visitor services expenses. The total costs
                                                    AGENCY: Western Area Power                              2017, at 10:00 a.m. MST in Phoenix,                    are offset by the projected revenue from
                                                    Administration, DOE.                                    Arizona. WAPA will accept written                      water sales, visitor services, ancillary
                                                    ACTION: Notice of proposed rate-setting
                                                                                                            comments any time during the                           services, and late fees. The annual
                                                    formulas for electric service and                       consultation and comment period.                       revenue requirement is the base charge
                                                    adjustment of fiscal year 2018 base                     ADDRESSES: The public information                      for electric service divided equally
                                                    charge and rates.                                       forum and public comment forum will                    between capacity and energy. The
                                                                                                            be held at WAPA’s Desert Southwest                     annual composite rate is the base charge
                                                    SUMMARY:   Western Area Power                           Customer Service Regional Office                       divided by annual energy sales.
                                                    Administration (WAPA) is proposing to                   located at 615 South 43rd Avenue,                         The proposed Rate Schedule BCP–F10
                                                    update the rate-setting formulas for                    Phoenix, Arizona 85009. Send written                   requires updated financial and
                                                    electric service for the Boulder Canyon                 comments to Mr. Ronald E. Moulton,                     hydrology data to calculate the annual
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    Project (BCP) under proposed Rate                       Regional Manager, Desert Southwest                     base charge and rates. The proposed
                                                    Schedule BCP–F10, and adjust the                        Customer Service Region, Western Area                  base charge for FY 2018 is $85,094,786
                                                    annual calculation for the fiscal year                  Power Administration, P.O. Box 6457,                   and the proposed composite rate is
                                                    (FY) 2018 base charge and rates. The                    Phoenix, Arizona 85005–6457, email                     24.39 mills/kilowatt-hour. The
                                                    expiration of the current base charge                   moulton@wapa.gov. WAPA will post                       following table compares the existing
                                                    and rates on September 30, 2017, and                    information about the rate process, as                 and proposed base charge and
                                                    beginning of the new 50-year marketing                  well as comments received via letter                   composite rate:




                                               VerDate Sep<11>2014   17:09 Jun 16, 2017   Jkt 241001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                    27814                                   Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices

                                                                                       COMPARISON OF EXISTING AND PROPOSED BASE CHARGE AND COMPOSITE RATE
                                                                                                                                                                           Existing                     Proposed
                                                                                                                                                                       October 1, 2016               October 1, 2017      Percent
                                                                                                                                                                           through                       through          change
                                                                                                                                                                     September 30, 2017            September 30, 2018

                                                    Base Charge ($) ..........................................................................................                    69,662,289                 85,094,786             22
                                                    Composite Rate (mills/kWh) ........................................................................                                19.63                      24.39             24



                                                       The proposed FY 2018 base charge                                   authority to develop power and                                   ENVIRONMENTAL PROTECTION
                                                    includes a one-time $15 million                                       transmission rates to WAPA’s                                     AGENCY
                                                    working capital fund primarily for                                    Administrator; (2) the authority to
                                                                                                                                                                                           [EPA–R05–RCRA–2017–0228; FRL–9963–
                                                    Reclamation, which is an increase of                                  confirm, approve, and place such rates                           63–Region 5]
                                                    approximately 22 percent compared to                                  into effect on an interim basis to the
                                                    the FY 2017 base charge. Under the BCP                                Deputy Secretary of Energy; and (3) the                          Illinois: Notice of Determination of
                                                    Electric Service Contracts and Amended                                authority to confirm, approve, and place                         Adequacy of Illinois’ Research,
                                                    and Restated Implementation                                           into effect on a final basis, to remand,                         Development and Demonstration
                                                    Agreements, Reclamation worked                                        or to disapprove such rates to the                               (RD&D) Permit Provisions for
                                                    collaboratively with BCP contractors to                               Federal Energy Regulatory Commission.                            Municipal Solid Waste Landfills
                                                    establish the $15 million working                                                                                                      (MSWLF)
                                                                                                                          Availability of Information
                                                    capital fund for the new marketing
                                                    period, to be collected in the FY 2018                                   All brochures, studies, comments,                             AGENCY: Environmental Protection
                                                    base charge. The FY 2019 base charge is                               letters, memorandums, or other                                   Agency (EPA).
                                                    expected to decrease by $15 million                                   documents WAPA initiates or uses to                              ACTION: Notice.
                                                    after the collection of working capital in                            develop the proposed rate-setting
                                                                                                                          formulas and the base charge and rates                           SUMMARY:    On May 10, 2016, the
                                                    FY 2018 (subject to Reclamation’s
                                                                                                                          will be available for inspection and                             Environmental Protection Agency (EPA)
                                                    annual working capital evaluation). The
                                                                                                                          copying at the Desert Southwest                                  issued a revision to the regulations
                                                    working capital fund accounts for nearly
                                                                                                                          Customer Service Regional Office,                                allowing RD&D permits to increase the
                                                    all of the increase to the base charge.
                                                                                                                          Western Area Power Administration,                               number of permit renewals allowed to
                                                    Increases in annual operation and
                                                                                                                          located at 615 South 43rd Avenue,                                six, for a total permit term of up to 21
                                                    maintenance and replacement costs, and
                                                                                                                          Phoenix, Arizona 85009. Many of these                            years.
                                                    decreases in debt service, uprating                                                                                                       On March 21, 2017, the Illinois
                                                    credits, non-power revenue, and                                       documents and supporting information
                                                                                                                          are available on WAPA’s Web site at:                             Environmental Protection Agency
                                                    carryover revenue account for the                                                                                                      (IEPA) submitted a notification to EPA
                                                    remaining increase to the base charge.                                http://www.wapa.gov/regions/DSW/
                                                                                                                          Rates/Pages/boulder-canyon-rates.aspx.                           Region 5 seeking Federal approval of its
                                                       The proposed FY 2018 composite rate
                                                                                                                                                                                           revised RD&D requirements per the
                                                    represents an increase of approximately                               Ratemaking Procedure Requirements                                procedures. Subject to public review
                                                    24 percent compared to the FY 2017
                                                                                                                          Environmental Compliance                                         and comment, this action approves
                                                    composite rate. The increase in the
                                                                                                                                                                                           Illinois’ revised RD&D permit
                                                    proposed base charge accounts for the                                    In compliance with the National                               requirements.
                                                    composite rate increase.                                              Environmental Policy Act (NEPA) of
                                                       This proposal, to be effective October                                                                                              DATES: This determination of adequacy
                                                                                                                          1969, 42 U.S.C. 4321–4347; the Council
                                                    1, 2017, is preliminary and is subject to                                                                                              of the RD&D permit program for Illinois
                                                                                                                          on Environmental Quality Regulations
                                                    change upon publication of the final                                                                                                   will become effective August 18, 2017
                                                                                                                          for implementing NEPA (40 CFR parts
                                                    base charge and rates.                                                                                                                 unless adverse comments are received.
                                                                                                                          1500–1508); and DOE NEPA
                                                                                                                                                                                           If adverse comments are received, EPA
                                                    Legal Authority                                                       Implementing Procedures and
                                                                                                                                                                                           will review those comments and
                                                                                                                          Guidelines (10 CFR part 1021), WAPA
                                                       In establishing rate-setting formulas                                                                                               publish another Federal Register
                                                                                                                          is in the process of determining whether
                                                    for electric service and the base charge                                                                                               document responding to those
                                                                                                                          an environmental assessment or an
                                                    and rates for BCP, WAPA will follow                                                                                                    comments and either affirm or revise
                                                                                                                          environmental impact statement should
                                                    the formal public process set forth in 10                                                                                              EPA’s initial decision. Comments on
                                                                                                                          be prepared or if this action can be
                                                    CFR parts 903 and 904, and review all                                                                                                  this determination of adequacy must be
                                                                                                                          categorically excluded from those
                                                    comments it receives on the proposed                                                                                                   received on or before July 19, 2017.
                                                                                                                          requirements.
                                                    base charge and rates before taking                                                                                                    ADDRESSES: Submit your comments,
                                                    action.                                                               Determination Under Executive Order                              identified by Docket ID No. EPA–R05–
                                                       WAPA is proposing this action under                                12866                                                            RCRA–2017–0228, to the Federal
                                                    the Department of Energy (DOE)                                          WAPA has an exemption from                                     eRulemaking Portal: https://
                                                    Organization Act (42 U.S.C. 7101–7352);                               centralized regulatory review under                              www.regulations.gov. Follow the online
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    the Reclamation Act of 1902 (ch. 1093,                                Executive Order 12866; accordingly, no                           instructions for submitting comments.
                                                    32 Stat. 388), as amended and                                         clearance of this notice by the Office of                        Once submitted, comments cannot be
                                                    supplemented by subsequent                                            Management and Budget is required.                               edited or withdrawn. The EPA may
                                                    enactments; and other acts that                                                                                                        publish any comment received to its
                                                    specifically apply to the project                                      Dated: May 4, 2017.                                             public docket. Do not submit
                                                    involved.                                                             Mark A. Gabriel,                                                 electronically any information you
                                                       By Delegation Order No. 00–037.00B                                 Administrator.                                                   consider to be Confidential Business
                                                    effective November 19, 2016, the                                      [FR Doc. 2017–12700 Filed 6–16–17; 8:45 am]                      Information (CBI) or other information
                                                    Secretary of Energy delegated: (1) The                                BILLING CODE 6450–01–P                                           whose disclosure is restricted by statute.


                                               VerDate Sep<11>2014        17:09 Jun 16, 2017       Jkt 241001     PO 00000       Frm 00033      Fmt 4703         Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1



Document Created: 2017-06-17 01:48:06
Document Modified: 2017-06-17 01:48:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed rate-setting formulas for electric service and adjustment of fiscal year 2018 base charge and rates.
DatesThe consultation and comment period begins today and will end September 18, 2017. WAPA will present a detailed explanation of the proposed rate-setting formulas and the FY 2018 base charge and rates at a public information forum that will be held on July 19, 2017, at 10:00 a.m. Mountain Standard Time (MST) in Phoenix, Arizona. WAPA will accept oral and written comments at a public comment forum that will be held on August 18, 2017, at 10:00 a.m. MST in Phoenix, Arizona. WAPA will accept written comments any time during the consultation and comment period.
ContactMr. Scott Lund, Rates Manager, Desert Southwest Customer Service Region, Western Area Power Administration, P.O. Box 6457, Phoenix, Arizona 85005-6457, (602) 605-2442, or email [email protected]