82_FR_29186 82 FR 29064 - Bayshore Solar B, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization

82 FR 29064 - Bayshore Solar B, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 122 (June 27, 2017)

Page Range29064-29065
FR Document2017-13384

Federal Register, Volume 82 Issue 122 (Tuesday, June 27, 2017)
[Federal Register Volume 82, Number 122 (Tuesday, June 27, 2017)]
[Notices]
[Pages 29064-29065]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-13384]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER17-1871-000]


Bayshore Solar B, LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Bayshore Solar B, LLC's application for market-based rate authority, 
with an accompanying rate tariff, noting that such application includes 
a request for

[[Page 29065]]

blanket authorization, under 18 CFR part 34, of future issuances of 
securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is July 11, 2017.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: June 21, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-13384 Filed 6-26-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  29064                          Federal Register / Vol. 82, No. 122 / Tuesday, June 27, 2017 / Notices

                                                  58725 (Sep. 30, 2015)). The amended                     Section 106 Review                                     binding agreement called a
                                                  applications are summarized below.                         Section 106 of the NHPA requires                    Programmatic Agreement or PA. DOE
                                                                                                          federal agencies to take into account the              has developed a draft PA through which
                                                  Applicant’s Proposal                                                                                           it proposes to satisfy the Section 106
                                                                                                          potential effects of their undertakings
                                                     In the July 2013 amended application,                that require federal funding, approvals,               requirements for the proposed Northern
                                                  NPT proposed to construct and operate                   or permits on historic properties and to               Pass project. All information for the
                                                  a primarily overhead high voltage direct                give the ACHP and SHPOs an                             public regarding the Section 106 process
                                                  current (HVDC) electric transmission                    opportunity to comment. Compliance                     are available at DOE’s Section 106
                                                  line that would originate at an HVDC                    with Section 106 also requires                         Consultation Page for the proposed
                                                                                                          consultation with other consulting                     Northern Pass Transmission Line
                                                  converter station to be constructed at
                                                                                                          parties, which may include federally-                  Project: http://www.northernpasseis.us/
                                                  the Des Cantons Substation in Québec,
                                                                                                          recognized Indian tribes, representatives              consultations/section106/.
                                                  Canada, then would be converted from
                                                  HVDC to alternating current (AC) in                     of local governments, the applicant,                   Change in Public Notification
                                                  Franklin, NH, and would continue to its                 certain individuals and organizations                  Procedure for Section 106 Consultation
                                                  southern terminus in Deerfield, NH. The                 with a demonstrated interest in the                      The Section 106 implementing
                                                  proposed facilities would be capable of                 proposed undertaking due to the nature                 regulations provide for specific public
                                                  transmitting up to 1200 megawatts                       of their legal or economic relation to the             involvement opportunities in the
                                                  (MW) of power.                                          undertaking or affected properties, or                 Section 106 process. The level of public
                                                     The New Hampshire portion of the                     their concern with the undertaking’s                   involvement is determined on a project-
                                                  proposed Project would be a single                      effects on historic properties (36 CFR                 by-project basis by the federal agency
                                                                                                          800.2). The public is also a participant               implementing Section 106. DOE
                                                  circuit 300 kilovolt (kV) HVDC
                                                                                                          in the Section 106 process, and federal                previously indicated that it would
                                                  transmission line running
                                                                                                          agencies must also seek and consider                   notify the public about the Section 106
                                                  approximately 153 miles from the U.S.
                                                                                                          the views of the public (36 CFR                        process through future Federal Register
                                                  border crossing with Canada near the
                                                                                                          800.2(d)). If adverse effects on historic              notices (see 78 FR 54876 (Sept. 6,
                                                  community of Pittsburg, NH, to a new
                                                                                                          properties are anticipated, agencies                   2013)). DOE is no longer using the
                                                  HVDC-to-AC transformer facility to be
                                                                                                          develop measures to avoid, minimize, or                Federal Register to notify the public
                                                  constructed in Franklin, NH. From
                                                                                                          mitigate those adverse effects through                 regarding Section 106. Going forward,
                                                  Franklin, NH, to the Project terminus at
                                                                                                          consultation.                                          DOE will continue to provide updates
                                                  the Public Service Company of New                          DOE initiated Section 106
                                                  Hampshire’s existing Deerfield                                                                                 and information to the public, including
                                                                                                          consultation with the NH SHPO—the                      about opportunities for public
                                                  Substation located in Deerfield, NH, the                New Hampshire Division of Historical
                                                  proposed Project would consist of 34                                                                           involvement, regarding the Section 106
                                                                                                          Resources—in February 2011 in                          process through DOE’s Section 106
                                                  miles of 345-kV AC electric                             response to NPT’s 2010 Presidential
                                                  transmission line. The total length of the                                                                     Consultation Page for the Project: http://
                                                                                                          permit application. DOE suspended its                  www.northernpasseis.us/consultations/
                                                  proposed Project would be                               Section 106 consultation following
                                                  approximately 187 miles.                                                                                       section106/. In accordance with this
                                                                                                          notification from NPT that NPT would                   decision, on June 14, 2017, DOE notified
                                                     NPT’s August 2015 application                        be submitting an amended Presidential                  the public that the draft Section 106
                                                  amendment (80 FR 58725) changed the                     permit application. DOE re-engaged the                 Programmatic Agreement for the
                                                  proposed transmission line route by                     NH SHPO in 2013 to continue Section                    Northern Pass Transmission Project was
                                                  adding three miles of buried                            106 consultation on NPT’s amended                      available to the public at this site.
                                                  transmission line adjacent to a road not                Presidential permit application
                                                  previously analyzed, adding two new                     submission; through consultation with                    Issued in Washington, DC, on June 16,
                                                                                                                                                                 2017.
                                                  transition stations (one in Bridgewater                 the NH SHPO and other consulting
                                                  and one in Bethlehem; both would                                                                               Brian Mills,
                                                                                                          federal agencies, DOE defined the area
                                                  transition the transmission line between                of potential effects (APE) (36 CFR                     Director, Transmission Permitting &
                                                                                                                                                                 Technical Assistance, Office of Electricity
                                                  aboveground and buried) of                              800.16(d)) and identified potential                    Delivery and Energy Reliability.
                                                  approximately one acre each, and                        additional consulting parties (36 CFR
                                                                                                                                                                 [FR Doc. 2017–13418 Filed 6–26–17; 8:45 am]
                                                  increasing the amount of proposed                       800.2). The ACHP was invited to
                                                                                                                                                                 BILLING CODE 6450–01–P
                                                  buried transmission line from                           participate in DOE’s Section 106
                                                  approximately eight miles to                            consultation in January 2014; ACHP
                                                  approximately 60 miles with a total                     formally joined DOE’s Section 106                      DEPARTMENT OF ENERGY
                                                  proposed Project length of                              consultation in February 2015.
                                                  approximately 192 miles. In addition,                   Additional consulting parties (36 CFR                  Federal Energy Regulatory
                                                  the amendment proposed a minor shift                    800.2) were invited to participate in                  Commission
                                                  (less than 100 feet) in the international               DOE’s Section 106 consultation in
                                                  border crossing location, changed the                   January 2014. DOE initiated                            [Docket No. ER17–1871–000]
                                                  project size from 1,200 MW to 1,000                     consultation with the VT SHPO—the                      Bayshore Solar B, LLC; Supplemental
                                                  MW with a potential transfer capability                 Vermont Division of Historic                           Notice That Initial Market-Based Rate
                                                  of 1,090 MW and included other design                   Preservation—in June 2016 to address                   Filing Includes Request for Blanket
                                                  changes (e.g., change in converter                      the portion of the APE within Vermont.
mstockstill on DSK30JT082PROD with NOTICES




                                                                                                                                                                 Section 204 Authorization
                                                  technology and type of cable). A copy of                   When the potential effects on historic
                                                  the amended Presidential permit                         properties are complex, involve large                    This is a supplemental notice in the
                                                  application and maps of the proposed                    land areas, and cannot be fully                        above-referenced proceeding of
                                                  Project route can be found at the DOE                   determined prior to approval of an                     Bayshore Solar B, LLC’s application for
                                                  environmental impact statement (EIS)                    undertaking, an agency’s obligations                   market-based rate authority, with an
                                                  Web site (http://www.northernpasseis                    under Section 106 are satisfied by                     accompanying rate tariff, noting that
                                                  .us).                                                   negotiation and execution of a legally                 such application includes a request for


                                             VerDate Sep<11>2014   18:33 Jun 26, 2017   Jkt 241001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\27JNN1.SGM   27JNN1


                                                                                 Federal Register / Vol. 82, No. 122 / Tuesday, June 27, 2017 / Notices                                                       29065

                                                  blanket authorization, under 18 CFR                     DEPARTMENT OF ENERGY                                      Applicants: New York Independent
                                                  part 34, of future issuances of securities                                                                     System Operator, Inc.
                                                  and assumptions of liability.                           Federal Energy Regulatory                                 Description: § 205(d) Rate Filing: 205
                                                                                                          Commission                                             filing of Rate Schedule 1 revisions for
                                                     Any person desiring to intervene or to
                                                                                                                                                                 Ramapo PARs cost recovery to be
                                                  protest should file with the Federal                    Combined Notice of Filings #2                          effective 7/1/2017.
                                                  Energy Regulatory Commission, 888                                                                                 Filed Date: 6/21/17.
                                                  First Street NE., Washington, DC 20426,                    Take notice that the Commission
                                                                                                                                                                    Accession Number: 20170621–5124.
                                                  in accordance with Rules 211 and 214                    received the following electric corporate                 Comments Due: 5 p.m. ET 7/12/17.
                                                  of the Commission’s Rules of Practice                   filings:
                                                                                                                                                                    Docket Numbers: ER17–1880–000.
                                                  and Procedure (18 CFR 385.211 and                          Docket Numbers: EC17–132–000.                          Applicants: Midcontinent
                                                  385.214). Anyone filing a motion to                        Applicants: FPL Energy Wyman IV                     Independent System Operator, Inc.
                                                  intervene or protest must serve a copy                  LLC, Public Service Company of New                        Description: § 205(d) Rate Filing:
                                                  of that document on the Applicant.                      Hampshire.                                             2017–06–21_SA 900 Termination of
                                                                                                             Description: Application for                        Entergy—Southcoast Wind LGIA to be
                                                     Notice is hereby given that the                      Authorization for Disposition of                       effective 9/4/2017.
                                                  deadline for filing protests with regard                Jurisdictional Facilities Under Section                   Filed Date: 6/21/17.
                                                  to the applicant’s request for blanket                  203 of the Federal Power Act and                          Accession Number: 20170621–5147.
                                                  authorization, under 18 CFR part 34, of                 Request for Expedited Action of FPL                       Comments Due: 5 p.m. ET 7/12/17.
                                                  future issuances of securities and                      Energy Wyman IV LLC, et. al.                              The filings are accessible in the
                                                  assumptions of liability, is July 11,                      Filed Date: 6/21/17.                                Commission’s eLibrary system by
                                                  2017.                                                      Accession Number: 20170621–5146.                    clicking on the links or querying the
                                                     The Commission encourages                               Comments Due: 5 p.m. ET 7/12/17.                    docket number.
                                                  electronic submission of protests and                      Take notice that the Commission                        Any person desiring to intervene or
                                                  interventions in lieu of paper, using the               received the following exempt                          protest in any of the above proceedings
                                                  FERC Online links at http://                            wholesale generator filings:                           must file in accordance with Rules 211
                                                  www.ferc.gov. To facilitate electronic                     Docket Numbers: EG17–119–000.                       and 214 of the Commission’s
                                                  service, persons with Internet access                      Applicants: Buckthorn Wind, LLC.                    Regulations (18 CFR 385.211 and
                                                                                                             Description: Notice of Self-                        385.214) on or before 5:00 p.m. Eastern
                                                  who will eFile a document and/or be
                                                                                                          Certification of Exempt Wholesale                      time on the specified comment date.
                                                  listed as a contact for an intervenor
                                                                                                          Generator Status of Buckthorn Wind,                    Protests may be considered, but
                                                  must create and validate an
                                                                                                          LLC.                                                   intervention is necessary to become a
                                                  eRegistration account using the                                                                                party to the proceeding.
                                                  eRegistration link. Select the eFiling                     Filed Date: 6/21/17.
                                                                                                             Accession Number: 20170621–5118.                       eFiling is encouraged. More detailed
                                                  link to log on and submit the                                                                                  information relating to filing
                                                                                                             Comments Due: 5 p.m. ET 7/12/17.
                                                  intervention or protests.                                                                                      requirements, interventions, protests,
                                                                                                             Docket Numbers: EG17–120–000.
                                                     Persons unable to file electronically                   Applicants: Bearkat Wind Energy I,                  service, and qualifying facilities filings
                                                  should submit an original and 5 copies                  LLC.                                                   can be found at: http://www.ferc.gov/
                                                  of the intervention or protest to the                      Description: Bearkat Wind Energy I,                 docs-filing/efiling/filing-req.pdf. For
                                                  Federal Energy Regulatory Commission,                   LLC’s Notice of Self-Certification of                  other information, call (866) 208–3676
                                                  888 First Street NE., Washington, DC                    Exempt Wholesale Generator Status.                     (toll free). For TTY, call (202) 502–8659.
                                                  20426.                                                     Filed Date: 6/21/17.                                  Dated: June 21, 2017.
                                                     The filings in the above-referenced                     Accession Number: 20170621–5149.                    Nathaniel J. Davis, Sr.,
                                                  proceeding are accessible in the                           Comments Due: 5 p.m. ET 7/12/17.                    Deputy Secretary.
                                                  Commission’s eLibrary system by                            Take notice that the Commission                     [FR Doc. 2017–13382 Filed 6–26–17; 8:45 am]
                                                  clicking on the appropriate link in the                 received the following electric rate                   BILLING CODE 6717–01–P
                                                  above list. They are also available for                 filings:
                                                  electronic review in the Commission’s                      Docket Numbers: ER17–1877–000.
                                                  Public Reference Room in Washington,                       Applicants: Southern California                     DEPARTMENT OF ENERGY
                                                  DC. There is an eSubscription link on                   Edison Company.
                                                                                                             Description: § 205(d) Rate Filing:                  Federal Energy Regulatory
                                                  the Web site that enables subscribers to                                                                       Commission
                                                  receive email notification when a                       Letter Agreement Huntington Beach
                                                  document is added to a subscribed                       Energy Project SA No. 193 to be                        [Docket Nos. AD17–12–000; PL03–3–000;
                                                  docket(s). For assistance with any FERC                 effective 6/22/2017.                                   AD03–7–000; ER17–795–000; ER17–795–
                                                                                                             Filed Date: 6/21/17.                                001; RP16–1299–000; RP16–1299–001;
                                                  Online service, please email                                                                                   RP16–1299–002; ER17–386–001; ER17–386–
                                                                                                             Accession Number: 20170621–5087.
                                                  FERCOnlineSupport@ferc.gov. or call                        Comments Due: 5 p.m. ET 7/12/17.                    002]
                                                  (866) 208–3676 (toll free). For TTY, call
                                                                                                             Docket Numbers: ER17–1878–000.                      Supplemental Notice of Technical
                                                  (202) 502–8659.
                                                                                                             Applicants: Southern California                     Conference
                                                    Dated: June 21, 2017.                                 Edison Company.
                                                  Nathaniel J. Davis, Sr.,                                   Description: § 205(d) Rate Filing:                                                          Docket Nos.
mstockstill on DSK30JT082PROD with NOTICES




                                                  Deputy Secretary.                                       Letter Agreement Alamitos Energy
                                                                                                                                                                 Developments in Natural Gas           AD17–12–000
                                                  [FR Doc. 2017–13384 Filed 6–26–17; 8:45 am]             Center Project SA No. 194 to be effective                Index Liquidity and Trans-
                                                                                                          6/22/2017.                                               parency.
                                                  BILLING CODE 6717–01–P
                                                                                                             Filed Date: 6/21/17.                                Price Discovery in Natural Gas        PL03–3–000
                                                                                                             Accession Number: 20170621–5088.                      and Electric Markets.
                                                                                                                                                                 Natural Gas Price Formation ...       AD03–7–000
                                                                                                             Comments Due: 5 p.m. ET 7/12/17.                    ISO New England Inc ...............   ER17–795–000
                                                                                                             Docket Numbers: ER17–1879–000.                                                            ER17–795–001



                                             VerDate Sep<11>2014   18:33 Jun 26, 2017   Jkt 241001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\27JNN1.SGM   27JNN1



Document Created: 2018-11-14 10:15:23
Document Modified: 2018-11-14 10:15:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 29064 