82_FR_28954 82 FR 28833 - Application To Export Electric Energy; Talen Energy Marketing, LLC

82 FR 28833 - Application To Export Electric Energy; Talen Energy Marketing, LLC

DEPARTMENT OF ENERGY

Federal Register Volume 82, Issue 121 (June 26, 2017)

Page Range28833-28834
FR Document2017-13291

Talen Energy Marketing, LLC (Applicant or Talen Energy) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to the Federal Power Act.

Federal Register, Volume 82 Issue 121 (Monday, June 26, 2017)
[Federal Register Volume 82, Number 121 (Monday, June 26, 2017)]
[Notices]
[Pages 28833-28834]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-13291]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-210-E]


Application To Export Electric Energy; Talen Energy Marketing, 
LLC

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Talen Energy Marketing, LLC (Applicant or Talen Energy) has 
applied to renew its authority to transmit electric energy from the 
United States to Canada pursuant to the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before July 26, 2017.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
[email protected], or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On August 18, 2012, DOE issued Order No. EA-210-C to PPL Energy 
Plus, LLC, which authorized the Applicant to transmit electric energy 
from the United States to Canada as a power marketer for a five-year 
term using existing international transmission facilities. On October 
16, 2015, PPL Energy Plus, LLC changed its name to Talen Energy 
Marketing, LLC in Order No. EA-210-D. That authority expires on August 
18, 2017. On May 5, 2017, Talen Energy filed an application with DOE 
for renewal of the export authority contained in Order No. EA-210 for 
an additional five-year term.
    In its application, Talen Energy states that it does not own or 
operate any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that Talen 
Energy proposes to export to Canada would be surplus energy purchased 
from third parties such as electric utilities and Federal power 
marketing agencies pursuant to voluntary agreements. The existing 
international transmission facilities to be utilized by Talen Energy 
have previously been authorized by Presidential Permits issued pursuant 
to Executive Order 10485, as amended, and are appropriate for open 
access transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC)

[[Page 28834]]

Rules of Practice and Procedures (18 CFR 385.211). Any person desiring 
to become a party to these proceedings should file a motion to 
intervene at the above address in accordance with FERC Rule 214 (18 CFR 
385.214). Five copies of such comments, protests, or motions to 
intervene should be sent to the address provided above on or before the 
date listed above.
    Comments and other filings concerning Talen Energy's application to 
export electric energy to Canada should be clearly marked with OE 
Docket No. EA-210-E. An additional copy is to be provided directly to 
both Sandra Rizzo, Arnold & Porter Kaye Scholer LLP, 601 Massachusetts 
Ave. NW., Washington, DC 20001 and Debra L. Raggio, Talen Energy 
Corporation, 117 Oronoco Street, Alexandria, VA 22302.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Issued in Washington, DC, on May 31, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-13291 Filed 6-23-17; 8:45 am]
BILLING CODE 6450-01-P



                                                                               Federal Register / Vol. 82, No. 121 / Monday, June 26, 2017 / Notices                                             28833

                                                DEPARTMENT OF ENERGY                                    should file a comment or protest to the                DATES:   Comments, protests, or motions
                                                                                                        application at the address provided                    to intervene must be submitted on or
                                                [OE Docket No. EA–436]
                                                                                                        above. Protests should be filed in                     before July 26, 2017.
                                                Application to Export Electric Energy;                  accordance with Rule 211 of the Federal                ADDRESSES: Comments, protests,
                                                MAG Energy Solutions, Inc.                              Energy Regulatory Commission’s (FERC)                  motions to intervene, or requests for
                                                                                                        Rules of Practice and Procedures (18                   more information should be addressed
                                                AGENCY: Office of Electricity Delivery                  CFR 385.211). Any person desiring to                   to: Office of Electricity Delivery and
                                                and Energy Reliability, DOE.                            become a party to these proceedings                    Energy Reliability, Mail Code: OE–20,
                                                ACTION: Notice of application.                          should file a motion to intervene at the               U.S. Department of Energy, 1000
                                                                                                        above address in accordance with FERC                  Independence Avenue SW.,
                                                SUMMARY:    MAG Energy Solutions, Inc.                  Rule 214 (18 CFR 385.214). Five copies                 Washington, DC 20585–0350. Because
                                                (Applicant or MAG) has applied for                      of such comments, protests, or motions                 of delays in handling conventional mail,
                                                authority to transmit electric energy                   to intervene should be sent to the                     it is recommended that documents be
                                                from the United States to Mexico                        address provided above on or before the                transmitted by overnight mail, by
                                                pursuant to section 202(e) of the Federal               date listed above.                                     electronic mail to Electricity.Exports@
                                                Power Act.                                                 Comments and other filings                          hq.doe.gov, or by facsimile to 202–586–
                                                DATES: Comments, protests, or motions                   concerning MAG’s application to export                 8008.
                                                to intervene must be submitted on or                    electric energy to Mexico should be
                                                                                                                                                               SUPPLEMENTARY INFORMATION: Exports of
                                                before July 26, 2017.                                   clearly marked with OE Docket No. EA–
                                                                                                        436. An additional copy is to be                       electricity from the United States to a
                                                ADDRESSES: Comments, protests,                                                                                 foreign country are regulated by the
                                                motions to intervene, or requests for                   provided to both Ruta Kalvaitis Skučas,
                                                                                                        Pierce Atwood LLC, 1875 K St., Suite                   Department of Energy (DOE) pursuant to
                                                more information should be addressed                                                                           sections 301(b) and 402(f) of the
                                                to: Office of Electricity Delivery and                  700, Washington, DC 20006 and Simon
                                                                                                        Pelletier, CEO, MAG Energy Solutions                   Department of Energy Organization Act
                                                Energy Reliability, Mail Code: OE–20,                                                                          (42 U.S.C. 7151(b), 7172(f)) and require
                                                U.S. Department of Energy, 1000                         Inc., 999 de Maisonneuve Boulevard
                                                                                                        West, Suite 875, Montreal, Quebec H3A                  authorization under section 202(e) of
                                                Independence Avenue SW.,                                                                                       the Federal Power Act (16 U.S.C.
                                                                                                        3L4.
                                                Washington, DC 20585–0350. Because                                                                             824a(e)).
                                                                                                           A final decision will be made on this
                                                of delays in handling conventional mail,                                                                          On August 18, 2012, DOE issued
                                                                                                        application after the environmental
                                                it is recommended that documents be                                                                            Order No. EA–210–C to PPL Energy
                                                                                                        impacts have been evaluated pursuant
                                                transmitted by overnight mail, by                                                                              Plus, LLC, which authorized the
                                                                                                        to DOE’s National Environmental Policy
                                                electronic mail to Electricity.Exports@                                                                        Applicant to transmit electric energy
                                                                                                        Act Implementing Procedures (10 CFR
                                                hq.doe.gov, or by facsimile to 202–586–                                                                        from the United States to Canada as a
                                                                                                        part 1021) and after a determination is
                                                8008.                                                                                                          power marketer for a five-year term
                                                                                                        made by DOE that the proposed action
                                                SUPPLEMENTARY INFORMATION: Exports of                   will not have an adverse impact on the                 using existing international
                                                electricity from the United States to a                 sufficiency of supply or reliability of the            transmission facilities. On October 16,
                                                foreign country are regulated by the                    U.S. electric power supply system.                     2015, PPL Energy Plus, LLC changed its
                                                Department of Energy (DOE) pursuant to                     Copies of this application will be                  name to Talen Energy Marketing, LLC in
                                                sections 301(b) and 402(f) of the                       made available, upon request, for public               Order No. EA–210–D. That authority
                                                Department of Energy Organization Act                   inspection and copying at the address                  expires on August 18, 2017. On May 5,
                                                (42 U.S.C. 7151(b), 7172(f)) and require                provided above, by accessing the                       2017, Talen Energy filed an application
                                                authorization under section 202(e) of                   program Web site at http://energy.gov/                 with DOE for renewal of the export
                                                the Federal Power Act (16 U.S.C.                        node/11845, or by emailing Angela Troy                 authority contained in Order No. EA–
                                                824a(e)).                                               at Angela.Troy@hq.doe.gov.                             210 for an additional five-year term.
                                                   On April 25, 2017, DOE received an                                                                             In its application, Talen Energy states
                                                                                                          Issued in Washington, DC, on May 10,
                                                application from MAG for authority to                   2017.
                                                                                                                                                               that it does not own or operate any
                                                transmit electric energy from the United                                                                       electric generation or transmission
                                                                                                        Christopher Lawrence,
                                                States to Mexico as a power marketer for                                                                       facilities, and it does not have a
                                                                                                        Electricity Policy Analyst, Office of Electricity
                                                a five-year term using existing                                                                                franchised service area. The electric
                                                                                                        Delivery and Energy Reliability.
                                                international transmission facilities.                                                                         energy that Talen Energy proposes to
                                                                                                        [FR Doc. 2017–13284 Filed 6–23–17; 8:45 am]
                                                   In its application, MAG states that it                                                                      export to Canada would be surplus
                                                                                                        BILLING CODE 6450–01–P
                                                does not own or control any electric                                                                           energy purchased from third parties
                                                generation or transmission facilities,                                                                         such as electric utilities and Federal
                                                and it does not have a franchised service                                                                      power marketing agencies pursuant to
                                                                                                        DEPARTMENT OF ENERGY
                                                area. The electric energy that MAG                                                                             voluntary agreements. The existing
                                                proposes to export to Mexico would be                   [OE Docket No. EA–210–E]                               international transmission facilities to
                                                surplus energy purchased from third                                                                            be utilized by Talen Energy have
                                                parties such as electric utilities and                  Application To Export Electric Energy;                 previously been authorized by
                                                Federal power marketing agencies                        Talen Energy Marketing, LLC                            Presidential Permits issued pursuant to
                                                pursuant to voluntary agreements. The                   AGENCY: Office of Electricity Delivery                 Executive Order 10485, as amended,
                                                existing international transmission                     and Energy Reliability, DOE.                           and are appropriate for open access
sradovich on DSK3GMQ082PROD with NOTICES




                                                facilities to be utilized by the Applicant              ACTION: Notice of application.                         transmission by third parties.
                                                have previously been authorized by                                                                                Procedural Matters: Any person
                                                Presidential Permits issued pursuant to                 SUMMARY:   Talen Energy Marketing, LLC                 desiring to be heard in this proceeding
                                                Executive Order 10485, as amended,                      (Applicant or Talen Energy) has applied                should file a comment or protest to the
                                                and are appropriate for open access                     to renew its authority to transmit                     application at the address provided
                                                transmission by third parties.                          electric energy from the United States to              above. Protests should be filed in
                                                   Procedural Matters: Any person                       Canada pursuant to the Federal Power                   accordance with Rule 211 of the Federal
                                                desiring to be heard in this proceeding                 Act.                                                   Energy Regulatory Commission’s (FERC)


                                           VerDate Sep<11>2014   17:04 Jun 23, 2017   Jkt 241001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\26JNN1.SGM   26JNN1


                                                28834                                     Federal Register / Vol. 82, No. 121 / Monday, June 26, 2017 / Notices

                                                Rules of Practice and Procedures (18                                       applied to renew its authority to                                             Procedural Matters: Any person
                                                CFR 385.211). Any person desiring to                                       transmit electric energy from the United                                   desiring to be heard in this proceeding
                                                become a party to these proceedings                                        States to Canada pursuant to the Federal                                   should file a comment or protest to the
                                                should file a motion to intervene at the                                   Power Act.                                                                 application at the address provided
                                                above address in accordance with FERC                                      DATES: Comments, protests, or motions                                      above. Protests should be filed in
                                                Rule 214 (18 CFR 385.214). Five copies                                     to intervene must be submitted on or                                       accordance with Rule 211 of the Federal
                                                of such comments, protests, or motions                                     before July 26, 2017.                                                      Energy Regulatory Commission’s (FERC)
                                                to intervene should be sent to the                                         ADDRESSES: Comments, protests,                                             Rules of Practice and Procedures (18
                                                address provided above on or before the                                    motions to intervene, or requests for                                      CFR 385.211). Any person desiring to
                                                date listed above.                                                         more information should be addressed                                       become a party to these proceedings
                                                   Comments and other filings                                              to: Office of Electricity Delivery and                                     should file a motion to intervene at the
                                                concerning Talen Energy’s application                                      Energy Reliability, Mail Code: OE–20,                                      above address in accordance with FERC
                                                to export electric energy to Canada                                        U.S. Department of Energy, 1000                                            Rule 214 (18 CFR 385.214). Five copies
                                                should be clearly marked with OE                                           Independence Avenue SW.,                                                   of such comments, protests, or motions
                                                Docket No. EA–210–E. An additional                                         Washington, DC 20585–0350. Because                                         to intervene should be sent to the
                                                copy is to be provided directly to both                                    of delays in handling conventional mail,                                   address provided above on or before the
                                                Sandra Rizzo, Arnold & Porter Kaye                                         it is recommended that documents be                                        date listed above.
                                                Scholer LLP, 601 Massachusetts Ave.                                        transmitted by overnight mail, by
                                                NW., Washington, DC 20001 and Debra                                                                                                                      Comments and other filings
                                                                                                                           electronic mail to Electricity.Exports@                                    concerning Rainbow’s application to
                                                L. Raggio, Talen Energy Corporation,                                       hq.doe.gov, or by facsimile to 202–586–
                                                117 Oronoco Street, Alexandria, VA                                                                                                                    export electric energy to Canada should
                                                                                                                           8008.                                                                      be clearly marked with OE Docket No.
                                                22302.
                                                                                                                           SUPPLEMENTARY INFORMATION: Exports of                                      EA–296–C. An additional copy is to be
                                                   A final decision will be made on this
                                                application after the environmental                                        electricity from the United States to a                                    provided directly to Joseph A. Wolfe,
                                                impacts have been evaluated pursuant                                       foreign country are regulated by the                                       Rainbow Energy Marketing Corporation,
                                                to DOE’s National Environmental Policy                                     Department of Energy (DOE) pursuant to                                     Kirkwood Office Tower, 919 South 7th
                                                Act Implementing Procedures (10 CFR                                        sections 301(b) and 402(f) of the                                          Street, Suite 405, Bismarck, ND 58504.
                                                part 1021) and after a determination is                                    Department of Energy Organization Act
                                                                                                                           (42 U.S.C. 7151(b), 7172(f)) and require                                      A final decision will be made on this
                                                made by DOE that the proposed action                                                                                                                  application after the environmental
                                                will not have an adverse impact on the                                     authorization under section 202(e) of
                                                                                                                           the Federal Power Act (16 U.S.C.                                           impacts have been evaluated pursuant
                                                sufficiency of supply or reliability of the                                                                                                           to DOE’s National Environmental Policy
                                                U.S. electric power supply system.                                         824a(e)).
                                                                                                                              On September 20, 2012, DOE issued                                       Act Implementing Procedures (10 CFR
                                                   Copies of this application will be
                                                                                                                           Order No. EA–296–B to Rainbow, which                                       part 1021) and after a determination is
                                                made available, upon request, for public
                                                                                                                           authorized the Applicant to transmit                                       made by DOE that the proposed action
                                                inspection and copying at the address
                                                                                                                           electric energy from the United States to                                  will not have an adverse impact on the
                                                provided above, by accessing the
                                                                                                                           Canada as a power marketer for a five-                                     sufficiency of supply or reliability of the
                                                program Web site at http://energy.gov/
                                                                                                                           year term using existing international                                     U.S. electric power supply system.
                                                node/11845, or by emailing Angela Troy
                                                at Angela.Troy@hq.doe.gov.                                                 transmission facilities. That authority                                       Copies of this application will be
                                                                                                                           expires on September 18, 2017. On May                                      made available, upon request, for public
                                                  Issued in Washington, DC, on May 31,
                                                2017.
                                                                                                                           25, 2017, Rainbow filed an application                                     inspection and copying at the address
                                                                                                                           with DOE for renewal of the export                                         provided above, by accessing the
                                                Christopher Lawrence,
                                                                                                                           authority contained in Order No. EA–                                       program Web site at http://energy.gov/
                                                Electricity Policy Analyst, Office of Electricity
                                                                                                                           296 for an additional five-year term.                                      node/11845, or by emailing Angela Troy
                                                Delivery and Energy Reliability.
                                                                                                                              In its application, Rainbow states that                                 at Angela.Troy@hq.doe.gov.
                                                [FR Doc. 2017–13291 Filed 6–23–17; 8:45 am]                                it does not own or operate any electric
                                                BILLING CODE 6450–01–P                                                     generation or transmission facilities,                                       Issued in Washington, DC, on June 8, 2017.
                                                                                                                           and it does not have a franchised service                                  Christopher Lawrence,
                                                                                                                           area. The electric energy that Rainbow                                     Electricity Analyst, Office of Electricity
                                                DEPARTMENT OF ENERGY                                                       proposes to export to Canada would be                                      Delivery and Energy Reliability.
                                                [OE Docket No. EA–296–C]                                                   surplus energy purchased from third                                        [FR Doc. 2017–13295 Filed 6–23–17; 8:45 am]
                                                                                                                           parties such as electric utilities and                                     BILLING CODE 6450–01–P
                                                Application to Export Electric Energy;                                     Federal power marketing agencies
                                                Rainbow Energy Marketing                                                   pursuant to voluntary agreements. The
                                                Corporation                                                                existing international transmission                                        DEPARTMENT OF ENERGY
                                                AGENCY: Office of Electricity Delivery                                     facilities to be utilized by Rainbow have
                                                and Energy Reliability, DOE.                                               previously been authorized by                                              Orders Granting Authority To Import
                                                ACTION: Notice of application.
                                                                                                                           Presidential Permits issued pursuant to                                    and Export Natural Gas, To Import and
                                                                                                                           Executive Order 10485, as amended,                                         Export Liquefied Natural Gas, and
                                                SUMMARY:  Rainbow Energy Marketing                                         and are appropriate for open access                                        Vacating Prior Authorization During
                                                Corporation (Applicant or Rainbow) has                                     transmission by third parties.                                             April 2017
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                                                                                    FE Docket Nos.

                                                DOWNEAST LNG, INC ....................................................................................................................................................................              14–172–LNG
                                                                                                                                                                                                                                                    14–173–LNG
                                                GOLDEN PASS PRODUCTS LLC ...................................................................................................................................................                        12–156–LNG
                                                NOBLE AMERICAS GAS & POWER CORP ...................................................................................................................................                                 17–36–NG
                                                MIECO INC .......................................................................................................................................................................................   17–33–NG
                                                STATOIL NATURAL GAS LLC ........................................................................................................................................................                    17–34–LNG



                                           VerDate Sep<11>2014         17:04 Jun 23, 2017         Jkt 241001      PO 00000        Frm 00021       Fmt 4703       Sfmt 4703      E:\FR\FM\26JNN1.SGM              26JNN1



Document Created: 2018-11-14 10:10:55
Document Modified: 2018-11-14 10:10:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before July 26, 2017.
FR Citation82 FR 28833 