82_FR_28430 82 FR 28312 - Davis & Weber Counties Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

82 FR 28312 - Davis & Weber Counties Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 118 (June 21, 2017)

Page Range28312-28313
FR Document2017-12929

Federal Register, Volume 82 Issue 118 (Wednesday, June 21, 2017)
[Federal Register Volume 82, Number 118 (Wednesday, June 21, 2017)]
[Notices]
[Pages 28312-28313]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-12929]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-12-000]


Davis & Weber Counties Canal Company; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On June 6, 2017, as supplemented on June 9, 2017, Davis & Weber 
Counties Canal Company filed a notice of intent to construct a 
qualifying conduit hydropower facility, pursuant to section 30 of the 
Federal Power Act (FPA), as amended by section 4 of the Hydropower 
Regulatory Efficiency Act of 2013 (HREA). The proposed Davis & Weber 
Canal Micro-Hydropower Project would have an installed capacity of 20 
kilowatts (kW), and would be located within the existing Davis & Weber 
Canal located in South Weber, Davis County, Utah.
    Applicant Contact: Richard Smith, General Manager, 138 West 1300 
North, Sunset, UT 84015, Phone No. (801) 774-6373.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) Initially installing two self-contained, 
5-kW turbine/generating units, with the future installation of two 
additional self-contained, 5-kW turbine/generating units for a total 
installed capacity of 20 kW; (2) an approximately 6-foot by 6-foot 
control shelter; and (3) appurtenant facilities. The proposed project 
would have an estimated annual generating capacity of 22,000 kilowatt-
hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                              Satisfies
       Statutory provision                Description           (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by     The conduit the facility           Y
 HREA.                              uses is a tunnel,
                                    canal, pipeline,
                                    aqueduct, flume, ditch,
                                    or similar manmade
                                    water conveyance that
                                    is operated for the
                                    distribution of water
                                    for agricultural,
                                    municipal, or
                                    industrial consumption
                                    and not primarily for
                                    the generation of
                                    electricity.
FPA 30(a)(3)(C)(i), as amended by  The facility is                    Y
 HREA.                              constructed, operated,
                                    or maintained for the
                                    generation of electric
                                    power and uses for such
                                    generation only the
                                    hydroelectric potential
                                    of a non-federally
                                    owned conduit.
FPA 30(a)(3)(C)(ii), as amended    The facility has an                Y
 by HREA.                           installed capacity that
                                    does not exceed 5
                                    megawatts.
FPA 30(a)(3)(C)(iii), as amended   On or before August 9,             Y
 by HREA.                           2013, the facility is
                                    not licensed, or
                                    exempted from the
                                    licensing requirements
                                    of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project within the agricultural and irrigation canal will 
not alter its primary purpose. Therefore, based upon the above 
information and criteria, Commission staff preliminarily determines 
that the proposal satisfies the requirements for a qualifying conduit 
hydropower facility, which is not required to be licensed or exempted 
from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A 
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) 
state in the heading the name of the applicant and the project number 
of the application to which the filing responds; (3) state the name, 
address, and telephone number of the person filing; and (4) otherwise 
comply with the requirements of sections 385.2001 through 385.2005 of 
the Commission's regulations.\1\ All comments contesting Commission 
staff's preliminary determination that the facility meets the 
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2016).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at

[[Page 28313]]

[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD17-12) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: June 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12929 Filed 6-20-17; 8:45 am]
BILLING CODE 6717-01-P



                                                    28312                        Federal Register / Vol. 82, No. 118 / Wednesday, June 21, 2017 / Notices

                                                    appropriate action to take, the                         in this proceeding, in accordance with                 Weber Canal Micro-Hydropower Project
                                                    Commission will consider all protests or                18 CFR 385.2010.                                       would have an installed capacity of 20
                                                    other comments filed, but only those                      Dated: June 15, 2017.                                kilowatts (kW), and would be located
                                                    who file a motion to intervene in                       Kimberly D. Bose,                                      within the existing Davis & Weber Canal
                                                    accordance with the Commission’s                                                                               located in South Weber, Davis County,
                                                                                                            Secretary.
                                                    Rules may become a party to the                                                                                Utah.
                                                                                                            [FR Doc. 2017–12928 Filed 6–20–17; 8:45 am]
                                                    proceeding. Any comments, protests, or                                                                           Applicant Contact: Richard Smith,
                                                                                                            BILLING CODE 6717–01–P
                                                    motions to intervene must be received                                                                          General Manager, 138 West 1300 North,
                                                    on or before the specified comment date                                                                        Sunset, UT 84015, Phone No. (801) 774–
                                                    for the particular application.                                                                                6373.
                                                                                                            DEPARTMENT OF ENERGY
                                                                                                                                                                     FERC Contact: Christopher Chaney,
                                                       o. Filing and Service of Documents:                                                                         Phone No. (202) 502–6778, email:
                                                    Any filing must (1) bear in all capital                 Federal Energy Regulatory
                                                                                                            Commission                                             Christopher.Chaney@ferc.gov.
                                                    letters the title COMMENTS, PROTEST,                                                                             Qualifying Conduit Hydropower
                                                    or MOTION TO INTERVENE as                               [Docket No. CD17–12–000]                               Facility Description: The proposed
                                                    applicable; (2) set forth in the heading                                                                       project would consist of: (1) Initially
                                                    the name of the applicant and the                       Davis & Weber Counties Canal
                                                                                                                                                                   installing two self-contained, 5-kW
                                                    project number of the application to                    Company; Notice of Preliminary
                                                                                                                                                                   turbine/generating units, with the future
                                                    which the filing responds; (3) furnish                  Determination of a Qualifying Conduit
                                                                                                                                                                   installation of two additional self-
                                                    the name, address, and telephone                        Hydropower Facility and Soliciting
                                                                                                                                                                   contained, 5-kW turbine/generating
                                                    number of the person commenting,                        Comments and Motions To Intervene
                                                                                                                                                                   units for a total installed capacity of 20
                                                    protesting or intervening; and (4)                        On June 6, 2017, as supplemented on                  kW; (2) an approximately 6-foot by 6-
                                                    otherwise comply with the requirements                  June 9, 2017, Davis & Weber Counties                   foot control shelter; and (3) appurtenant
                                                    of 18 CFR 385.2001 through 385.2005.                    Canal Company filed a notice of intent                 facilities. The proposed project would
                                                    All comments, motions to intervene, or                  to construct a qualifying conduit                      have an estimated annual generating
                                                    protests must set forth their evidentiary               hydropower facility, pursuant to section               capacity of 22,000 kilowatt-hours.
                                                    basis. Any filing made by an intervenor                 30 of the Federal Power Act (FPA), as                    A qualifying conduit hydropower
                                                    must be accompanied by proof of                         amended by section 4 of the                            facility is one that is determined or
                                                    service on all persons listed in the                    Hydropower Regulatory Efficiency Act                   deemed to meet all of the criteria shown
                                                    service list prepared by the Commission                 of 2013 (HREA). The proposed Davis &                   in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                          Satisfies
                                                                 Statutory provision                                                                 Description                                           (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ....             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or              Y
                                                                                                           similar manmade water conveyance that is operated for the distribution of water for
                                                                                                           agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                           tion of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric                 Y
                                                                                                           power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                           ally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended by HREA              The facility has an installed capacity that does not exceed 5 megawatts ......................      Y
                                                    FPA 30(a)(3)(C)(iii), as amended by HREA             On or before August 9, 2013, the facility is not licensed, or exempted from the licens-             Y
                                                                                                           ing requirements of Part I of the FPA.



                                                       Preliminary Determination: The                          Anyone may submit comments or a                     385.2001 through 385.2005 of the
                                                    proposed addition of the hydroelectric                  motion to intervene in accordance with                 Commission’s regulations.1 All
                                                    project within the agricultural and                     the requirements of Rules of Practice                  comments contesting Commission staff’s
                                                    irrigation canal will not alter its primary             and Procedure, 18 CFR 385.210 and                      preliminary determination that the
                                                    purpose. Therefore, based upon the                      385.214. Any motions to intervene must                 facility meets the qualifying criteria
                                                    above information and criteria,                         be received on or before the specified                 must set forth their evidentiary basis.
                                                    Commission staff preliminarily                          deadline date for the particular                          The Commission strongly encourages
                                                    determines that the proposal satisfies                  proceeding.                                            electronic filing. Please file motions to
                                                    the requirements for a qualifying                          Filing and Service of Responsive                    intervene and comments using the
                                                    conduit hydropower facility, which is                   Documents: All filings must (1) bear in                Commission’s eFiling system at http://
                                                    not required to be licensed or exempted                 all capital letters the COMMENTS                       www.ferc.gov/docs-filing/efiling.asp.
                                                    from licensing.                                         CONTESTING QUALIFICATION FOR A                         Commenters can submit brief comments
                                                                                                            CONDUIT HYDROPOWER FACILITY or                         up to 6,000 characters, without prior
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                       Comments and Motions to Intervene:
                                                    Deadline for filing comments contesting                 MOTION TO INTERVENE, as                                registration, using the eComment system
                                                    whether the facility meets the qualifying               applicable; (2) state in the heading the               at http://www.ferc.gov/docs-filing/
                                                    criteria is 45 days from the issuance                   name of the applicant and the project                  ecomment.asp. You must include your
                                                                                                            number of the application to which the                 name and contact information at the end
                                                    date of this notice.
                                                                                                            filing responds; (3) state the name,                   of your comments. For assistance,
                                                       Deadline for filing motions to                       address, and telephone number of the                   please contact FERC Online Support at
                                                    intervene is 30 days from the issuance                  person filing; and (4) otherwise comply
                                                    date of this notice.                                    with the requirements of sections                       1 18   CFR 385.2001–2005 (2016).



                                               VerDate Sep<11>2014   19:12 Jun 20, 2017   Jkt 241001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM    21JNN1


                                                                                 Federal Register / Vol. 82, No. 118 / Wednesday, June 21, 2017 / Notices                                                  28313

                                                    FERCOnlineSupport@ferc.gov, (866)              Description: § 205(d) Rate Filing:                              requirements, interventions, protests,
                                                    208–3676 (toll free), or (202) 502–8659     Nautilus MBR Tariff to be effective                                service, and qualifying facilities filings
                                                    (TTY). In lieu of electronic filing, please 6/15/2017.                                                         can be found at: http://www.ferc.gov/
                                                    send a paper copy to: Secretary, Federal       Filed Date: 6/15/17.                                            docs-filing/efiling/filing-req.pdf. For
                                                    Energy Regulatory Commission, 888              Accession Number: 20170615–5077.                                other information, call (866) 208–3676
                                                    First Street NE., Washington, DC 20426.        Comments Due: 5 p.m. ET 7/6/17.                                 (toll free). For TTY, call (202) 502–8659.
                                                    A copy of all other filings in reference       Docket Numbers: ER17–1837–000.                                    Dated: June 15, 2017.
                                                    to this application must be accompanied        Applicants: PJM Interconnection,                                Kimberly D. Bose,
                                                    by proof of service on all persons listed   L.L.C.                                                             Secretary.
                                                    in the service list prepared by the            Description: § 205(d) Rate Filing:                              [FR Doc. 2017–12925 Filed 6–20–17; 8:45 am]
                                                    Commission in this proceeding, in           Queue Position #AC1–027, Original                                  BILLING CODE 6717–01–P
                                                    accordance with 18 CFR 4.34(b) and          Service Agreement No. 4727 to be
                                                    385.2010.                                   effective 5/17/2017.
                                                      Locations of Notice of Intent: Copies        Filed Date: 6/15/17.                                            DEPARTMENT OF ENERGY
                                                    of the notice of intent can be obtained        Accession Number: 20170615–5109.
                                                    directly from the applicant or such            Comments Due: 5 p.m. ET 7/6/17.                                 Federal Energy Regulatory
                                                    copies can be viewed and reproduced at         Docket Numbers: ER17–1838–000.                                  Commission
                                                    the Commission in its Public Reference         Applicants: PJM Interconnection,
                                                    Room, Room 2A, 888 First Street NE.,                                                                           [Docket Nos. CP17–458–000; PF17–3–000]
                                                                                                L.L.C.
                                                    Washington, DC 20426. The filing may           Description: § 205(d) Rate Filing:                              Midship Pipeline Company, LLC;
                                                    also be viewed on the web at http://        Queue Position #AC1–112, Original                                  Notice of Application
                                                    www.ferc.gov/docs-filing/elibrary.asp       Service Agreement No. 4728 to be
                                                    using the ‘‘eLibrary’’ link. Enter the      effective 5/17/2017.                                                  Take notice that on May 31, 2017,
                                                    docket number (i.e., CD17–12) in the           Filed Date: 6/15/17.                                            Midship Pipeline Company, LLC
                                                    docket number field to access the              Accession Number: 20170615–5110.                                (Midship), 700 Milam Street, Suite
                                                    document. For assistance, call toll-free       Comments Due: 5 p.m. ET 7/6/17.                                 1900, Houston, TX 77002, filed in
                                                    1–866–208–3676 or email                                                                                        Docket No. CP17–458–000, an
                                                    FERCOnlineSupport@ferc.gov. For TTY,           Docket Numbers: ER17–1839–000.
                                                                                                   Applicants: Duke Energy Progress,                               application, pursuant to Section 7(c) of
                                                    call (202) 502–8659.                                                                                           the Natural Gas Act (NGA) and Parts
                                                                                                LLC.
                                                       Dated: June 15, 2017.                       Description: § 205(d) Rate Filing:                              157 and 284 of the Commission’s
                                                    Kimberly D. Bose,                           DEP–RS No. 172 and 180 Revised PPAs                                regulations requesting authorization to
                                                    Secretary.                                  to be effective 7/1/2017.                                          construct, own and operate a new 199.4-
                                                    [FR Doc. 2017–12929 Filed 6–20–17; 8:45 am]    Filed Date: 6/15/17.                                            mile natural gas pipeline system
                                                    BILLING CODE 6717–01–P                         Accession Number: 20170615–5130.                                (Midcontinent Supply Header Interstate
                                                                                                   Comments Due: 5 p.m. ET 7/6/17.                                 Pipeline Project or Midship Project).
                                                                                                                                                                   The project also includes three new
                                                                                                   Docket Numbers: ER17–1840–000.
                                                    DEPARTMENT OF ENERGY                                                                                           mainline compressor stations and one
                                                                                                   Applicants: Canton Mountain Wind,
                                                                                                                                                                   lateral booster station rated for a total of
                                                                                                LLC.
                                                    Federal Energy Regulatory                                                                                      118,440 horsepower (hp), metering and
                                                                                                   Description: Baseline eTariff Filing:
                                                    Commission                                                                                                     regulating stations, and appurtenant
                                                                                                Application for Order Accepting Initial
                                                                                                                                                                   facilities with a total system capacity of
                                                    Combined Notice of Filings #2               Tariff to be effective 8/14/2017.
                                                                                                                                                                   1,440 MMcf/d. The project will also
                                                                                                   Filed Date: 6/15/17.
                                                       Take notice that the Commission                                                                             include 20.3 miles of 30-inch diameter
                                                                                                   Accession Number: 20170615–5139.
                                                    received the following electric rate                                                                           pipeline lateral in Kingfisher County,
                                                                                                   Comments Due: 5 p.m. ET 7/6/17.
                                                    filings:                                                                                                       Oklahoma, and 13.6 miles of 16-inch
                                                                                                   Docket Numbers: ER17–1841–000.                                  diameter pipeline lateral in Stephens,
                                                       Docket Numbers: ER17–1715–001.              Applicants: Moxie Freedom LLC.                                  Carter, and Garvin Counties Oklahoma.
                                                       Applicants: Pacific Gas and Electric        Description: Baseline eTariff Filing:                           The proposed project will provide firm
                                                    Company.                                    MBR tariff to be effective 8/15/2017.                              transportation capacity from the South
                                                       Description: Tariff Amendment: Errata       Filed Date: 6/15/17.                                            Central Oklahoma Oil Province
                                                    to May 2017 Western WDT Service                Accession Number: 20170615–5141.                                (SCOOP) and the Sooner Trend
                                                    Agreement Biannual Filing to be                Comments Due: 5 p.m. ET 7/6/17.                                 Anadarko Basin Canadian and
                                                    effective 8/1/2017.                            The filings are accessible in the                               Kingfisher (STACK) plays in the
                                                       Filed Date: 6/15/17.                     Commission’s eLibrary system by                                    Anadarko Basin in Oklahoma to existing
                                                       Accession Number: 20170615–5144.         clicking on the links or querying the                              natural gas pipelines near Bennington,
                                                       Comments Due: 5 p.m. ET 7/6/17.          docket number.                                                     Oklahoma for transport to growing Gulf
                                                       Docket Numbers: ER17–1835–000.              Any person desiring to intervene or                             Coast and Southeast markets.
                                                       Applicants: PJM Interconnection,         protest in any of the above proceedings                               Midship also requests a blanket
                                                    L.L.C.                                      must file in accordance with Rules 211                             certificate pursuant to Part 157, Subpart
                                                       Description: § 205(d) Rate Filing:
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                and 214 of the Commission’s                                        F of the Commission’s regulations,
                                                    Original Service Agreement No. 4722;        Regulations (18 CFR 385.211 and                                    authorizing Midship to construct and
                                                    Queue AC1–118 (WMPA) to be effective 385.214) on or before 5:00 p.m. Eastern                                   operate certain facilities as described in
                                                    5/17/2017.                                  time on the specified comment date.                                Part 157, Subpart F, and a blanket
                                                       Filed Date: 6/15/17.                     Protests may be considered, but                                    certificate pursuant to Part 284, Subpart
                                                       Accession Number: 20170615–5072.         intervention is necessary to become a                              G of the Commission’s regulations,
                                                       Comments Due: 5 p.m. ET 7/6/17.          party to the proceeding.                                           authorizing Midship to provide open
                                                       Docket Numbers: ER17–1836–000.              eFiling is encouraged. More detailed                            access firm and interruptible interstate
                                                       Applicants: Nautilus Power, LLC.         information relating to filing                                     natural gas transportation and parking


                                               VerDate Sep<11>2014   19:12 Jun 20, 2017   Jkt 241001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\21JNN1.SGM   21JNN1



Document Created: 2018-11-14 10:09:20
Document Modified: 2018-11-14 10:09:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 28312 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR