The Coast Guard has modified a temporary deviation from the operating schedule that governs the Hutchinson River Parkway Bridge across the Hutchinson River, mile 0.9 at New York, New York. This deviation is necessary to complete application of protective coating on the bridge as well as maintenance of operating machinery. This modified deviation allows the bridge to remain in the closed-to-navigation position for periods of up to two weeks over the course of the summer months in order to expedite work efforts.

Federal Register, Volume 82 Issue 128 (Thursday, July 6, 2017)
[Federal Register Volume 82, Number 128 (Thursday, July 6, 2017)]
[Rules and Regulations]
[Pages 31254-31255]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-14171]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0231]


Drawbridge Operation Regulation; Hutchinson River, New York, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from drawbridge regulation; 
modification.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has modified a temporary deviation from the 
operating schedule that governs the Hutchinson River Parkway Bridge 
across the Hutchinson River, mile 0.9 at New York, New York. This 
deviation is necessary to complete application of protective coating on 
the bridge as well as maintenance of operating machinery. This modified 
deviation allows the bridge to remain in the closed-to-navigation 
position for periods of up to two weeks over the course of the summer 
months in order to expedite work efforts.

DATES: This deviation is effective without actual notice from July 6, 
2017 through 12:01 a.m. on September 29, 2017. For the purposes of 
enforcement, actual notice will be used from 12:01 a.m. on June 30, 
2017 until July 6, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0231 is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this modified 
temporary deviation, call or email James M. Moore, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4334, email [email protected].

SUPPLEMENTARY INFORMATION: The New York City Department of 
Transportation, the owner of the bridge, requested a temporary 
deviation from the normal operating schedule to facilitate application 
of protective coating to the bridge as well as maintenance of operating 
machinery. The Hutchinson River Parkway Bridge, across the Hutchinson 
River, mile 0.9 at New York, New York has a vertical clearance of 30 
feet at mean high water and 38 feet at mean low water in the closed 
position. The existing drawbridge operating regulations are listed at 
33 CFR 117.793(b).
    On May 1, 2017, the Coast Guard published a temporary deviation 
entitled ``Drawbridge Operation Regulation; Hutchinson River, New York, 
NY'' in the Federal Register (82 FR 20257). Under that temporary 
deviation, between April 3, 2017 and September 29, 2017, the draw of 
the Hutchinson River Parkway Bridge would remain closed to navigation 
for a period not to exceed 7 days; the draw would then open for vessels 
in accordance with established operating regulations for a period not 
to exceed another 7 days, after which the cycle would repeat.
    Due to project delays prompted by inclement weather and bridge 
equipment failure, the New York City Department of Transportation has 
requested that between June 9, 2017 and August 31, 2017 the draw of the 
Hutchinson River Parkway Bridge remain closed to navigation for a 
period not to exceed 14 days; the draw will then open for vessels in 
accordance with established operating regulations for a period not to 
exceed 7 days, after which the cycle will repeat. Between September 1, 
2017 and September 29, 2017, the draw will remain closed to navigation 
for a period not to exceed 7 days; the draw will then open for vessels 
in accordance with established operation regulations for another 7 
days, after which the cycle will repeat.
    Vessels that can pass under the bridge without an opening may do so 
at all times. The bridge will not be able to open for emergencies. 
There is no alternate route for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transit to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.


[[Page 31255]]


    Dated: June 30, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-14171 Filed 7-5-17; 8:45 am]
BILLING CODE 9110-04-P



                                                31254               Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations

                                                the Mill River, mile 0.4 at New Haven,                   from the operating regulations is                     operating machinery. The Hutchinson
                                                Connecticut offers mariners a vertical                   authorized under 33 CFR 117.35.                       River Parkway Bridge, across the
                                                clearance of 7.9 feet at mean high water                   Dated: June 30, 2017.                               Hutchinson River, mile 0.9 at New York,
                                                and 14 feet at mean low water in the                     C.J. Bisignano,                                       New York has a vertical clearance of 30
                                                closed position. The existing                                                                                  feet at mean high water and 38 feet at
                                                                                                         Supervisory Bridge Management Specialist,
                                                drawbridge operating regulations are                     First Coast Guard District.                           mean low water in the closed position.
                                                listed at 33 CFR 117.213(d).                                                                                   The existing drawbridge operating
                                                                                                         [FR Doc. 2017–14164 Filed 7–5–17; 8:45 am]
                                                   Under this temporary deviation the                                                                          regulations are listed at 33 CFR
                                                Chapel Street Bridge will operate as                     BILLING CODE 9110–04–P
                                                                                                                                                               117.793(b).
                                                follows: From 12:01 a.m. July 10, 2017
                                                until 11:59 p.m. July 26, 2017, the                                                                               On May 1, 2017, the Coast Guard
                                                Chapel Street Bridge will open for the                   DEPARTMENT OF HOMELAND                                published a temporary deviation
                                                passage of vessels requiring an opening                  SECURITY                                              entitled ‘‘Drawbridge Operation
                                                provided two hours of advance notice is                                                                        Regulation; Hutchinson River, New
                                                                                                         Coast Guard
                                                furnished to the owner of the bridge;                                                                          York, NY’’ in the Federal Register (82
                                                except that, from 7:30 a.m. to 8:30 a.m.                                                                       FR 20257). Under that temporary
                                                                                                         33 CFR Part 117
                                                and 4:45 p.m. to 5:45 p.m., Monday                                                                             deviation, between April 3, 2017 and
                                                through Friday, except Federal holidays,                 [Docket No. USCG–2017–0231]                           September 29, 2017, the draw of the
                                                the draw need not open for the passage                                                                         Hutchinson River Parkway Bridge
                                                of vessel traffic. The bridge will remain                Drawbridge Operation Regulation;                      would remain closed to navigation for a
                                                closed to all vessels requiring an                       Hutchinson River, New York, NY                        period not to exceed 7 days; the draw
                                                opening from 12:01 a.m. July 27, 2017                    AGENCY: Coast Guard, DHS.                             would then open for vessels in
                                                until 11:59 p.m. August 7, 2017 to                       ACTION:Notice of temporary deviation                  accordance with established operating
                                                facilitate the pouring/curing of new                     from drawbridge regulation;                           regulations for a period not to exceed
                                                bridge deck material. From 12:01 a.m.                    modification.                                         another 7 days, after which the cycle
                                                August 8, 2017 until 11:59 p.m.                                                                                would repeat.
                                                September 9, 2017 the bridge will open                   SUMMARY:   The Coast Guard has modified
                                                for the passage of vessels requiring an                  a temporary deviation from the                           Due to project delays prompted by
                                                opening provided two hours of advance                    operating schedule that governs the                   inclement weather and bridge
                                                notice is furnished to the owner of the                  Hutchinson River Parkway Bridge                       equipment failure, the New York City
                                                bridge; except that from 7:30 a.m. to                    across the Hutchinson River, mile 0.9 at              Department of Transportation has
                                                8:30 a.m. and 4:45 p.m. to 5:45 p.m.,                    New York, New York. This deviation is                 requested that between June 9, 2017 and
                                                Monday through Friday, except Federal                    necessary to complete application of                  August 31, 2017 the draw of the
                                                holidays, the draw need not open for the                 protective coating on the bridge as well              Hutchinson River Parkway Bridge
                                                passage of vessel traffic.                               as maintenance of operating machinery.                remain closed to navigation for a period
                                                   The bridge routinely opens for                        This modified deviation allows the                    not to exceed 14 days; the draw will
                                                commercial vessels. Nevertheless,                        bridge to remain in the closed-to-                    then open for vessels in accordance
                                                outreach with mariners has indicated                     navigation position for periods of up to              with established operating regulations
                                                the requirement for two hours of                         two weeks over the course of the                      for a period not to exceed 7 days, after
                                                advance notice will not impede routine                   summer months in order to expedite                    which the cycle will repeat. Between
                                                waterway operations. Mariners also                       work efforts.                                         September 1, 2017 and September 29,
                                                offered no objection to a ten day closure                DATES: This deviation is effective                    2017, the draw will remain closed to
                                                of the draw in order to complete the                     without actual notice from July 6, 2017               navigation for a period not to exceed 7
                                                necessary deck replacement. The                          through 12:01 a.m. on September 29,                   days; the draw will then open for
                                                concrete pour and curing process can be                  2017. For the purposes of enforcement,                vessels in accordance with established
                                                accomplished in four days, but a ten day                 actual notice will be used from 12:01                 operation regulations for another 7 days,
                                                closure period has been requested in                     a.m. on June 30, 2017 until July 6, 2017.             after which the cycle will repeat.
                                                order to take inclement weather into
                                                                                                         ADDRESSES: The docket for this                           Vessels that can pass under the bridge
                                                account. The bridge will resume
                                                                                                         deviation, USCG–2017–0231 is available                without an opening may do so at all
                                                operations as soon as the curing process
                                                                                                         at http://www.regulations.gov. Type the               times. The bridge will not be able to
                                                has been completed.
                                                   Vessels that can pass under the bridge                docket number in the ‘‘SEARCH’’ box                   open for emergencies. There is no
                                                without an opening may do so at all                      and click ‘‘SEARCH.’’ Click on Open                   alternate route for vessels to pass.
                                                times. The bridge will be not able to                    Docket Folder on the line associated
                                                                                                         with this deviation.                                     The Coast Guard will also inform the
                                                open for emergencies. There is no                                                                              users of the waterways through our
                                                alternate route for vessels to pass.                     FOR FURTHER INFORMATION CONTACT: If
                                                                                                         you have questions on this modified                   Local and Broadcast Notices to Mariners
                                                   The Coast Guard will also inform the                                                                        of the change in operating schedule for
                                                users of the waterways through our                       temporary deviation, call or email James
                                                                                                         M. Moore, Bridge Management                           the bridge so that vessel operators can
                                                Local and Broadcast Notices to Mariners                                                                        arrange their transit to minimize any
                                                of the change in operating schedule for                  Specialist, First District Bridge Branch,
                                                                                                         U.S. Coast Guard; telephone 212–514–                  impact caused by the temporary
                                                the bridge so that vessel operators can
                                                                                                         4334, email james.m.moore2@uscg.mil.                  deviation.
                                                arrange their transits to minimize any
jstallworth on DSK7TPTVN1PROD with RULES




                                                impact caused by the temporary                           SUPPLEMENTARY INFORMATION: The New                       In accordance with 33 CFR 117.35(e),
                                                deviation.                                               York City Department of Transportation,               the drawbridge must return to its regular
                                                   In accordance with 33 CFR 117.35(e),                  the owner of the bridge, requested a                  operating schedule immediately at the
                                                the drawbridge must return to its regular                temporary deviation from the normal                   end of the effective period of this
                                                operating schedule immediately at the                    operating schedule to facilitate                      temporary deviation. This deviation
                                                end of the effective period of this                      application of protective coating to the              from the operating regulations is
                                                temporary deviation. This deviation                      bridge as well as maintenance of                      authorized under 33 CFR 117.35.


                                           VerDate Sep<11>2014   14:53 Jul 05, 2017   Jkt 241001   PO 00000   Frm 00014   Fmt 4700   Sfmt 4700   E:\FR\FM\06JYR1.SGM   06JYR1


                                                                    Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations                                          31255

                                                  Dated: June 30, 2017.                                  Hodges) Bridge to require vessels                     temporary safety zone is necessary to
                                                C.J. Bisignano,                                          seeking an opening of the draw to                     protect mariners and vessels from the
                                                Supervisory Bridge Management Specialist,                submit a minimum of two hours of                      navigational hazards associated with a
                                                First Coast Guard District.                              advance notice on weekdays (Monday                    fireworks display.
                                                [FR Doc. 2017–14171 Filed 7–5–17; 8:45 am]               through Friday) between the hours of 8                DATES: This rule is effective from 9:15
                                                BILLING CODE 9110–04–P                                   a.m. and 4 p.m. from July 1, 2017 to                  p.m. on July 27, 2017, until 10:45 p.m.
                                                                                                         December 22, 2017.                                    July 28, 2017.
                                                                                                            The waterway is transited by seasonal              ADDRESSES: To view documents
                                                DEPARTMENT OF HOMELAND                                   recreational traffic as well as                       mentioned in this preamble as being
                                                SECURITY                                                 commercial vessels, largely tug and                   available in the docket, go to http://
                                                                                                         barge combinations. The 55 foot vertical              www.regulations.gov, type USCG–2017–
                                                Coast Guard                                              clearance while the bridge is in the                  0345 in the ‘‘SEARCH’’ box and click
                                                                                                         closed position offers the bulk of                    ‘‘SEARCH.’’ Click on Open Docket
                                                33 CFR Part 117                                          commercial traffic sufficient room to                 Folder on the line associated with this
                                                [Docket No. USCG–2017–0595]                              transit under the bridge in the closed                rule.
                                                                                                         position. Vessels that can pass under the             FOR FURTHER INFORMATION CONTACT: If
                                                Drawbridge Operation Regulation;                         bridge without an opening may do so at                you have questions on this rule, call or
                                                Jamaica Bay, Queens, NY                                  all times. The bridge will be able to                 email LT Michael Collet, Chief of
                                                                                                         open for emergencies. There is no                     Waterways Management, U.S. Coast
                                                AGENCY: Coast Guard, DHS.
                                                                                                         immediate alternate route for vessels                 Guard Sector Buffalo; telephone 716–
                                                ACTION:Notice of deviation from                          unable to pass through the bridge when
                                                drawbridge regulation.                                                                                         843–9322, email
                                                                                                         in the closed position.                               SectorBuffaloMarineSafety@uscg.mil.
                                                SUMMARY:   The Coast Guard has issued a                     The Coast Guard will also inform the               SUPPLEMENTARY INFORMATION:
                                                temporary deviation from the operating                   users of the waterways through our
                                                schedule that governs the Marine                         Local and Broadcast Notices to Mariners               I. Table of Abbreviations
                                                Parkway (Gil Hodges) Bridge across                       of the change in operating schedule for               CFR Code of Federal Regulations
                                                Rockaway Inlet, mile 3.0, at Queens,                     the bridge so that vessel operators can               DHS Department of Homeland Security
                                                NY. This deviation is necessary to                       arrange their transits to minimize any                FR Federal Register
                                                complete bridge maintenance and                          impact caused by this temporary                       NPRM Notice of proposed rulemaking
                                                                                                         deviation.                                            § Section
                                                repairs. This deviation allows the bridge
                                                                                                            In accordance with 33 CFR 117.35(e),               U.S.C. United States Code
                                                to remain in the closed position.
                                                DATES: This deviation is effective                       the drawbridge must return to its regular             II. Background Information and
                                                without actual notice from July 6, 2017                  operating schedule immediately at the                 Regulatory History
                                                through 4 p.m. on December 22, 2017.                     end of the effective period of this
                                                                                                                                                                  The Coast Guard is issuing this
                                                For the purposes of enforcement, actual                  temporary deviation. This deviation
                                                                                                                                                               temporary rule without prior notice and
                                                notice will be used from 8 a.m. on July                  from the operating regulations is
                                                                                                                                                               opportunity to comment pursuant to
                                                1, 2017 until July 6, 2017.                              authorized under 33 CFR 117.35.                       authority under section 4(a) of the
                                                ADDRESSES: The docket for this                             Dated: June 29, 2017.                               Administrative Procedure Act (APA) (5
                                                deviation, USCG–2017–0595 is available                   C.J. Bisignano,                                       U.S.C. 553(b)). This provision
                                                at http://www.regulations.gov. Type the                  Supervisory Bridge Management Specialist,             authorizes an agency to issue a rule
                                                docket number in the ‘‘SEARCH’’ box                      First Coast Guard District.                           without prior notice and opportunity to
                                                and click ‘‘SEARCH’’. Click on Open                      [FR Doc. 2017–14103 Filed 7–5–17; 8:45 am]            comment when the agency for good
                                                Docket Folder on the line associated                     BILLING CODE 9110–04–P                                cause finds that those procedures are
                                                with this deviation.                                                                                           ‘‘impracticable, unnecessary, or contrary
                                                FOR FURTHER INFORMATION CONTACT: If                                                                            to the public interest.’’ Under 5 U.S.C.
                                                you have questions on this temporary                     DEPARTMENT OF HOMELAND                                553(b)(B), the Coast Guard finds that
                                                deviation, call or email James M. Moore,                 SECURITY                                              good cause exists for not publishing a
                                                Bridge Management Specialist, First                                                                            notice of proposed rulemaking (NPRM)
                                                District Bridge Branch, U.S. Coast                       Coast Guard                                           with respect to this rule because doing
                                                Guard; telephone 212–514–4334, email                                                                           so would be impracticable. The final
                                                james.m.moore2@uscg.mil.                                 33 CFR Part 165                                       details of this event were not known to
                                                SUPPLEMENTARY INFORMATION: The owner                     [Docket Number USCG–2017–0345]                        the Coast Guard until there was
                                                of the bridge, the Metropolitan                                                                                insufficient time remaining before the
                                                Transportation Authority, requested a                    RIN 1625–AA00                                         event to publish an NPRM. Thus,
                                                temporary deviation in order to                                                                                delaying the effective date of this rule to
                                                                                                         Safety Zone; Oswego Harborfest 2017
                                                complete rehabilitation work associated                                                                        wait for a comment period to run would
                                                                                                         Breakwall Fireworks Display; Oswego
                                                with the replacement of lift span                                                                              be impracticable because it would
                                                                                                         Harbor, Oswego, NY
                                                machinery. The Marine Parkway (Gil                                                                             inhibit the Coast Guard’s ability to
                                                Hodges) Bridge across Rockaway Inlet,                    AGENCY:    Coast Guard, DHS.                          protect mariners and vessels from the
                                                mile 3.0 at Queens, New York has a                       ACTION:   Temporary final rule.                       hazards associated with a maritime
                                                vertical clearance of 55 feet at mean                                                                          fireworks display.
jstallworth on DSK7TPTVN1PROD with RULES




                                                high water and 59 feet at mean low                       SUMMARY:   The Coast Guard is                            Under 5 U.S.C. 553(d)(3), the Coast
                                                water in the closed position. The                        establishing a temporary safety zone on               Guard finds that good cause exists for
                                                existing drawbridge operating                            Oswego Harbor, Oswego, NY. This                       making this temporary rule effective less
                                                regulations are listed at 33 CFR                         safety zone is intended to restrict                   than 30 days after publication in the
                                                117.795(a).                                              vessels from a portion of the Oswego                  Federal Register because doing so
                                                   The temporary deviation will allow                    Harbor during the Oswego Harborfest                   would be impracticable and contrary to
                                                the owner of the Marine Parkway (Gil                     2017 Breakwall Fireworks Display. This                the public interest. Delaying the


                                           VerDate Sep<11>2014   14:53 Jul 05, 2017   Jkt 241001   PO 00000   Frm 00015   Fmt 4700   Sfmt 4700   E:\FR\FM\06JYR1.SGM   06JYR1



Document Created: 2017-07-06 01:04:59
Document Modified: 2017-07-06 01:04:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of temporary deviation from drawbridge regulation; modification.
DatesThis deviation is effective without actual notice from July 6, 2017 through 12:01 a.m. on September 29, 2017. For the purposes of enforcement, actual notice will be used from 12:01 a.m. on June 30, 2017 until July 6, 2017.