82_FR_31901 82 FR 31771 - Northern Natural Gas Company; Notice of Request Under Blanket Authorization

82 FR 31771 - Northern Natural Gas Company; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 130 (July 10, 2017)

Page Range31771-31772
FR Document2017-14380

Federal Register, Volume 82 Issue 130 (Monday, July 10, 2017)
[Federal Register Volume 82, Number 130 (Monday, July 10, 2017)]
[Notices]
[Pages 31771-31772]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-14380]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-466-000]


Northern Natural Gas Company; Notice of Request Under Blanket 
Authorization

    Take notice that on June 22, 2017, Northern Natural Gas Company 
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in 
Docket No. CP17-466-000 a prior notice request pursuant to sections 
157.205 and 157.208 of the Federal Energy Regulatory Commission's 
(Commission) regulations under the Natural Gas Act (NGA) and Northern's 
blanket authorizations issued in Docket No. CP82-401-000. Northern 
seeks authorization to install and operate (1) a compressor station, 
(2) a segment of pipeline, and (3) an interconnect, all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection. The filing may also be viewed on the web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    First, Northern proposes to install and operate a new 11,152-
horsepower (HP) compressor station (Bakersfield Compressor Station or 
Project) in Peco County, Texas. Second, Northern proposes to construct 
and operate 1.5 miles of 20-inch diameter pipeline. Third, Northern 
proposes to construct and operate an interconnect with a third-party. 
The pipeline will be connected to the discharge side of the Bakersfield 
compressor station and the terminus will be at the proposed 
interconnect station with a third-party pipeline. The Project will 
allow Northern to transport 200,000 Dth/day of incremental load through 
the addition of compression, pipeline and interconnect to a third-party 
pipeline from Northern's existing system. The total cost is 
approximately $28,200,000.
    Any questions regarding this Application should be directed to 
Michael T Loeffler, Senior Director, Certificates and External Affairs 
for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, by phone 
(402) 398-7103, by fax (402) 398-7592, or by email at 
[email protected].
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed 
therefore, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for protest. If a protest is 
filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request shall be treated as an 
application for authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii)

[[Page 31772]]

and the instructions on the Commission's Web site (www.ferc.gov) under 
the ``e-Filing'' link. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: July 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-14380 Filed 7-7-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices                                            31771

                                                   Filed Date: 6/30/17.                                  DEPARTMENT OF ENERGY                                  file pursuant to Rule 214 of the
                                                   Accession Number: 20170630–5289.                                                                            Commission’s Procedural Rules (18 CFR
                                                                                                         Federal Energy Regulatory                             385.214) a motion to intervene or notice
                                                   Comments Due: 5 p.m. ET 8/29/17.                      Commission                                            of intervention and, pursuant to section
                                                  Docket Numbers: ER17–2023–000.                         [Docket No. CP17–466–000]                             157.205 of the Commission’s
                                                                                                                                                               Regulations under the NGA (18 CFR
                                                  Applicants: National Grid Generation
                                                                                                         Northern Natural Gas Company; Notice                  157.205) a protest to the request. If no
                                                LLC.                                                                                                           protest is filed within the time allowed
                                                                                                         of Request Under Blanket
                                                  Description: § 205(d) Rate Filing:                     Authorization                                         therefore, the proposed activity shall be
                                                Annual Reset of Pension and OPEB                                                                               deemed to be authorized effective the
                                                Expenses to be effective 1/1/2017.                          Take notice that on June 22, 2017,                 day after the time allowed for protest. If
                                                                                                         Northern Natural Gas Company                          a protest is filed and not withdrawn
                                                  Filed Date: 6/30/17.                                   (Northern), 1111 South 103rd Street,                  within 30 days after the time allowed
                                                  Accession Number: 20170630–5298.                       Omaha, Nebraska 68124, filed in Docket                for filing a protest, the instant request
                                                  Comments Due: 5 p.m. ET 7/21/17.                       No. CP17–466–000 a prior notice                       shall be treated as an application for
                                                                                                         request pursuant to sections 157.205                  authorization pursuant to section 7 of
                                                  Docket Numbers: ER17–2024–000.                         and 157.208 of the Federal Energy                     the NGA.
                                                  Applicants: Nevada Power Company.                      Regulatory Commission’s (Commission)                     Pursuant to section 157.9 of the
                                                                                                         regulations under the Natural Gas Act                 Commission’s rules, 18 CFR 157.9,
                                                  Description: Compliance filing:
                                                                                                         (NGA) and Northern’s blanket                          within 90 days of this Notice the
                                                Market-Based Rate Tariff, Volume No.                     authorizations issued in Docket No.
                                                11 Order 819 Compliance to be effective                                                                        Commission staff will either: Complete
                                                                                                         CP82–401–000. Northern seeks                          its environmental assessment (EA) and
                                                7/1/2017.                                                authorization to install and operate (1)              place it into the Commission’s public
                                                  Filed Date: 6/30/17.                                   a compressor station, (2) a segment of                record (eLibrary) for this proceeding, or
                                                  Accession Number: 20170630–5307.                       pipeline, and (3) an interconnect, all as             issue a Notice of Schedule for
                                                                                                         more fully set forth in the application               Environmental Review. If a Notice of
                                                  Comments Due: 5 p.m. ET 7/21/17.                       which is on file with the Commission                  Schedule for Environmental Review is
                                                  Docket Numbers: ER17–2025–000.                         and open to public inspection. The                    issued, it will indicate, among other
                                                                                                         filing may also be viewed on the web at               milestones, the anticipated date for the
                                                  Applicants: Sierra Pacific Power
                                                                                                         http://www.ferc.gov using the                         Commission staff’s issuance of the final
                                                Company.                                                 ‘‘eLibrary’’ link. Enter the docket                   environmental impact statement (FEIS)
                                                  Description: Compliance filing:                        number excluding the last three digits in             or EA for this proposal. The filing of the
                                                Market-Based Rate Tariff Vol 7 Order                     the docket number field to access the                 EA in the Commission’s public record
                                                819 Compliance to be effective 7/1/                      document. For assistance, contact FERC                for this proceeding or the issuance of a
                                                2017.                                                    at FERCOnlineSupport@ferc.gov or call                 Notice of Schedule for Environmental
                                                  Filed Date: 6/30/17.                                   toll-free, (866) 208–3676 or TTY, (202)               Review will serve to notify federal and
                                                                                                         502–8659.                                             state agencies of the timing for the
                                                  Accession Number: 20170630–5311.                          First, Northern proposes to install and            completion of all necessary reviews, and
                                                  Comments Due: 5 p.m. ET 7/21/17.                       operate a new 11,152-horsepower (HP)                  the subsequent need to complete all
                                                                                                         compressor station (Bakersfield                       federal authorizations within 90 days of
                                                   The filings are accessible in the                     Compressor Station or Project) in Peco
                                                Commission’s eLibrary system by                                                                                the date of issuance of the Commission
                                                                                                         County, Texas. Second, Northern                       staff’s FEIS or EA.
                                                clicking on the links or querying the                    proposes to construct and operate 1.5                    Persons who wish to comment only
                                                docket number.                                           miles of 20-inch diameter pipeline.                   on the environmental review of this
                                                   Any person desiring to intervene or                   Third, Northern proposes to construct                 project should submit an original and
                                                protest in any of the above proceedings                  and operate an interconnect with a                    two copies of their comments to the
                                                must file in accordance with Rules 211                   third-party. The pipeline will be                     Secretary of the Commission.
                                                and 214 of the Commission’s                              connected to the discharge side of the                Environmental commenters will be
                                                Regulations (18 CFR 385.211 and                          Bakersfield compressor station and the                placed on the Commission’s
                                                385.214) on or before 5:00 p.m. Eastern                  terminus will be at the proposed                      environmental mailing list, will receive
                                                time on the specified comment date.                      interconnect station with a third-party               copies of the environmental documents,
                                                Protests may be considered, but                          pipeline. The Project will allow                      and will be notified of meetings
                                                intervention is necessary to become a                    Northern to transport 200,000 Dth/day                 associated with the Commission’s
                                                party to the proceeding.                                 of incremental load through the                       environmental review process.
                                                                                                         addition of compression, pipeline and                 Environmental commenters will not be
                                                   eFiling is encouraged. More detailed                  interconnect to a third-party pipeline                required to serve copies of filed
                                                information relating to filing                           from Northern’s existing system. The                  documents on all other parties.
                                                requirements, interventions, protests,                   total cost is approximately $28,200,000.              However, the non-party commenters
                                                service, and qualifying facilities filings                  Any questions regarding this                       will not receive copies of all documents
                                                can be found at: http://www.ferc.gov/                    Application should be directed to                     filed by other parties or issued by the
                                                docs-filing/efiling/filing-req.pdf. For                  Michael T Loeffler, Senior Director,                  Commission (except for the mailing of
                                                other information, call (866) 208–3676
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                         Certificates and External Affairs for                 environmental documents issued by the
                                                (toll free). For TTY, call (202) 502–8659.               Northern, 1111 South 103rd Street,                    Commission) and will not have the right
                                                  Dated: June 30, 2017.                                  Omaha, Nebraska 68124, by phone (402)                 to seek court review of the
                                                                                                         398–7103, by fax (402) 398–7592, or by                Commission’s final order.
                                                Kimberly D. Bose,
                                                                                                         email at mike.loeffler@nngco.com.                        The Commission strongly encourages
                                                Secretary.                                                  Any person or the Commission’s Staff               electronic filings of comments, protests,
                                                [FR Doc. 2017–14332 Filed 7–7–17; 8:45 am]               may, within 60 days after the issuance                and interventions via the internet in lieu
                                                BILLING CODE 6717–01–P                                   of the instant notice by the Commission,              of paper. See 18 CFR 385.2001(a)(1)(iii)


                                           VerDate Sep<11>2014   16:08 Jul 07, 2017   Jkt 241001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\10JYN1.SGM   10JYN1


                                                31772                           Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices

                                                and the instructions on the                              Regulatory Commission, 888 First Street               the requirements of Rules of Practice
                                                Commission’s Web site (www.ferc.gov)                     NE., Washington, DC 20426. The first                  and Procedure, 18 CFR 385.210,
                                                under the ‘‘e-Filing’’ link. Persons                     page of any filing should include docket              385.211, and 385.214. In determining
                                                unable to file electronically should                     number P–2808–017.                                    the appropriate action to take, the
                                                submit an original and 5 copies of the                      The Commission’s Rules of Practice                 Commission will consider all protests
                                                protest or intervention to the Federal                   and Procedure require all interveners                 filed, but only those who file a motion
                                                Energy Regulatory Commission, 888                        filing documents with the Commission                  to intervene in accordance with the
                                                First Street NE., Washington, DC 20426.                  to serve a copy of that document on                   Commission’s Rules may become a
                                                                                                         each person on the official service list              party to the proceeding. Any protests or
                                                  Dated: July 3, 2017.
                                                                                                         for the project. Further, if an intervener            motions to intervene must be received
                                                Kimberly D. Bose,
                                                                                                         files comments or documents with the                  on or before the specified deadline date
                                                Secretary.                                               Commission relating to the merits of an               for the particular application.
                                                [FR Doc. 2017–14380 Filed 7–7–17; 8:45 am]               issue that may affect the responsibilities               All filings must (1) bear in all capital
                                                BILLING CODE 6717–01–P                                   of a particular resource agency, they                 letters the title ‘‘PROTEST’’ or
                                                                                                         must also serve a copy of the document                ‘‘MOTION TO INTERVENE;’’ (2) set
                                                                                                         on that resource agency.                              forth in the heading the name of the
                                                DEPARTMENT OF ENERGY                                        k. This application has been accepted,             applicant and the project number of the
                                                                                                         but is not ready for environmental                    application to which the filing
                                                Federal Energy Regulatory                                analysis at this time.
                                                Commission                                                                                                     responds; (3) furnish the name, address,
                                                                                                            l. The Barker’s Mill Project consists of           and telephone number of the person
                                                [Project No. 2808–017]                                   the following existing facilities: (1) A              protesting or intervening; and (4)
                                                                                                         232-foot-long, 30-foot-high concrete                  otherwise comply with the requirements
                                                KEI (Maine) Power Management (III)                       dam with a 125-foot-long spillway                     of 18 CFR 385.2001 through 385.2005.
                                                LLC; Notice of Application Accepted                      section with flashboards, a 46-foot-long              Agencies may obtain copies of the
                                                for Filing and Soliciting Motions To                     non-overflow section with two waste                   application directly from the applicant.
                                                Intervene and Protests                                   gates along the left buttress, and a 61-              A copy of any protest or motion to
                                                                                                         foot-long non-overflow section with                   intervene must be served upon each
                                                   Take notice that the following                        seven stop-logs adjacent to the intake
                                                hydroelectric applications have been                                                                           representative of the applicant specified
                                                                                                         canal; (2) a 16.5-acre reservoir with a               in the particular application.
                                                filed with Commission and are available                  storage capacity of 150-acre-feet; (3) a
                                                for public inspection:                                   60-foot-long, 20-foot-wide, 9 foot, 7                   Dated: June 30, 2017.
                                                   a. Type of Application: Subsequent                    inch-deep intake canal on the right bank              Kimberly D. Bose,
                                                Minor License.                                           with seven stop-logs; (4) a 35-foot-long,             Secretary.
                                                   b. Project No.: 2808–017.                             20-foot-wide gatehouse containing a                   [FR Doc. 2017–14334 Filed 7–7–17; 8:45 am]
                                                   c. Date filed: January 30, 2017.                      single gate fitted with trash racks; (5) a            BILLING CODE 6717–01–P
                                                   d. Applicant: KEI (Maine) Power                       buried 650-foot-long, 10 foot, 2 inch-
                                                Management (III) LLC.                                    wide, 7 foot, 2 inch-high concrete
                                                   e. Name of Project: Barker’s Mill                     penstock; (6) a 50-foot-long, 25-foot-                DEPARTMENT OF ENERGY
                                                Hydroelectric Project.                                   wide concrete partially buried
                                                   f. Location: On the Little                            powerhouse containing a single semi-                  Federal Energy Regulatory
                                                Androscoggin River, in the City of                       Kaplan-type turbine/generating unit                   Commission
                                                Auburn, Androscoggin County, Maine.                      with a rated capacity of 1.5 megawatts;
                                                The project does not occupy lands of the                 (7) a tailrace; (8) a 250-foot-long, 4.2              Combined Notice of Filings #1
                                                United States.                                           kilovolt underground power line; (9) a                   Take notice that the Commission
                                                   g. Filed Pursuant to: Federal Power                   substation; and (10) appurtenant                      received the following electric rate
                                                Act, 16 U.S.C. 791(a)–825(r).                            facilities. The project produces an                   filings:
                                                   h. Applicant Contact: Lewis Loon,                     average of 5,087 megawatt-hours                          Docket Numbers: ER10–2651–004.
                                                Operations and Maintenance Manager,                      annually.                                                Applicants: Lockhart Power
                                                423 Brunswick Avenue, Gardiner, ME                          m. A copy of the application is                    Company.
                                                04345, (207) 203–3025.                                   available for review at the Commission                   Description: Updated Market Power
                                                   i. FERC Contact: Karen Sughrue,                       in the Public Reference Room or may be                Analysis for the Southeast Region of
                                                karen.sughrue@ferc.gov, (202) 502–                       viewed on the Commission’s Web site at                Lockhart Power Company.
                                                8556.                                                    http://www.ferc.gov using the                            Filed Date: 6/29/17.
                                                   j. Deadline for filing motions to                     ‘‘eLibrary’’ link. Enter the docket                      Accession Number: 20170629–5245.
                                                intervene and protests and requests for                  number excluding the last three digits in                Comments Due: 5 p.m. ET 8/28/17.
                                                cooperating agency status: August 29,                    the docket number field to access the                    Docket Numbers: ER10–2794–022;
                                                2017.                                                    document. For assistance, contact FERC                ER12–1825 020; ER14–2672 007.
                                                   The Commission strongly encourages                    Online Support. A copy is also available                 Applicants: EDF Trading North
                                                electronic filing. Please file motions to                for inspection and reproduction at the                America, LLC, EDF Energy Services,
                                                intervene and protests and requests for                  address in item h above.                              LLC, EDF Industrial Power Services
                                                cooperating agency status using the                         You may also register online at http://            (CA), LLC.
                                                Commission’s eFiling system at http://
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                         www.ferc.gov/docs-filing/                                Description: Updated Market Power
                                                www.ferc.gov/docs-filing/efiling.asp. For                esubscription.asp to be notified via                  Analysis for the Northeast Region of the
                                                assistance, please contact FERC Online                   email of new filings and issuances                    EDF Sellers.
                                                Support at FERCOnlineSupport@                            related to this or other pending projects.               Filed Date: 6/29/17.
                                                ferc.gov, (866) 208–3676 (toll free), or                 For assistance, contact FERC Online                      Accession Number: 20170629–5247.
                                                (202) 502–8659 (TTY). In lieu of                         Support.                                                 Comments Due: 5 p.m. ET 8/28/17.
                                                electronic filing, please send a paper                      n. Anyone may submit a protest or a                   Docket Numbers: ER10–2881–031;
                                                copy to: Secretary, Federal Energy                       motion to intervene in accordance with                ER10–1874 005; ER10–2641 030; ER10–


                                           VerDate Sep<11>2014   16:08 Jul 07, 2017   Jkt 241001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\10JYN1.SGM   10JYN1



Document Created: 2017-07-08 00:55:46
Document Modified: 2017-07-08 00:55:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 31771 

2025 Federal Register | Disclaimer | Privacy Policy