The Coast Guard has issued a temporary deviation from the operating schedule that governs the Amtrak Bridge across Thames River, mile 3.0, at New London, CT. This action is necessary to complete installation of an emergency generator. This deviation allows the bridge to require a two hour advance notice for openings during nighttime hours.

Federal Register, Volume 82 Issue 120 (Friday, June 23, 2017)
[Federal Register Volume 82, Number 120 (Friday, June 23, 2017)]
[Rules and Regulations]
[Pages 28552-28553]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-13165]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0517]


Drawbridge Operation Regulation; Thames River, New London, CT

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating

[[Page 28553]]

schedule that governs the Amtrak Bridge across Thames River, mile 3.0, 
at New London, CT. This action is necessary to complete installation of 
an emergency generator. This deviation allows the bridge to require a 
two hour advance notice for openings during nighttime hours.

DATES: This deviation is effective from 9 p.m. on July 31, 2017 to 7 
a.m. on September 12, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0517 is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email James L. Rousseau, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
617-223-8619, email [email protected].

SUPPLEMENTARY INFORMATION: Amtrak, the owner of the bridge, requested a 
temporary deviation in order to facilitate installation of a lift span 
emergency generator. The Amtrak Bridge across the Thames River, mile 
3.0 at New London, Connecticut has a horizontal clearance of 150 feet 
and a vertical clearance of 29 feet at mean high water and 31 feet at 
mean low water in the closed position. The bridge has a vertical 
clearance of 75 feet in the intermediate raised position and 135 feet 
in the fully open position at mean high water. The existing drawbridge 
operating regulations are listed at 33 CFR 117.224.
    This temporary deviation will allow the Amtrak Bridge to require a 
2 hour advance notice between 9 p.m. and 7 a.m. from July 31, 2017 to 
September 12, 2017, while a crane barge is present next to the lift 
span. The presence of the crane barge reduces the horizontal clearance 
to 70 feet. Additionally, between July 31, 2017 and September 10, 2017 
the lift span will be in the down position during daytime hours but 
will be able to open when requested.
    The waterway is transited by recreational traffic, commercial 
vessels, ferries, and military vessels. Vessels that can pass under the 
bridge without an opening may do so at all times. When the barge is 
located next to the lift span, the bridge will not be able to open 
immediately for emergencies. There is no alternate route for vessels 
unable to pass through the bridge when in the closed position.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by this temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: June 20, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-13165 Filed 6-22-17; 8:45 am]
 BILLING CODE 9110-04-P



                                             28552                Federal Register / Vol. 82, No. 120 / Friday, June 23, 2017 / Rules and Regulations

                                             include $68,638 for administrative                      reduce the burden on producers. In                        A small business guide on complying
                                             expenses, $35,437 for travel/office                     addition, the Committee’s meeting was                  with fruit, vegetable, and specialty crop
                                             expenses, and $15,000 for marketing                     widely publicized throughout the Idaho-                marketing agreements and orders may
                                             order contingency. Budgeted expenses                    Eastern Oregon potato industry and all                 be viewed at: http://www.ams.usda.gov/
                                             for these items in 2015–2016 were                       interested persons were invited to                     rules-regulations/moa/small-businesses.
                                             $64,901, $37,340, and $15,000,                          attend the meeting and participate in                  Any questions about the compliance
                                             respectively.                                           Committee deliberations on all issues.                 guide should be sent to Richard Lower
                                                The lower assessment rate is                         Like all Committee meetings, the                       at the previously mentioned address in
                                             necessary to reduce the reserve balance                 November 9, 2016, meeting was a public                 the FOR FURTHER INFORMATION CONTACT
                                             to less than approximately one fiscal                   meeting and all entities, both large and               section.
                                             period’s budgeted expenses. The reserve                 small, were able to express views on                      After consideration of all relevant
                                             balance on July 31, 2017, is projected to               this issue.                                            material presented, including the
                                             be $158,275. Assessment income for the                     In accordance with the Paperwork                    information and recommendation
                                             2017–2018 fiscal period is estimated at                 Reduction Act of 1995, (44 U.S.C.                      submitted by the Committee and other
                                             $64,000, while expenses are estimated                   Chapter 35), the order’s information                   available information, it is hereby found
                                             to be $119,075. The Committee                           collection requirements have been                      that this rule, as hereinafter set forth,
                                             anticipates compensating for the                        previously approved by OMB and                         will tend to effectuate the declared
                                             reduced assessment revenue with                         assigned OMB No. 0581–0178 (Generic                    policy of the Act.
                                             $5,100 from miscellaneous income,                       Vegetable and Specialty Crops). No
                                             $100 from interest income, and $49,875                                                                         List of Subjects in 7 CFR Part 945
                                                                                                     changes in those requirements as a
                                             from its reserve fund. The reserve fund                 result of this action are necessary.                     Marketing agreements, Potatoes,
                                             is projected to be under the maximum                    Should any changes become necessary,                   Reporting and recordkeeping
                                             authorized level at the end of the 2017–                they would be submitted to OMB for                     requirements.
                                             2018 fiscal period.                                     approval.                                                For the reasons set forth in the
                                                The Committee discussed alternatives                                                                        preamble, 7 CFR part 945 is amended as
                                                                                                        This rule imposes no additional
                                             to this change, including suspending                                                                           follows:
                                                                                                     reporting or recordkeeping requirements
                                             assessments for one year,
                                                                                                     on either small or large Idaho-Eastern
                                             recommending other assessment rate                                                                             PART 945—IRISH POTATOES GROWN
                                                                                                     Oregon potato handlers. As with all
                                             levels, and leaving the current rate in                                                                        IN CERTAIN DESIGNATED COUNTIES
                                                                                                     Federal marketing order programs,
                                             place. Prior to arriving at this                                                                               IN IDAHO, AND MALHEUR COUNTY,
                                                                                                     reports and forms are periodically
                                             assessment rate recommendation, the                                                                            OREGON
                                                                                                     reviewed to reduce information
                                             Committee considered information from
                                                                                                     requirements and duplication by
                                             the Board’s Executive Committee on the                                                                         ■ 1. The authority citation for 7 CFR
                                                                                                     industry and public sector agencies. As
                                             cost savings resulting from recent                                                                             part 945 continues to read as follows:
                                             administrative changes in the                           noted in the initial regulatory flexibility
                                                                                                     analysis, USDA has not identified any                      Authority: 7 U.S.C. 601–674.
                                             Committee office and the level of
                                             anticipated Committee expenses moving                   relevant Federal rules that duplicate,                 ■ 2. Section 945.249 is revised to read
                                             forward. The Committee debated                          overlap, or conflict with this final rule.             as follows:
                                             between suspending assessments for                         AMS is committed to complying with
                                                                                                     the E-Government Act, to promote the                   § 945.249    Assessment rate.
                                             one year and recommending the
                                             assessment rate be lowered to $0.002                    use of the internet and other                            On and after August 1, 2017, an
                                             per hundredweight of potatoes. Based                    information technologies to provide                    assessment rate of $0.002 per
                                             on the market and shipping quantities,                  increased opportunities for citizen                    hundredweight is established for Idaho-
                                             the Committee recommended the rate of                   access to Government information and                   Eastern Oregon potatoes.
                                             $0.002 per hundredweight. The                           services, and for other purposes.                        Dated: June 20, 2017.
                                             Committee believes this assessment rate,                   A proposed rule concerning this                     Erin Morris,
                                             in combination with other income,                       action was published in the Federal                    Associate Administrator, Agricultural
                                             interest earned, and funds utilized from                Register on March 21, 2017 (82 FR                      Marketing Service.
                                             the Committee’s financial reserve, will                 14485). Copies of the proposed rule                    [FR Doc. 2017–13174 Filed 6–22–17; 8:45 am]
                                             provide sufficient funds to meet its                    were also mailed or sent via facsimile to
                                                                                                                                                            BILLING CODE 3410–02–P
                                             expenses.                                               all Idaho-E. Oregon potato handlers.
                                                A review of historical information and               Finally, the proposal was made
                                             preliminary information pertaining to                   available through the internet by USDA
                                                                                                     and the Office of the Federal Register. A              DEPARTMENT OF HOMELAND
                                             the upcoming fiscal period indicates                                                                           SECURITY
                                             that the producer price for the 2017 crop               30-day comment period ending April
                                             could range between $6.00 and $9.00                     20, 2017, was provided for interested                  Coast Guard
                                             per hundredweight of potatoes.                          persons to respond to the proposal.
                                             Therefore, the estimated assessment                        Two comments were received during                   33 CFR Part 117
                                             revenue for the 2017–2018 fiscal period                 the comment period in response to the
                                             as a percentage of total producer                       proposal. Both comments were received                  [Docket No. USCG–2017–0517]
                                             revenue could range between 0.022 and                   from outside of the regulated production
                                                                                                     area. One comment supported the                        Drawbridge Operation Regulation;
                                             0.033 percent.
Pmangrum on DSK7TPTVN1PROD with RULES




                                                This action decreases the assessment                 proposed assessment decrease. The                      Thames River, New London, CT
                                             obligation imposed on handlers.                         other comment did not support the                      AGENCY: Coast Guard, DHS.
                                             Assessments are applied uniformly on                    proposal, however, it did not address                  ACTION:Notice of deviation from
                                             all handlers, and some of the costs may                 the merits of the proposed rule.                       drawbridge regulation.
                                             be passed on to producers. However,                     Accordingly, no changes have been
                                             decreasing the assessment rate will                     made to the rule as proposed, based on                 SUMMARY: The Coast Guard has issued a
                                             reduce the burden on handlers, and may                  the comments received.                                 temporary deviation from the operating


                                        VerDate Sep<11>2014   15:26 Jun 22, 2017   Jkt 241001   PO 00000   Frm 00004   Fmt 4700   Sfmt 4700   E:\FR\FM\23JNR1.SGM   23JNR1


                                                                  Federal Register / Vol. 82, No. 120 / Friday, June 23, 2017 / Rules and Regulations                                         28553

                                             schedule that governs the Amtrak                        Local and Broadcast Notices to Mariners                Folder on the line associated with this
                                             Bridge across Thames River, mile 3.0, at                of the change in operating schedule for                rule.
                                             New London, CT. This action is                          the bridge so that vessel operators can                FOR FURTHER INFORMATION CONTACT:     If
                                             necessary to complete installation of an                arrange their transits to minimize any                 you have questions about this
                                             emergency generator. This deviation                     impact caused by this temporary                        rulemaking, call or email Petty Officer
                                             allows the bridge to require a two hour                 deviation.                                             Amanda Boone, U.S. Coast Guard,
                                             advance notice for openings during                         In accordance with 33 CFR 117.35(e),                Sector Delaware Bay, Waterways
                                             nighttime hours.                                        the drawbridge must return to its regular              Management Division, Coast Guard;
                                             DATES: This deviation is effective from                 operating schedule immediately at the                  telephone (215) 271–4814, email
                                             9 p.m. on July 31, 2017 to 7 a.m. on                    end of the effective period of this                    Amanda.N.Boone@uscg.mil.
                                             September 12, 2017.                                     temporary deviation. This deviation
                                             ADDRESSES: The docket for this                          from the operating regulations is                      SUPPLEMENTARY INFORMATION:
                                             deviation, USCG–2017–0517 is available                  authorized under 33 CFR 117.35.                        I. Table of Abbreviations
                                             at http://www.regulations.gov. Type the                   Dated: June 20, 2017.
                                             docket number in the ‘‘SEARCH’’ box                                                                            CFR Code of Federal Regulations
                                                                                                     C.J. Bisignano,                                        DHS Department of Homeland Security
                                             and click ‘‘SEARCH’’. Click on Open                     Supervisory Bridge Management Specialist,              E.O. Executive order
                                             Docket Folder on the line associated                    First Coast Guard District.                            FR Federal Register
                                             with this deviation.                                    [FR Doc. 2017–13165 Filed 6–22–17; 8:45 am]            Pub. L. Public Law
                                             FOR FURTHER INFORMATION CONTACT: If                                                                            § Section
                                                                                                     BILLING CODE 9110–04–P
                                             you have questions on this temporary                                                                           U.S.C. United States Code
                                             deviation, call or email James L.                                                                              COTP Captain of the Port
                                             Rousseau, Bridge Management                             DEPARTMENT OF HOMELAND                                 II. Background Information and
                                             Specialist, First District Bridge Branch,               SECURITY                                               Regulatory History
                                             U.S. Coast Guard; telephone 617–223–
                                             8619, email james.l.rousseau2@                          Coast Guard                                               The Coast Guard is issuing this
                                             uscg.mil.                                                                                                      temporary rule without prior notice and
                                             SUPPLEMENTARY INFORMATION: Amtrak,                      33 CFR Part 165                                        opportunity to comment pursuant to
                                             the owner of the bridge, requested a                                                                           authority under section 4(a) of the
                                                                                                     [Docket Number USCG–2017–0279]
                                             temporary deviation in order to                                                                                Administrative Procedure Act (APA) (5
                                             facilitate installation of a lift span                  RIN 1625–AA00                                          U.S.C. 553(b)). This provision
                                             emergency generator. The Amtrak                                                                                authorizes an agency to issue a rule
                                             Bridge across the Thames River, mile                    Safety Zone, Delaware River; Dredging                  without prior notice and opportunity to
                                             3.0 at New London, Connecticut has a                                                                           comment when the agency for good
                                                                                                     AGENCY:    Coast Guard, DHS.
                                             horizontal clearance of 150 feet and a                                                                         cause finds that those procedures are
                                                                                                     ACTION:   Temporary final rule.                        impracticable, unnecessary, or contrary
                                             vertical clearance of 29 feet at mean
                                             high water and 31 feet at mean low                      SUMMARY:    The Coast Guard is                         to the public interest. Under 5 U.S.C.
                                             water in the closed position. The bridge                establishing temporary safety zones in                 553(b) (B), the Coast Guard finds that
                                             has a vertical clearance of 75 feet in the              portions of Marcus Hook Range,                         good cause exists for not publishing a
                                             intermediate raised position and 135                    Deepwater Point Range, and New Castle                  notice of proposed rulemaking (NPRM)
                                             feet in the fully open position at mean                 Range, on the Delaware River, to                       with respect to this rule because doing
                                             high water. The existing drawbridge                     facilitate the annual maintenance                      so would be impractical and contrary to
                                             operating regulations are listed at 33                  dredging of the Federal Navigation                     the public interest. Final details for the
                                             CFR 117.224.                                            Channel. The safety zones will be                      dredging operation were not received by
                                                This temporary deviation will allow                  established for the waters in the vicinity             the Coast Guard until June 15, 2017.
                                             the Amtrak Bridge to require a 2 hour                   of the dredge and associated pipeline,                 Vessels transiting through New Castle
                                             advance notice between 9 p.m. and 7                     including dredge pipe which is located                 Range, Deepwater Point Range, Marcus
                                             a.m. from July 31, 2017 to September 12,                in Marcus Hook Anchorage No. 7 and                     Hook Range or attempting to enter the
                                             2017, while a crane barge is present next               Pea Patch Island Anchorage No. 5. This                 waters of Marcus Hook Anchorage No.
                                             to the lift span. The presence of the                   regulation is necessary to provide for                 7 and Pea Patch Island Anchorage No.
                                             crane barge reduces the horizontal                      the safety of life on navigable waters of              5 during pipe-laying or dredging
                                             clearance to 70 feet. Additionally,                     the Delaware River, in the vicinity of                 operations may be at risk. Delaying this
                                             between July 31, 2017 and September                     dredging activity, and is intended to                  rule for the purpose of providing a
                                             10, 2017 the lift span will be in the                   protect mariners from the hazards                      notice and comment period would be
                                             down position during daytime hours but                  associated with pipe-laying and                        contrary to the public interest as it
                                             will be able to open when requested.                    dredging operations.                                   would inhibit the Coast Guard’s ability
                                                The waterway is transited by                                                                                to protect the public from the hazards
                                                                                                     DATES: This rule is effective without
                                             recreational traffic, commercial vessels,                                                                      associated with pipe-laying and
                                                                                                     actual notice from June 26, 2017 until                 dredging operations. We are issuing this
                                             ferries, and military vessels. Vessels that
                                                                                                     September 1, 2017. For purposes of                     rule, and, under 5 U.S.C. 553(d)(3), the
                                             can pass under the bridge without an
                                                                                                     enforcement, actual notice will be used                Coast Guard finds that good cause exists
                                             opening may do so at all times. When
                                                                                                     from June 17, 2017 through June 26,                    for making it effective less than 30 days
                                             the barge is located next to the lift span,
Pmangrum on DSK7TPTVN1PROD with RULES




                                                                                                     2017.                                                  after publication in the Federal Register
                                             the bridge will not be able to open
                                             immediately for emergencies. There is                   ADDRESSES:   To view documents                         because doing so would be contrary to
                                             no alternate route for vessels unable to                mentioned in this preamble as being                    the public interest. Allowing this
                                             pass through the bridge when in the                     available in the docket, go to http://                 dredging and pipe laying operation to go
                                             closed position.                                        www.regulations.gov, type USCG–2017–                   forward without safety zones in place
                                                The Coast Guard will also inform the                 0279 in the ‘‘SEARCH’’ box and click                   would expose mariners and the public
                                             users of the waterways through our                      ‘‘SEARCH.’’ Click on Open Docket                       to unnecessary dangers.


                                        VerDate Sep<11>2014   15:26 Jun 22, 2017   Jkt 241001   PO 00000   Frm 00005   Fmt 4700   Sfmt 4700   E:\FR\FM\23JNR1.SGM   23JNR1



Document Created: 2017-06-23 03:37:32
Document Modified: 2017-06-23 03:37:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 9 p.m. on July 31, 2017 to 7 a.m. on September 12, 2017.