DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 130 (July 10, 2017)

Page Range31772-31772
FR Document2017-14334

Federal Register, Volume 82 Issue 130 (Monday, July 10, 2017)
[Federal Register Volume 82, Number 130 (Monday, July 10, 2017)]
[Notices]
[Page 31772]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-14334]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2808-017]


KEI (Maine) Power Management (III) LLC; Notice of Application 
Accepted for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric applications have been 
filed with Commission and are available for public inspection:
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2808-017.
    c. Date filed: January 30, 2017.
    d. Applicant: KEI (Maine) Power Management (III) LLC.
    e. Name of Project: Barker's Mill Hydroelectric Project.
    f. Location: On the Little Androscoggin River, in the City of 
Auburn, Androscoggin County, Maine. The project does not occupy lands 
of the United States.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Lewis Loon, Operations and Maintenance 
Manager, 423 Brunswick Avenue, Gardiner, ME 04345, (207) 203-3025.
    i. FERC Contact: Karen Sughrue, [email protected], (202) 502-
8556.
    j. Deadline for filing motions to intervene and protests and 
requests for cooperating agency status: August 29, 2017.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests and requests for cooperating agency 
status using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2808-017.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The Barker's Mill Project consists of the following existing 
facilities: (1) A 232-foot-long, 30-foot-high concrete dam with a 125-
foot-long spillway section with flashboards, a 46-foot-long non-
overflow section with two waste gates along the left buttress, and a 
61-foot-long non-overflow section with seven stop-logs adjacent to the 
intake canal; (2) a 16.5-acre reservoir with a storage capacity of 150-
acre-feet; (3) a 60-foot-long, 20-foot-wide, 9 foot, 7 inch-deep intake 
canal on the right bank with seven stop-logs; (4) a 35-foot-long, 20-
foot-wide gatehouse containing a single gate fitted with trash racks; 
(5) a buried 650-foot-long, 10 foot, 2 inch-wide, 7 foot, 2 inch-high 
concrete penstock; (6) a 50-foot-long, 25-foot-wide concrete partially 
buried powerhouse containing a single semi-Kaplan-type turbine/
generating unit with a rated capacity of 1.5 megawatts; (7) a tailrace; 
(8) a 250-foot-long, 4.2 kilovolt underground power line; (9) a 
substation; and (10) appurtenant facilities. The project produces an 
average of 5,087 megawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.

    Dated: June 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-14334 Filed 7-7-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                31772                           Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices

                                                and the instructions on the                              Regulatory Commission, 888 First Street               the requirements of Rules of Practice
                                                Commission’s Web site (www.ferc.gov)                     NE., Washington, DC 20426. The first                  and Procedure, 18 CFR 385.210,
                                                under the ‘‘e-Filing’’ link. Persons                     page of any filing should include docket              385.211, and 385.214. In determining
                                                unable to file electronically should                     number P–2808–017.                                    the appropriate action to take, the
                                                submit an original and 5 copies of the                      The Commission’s Rules of Practice                 Commission will consider all protests
                                                protest or intervention to the Federal                   and Procedure require all interveners                 filed, but only those who file a motion
                                                Energy Regulatory Commission, 888                        filing documents with the Commission                  to intervene in accordance with the
                                                First Street NE., Washington, DC 20426.                  to serve a copy of that document on                   Commission’s Rules may become a
                                                                                                         each person on the official service list              party to the proceeding. Any protests or
                                                  Dated: July 3, 2017.
                                                                                                         for the project. Further, if an intervener            motions to intervene must be received
                                                Kimberly D. Bose,
                                                                                                         files comments or documents with the                  on or before the specified deadline date
                                                Secretary.                                               Commission relating to the merits of an               for the particular application.
                                                [FR Doc. 2017–14380 Filed 7–7–17; 8:45 am]               issue that may affect the responsibilities               All filings must (1) bear in all capital
                                                BILLING CODE 6717–01–P                                   of a particular resource agency, they                 letters the title ‘‘PROTEST’’ or
                                                                                                         must also serve a copy of the document                ‘‘MOTION TO INTERVENE;’’ (2) set
                                                                                                         on that resource agency.                              forth in the heading the name of the
                                                DEPARTMENT OF ENERGY                                        k. This application has been accepted,             applicant and the project number of the
                                                                                                         but is not ready for environmental                    application to which the filing
                                                Federal Energy Regulatory                                analysis at this time.
                                                Commission                                                                                                     responds; (3) furnish the name, address,
                                                                                                            l. The Barker’s Mill Project consists of           and telephone number of the person
                                                [Project No. 2808–017]                                   the following existing facilities: (1) A              protesting or intervening; and (4)
                                                                                                         232-foot-long, 30-foot-high concrete                  otherwise comply with the requirements
                                                KEI (Maine) Power Management (III)                       dam with a 125-foot-long spillway                     of 18 CFR 385.2001 through 385.2005.
                                                LLC; Notice of Application Accepted                      section with flashboards, a 46-foot-long              Agencies may obtain copies of the
                                                for Filing and Soliciting Motions To                     non-overflow section with two waste                   application directly from the applicant.
                                                Intervene and Protests                                   gates along the left buttress, and a 61-              A copy of any protest or motion to
                                                                                                         foot-long non-overflow section with                   intervene must be served upon each
                                                   Take notice that the following                        seven stop-logs adjacent to the intake
                                                hydroelectric applications have been                                                                           representative of the applicant specified
                                                                                                         canal; (2) a 16.5-acre reservoir with a               in the particular application.
                                                filed with Commission and are available                  storage capacity of 150-acre-feet; (3) a
                                                for public inspection:                                   60-foot-long, 20-foot-wide, 9 foot, 7                   Dated: June 30, 2017.
                                                   a. Type of Application: Subsequent                    inch-deep intake canal on the right bank              Kimberly D. Bose,
                                                Minor License.                                           with seven stop-logs; (4) a 35-foot-long,             Secretary.
                                                   b. Project No.: 2808–017.                             20-foot-wide gatehouse containing a                   [FR Doc. 2017–14334 Filed 7–7–17; 8:45 am]
                                                   c. Date filed: January 30, 2017.                      single gate fitted with trash racks; (5) a            BILLING CODE 6717–01–P
                                                   d. Applicant: KEI (Maine) Power                       buried 650-foot-long, 10 foot, 2 inch-
                                                Management (III) LLC.                                    wide, 7 foot, 2 inch-high concrete
                                                   e. Name of Project: Barker’s Mill                     penstock; (6) a 50-foot-long, 25-foot-                DEPARTMENT OF ENERGY
                                                Hydroelectric Project.                                   wide concrete partially buried
                                                   f. Location: On the Little                            powerhouse containing a single semi-                  Federal Energy Regulatory
                                                Androscoggin River, in the City of                       Kaplan-type turbine/generating unit                   Commission
                                                Auburn, Androscoggin County, Maine.                      with a rated capacity of 1.5 megawatts;
                                                The project does not occupy lands of the                 (7) a tailrace; (8) a 250-foot-long, 4.2              Combined Notice of Filings #1
                                                United States.                                           kilovolt underground power line; (9) a                   Take notice that the Commission
                                                   g. Filed Pursuant to: Federal Power                   substation; and (10) appurtenant                      received the following electric rate
                                                Act, 16 U.S.C. 791(a)–825(r).                            facilities. The project produces an                   filings:
                                                   h. Applicant Contact: Lewis Loon,                     average of 5,087 megawatt-hours                          Docket Numbers: ER10–2651–004.
                                                Operations and Maintenance Manager,                      annually.                                                Applicants: Lockhart Power
                                                423 Brunswick Avenue, Gardiner, ME                          m. A copy of the application is                    Company.
                                                04345, (207) 203–3025.                                   available for review at the Commission                   Description: Updated Market Power
                                                   i. FERC Contact: Karen Sughrue,                       in the Public Reference Room or may be                Analysis for the Southeast Region of
                                                karen.sughrue@ferc.gov, (202) 502–                       viewed on the Commission’s Web site at                Lockhart Power Company.
                                                8556.                                                    http://www.ferc.gov using the                            Filed Date: 6/29/17.
                                                   j. Deadline for filing motions to                     ‘‘eLibrary’’ link. Enter the docket                      Accession Number: 20170629–5245.
                                                intervene and protests and requests for                  number excluding the last three digits in                Comments Due: 5 p.m. ET 8/28/17.
                                                cooperating agency status: August 29,                    the docket number field to access the                    Docket Numbers: ER10–2794–022;
                                                2017.                                                    document. For assistance, contact FERC                ER12–1825 020; ER14–2672 007.
                                                   The Commission strongly encourages                    Online Support. A copy is also available                 Applicants: EDF Trading North
                                                electronic filing. Please file motions to                for inspection and reproduction at the                America, LLC, EDF Energy Services,
                                                intervene and protests and requests for                  address in item h above.                              LLC, EDF Industrial Power Services
                                                cooperating agency status using the                         You may also register online at http://            (CA), LLC.
                                                Commission’s eFiling system at http://
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                         www.ferc.gov/docs-filing/                                Description: Updated Market Power
                                                www.ferc.gov/docs-filing/efiling.asp. For                esubscription.asp to be notified via                  Analysis for the Northeast Region of the
                                                assistance, please contact FERC Online                   email of new filings and issuances                    EDF Sellers.
                                                Support at FERCOnlineSupport@                            related to this or other pending projects.               Filed Date: 6/29/17.
                                                ferc.gov, (866) 208–3676 (toll free), or                 For assistance, contact FERC Online                      Accession Number: 20170629–5247.
                                                (202) 502–8659 (TTY). In lieu of                         Support.                                                 Comments Due: 5 p.m. ET 8/28/17.
                                                electronic filing, please send a paper                      n. Anyone may submit a protest or a                   Docket Numbers: ER10–2881–031;
                                                copy to: Secretary, Federal Energy                       motion to intervene in accordance with                ER10–1874 005; ER10–2641 030; ER10–


                                           VerDate Sep<11>2014   16:08 Jul 07, 2017   Jkt 241001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\10JYN1.SGM   10JYN1



Document Created: 2017-07-08 00:55:40
Document Modified: 2017-07-08 00:55:40
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 31772 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR