82_FR_33060 82 FR 32924 - FY17 Competitive Funding Opportunity; Grants for Buses and Bus Facilities Infrastructure Investment Program

82 FR 32924 - FY17 Competitive Funding Opportunity; Grants for Buses and Bus Facilities Infrastructure Investment Program

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 82, Issue 136 (July 18, 2017)

Page Range32924-32929
FR Document2017-15043

The Federal Transit Administration (FTA) announces the opportunity to apply for approximately $226.5 million in Fiscal Year (FY) 2017 funds under Grants for Buses and Bus Facilities Infrastructure Investment Program (CFDA#20.526). As required by federal transit law and subject to funding availability, funds will be awarded competitively to assist in the financing of capital projects to replace, rehabilitate, purchase or lease buses and related equipment, and to rehabilitate, purchase, construct or lease bus-related facilities. Projects may include costs incidental to the acquisition of buses or to the construction of facilities, such as the costs of related workforce development and training activities, and project administration expenses. FTA may award additional funds if they are made available to the program prior to the announcement of project selections.

Federal Register, Volume 82 Issue 136 (Tuesday, July 18, 2017)
[Federal Register Volume 82, Number 136 (Tuesday, July 18, 2017)]
[Notices]
[Pages 32924-32929]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15043]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration


FY17 Competitive Funding Opportunity; Grants for Buses and Bus 
Facilities Infrastructure Investment Program

AGENCY: Federal Transit Administration (FTA), DOT.

ACTION: Notice of funding opportunity (NOFO).

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) announces the 
opportunity to apply for approximately $226.5 million in Fiscal Year 
(FY) 2017 funds under Grants for Buses and Bus Facilities 
Infrastructure Investment Program (CFDA#20.526). As required by federal 
transit law and subject to funding availability, funds will be awarded 
competitively to assist in the financing of capital projects to 
replace, rehabilitate, purchase or lease buses and related equipment, 
and to rehabilitate, purchase, construct or lease bus-related 
facilities. Projects may include costs incidental to the acquisition of 
buses or to the construction of facilities, such as the costs of 
related workforce development and training activities, and project 
administration expenses. FTA may award additional funds if they are 
made available to the program prior to the announcement of project 
selections.

DATES: Complete proposals must be submitted electronically through the 
GRANTS.GOV ``APPLY'' function by 11:59 p.m. on August 25, 2017. 
Prospective applicants should initiate the process by registering on 
the GRANTS.GOV Web site promptly to ensure completion of the 
application process before the submission deadline. Instructions for 
applying can be found on FTA's Web site at http://transit.dot.gov/howtoapply and in the ``FIND'' module of GRANTS.GOV. The GRANTS.GOV 
funding opportunity ID is FTA-2017-004-TPM-Bus. Mail and fax 
submissions will not be accepted.

FOR FURTHER INFORMATION CONTACT: Mark Bathrick, FTA Office of Program 
Management, 202-366-9955, or [email protected].

SUPPLEMENTARY INFORMATION: 

Table of Contents

A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review
F. Review and Selection Process
G. Federal Award Administration
H. Technical Assistance and Other Program Information
I. Federal Awarding Agency Contacts

A. Program Description

    Section 5339(b) of Title 49, United States Code, as amended by the 
Fixing America's Surface Transportation (FAST) Act (Pub. L. 114-94, 
Dec. 4, 2015), authorizes FTA to award funds under the Buses and Bus 
Facilities Infrastructure Investment Program (Bus and Bus 
Infrastructure Program) through a competitive process, as described in 
this notice, for capital projects to replace, rehabilitate, purchase or 
lease buses and related equipment and to rehabilitate, purchase, 
construct or lease bus-related facilities.
    The purpose of the Bus and Bus Infrastructure Program is to assist 
in the financing of buses and bus facilities capital projects, 
including replacing, rehabilitating, purchasing or leasing buses or 
related equipment, and rehabilitating, purchasing, constructing or 
leasing bus-related facilities.
    The Bus and Bus Infrastructure Program provides funds to designated 
recipients that allocate funds to fixed route bus operators, and to 
States, and local governmental authorities that operate fixed route bus 
service. FTA also may award grants to eligible recipients for projects 
to be undertaken by subrecipients that are public agencies or private 
non-profit organizations engaged in public transportation. In 
accordance with 49 U.S.C. 5339(b)(2), FTA will ``consider the age and 
condition of buses, bus fleets, related equipment, and bus-related 
facilities'' in selecting projects for funding. FTA may prioritize 
projects that demonstrate how they will address significant repair and 
maintenance needs, improve the safety of transit systems, and deploy 
connective projects that include advanced technologies to connect bus 
systems with other networks.

B. Federal Award Information

    Federal transit law at 49 U.S.C. 5338(a)(2)(M) authorizes 
$283,600,000 in FY 2017 funds for the Section 5339(b) Bus and Bus 
Infrastructure Program and the 5339(c) Low or No Emission Grants (Low-
No) Program. Of this amount, 0.75 percent, or $2,127,000, has been 
reserved for program oversight in accordance with 49 U.S.C. 
5338(f)(1)(H). Of the amount available for grants, FTA separately 
announced the availability of $55 million for Low-No Grants and is 
making the remaining $226,473,000 available through this notice for 
competitive grants under the Bus and Bus Infrastructure Program.
    As required under 49 U.S.C. 5339(b)(5), a minimum of 10 percent of 
the amount awarded under the Bus and

[[Page 32925]]

Bus Infrastructure Program will be awarded to projects located in rural 
areas. And, as required by 49 U.S.C. 5339(b)(8), no single grantee will 
be awarded more than 10 percent of the amounts made available.
    FTA will grant pre-award authority to incur costs for selected 
projects beginning on the date that project selections are announced. 
Funds are only available for projects that have not incurred costs 
prior to the selection of projects and will remain available for 
obligation until September 30, 2020.

C. Eligibility Information

1. Eligible Applicants

    Under 49 U.S.C. 5339(b)(1), eligible applicants include designated 
recipients that allocate funds to fixed route bus operators, states or 
local governmental entities that operate fixed route bus service, and 
Indian tribes. Except for projects proposed by Indian tribes, proposals 
for projects in rural (non-urbanized) areas must be submitted as part 
of a consolidated State proposal. Under 49 U.S.C. 5339(b)(3), states 
and other eligible applicants may also submit consolidated proposals 
for projects in urbanized areas. The submission of the statewide 
application shall not preclude the submission and consideration of any 
application from other eligible recipients in an urbanized area in a 
State. Proposals may contain projects to be implemented by the 
recipient or its subrecipients.
    To be considered eligible, applicants must be able to demonstrate 
the requisite legal, financial and technical capabilities to receive 
and administer Federal funds under this program. Eligible subrecipients 
under this program include all otherwise eligible applicants and 
private nonprofit organizations engaged in public transportation.

2. Cost Sharing or Matching

    The maximum federal share for projects selected under the Bus and 
Bus Infrastructure Program is 80 percent of the net project cost, 
unless noted below by one of the exceptions. FTA may prioritize 
projects proposed with a higher local share.
    i. The maximum federal share is 85 percent of the net project cost 
of acquiring vehicles (including clean-fuel or alternative fuel 
vehicles) that are compliant with the Clean Air Act (CAA) and/or the 
Americans with Disabilities Act (ADA) of 1990.
    ii. The maximum federal share is 90 percent of the net project cost 
of acquiring, installing or constructing vehicle-related equipment or 
facilities (including clean fuel or alternative-fuel vehicle-related 
equipment or facilities) that are required by the ADA of 1990, or that 
are necessary to comply with or maintain compliance with the Clean Air 
Act. The award recipient must itemize the cost of specific, discrete, 
vehicle-related equipment associated with compliance with ADA or CAA to 
be eligible for the maximum 90 percent Federal share for these costs.
    Eligible sources of local match include the following: Cash from 
non-Government sources other than revenues from providing public 
transportation services; revenues derived from the sale of advertising 
and concessions; amounts received under a service agreement with a 
State or local social service agency or private social service 
organization; revenues generated from value capture financing 
mechanisms; or funds from an undistributed cash surplus; replacement or 
depreciation cash fund or reserve; or new capital. In addition, 
transportation development credits or documentation of in-kind match 
may substitute for local match if identified in the application.

3. Eligible Projects

    Under 49 U.S.C. 5339(b)(1), eligible projects are capital projects 
to replace, rehabilitate purchase, or lease buses, vans, and related 
equipment, and capital projects to rehabilitate, purchase, construct, 
or lease bus-related facilities.
    Recipients are permitted to use up to 0.5 percent of their 
requested grant award for workforce development activities eligible 
under 49 U.S.C. 5314(b) and an additional 0.5 percent for costs 
associated with training at the National Transit Institute. Applicants 
must identify the proposed use of funds for these activities in the 
project proposal and identify them separately in the project budget.

D. Application and Submission Information

1. Address

    Applications must be submitted electronically through GRANTS.GOV. 
General information for submitting applications through GRANTS.GOV can 
be found at https://www.transit.dot.gov/funding/grants/applying/applying-fta-funding along with specific instructions for the forms and 
attachments required for submission. Mail and fax submissions will not 
be accepted. A complete proposal submission consists of at least two 
forms: The SF424 Mandatory Form (downloaded from GRANTS.GOV) and the 
supplemental form for the FY 2017 Bus and Bus Infrastructure Program 
(downloaded from GRANTS.GOV or the FTA Web site at www.transit.dot.gov/busprogram). Failure to submit the information as requested can delay 
review of the application.

2. Content and Form of Application Submission

    A complete proposal submission consists of at least two forms: The 
SF424 Mandatory Form and the FY 2017 Bus Infrastructure Program 
supplemental form. The application must include responses to all 
sections of the SF424 Mandatory Form and the supplemental form, unless 
indicated as optional. The information on the supplemental form will be 
used to determine applicant and project eligibility for the program, 
and to evaluate the proposal against the selection criteria described 
in part E of this notice.
    An applicant may submit multiple project proposals in a single 
submission, and if doing so must include all project proposals on a 
single supplemental form. To add additional projects, select the ``add 
project'' button and complete a separate ``project detail'' section for 
each project. FTA will only accept one supplemental form per 
submission.
    The supplemental form must be submitted as an attachment to the 
SF424 Mandatory Form. All project proposals will be evaluated 
separately, regardless of whether they are submitted as a single 
submission.
    An applicant may submit additional supporting documentation for 
each project proposal as attachments. Any supporting documentation must 
be described and referenced by file name in the appropriate response 
section of the supplemental form, or it may not be reviewed.
    Information such as proposer name, Federal amount requested, local 
match amount, description of areas served, etc. may be requested in 
varying degrees of detail on both the SF424 form and Supplemental Form. 
Proposers must fill in all fields unless stated otherwise on the forms. 
Applicants should not place N/A or ``refer to attachment'' in lieu of 
typing in responses in the field sections. If information is copied 
into the supplemental form from another source, applicants should 
verify that pasted text is fully captured on the supplemental form and 
has not been truncated by the character limits built into the form. 
Proposers should use both the ``Check Package for Errors'' and the 
``Validate Form'' validation buttons on both forms to check all 
required fields on the forms, and ensure that the federal and local 
amounts specified are consistent.

[[Page 32926]]

    The SF424 Mandatory Form and the Supplemental Form will prompt 
applicants for the required information, including:
    a. Applicant Name
    b. Dun and Bradstreet (D&B) Data Universal Numbering System (DUNS) 
number
    c. Key contact information (including contact name, address, email 
address, and phone)
    d. Congressional district(s) where project will take place
    e. Project Information (including title, an executive summary, and 
type)
    f. A detailed description of the need for the project
    g. A detailed description on how the project will support the Bus 
Infrastructure Program's objectives
    h. Evidence that the project is consistent with local and regional 
planning objectives
    i. Evidence that the applicant can provide the local cost share
    j. A description of the technical, legal, and financial capacity of 
the applicant
    k. A detailed project budget
    l. An explanation of the scalability of the project
    m. Details on the local matching funds
    n. A detailed project timeline

3. Unique Entity Identifier and System for Award Management (SAM)

    Each applicant is required to: (1) Be registered in SAM before 
submitting an application; (2) provide a valid unique entity identifier 
in its application; and (3) continue to maintain an active SAM 
registration with current information at all times during which the 
applicant has an active Federal award or an application or plan under 
consideration by FTA. These requirements do not apply if the applicant: 
(1) Is an individual; (2) is excepted from the requirements under 2 CFR 
25.110(b) or (c); or (3) has an exception approved by FTA under 2 CFR 
25.110(d). FTA may not make an Award until the applicant has complied 
with all applicable unique entity identifier and SAM requirements. If 
an applicant has not fully complied with the requirements by the time 
FTA is ready to make an Award, FTA may determine that the applicant is 
not qualified to receive an Award and use that determination as a basis 
for making a Federal award to another applicant. All applicants must 
provide a unique entity identifier provided by SAM. Registration in SAM 
may take as little as 3-5 business days, but since there could be 
unexpected steps or delays (for example, if you need to obtain an 
Employer Identification Number), FTA recommends allowing ample time, up 
to several weeks, for completion of all steps. For additional 
information on obtaining a unique entity identifier, please visit 
www.sam.gov.

4. Submission Dates and Times

    Project proposals must be submitted electronically through 
GRANTS.GOV by 11:59 p.m. Eastern on August 25, 2017. Mail and fax 
submissions will not be accepted.
    FTA urges proposers to submit applications at least 72 hours prior 
to the due date to allow time to receive the validation messages and to 
correct any problems that may have caused a rejection notification. FTA 
will not accept submissions after the stated deadline, as determined 
through the timestamp assigned to the application upon receipt in 
GRANTS.GOV. GRANTS.GOV scheduled maintenance and outage times are 
announced on the GRANTS.GOV Web site. Deadlines will not be extended 
due to scheduled Web site maintenance.
    Within 48 hours after submitting an electronic application, the 
applicant should receive three email messages from GRANTS.GOV: (1) 
Confirmation of successful transmission to GRANTS.GOV, (2) confirmation 
of successful validation by GRANTS.GOV, and (3) confirmation of 
successful validation by FTA. If confirmations of successful validation 
are not received or a notice of failed validation or incomplete 
materials is received, the applicant must address the reason for the 
failed validation, as described in the email notice, and resubmit 
before the submission deadline. If making a resubmission for any 
reason, include all original attachments regardless of which 
attachments were updated and check the box on the supplemental form 
indicating this is a resubmission.
    Proposers are encouraged to begin the process of registration on 
the GRANTS.GOV site well in advance of the submission deadline. 
Registration is a multi-step process, which may take several weeks to 
complete before an application can be submitted. Registered proposers 
may still be required to take steps to keep their registration up to 
date before submissions can be made successfully: (1) Registration in 
the System for Award Management (SAM) is renewed annually; and, (2) 
persons making submissions on behalf of the Authorized Organization 
Representative (AOR) must be authorized in GRANTS.GOV by the AOR to 
make submissions.

5. Funding Restrictions

    Funds under this NOFO cannot be used to reimburse applicants for 
otherwise eligible expenses incurred prior to FTA award of a Grant 
Agreement until FTA has issued pre-award authority for selected 
projects or unless FTA has issued a ``Letter of No Prejudice'' for the 
project before the expenses are incurred.

6. Other Submission Requirements

    Applicants are encouraged to identify scaled funding options in 
case insufficient funding is available to fund a project at the full 
requested amount. If an applicant indicates that a project is scalable, 
the applicant must provide an appropriate minimum funding amount that 
will fund an eligible project that achieves the objectives of the 
program and meets all relevant program requirements. The applicant must 
provide a clear explanation of how the project budget would be affected 
by a reduced award. FTA may award a lesser amount whether or not a 
scalable option is provided.

E. Application Review

    FTA will evaluate project proposals for the Bus and Bus 
Infrastructure Program based on the criteria described in this notice. 
Projects will be evaluated primarily on the responses provided in the 
supplemental form. Additional information may be provided to support 
the responses; however, any additional documentation must be directly 
referenced on the supplemental form, including the file name where the 
additional information can be found.

a. Demonstration of Need

    Applicants must demonstrate how the proposed project will address 
an unmet need for capital investment in bus vehicles and/or supporting 
facilities, enhance the safety of the transit system for transit 
vehicle operators, riders, and the general public, or improve the 
connectivity of bus systems with other networks through the use of 
deployment-ready information technologies. For example, an applicant 
may demonstrate a substantial backlog of deferred capital investment, 
insufficient size or capacity of maintenance facilities, excessive 
reliance on vehicles that are beyond their intended service life, a 
vehicle fleet that is insufficient to meet current ridership demands, 
or passenger facilities that are insufficient for their current use. 
For safety, an applicant may demonstrate safety concerns with vehicles, 
equipment, or facilities that are beyond their intended useful life, or 
that are no longer appropriate for use due to safety concerns. To 
improve connectivity, bus systems may deploy Intelligent Transportation 
Systems (ITS)

[[Page 32927]]

technologies or software that link buses with other transportation 
modes. Applicants should also describe how the proposed project will 
improve the operation of the transit system and whether the project 
represents a one-time or periodic need that cannot reasonably be funded 
from FTA formula program allocations and State or local resources. As a 
part of the response for demonstration of need, applicants should 
provide the following information:
    i. For bus projects (replacement, rehabilitation or expansion): 
Applicants must provide information on the age, condition and 
performance of the asset(s) to be replaced or rehabilitated by the 
proposed project. For service expansion requests, applicants must 
provide information on the proposed service expansion and the benefits 
for transit riders and the community from the new service. For all 
vehicle projects, the proposal must address how the project conforms to 
FTA's spare ratio guidelines.
    ii. For bus facility and equipment projects (replacement, 
rehabilitation, and/or expansion): Applicants must provide information 
on the age and condition of the asset to be rehabilitated or replaced 
relative to its minimum useful life.

b. Demonstration of Benefits

    Applications will be evaluated based on how well they describe how 
the proposed project will improve the condition of the transit system, 
improve the reliability of transit service for its riders, and/or 
enhance access and mobility within the service area.
    System Condition: FTA will evaluate the potential for the project 
to improve the condition of the transit system by repairing and/or 
replacing assets that are in poor condition or have surpassed their 
minimum or intended useful life benchmarks, lowering the average age of 
vehicles in the fleet, and/or reducing the cost of maintaining outdated 
vehicles, facilities and equipment. Applicants should document how the 
project's asset(s) will be operated, inspected, maintained, 
rehabilitated, and replaced to manage the asset's performance, risks, 
and costs over its life cycle to provide safe, cost-effective, and 
reliable public transportation.
    Service Reliability: FTA will evaluate the potential for the 
project to reduce the frequency of breakdowns or other service 
interruptions as caused by the age and condition of the agency's bus 
fleet. Applicants should document their current service reliability 
metrics and benchmark goals, including their strategy for improving 
reliability with or without the award of Bus Infrastructure Program 
funds.
    Enhanced Access and Mobility: FTA will evaluate the potential for 
the project to improve access to employment opportunities, education, 
and other services. FTA will also evaluate the potential for the 
project to improve mobility for the transit riding public, such as 
through improved headways, creation of new transportation choices, or 
eliminating gaps in the current route network. Proposed benefits should 
be based on documented ridership demand and be well-described or 
documented through a study or route planning proposal.

c. Planning and Local/Regional Prioritization

    Applicants must demonstrate how the proposed project will be 
consistent with local and regional long-range planning documents and 
local government priorities. This will involve assessing whether the 
project is consistent with the transit priorities identified in the 
long-range plan; and/or contingency/illustrative projects included in 
that plan; or the locally developed human services public 
transportation coordinated plan. Applicants are not required to submit 
copies of such plans, but should describe how the project will support 
regional goals. Additional consideration will be given to applications 
including support letters from local and regional planning 
organizations, local government officials, public agencies, and/or non-
profit or private sector partners attesting to the consistency of the 
proposed project with these plans. Applicants may also address how the 
proposed project will impact overall system performance, asset 
management performance, or specific performance measures tracked and 
monitored by the applying entity to demonstrate how the proposed 
project will address local and regional planning priorities.
    Evidence of additional local or regional prioritization (i.e. STIP 
and LRTP) should include letters of support for the project from local 
government officials, public agencies (i.e. MPOs), and non-profit or 
private sector partners.

d. Local Financial Commitment

    Applicants must identify the source of the local cost share and 
describe whether such funds are currently available for the project or 
will need to be secured if the project is selected for funding. FTA 
will consider the availability of the local cost share as evidence of 
local financial commitment to the project. Additional consideration 
will be given to those projects for which local funds have already been 
made available or reserved. Applicants should submit evidence of the 
availability of funds for the project, for example by including a board 
resolution, letter of support from the State, or other documentation of 
the source of local funds such as a budget document highlighting the 
line item or section committing funds to the proposed project.

e. Project Implementation Strategy

    Projects will be evaluated based on the extent to which the project 
is ready to implement within a reasonable period of time and whether 
the applicant's proposed implementation plans are reasonable and 
complete.
    In assessing whether the project is ready to implement within a 
reasonable period of time, FTA will consider whether the project 
qualifies for a Categorical Exclusion (CE), or whether the required 
environmental work has been initiated or completed for projects that 
require an Environmental Assessment (EA) or Environmental Impact 
Statement (EIS) under the National Environmental Policy Act of 1969 
(NEPA), as amended. The proposal must also state whether grant funds 
can be obligated within 12 months from time of award, if selected, and 
indicate the timeframe under which the Metropolitan Transportation 
Improvement Program (TIP) and/or Statewide Transportation Improvement 
Program (STIP) can be amended to include the proposed project. 
Additional consideration will be given to projects for which grant 
funds can be obligated within 12 months from time of award.
    In assessing whether the proposed implementation plans are 
reasonable and complete, FTA will review the proposed project 
implementation plan, including all necessary project milestones and the 
overall project timeline. For projects that will require formal 
coordination, approvals or permits from other agencies or project 
partners, the applicant must demonstrate coordination with these 
organizations and their support for the project, such as through 
letters of support.

f. Technical, Legal, and Financial Capacity

    Applicants must demonstrate that they have the technical, legal and 
financial capacity to undertake the project. FTA will review relevant 
oversight assessments and records to determine whether there are any 
outstanding legal, technical, or financial

[[Page 32928]]

issues with the applicant that would affect the outcome of the proposed 
project. Applicants with outstanding legal, technical, or financial 
compliance issues from a Federal Transit Administration compliance 
review or Federal Transit grant-related Single Audit finding must 
explain how corrective actions taken will mitigate negative impacts on 
the project.

F. Review and Selection Process

    In addition to other FTA staff that may review the proposals, a 
technical evaluation committee will evaluate proposals based on the 
published evaluation criteria. Based on the findings of the technical 
evaluation committee, the FTA Administrator will determine the final 
selection of projects for program funding. FTA may consider geographic 
diversity, diversity in the size of the transit systems receiving 
funding, and/or the applicant's receipt of other discretionary awards 
in determining the allocation of program funds. FTA may prioritize 
projects that have a higher local financial commitment. FTA may 
prioritize projects that demonstrate how they will address significant 
repair and maintenance needs, improve the safety of transit systems, 
and deploy connective projects that include advanced technologies to 
connect bus systems with other networks. FTA may prioritize projects in 
rural areas. Not less than 10 percent of the Bus and Bus Infrastructure 
Program funds will be distributed to projects in rural areas. In 
addition, FTA will not award more than 10 percent of the funds to a 
single grantee.

G. Federal Award Administration

i. Federal Award Notice

    Subsequent to an announcement by the FTA Administrator of the final 
project selections, which will be posted on the FTA Web site, FTA will 
publish a list of the selected projects, a summary of final scores for 
selected projects, Federal award amounts and recipients in the Federal 
Register. Project recipients should contact their FTA Regional Offices 
for additional information regarding allocations for projects under the 
Bus and Bus Infrastructure Program.
    At the time the project selections are announced, FTA will extend 
pre-award authority for the selected projects. There is no blanket pre-
award authority for these projects before announcement.

ii. Award Administration

    Funds under the Bus and Bus Infrastructure Program are available to 
designated recipients that allocate funds to fixed route bus operators, 
or state or local governmental entities, including Indian tribes, that 
operate fixed route bus service. There is no minimum or maximum grant 
award amount; however, FTA intends to fund as many meritorious projects 
as possible. Only proposals from eligible recipients for eligible 
activities will be considered for funding. Due to funding limitations, 
proposers that are selected for funding may receive less than the 
amount originally requested. In those cases, applicants must be able to 
demonstrate that the proposed projects are still viable stand-alone 
projects that can be completed with the amount awarded.

iii. Administrative and National Policy Requirements

a. Pre-Award Authority
    The FTA will issue specific guidance to recipients regarding pre-
award authority at the time of selection. The FTA does not provide pre-
award authority for discretionary funds until projects are selected and 
even then, there are Federal requirements that must be met before costs 
are incurred. Funds under this NOFO cannot be used to reimburse 
applicants for otherwise eligible expenses incurred prior to FTA award 
of a Grant Agreement until FTA has issued pre-award authority for 
selected projects through a notification in the Federal Register, or 
unless FTA has issued a ``Letter of No Prejudice'' for the project 
before the expenses are incurred. For more information about FTA's 
policy on pre-award authority, please see the FY 2017 Apportionment 
Notice published on January 19, 2017.
b. Grant Requirements
    If selected, awardees will apply for a grant through FTA's Transit 
Award Management System (TrAMS). Recipients of Bus and Bus 
Infrastructure Program funding in urban areas are subject to the grant 
requirements of section 5307 Urbanized Area Formula Grant program, 
including those of FTA Circular 9030.1E. Recipients of Bus and Bus 
Infrastructure Program funding in rural areas are subject to the grant 
requirements of section 5311 Formula Grants for Rural Areas Program, 
including those of FTA Circular 9040.1G. All recipients must follow the 
Grants Management Requirements of FTA Circular 5010.1E, and the labor 
protections of 49 U.S.C. 5333(b). All discretionary grants, regardless 
of award amount, will be subject to the congressional notification and 
release process. Technical assistance regarding these requirements is 
available from each FTA regional office.
c. Buy America
    The FTA requires that all capital procurements meet FTA's Buy 
America requirements, which require that all iron, steel, or 
manufactured products be produced in the U.S. These requirements help 
create and protect manufacturing jobs in the U.S. The Bus 
Infrastructure Program will have a significant economic impact toward 
meeting the objectives of the Buy America law. The FAST Act amended the 
Buy America requirements to provide for a phased increase in the 
domestic content for rolling stock. For FY 2016 and FY 2017, the cost 
of components and subcomponents produced in the United States must be 
more than 60 percent of the cost of all components. For FY 2018 and FY 
2019, the cost of components and subcomponents produced in the United 
States must be more than 65 percent of the cost of all components. For 
FY 2020 and beyond, the cost of components and subcomponents produced 
in the United States must be more than 70 percent of the cost of all 
components. There is no change to the requirement that final assembly 
of rolling stock must occur in the United States. FTA issued final 
guidance on the implementation of the phased increase in domestic 
content on September 1, 2016. Any proposal that will require a waiver 
must identify the items for which a waiver will be sought in the 
application.
d. Disadvantaged Business Enterprise
    FTA requires that its recipients receiving planning, capital and/or 
operating assistance that will award prime contracts exceeding $250,000 
in FTA funds in a Federal fiscal year comply with the Disadvantaged 
Business Enterprise (DBE) program regulations at 49 CFR part 26. 
Applicants should expect to include any funds awarded, excluding those 
to be used for vehicle procurements, in setting their overall DBE goal. 
Note, however, that projects including vehicle procurements remain 
subject to the DBE program regulations. The rule requires that, prior 
to bidding on any FTA-assisted vehicle procurement, entities that 
manufacture vehicles, perform post-production alterations or 
retrofitting must submit a DBE Program plan and goal methodology to 
FTA. Further, to the extent that a vehicle remanufacturer is responding 
to a solicitation for new or remanufactured vehicles with a vehicle to 
which the remanufacturer has provided post-production alterations or 
retro-fitting (e.g., replacing major

[[Page 32929]]

components such as engine to provide a ``like new'' vehicle), the 
vehicle remanufacturer is considered a transit vehicle manufacturer and 
must also comply with the DBE regulations.
    FTA will then issue a transit vehicle manufacturer (TVM) 
concurrence/certification letter. Grant recipients must verify each 
entity's compliance with these requirements before accepting its bid. A 
list of compliant, certified TVMs is posted on FTA's Web page at 
https://www.fta.dot.gov/regulations-and-guidance/civil-rights-ada/eligible-tvms-list. Please note, that this list is nonexclusive and 
recipients must contact FTA before accepting bids from entities not 
listed on this web-posting. Recipients may also establish project 
specific DBE goals for vehicle procurements. The FTA will provide 
additional guidance as grants are awarded. For more information on DBE 
requirements, please contact Janelle Hinton, Office of Civil Rights, 
202-366-9259, email: [email protected].
e. Planning
    FTA encourages proposers to notify the appropriate State 
Departments of Transportation and MPOs in areas likely to be served by 
the project funds made available under this program. Selected projects 
must be incorporated into the long-range plans and transportation 
improvement programs of states and metropolitan areas before they are 
eligible for FTA funding.
f. Standard Assurances
    The applicant assures that it will comply with all applicable 
federal statutes, regulations, executive orders, directives, FTA 
circulars, and other federal administrative requirements in carrying 
out any project supported by the FTA grant. The applicant acknowledges 
that it is under a continuing obligation to comply with the terms and 
conditions of the grant agreement issued for its project with FTA. The 
applicant understands that Federal laws, regulations, policies, and 
administrative practices might be modified from time to time and may 
affect the implementation of the project. The applicant agrees that the 
most recent Federal requirements will apply to the project, unless FTA 
issues a written determination otherwise. The applicant must submit the 
Certifications and Assurances before receiving a grant if it does not 
have current certifications on file.
g. Reporting
    Post-award reporting requirements include the electronic submission 
of Federal Financial Reports and Milestone Reports in FTA's electronic 
grants management system.

H. Technical Assistance and Other Program Information

    This program is not subject to Executive Order 12372, 
``Intergovernmental Review of Federal Programs.'' FTA will consider 
applications for funding only from eligible recipients for eligible 
projects listed in Section C. Complete applications must be submitted 
through GRANTS.GOV by 11:59 p.m. EDT on August 25, 2017. For issues 
with GRANTS.GOV please contact GRANTS.GOV by phone at 1-800-518-4726 or 
by email at [email protected]. Contact information for FTA's regional 
offices can be found on FTA's Web site at https://www.transit.dot.gov/about/regional-offices/regional-offices.

I. Federal Awarding Agency Contacts

    For further information concerning this notice please contact the 
Bus Infrastructure Program manager, Mark Bathrick, via email at 
[email protected], or by phone at 202-366-9955. A TDD is available 
for individuals who are deaf or hard of hearing at 1-800-877-8339. In 
addition, FTA will post answers to questions and requests for 
clarifications on FTA's Web site at http://transit.dot.gov/busprogram. 
To ensure applicants receive accurate information about eligibility or 
the program, the applicant is encouraged to contact FTA directly, 
rather than through intermediaries or third parties, with questions. 
FTA staff may also conduct briefings on the discretionary grants 
selection and award process upon request.

Matthew J. Welbes,
Executive Director.
[FR Doc. 2017-15043 Filed 7-17-17; 8:45 am]
 BILLING CODE P



                                                32924                           Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices

                                                distribute, and gather information, and                  DEPARTMENT OF TRANSPORTATION                          I. Federal Awarding Agency Contacts
                                                to communicate with one another, one
                                                on one, or in groups. FRA uses ICT to                    Federal Transit Administration                        A. Program Description
                                                disseminate research findings and to                                                                              Section 5339(b) of Title 49, United
                                                                                                         FY17 Competitive Funding                              States Code, as amended by the Fixing
                                                increase awareness of safety education
                                                                                                         Opportunity; Grants for Buses and Bus                 America’s Surface Transportation
                                                programs and other FRA sponsored
                                                                                                         Facilities Infrastructure Investment                  (FAST) Act (Pub. L. 114–94, Dec. 4,
                                                innovation projects. The data gathered
                                                                                                         Program                                               2015), authorizes FTA to award funds
                                                in this study will help FRA and DOT
                                                attain the strategic goal of improving                   AGENCY: Federal Transit Administration                under the Buses and Bus Facilities
                                                safety in transportation by providing                    (FTA), DOT.                                           Infrastructure Investment Program (Bus
                                                information that will improve and                        ACTION: Notice of funding opportunity
                                                                                                                                                               and Bus Infrastructure Program) through
                                                inform their strategic communication                     (NOFO).                                               a competitive process, as described in
                                                                                                                                                               this notice, for capital projects to
                                                dissemination efforts to reach the
                                                                                                         SUMMARY:    The Federal Transit                       replace, rehabilitate, purchase or lease
                                                railroading population more efficiently
                                                                                                         Administration (FTA) announces the                    buses and related equipment and to
                                                and successfully.                                                                                              rehabilitate, purchase, construct or lease
                                                                                                         opportunity to apply for approximately
                                                   The proposed study is a needs                         $226.5 million in Fiscal Year (FY) 2017               bus-related facilities.
                                                assessment designed to understand the                    funds under Grants for Buses and Bus                     The purpose of the Bus and Bus
                                                current state of railroading industry use                Facilities Infrastructure Investment                  Infrastructure Program is to assist in the
                                                and application of ICT. As such, this                    Program (CFDA#20.526). As required by                 financing of buses and bus facilities
                                                study asks broad questions about ICT.                    federal transit law and subject to                    capital projects, including replacing,
                                                The main objectives of this study are to:                funding availability, funds will be                   rehabilitating, purchasing or leasing
                                                (1) Determine how Transportation, Yard                   awarded competitively to assist in the                buses or related equipment, and
                                                and Engineer railroaders use ICT; (2)                    financing of capital projects to replace,             rehabilitating, purchasing, constructing
                                                identify ways to reach this population                   rehabilitate, purchase or lease buses and             or leasing bus-related facilities.
                                                                                                         related equipment, and to rehabilitate,                  The Bus and Bus Infrastructure
                                                with future ICT-based education and
                                                                                                         purchase, construct or lease bus-related              Program provides funds to designated
                                                communication efforts; and (3) develop                                                                         recipients that allocate funds to fixed
                                                baseline awareness data for FRA’s                        facilities. Projects may include costs
                                                                                                         incidental to the acquisition of buses or             route bus operators, and to States, and
                                                research, development and technology                                                                           local governmental authorities that
                                                programs.                                                to the construction of facilities, such as
                                                                                                                                                               operate fixed route bus service. FTA
                                                                                                         the costs of related workforce
                                                   Affected Public: Railroad Union                                                                             also may award grants to eligible
                                                                                                         development and training activities, and
                                                Members.                                                                                                       recipients for projects to be undertaken
                                                                                                         project administration expenses. FTA
                                                   Form(s): FRA Form 6180.169.                                                                                 by subrecipients that are public agencies
                                                                                                         may award additional funds if they are
                                                                                                                                                               or private non-profit organizations
                                                   Total Estimated Annual Responses:                     made available to the program prior to
                                                                                                                                                               engaged in public transportation. In
                                                1,553.                                                   the announcement of project selections.
                                                                                                                                                               accordance with 49 U.S.C. 5339(b)(2),
                                                                                                         DATES: Complete proposals must be                     FTA will ‘‘consider the age and
                                                   Total Estimated Annual Burden: 511
                                                                                                         submitted electronically through the                  condition of buses, bus fleets, related
                                                hours.
                                                                                                         GRANTS.GOV ‘‘APPLY’’ function by                      equipment, and bus-related facilities’’ in
                                                   Comments are invited on the                           11:59 p.m. on August 25, 2017.                        selecting projects for funding. FTA may
                                                following: Whether the proposed                          Prospective applicants should initiate                prioritize projects that demonstrate how
                                                collection of information is necessary                   the process by registering on the                     they will address significant repair and
                                                for FRA to properly perform its                          GRANTS.GOV Web site promptly to                       maintenance needs, improve the safety
                                                functions, including whether the                         ensure completion of the application                  of transit systems, and deploy
                                                information will have practical utility;                 process before the submission deadline.               connective projects that include
                                                the accuracy of FRA’s estimates of the                   Instructions for applying can be found                advanced technologies to connect bus
                                                burden of the proposed information                       on FTA’s Web site at http://                          systems with other networks.
                                                collections; ways to enhance the quality,                transit.dot.gov/howtoapply and in the
                                                                                                         ‘‘FIND’’ module of GRANTS.GOV. The                    B. Federal Award Information
                                                utility, and clarity of the information to
                                                be collected; and ways to minimize the                   GRANTS.GOV funding opportunity ID                       Federal transit law at 49 U.S.C.
                                                burden of the collections of information                 is FTA–2017–004–TPM-Bus. Mail and                     5338(a)(2)(M) authorizes $283,600,000
                                                on respondents, including the use of                     fax submissions will not be accepted.                 in FY 2017 funds for the Section 5339(b)
                                                automated collection techniques or                       FOR FURTHER INFORMATION CONTACT:                      Bus and Bus Infrastructure Program and
                                                other forms of information technology.                   Mark Bathrick, FTA Office of Program                  the 5339(c) Low or No Emission Grants
                                                                                                         Management, 202–366–9955, or                          (Low-No) Program. Of this amount, 0.75
                                                   A comment to OMB is best assured of                                                                         percent, or $2,127,000, has been
                                                                                                         mark.bathrick@dot.gov.
                                                having its full effect if OMB receives it                                                                      reserved for program oversight in
                                                                                                         SUPPLEMENTARY INFORMATION:
                                                within 30 days of publication of this                                                                          accordance with 49 U.S.C. 5338(f)(1)(H).
                                                notice in the Federal Register.                          Table of Contents                                     Of the amount available for grants, FTA
                                                   Authority: 44 U.S.C. 3501–3520.                                                                             separately announced the availability of
                                                                                                         A. Program Description
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                               $55 million for Low-No Grants and is
                                                Sarah L. Inderbitzin,                                    B. Federal Award Information                          making the remaining $226,473,000
                                                                                                         C. Eligibility Information
                                                Acting Chief Counsel.
                                                                                                         D. Application and Submission Information
                                                                                                                                                               available through this notice for
                                                [FR Doc. 2017–15053 Filed 7–17–17; 8:45 am]              E. Application Review                                 competitive grants under the Bus and
                                                BILLING CODE 4910–06–P                                   F. Review and Selection Process                       Bus Infrastructure Program.
                                                                                                         G. Federal Award Administration                         As required under 49 U.S.C.
                                                                                                         H. Technical Assistance and Other Program             5339(b)(5), a minimum of 10 percent of
                                                                                                              Information                                      the amount awarded under the Bus and


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00140   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                                                Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices                                           32925

                                                Bus Infrastructure Program will be                       (including clean fuel or alternative-fuel             Infrastructure Program (downloaded
                                                awarded to projects located in rural                     vehicle-related equipment or facilities)              from GRANTS.GOV or the FTA Web site
                                                areas. And, as required by 49 U.S.C.                     that are required by the ADA of 1990,                 at www.transit.dot.gov/busprogram).
                                                5339(b)(8), no single grantee will be                    or that are necessary to comply with or               Failure to submit the information as
                                                awarded more than 10 percent of the                      maintain compliance with the Clean Air                requested can delay review of the
                                                amounts made available.                                  Act. The award recipient must itemize                 application.
                                                  FTA will grant pre-award authority to                  the cost of specific, discrete, vehicle-              2. Content and Form of Application
                                                incur costs for selected projects                        related equipment associated with                     Submission
                                                beginning on the date that project                       compliance with ADA or CAA to be
                                                selections are announced. Funds are                      eligible for the maximum 90 percent                      A complete proposal submission
                                                only available for projects that have not                Federal share for these costs.                        consists of at least two forms: The
                                                incurred costs prior to the selection of                    Eligible sources of local match                    SF424 Mandatory Form and the FY
                                                projects and will remain available for                   include the following: Cash from non-                 2017 Bus Infrastructure Program
                                                obligation until September 30, 2020.                     Government sources other than                         supplemental form. The application
                                                                                                         revenues from providing public                        must include responses to all sections of
                                                C. Eligibility Information                                                                                     the SF424 Mandatory Form and the
                                                                                                         transportation services; revenues
                                                1. Eligible Applicants                                   derived from the sale of advertising and              supplemental form, unless indicated as
                                                                                                         concessions; amounts received under a                 optional. The information on the
                                                   Under 49 U.S.C. 5339(b)(1), eligible                                                                        supplemental form will be used to
                                                applicants include designated recipients                 service agreement with a State or local
                                                                                                         social service agency or private social               determine applicant and project
                                                that allocate funds to fixed route bus                                                                         eligibility for the program, and to
                                                operators, states or local governmental                  service organization; revenues generated
                                                                                                         from value capture financing                          evaluate the proposal against the
                                                entities that operate fixed route bus                                                                          selection criteria described in part E of
                                                service, and Indian tribes. Except for                   mechanisms; or funds from an
                                                                                                         undistributed cash surplus; replacement               this notice.
                                                projects proposed by Indian tribes,                                                                               An applicant may submit multiple
                                                proposals for projects in rural (non-                    or depreciation cash fund or reserve; or
                                                                                                                                                               project proposals in a single submission,
                                                urbanized) areas must be submitted as                    new capital. In addition, transportation
                                                                                                                                                               and if doing so must include all project
                                                part of a consolidated State proposal.                   development credits or documentation
                                                                                                                                                               proposals on a single supplemental
                                                Under 49 U.S.C. 5339(b)(3), states and                   of in-kind match may substitute for
                                                                                                                                                               form. To add additional projects, select
                                                other eligible applicants may also                       local match if identified in the
                                                                                                                                                               the ‘‘add project’’ button and complete
                                                submit consolidated proposals for                        application.
                                                                                                                                                               a separate ‘‘project detail’’ section for
                                                projects in urbanized areas. The                         3. Eligible Projects                                  each project. FTA will only accept one
                                                submission of the statewide application                                                                        supplemental form per submission.
                                                                                                           Under 49 U.S.C. 5339(b)(1), eligible
                                                shall not preclude the submission and                                                                             The supplemental form must be
                                                                                                         projects are capital projects to replace,
                                                consideration of any application from                                                                          submitted as an attachment to the SF424
                                                                                                         rehabilitate purchase, or lease buses,
                                                other eligible recipients in an urbanized                                                                      Mandatory Form. All project proposals
                                                                                                         vans, and related equipment, and
                                                area in a State. Proposals may contain                                                                         will be evaluated separately, regardless
                                                                                                         capital projects to rehabilitate, purchase,
                                                projects to be implemented by the                                                                              of whether they are submitted as a
                                                                                                         construct, or lease bus-related facilities.
                                                recipient or its subrecipients.                                                                                single submission.
                                                                                                           Recipients are permitted to use up to
                                                   To be considered eligible, applicants                                                                          An applicant may submit additional
                                                                                                         0.5 percent of their requested grant
                                                must be able to demonstrate the                                                                                supporting documentation for each
                                                                                                         award for workforce development
                                                requisite legal, financial and technical                                                                       project proposal as attachments. Any
                                                                                                         activities eligible under 49 U.S.C.
                                                capabilities to receive and administer                                                                         supporting documentation must be
                                                                                                         5314(b) and an additional 0.5 percent
                                                Federal funds under this program.                                                                              described and referenced by file name
                                                                                                         for costs associated with training at the
                                                Eligible subrecipients under this                                                                              in the appropriate response section of
                                                                                                         National Transit Institute. Applicants
                                                program include all otherwise eligible                                                                         the supplemental form, or it may not be
                                                                                                         must identify the proposed use of funds
                                                applicants and private nonprofit                                                                               reviewed.
                                                                                                         for these activities in the project                      Information such as proposer name,
                                                organizations engaged in public
                                                                                                         proposal and identify them separately in              Federal amount requested, local match
                                                transportation.
                                                                                                         the project budget.                                   amount, description of areas served, etc.
                                                2. Cost Sharing or Matching                                                                                    may be requested in varying degrees of
                                                                                                         D. Application and Submission
                                                  The maximum federal share for                          Information                                           detail on both the SF424 form and
                                                projects selected under the Bus and Bus                                                                        Supplemental Form. Proposers must fill
                                                Infrastructure Program is 80 percent of                  1. Address                                            in all fields unless stated otherwise on
                                                the net project cost, unless noted below                   Applications must be submitted                      the forms. Applicants should not place
                                                by one of the exceptions. FTA may                        electronically through GRANTS.GOV.                    N/A or ‘‘refer to attachment’’ in lieu of
                                                prioritize projects proposed with a                      General information for submitting                    typing in responses in the field sections.
                                                higher local share.                                      applications through GRANTS.GOV can                   If information is copied into the
                                                  i. The maximum federal share is 85                     be found at https://www.transit.dot.gov/              supplemental form from another source,
                                                percent of the net project cost of                       funding/grants/applying/applying-fta-                 applicants should verify that pasted text
                                                acquiring vehicles (including clean-fuel                 funding along with specific instructions              is fully captured on the supplemental
                                                or alternative fuel vehicles) that are                   for the forms and attachments required                form and has not been truncated by the
sradovich on DSK3GMQ082PROD with NOTICES




                                                compliant with the Clean Air Act (CAA)                   for submission. Mail and fax                          character limits built into the form.
                                                and/or the Americans with Disabilities                   submissions will not be accepted. A                   Proposers should use both the ‘‘Check
                                                Act (ADA) of 1990.                                       complete proposal submission consists                 Package for Errors’’ and the ‘‘Validate
                                                  ii. The maximum federal share is 90                    of at least two forms: The SF424                      Form’’ validation buttons on both forms
                                                percent of the net project cost of                       Mandatory Form (downloaded from                       to check all required fields on the forms,
                                                acquiring, installing or constructing                    GRANTS.GOV) and the supplemental                      and ensure that the federal and local
                                                vehicle-related equipment or facilities                  form for the FY 2017 Bus and Bus                      amounts specified are consistent.


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00141   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                32926                           Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices

                                                  The SF424 Mandatory Form and the                       several weeks, for completion of all                  otherwise eligible expenses incurred
                                                Supplemental Form will prompt                            steps. For additional information on                  prior to FTA award of a Grant
                                                applicants for the required information,                 obtaining a unique entity identifier,                 Agreement until FTA has issued pre-
                                                including:                                               please visit www.sam.gov.                             award authority for selected projects or
                                                  a. Applicant Name                                                                                            unless FTA has issued a ‘‘Letter of No
                                                                                                         4. Submission Dates and Times
                                                  b. Dun and Bradstreet (D&B) Data                                                                             Prejudice’’ for the project before the
                                                Universal Numbering System (DUNS)                           Project proposals must be submitted                expenses are incurred.
                                                number                                                   electronically through GRANTS.GOV by
                                                  c. Key contact information (including                  11:59 p.m. Eastern on August 25, 2017.                6. Other Submission Requirements
                                                contact name, address, email address,                    Mail and fax submissions will not be                     Applicants are encouraged to identify
                                                and phone)                                               accepted.                                             scaled funding options in case
                                                  d. Congressional district(s) where                        FTA urges proposers to submit                      insufficient funding is available to fund
                                                project will take place                                  applications at least 72 hours prior to               a project at the full requested amount.
                                                  e. Project Information (including title,               the due date to allow time to receive the             If an applicant indicates that a project
                                                an executive summary, and type)                          validation messages and to correct any                is scalable, the applicant must provide
                                                  f. A detailed description of the need                  problems that may have caused a                       an appropriate minimum funding
                                                for the project                                          rejection notification. FTA will not                  amount that will fund an eligible project
                                                  g. A detailed description on how the                   accept submissions after the stated                   that achieves the objectives of the
                                                project will support the Bus                             deadline, as determined through the                   program and meets all relevant program
                                                Infrastructure Program’s objectives                      timestamp assigned to the application                 requirements. The applicant must
                                                  h. Evidence that the project is                        upon receipt in GRANTS.GOV.                           provide a clear explanation of how the
                                                consistent with local and regional                       GRANTS.GOV scheduled maintenance                      project budget would be affected by a
                                                planning objectives                                      and outage times are announced on the                 reduced award. FTA may award a lesser
                                                  i. Evidence that the applicant can                     GRANTS.GOV Web site. Deadlines will                   amount whether or not a scalable option
                                                provide the local cost share                             not be extended due to scheduled Web                  is provided.
                                                  j. A description of the technical, legal,              site maintenance.
                                                and financial capacity of the applicant                     Within 48 hours after submitting an                E. Application Review
                                                  k. A detailed project budget                           electronic application, the applicant                   FTA will evaluate project proposals
                                                  l. An explanation of the scalability of                should receive three email messages                   for the Bus and Bus Infrastructure
                                                the project                                              from GRANTS.GOV: (1) Confirmation of                  Program based on the criteria described
                                                  m. Details on the local matching                       successful transmission to                            in this notice. Projects will be evaluated
                                                funds                                                    GRANTS.GOV, (2) confirmation of                       primarily on the responses provided in
                                                  n. A detailed project timeline                         successful validation by GRANTS.GOV,                  the supplemental form. Additional
                                                3. Unique Entity Identifier and System                   and (3) confirmation of successful                    information may be provided to support
                                                for Award Management (SAM)                               validation by FTA. If confirmations of                the responses; however, any additional
                                                                                                         successful validation are not received or             documentation must be directly
                                                   Each applicant is required to: (1) Be                 a notice of failed validation or                      referenced on the supplemental form,
                                                registered in SAM before submitting an                   incomplete materials is received, the                 including the file name where the
                                                application; (2) provide a valid unique                  applicant must address the reason for                 additional information can be found.
                                                entity identifier in its application; and                the failed validation, as described in the
                                                (3) continue to maintain an active SAM                                                                         a. Demonstration of Need
                                                                                                         email notice, and resubmit before the
                                                registration with current information at                 submission deadline. If making a                         Applicants must demonstrate how the
                                                all times during which the applicant has                 resubmission for any reason, include all              proposed project will address an unmet
                                                an active Federal award or an                            original attachments regardless of which              need for capital investment in bus
                                                application or plan under consideration                  attachments were updated and check                    vehicles and/or supporting facilities,
                                                by FTA. These requirements do not                        the box on the supplemental form                      enhance the safety of the transit system
                                                apply if the applicant: (1) Is an                        indicating this is a resubmission.                    for transit vehicle operators, riders, and
                                                individual; (2) is excepted from the                        Proposers are encouraged to begin the              the general public, or improve the
                                                requirements under 2 CFR 25.110(b) or                    process of registration on the                        connectivity of bus systems with other
                                                (c); or (3) has an exception approved by                 GRANTS.GOV site well in advance of                    networks through the use of
                                                FTA under 2 CFR 25.110(d). FTA may                       the submission deadline. Registration is              deployment-ready information
                                                not make an Award until the applicant                    a multi-step process, which may take                  technologies. For example, an applicant
                                                has complied with all applicable unique                  several weeks to complete before an                   may demonstrate a substantial backlog
                                                entity identifier and SAM requirements.                  application can be submitted. Registered              of deferred capital investment,
                                                If an applicant has not fully complied                   proposers may still be required to take               insufficient size or capacity of
                                                with the requirements by the time FTA                    steps to keep their registration up to                maintenance facilities, excessive
                                                is ready to make an Award, FTA may                       date before submissions can be made                   reliance on vehicles that are beyond
                                                determine that the applicant is not                      successfully: (1) Registration in the                 their intended service life, a vehicle
                                                qualified to receive an Award and use                    System for Award Management (SAM)                     fleet that is insufficient to meet current
                                                that determination as a basis for making                 is renewed annually; and, (2) persons                 ridership demands, or passenger
                                                a Federal award to another applicant.                    making submissions on behalf of the                   facilities that are insufficient for their
                                                All applicants must provide a unique                                                                           current use. For safety, an applicant
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                         Authorized Organization Representative
                                                entity identifier provided by SAM.                       (AOR) must be authorized in                           may demonstrate safety concerns with
                                                Registration in SAM may take as little                   GRANTS.GOV by the AOR to make                         vehicles, equipment, or facilities that
                                                as 3–5 business days, but since there                    submissions.                                          are beyond their intended useful life, or
                                                could be unexpected steps or delays (for                                                                       that are no longer appropriate for use
                                                example, if you need to obtain an                        5. Funding Restrictions                               due to safety concerns. To improve
                                                Employer Identification Number), FTA                        Funds under this NOFO cannot be                    connectivity, bus systems may deploy
                                                recommends allowing ample time, up to                    used to reimburse applicants for                      Intelligent Transportation Systems (ITS)


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00142   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                                                Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices                                           32927

                                                technologies or software that link buses                 without the award of Bus Infrastructure               will be given to those projects for which
                                                with other transportation modes.                         Program funds.                                        local funds have already been made
                                                Applicants should also describe how                         Enhanced Access and Mobility: FTA                  available or reserved. Applicants should
                                                the proposed project will improve the                    will evaluate the potential for the                   submit evidence of the availability of
                                                operation of the transit system and                      project to improve access to                          funds for the project, for example by
                                                whether the project represents a one-                    employment opportunities, education,                  including a board resolution, letter of
                                                time or periodic need that cannot                        and other services. FTA will also                     support from the State, or other
                                                reasonably be funded from FTA formula                    evaluate the potential for the project to             documentation of the source of local
                                                program allocations and State or local                   improve mobility for the transit riding               funds such as a budget document
                                                resources. As a part of the response for                 public, such as through improved                      highlighting the line item or section
                                                demonstration of need, applicants                        headways, creation of new                             committing funds to the proposed
                                                should provide the following                             transportation choices, or eliminating                project.
                                                information:                                             gaps in the current route network.
                                                   i. For bus projects (replacement,                     Proposed benefits should be based on                  e. Project Implementation Strategy
                                                rehabilitation or expansion): Applicants                 documented ridership demand and be                       Projects will be evaluated based on
                                                must provide information on the age,                     well-described or documented through a                the extent to which the project is ready
                                                condition and performance of the                         study or route planning proposal.                     to implement within a reasonable
                                                asset(s) to be replaced or rehabilitated                                                                       period of time and whether the
                                                                                                         c. Planning and Local/Regional                        applicant’s proposed implementation
                                                by the proposed project. For service
                                                                                                         Prioritization                                        plans are reasonable and complete.
                                                expansion requests, applicants must
                                                provide information on the proposed                         Applicants must demonstrate how the                   In assessing whether the project is
                                                service expansion and the benefits for                   proposed project will be consistent with              ready to implement within a reasonable
                                                transit riders and the community from                    local and regional long-range planning                period of time, FTA will consider
                                                the new service. For all vehicle projects,               documents and local government                        whether the project qualifies for a
                                                the proposal must address how the                        priorities. This will involve assessing               Categorical Exclusion (CE), or whether
                                                project conforms to FTA’s spare ratio                    whether the project is consistent with                the required environmental work has
                                                guidelines.                                              the transit priorities identified in the              been initiated or completed for projects
                                                   ii. For bus facility and equipment                    long-range plan; and/or contingency/                  that require an Environmental
                                                projects (replacement, rehabilitation,                   illustrative projects included in that                Assessment (EA) or Environmental
                                                and/or expansion): Applicants must                       plan; or the locally developed human                  Impact Statement (EIS) under the
                                                provide information on the age and                       services public transportation                        National Environmental Policy Act of
                                                condition of the asset to be rehabilitated               coordinated plan. Applicants are not                  1969 (NEPA), as amended. The proposal
                                                or replaced relative to its minimum                      required to submit copies of such plans,              must also state whether grant funds can
                                                useful life.                                             but should describe how the project will              be obligated within 12 months from
                                                                                                         support regional goals. Additional                    time of award, if selected, and indicate
                                                b. Demonstration of Benefits                             consideration will be given to                        the timeframe under which the
                                                   Applications will be evaluated based                  applications including support letters                Metropolitan Transportation
                                                on how well they describe how the                        from local and regional planning                      Improvement Program (TIP) and/or
                                                proposed project will improve the                        organizations, local government                       Statewide Transportation Improvement
                                                condition of the transit system, improve                 officials, public agencies, and/or non-               Program (STIP) can be amended to
                                                the reliability of transit service for its               profit or private sector partners attesting           include the proposed project.
                                                riders, and/or enhance access and                        to the consistency of the proposed                    Additional consideration will be given
                                                mobility within the service area.                        project with these plans. Applicants                  to projects for which grant funds can be
                                                   System Condition: FTA will evaluate                   may also address how the proposed                     obligated within 12 months from time of
                                                the potential for the project to improve                 project will impact overall system                    award.
                                                the condition of the transit system by                   performance, asset management                            In assessing whether the proposed
                                                repairing and/or replacing assets that                   performance, or specific performance                  implementation plans are reasonable
                                                are in poor condition or have surpassed                  measures tracked and monitored by the                 and complete, FTA will review the
                                                their minimum or intended useful life                    applying entity to demonstrate how the                proposed project implementation plan,
                                                benchmarks, lowering the average age of                  proposed project will address local and               including all necessary project
                                                vehicles in the fleet, and/or reducing the               regional planning priorities.                         milestones and the overall project
                                                cost of maintaining outdated vehicles,                      Evidence of additional local or                    timeline. For projects that will require
                                                facilities and equipment. Applicants                     regional prioritization (i.e. STIP and                formal coordination, approvals or
                                                should document how the project’s                        LRTP) should include letters of support               permits from other agencies or project
                                                asset(s) will be operated, inspected,                    for the project from local government                 partners, the applicant must
                                                maintained, rehabilitated, and replaced                  officials, public agencies (i.e. MPOs),               demonstrate coordination with these
                                                to manage the asset’s performance, risks,                and non-profit or private sector                      organizations and their support for the
                                                and costs over its life cycle to provide                 partners.                                             project, such as through letters of
                                                safe, cost-effective, and reliable public                                                                      support.
                                                transportation.                                          d. Local Financial Commitment
                                                   Service Reliability: FTA will evaluate                  Applicants must identify the source of              f. Technical, Legal, and Financial
                                                the potential for the project to reduce                  the local cost share and describe                     Capacity
sradovich on DSK3GMQ082PROD with NOTICES




                                                the frequency of breakdowns or other                     whether such funds are currently                         Applicants must demonstrate that
                                                service interruptions as caused by the                   available for the project or will need to             they have the technical, legal and
                                                age and condition of the agency’s bus                    be secured if the project is selected for             financial capacity to undertake the
                                                fleet. Applicants should document their                  funding. FTA will consider the                        project. FTA will review relevant
                                                current service reliability metrics and                  availability of the local cost share as               oversight assessments and records to
                                                benchmark goals, including their                         evidence of local financial commitment                determine whether there are any
                                                strategy for improving reliability with or               to the project. Additional consideration              outstanding legal, technical, or financial


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00143   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                32928                           Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices

                                                issues with the applicant that would                     designated recipients that allocate funds             these requirements is available from
                                                affect the outcome of the proposed                       to fixed route bus operators, or state or             each FTA regional office.
                                                project. Applicants with outstanding                     local governmental entities, including                c. Buy America
                                                legal, technical, or financial compliance                Indian tribes, that operate fixed route
                                                issues from a Federal Transit                            bus service. There is no minimum or                      The FTA requires that all capital
                                                Administration compliance review or                      maximum grant award amount;                           procurements meet FTA’s Buy America
                                                Federal Transit grant-related Single                     however, FTA intends to fund as many                  requirements, which require that all
                                                Audit finding must explain how                           meritorious projects as possible. Only                iron, steel, or manufactured products be
                                                corrective actions taken will mitigate                   proposals from eligible recipients for                produced in the U.S. These
                                                negative impacts on the project.                         eligible activities will be considered for            requirements help create and protect
                                                                                                         funding. Due to funding limitations,                  manufacturing jobs in the U.S. The Bus
                                                F. Review and Selection Process                                                                                Infrastructure Program will have a
                                                                                                         proposers that are selected for funding
                                                   In addition to other FTA staff that                   may receive less than the amount                      significant economic impact toward
                                                may review the proposals, a technical                    originally requested. In those cases,                 meeting the objectives of the Buy
                                                evaluation committee will evaluate                       applicants must be able to demonstrate                America law. The FAST Act amended
                                                proposals based on the published                         that the proposed projects are still                  the Buy America requirements to
                                                evaluation criteria. Based on the                        viable stand-alone projects that can be               provide for a phased increase in the
                                                findings of the technical evaluation                     completed with the amount awarded.                    domestic content for rolling stock. For
                                                committee, the FTA Administrator will                                                                          FY 2016 and FY 2017, the cost of
                                                determine the final selection of projects                iii. Administrative and National Policy               components and subcomponents
                                                for program funding. FTA may consider                    Requirements                                          produced in the United States must be
                                                geographic diversity, diversity in the                                                                         more than 60 percent of the cost of all
                                                                                                         a. Pre-Award Authority                                components. For FY 2018 and FY 2019,
                                                size of the transit systems receiving
                                                funding, and/or the applicant’s receipt                     The FTA will issue specific guidance               the cost of components and
                                                of other discretionary awards in                         to recipients regarding pre-award                     subcomponents produced in the United
                                                determining the allocation of program                    authority at the time of selection. The               States must be more than 65 percent of
                                                funds. FTA may prioritize projects that                  FTA does not provide pre-award                        the cost of all components. For FY 2020
                                                have a higher local financial                            authority for discretionary funds until               and beyond, the cost of components and
                                                commitment. FTA may prioritize                           projects are selected and even then,                  subcomponents produced in the United
                                                projects that demonstrate how they will                  there are Federal requirements that must              States must be more than 70 percent of
                                                address significant repair and                           be met before costs are incurred. Funds               the cost of all components. There is no
                                                maintenance needs, improve the safety                    under this NOFO cannot be used to                     change to the requirement that final
                                                of transit systems, and deploy                           reimburse applicants for otherwise                    assembly of rolling stock must occur in
                                                connective projects that include                         eligible expenses incurred prior to FTA               the United States. FTA issued final
                                                advanced technologies to connect bus                     award of a Grant Agreement until FTA                  guidance on the implementation of the
                                                systems with other networks. FTA may                     has issued pre-award authority for                    phased increase in domestic content on
                                                prioritize projects in rural areas. Not                  selected projects through a notification              September 1, 2016. Any proposal that
                                                less than 10 percent of the Bus and Bus                  in the Federal Register, or unless FTA                will require a waiver must identify the
                                                                                                                                                               items for which a waiver will be sought
                                                Infrastructure Program funds will be                     has issued a ‘‘Letter of No Prejudice’’ for
                                                                                                                                                               in the application.
                                                distributed to projects in rural areas. In               the project before the expenses are
                                                addition, FTA will not award more than                   incurred. For more information about                  d. Disadvantaged Business Enterprise
                                                10 percent of the funds to a single                      FTA’s policy on pre-award authority,                     FTA requires that its recipients
                                                grantee.                                                 please see the FY 2017 Apportionment                  receiving planning, capital and/or
                                                                                                         Notice published on January 19, 2017.                 operating assistance that will award
                                                G. Federal Award Administration
                                                                                                         b. Grant Requirements                                 prime contracts exceeding $250,000 in
                                                i. Federal Award Notice                                                                                        FTA funds in a Federal fiscal year
                                                   Subsequent to an announcement by                        If selected, awardees will apply for a              comply with the Disadvantaged
                                                the FTA Administrator of the final                       grant through FTA’s Transit Award                     Business Enterprise (DBE) program
                                                project selections, which will be posted                 Management System (TrAMS).                            regulations at 49 CFR part 26.
                                                on the FTA Web site, FTA will publish                    Recipients of Bus and Bus Infrastructure              Applicants should expect to include any
                                                a list of the selected projects, a summary               Program funding in urban areas are                    funds awarded, excluding those to be
                                                of final scores for selected projects,                   subject to the grant requirements of                  used for vehicle procurements, in
                                                Federal award amounts and recipients                     section 5307 Urbanized Area Formula                   setting their overall DBE goal. Note,
                                                in the Federal Register. Project                         Grant program, including those of FTA                 however, that projects including vehicle
                                                recipients should contact their FTA                      Circular 9030.1E. Recipients of Bus and               procurements remain subject to the DBE
                                                Regional Offices for additional                          Bus Infrastructure Program funding in                 program regulations. The rule requires
                                                information regarding allocations for                    rural areas are subject to the grant                  that, prior to bidding on any FTA-
                                                projects under the Bus and Bus                           requirements of section 5311 Formula                  assisted vehicle procurement, entities
                                                Infrastructure Program.                                  Grants for Rural Areas Program,                       that manufacture vehicles, perform post-
                                                   At the time the project selections are                including those of FTA Circular                       production alterations or retrofitting
                                                                                                         9040.1G. All recipients must follow the               must submit a DBE Program plan and
sradovich on DSK3GMQ082PROD with NOTICES




                                                announced, FTA will extend pre-award
                                                authority for the selected projects. There               Grants Management Requirements of                     goal methodology to FTA. Further, to
                                                is no blanket pre-award authority for                    FTA Circular 5010.1E, and the labor                   the extent that a vehicle remanufacturer
                                                these projects before announcement.                      protections of 49 U.S.C. 5333(b). All                 is responding to a solicitation for new
                                                                                                         discretionary grants, regardless of award             or remanufactured vehicles with a
                                                ii. Award Administration                                 amount, will be subject to the                        vehicle to which the remanufacturer has
                                                  Funds under the Bus and Bus                            congressional notification and release                provided post-production alterations or
                                                Infrastructure Program are available to                  process. Technical assistance regarding               retro-fitting (e.g., replacing major


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00144   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1


                                                                                Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices                                          32929

                                                components such as engine to provide                     Reports in FTA’s electronic grants                    development sponsored and/or
                                                a ‘‘like new’’ vehicle), the vehicle                     management system.                                    conducted by the Veterans Health
                                                remanufacturer is considered a transit                                                                         Administration (VHA) to include: (1)
                                                                                                         H. Technical Assistance and Other
                                                vehicle manufacturer and must also                                                                             The policies and projects of the Office
                                                                                                         Program Information
                                                comply with the DBE regulations.                                                                               of Research and Development (ORD); (2)
                                                   FTA will then issue a transit vehicle                    This program is not subject to                     the focus of research on the high
                                                manufacturer (TVM) concurrence/                          Executive Order 12372,                                priority health care needs of Veterans;
                                                certification letter. Grant recipients                   ‘‘Intergovernmental Review of Federal                 (3) the balance of basic, applied, and
                                                must verify each entity’s compliance                     Programs.’’ FTA will consider                         outcomes research; (4) the scientific
                                                with these requirements before                           applications for funding only from                    merit review process; (5) the appropriate
                                                accepting its bid. A list of compliant,                  eligible recipients for eligible projects             mechanisms by which ORD can leverage
                                                certified TVMs is posted on FTA’s Web                    listed in Section C. Complete                         its resources to enhance the research
                                                page at https://www.fta.dot.gov/                         applications must be submitted through                financial base; (6) the rapid response to
                                                regulations-and-guidance/civil-rights-                   GRANTS.GOV by 11:59 p.m. EDT on                       changing health care needs, while
                                                ada/eligible-tvms-list. Please note, that                August 25, 2017. For issues with                      maintaining the stability of the research
                                                this list is nonexclusive and recipients                 GRANTS.GOV please contact                             infrastructure; and (7) the protection of
                                                must contact FTA before accepting bids                   GRANTS.GOV by phone at 1–800–518–                     human subjects of research.
                                                from entities not listed on this web-                    4726 or by email at support@grants.gov.
                                                                                                         Contact information for FTA’s regional                DATES: Nominations for membership on
                                                posting. Recipients may also establish
                                                                                                         offices can be found on FTA’s Web site                the Council must be received no later
                                                project specific DBE goals for vehicle
                                                                                                         at https://www.transit.dot.gov/about/                 than 5:00 p.m. EST on August 15, 2017.
                                                procurements. The FTA will provide
                                                                                                         regional-offices/regional-offices.                    Packages received after this time will
                                                additional guidance as grants are
                                                                                                                                                               not be considered for the current
                                                awarded. For more information on DBE                     I. Federal Awarding Agency Contacts                   membership cycle.
                                                requirements, please contact Janelle
                                                Hinton, Office of Civil Rights, 202–366–                    For further information concerning                 ADDRESSES: All nominations should be
                                                9259, email: janelle.hinton@dot.gov.                     this notice please contact the Bus                    mailed to Veterans Health
                                                                                                         Infrastructure Program manager, Mark                  Administration, Department of Veterans
                                                e. Planning                                              Bathrick, via email at mark.bathrick@                 Affairs, 810 Vermont Avenue NW.,
                                                   FTA encourages proposers to notify                    dot.gov, or by phone at 202–366–9955.                 (10P9), Washington, DC 20420, emailed
                                                the appropriate State Departments of                     A TDD is available for individuals who                (recommended) to Melissa.Cooper@
                                                Transportation and MPOs in areas likely                  are deaf or hard of hearing at 1–800–                 va.gov, or faxed to (202) 495–6196.
                                                to be served by the project funds made                   877–8339. In addition, FTA will post
                                                                                                                                                               FOR FURTHER INFORMATION CONTACT:
                                                available under this program. Selected                   answers to questions and requests for
                                                                                                                                                               Melissa Cooper, Designated Federal
                                                projects must be incorporated into the                   clarifications on FTA’s Web site at
                                                                                                                                                               Officer, Veterans Health Administration,
                                                long-range plans and transportation                      http://transit.dot.gov/busprogram. To
                                                                                                                                                               Department of Veterans Affairs, 810
                                                improvement programs of states and                       ensure applicants receive accurate
                                                                                                                                                               Vermont Avenue NW., (10P),
                                                metropolitan areas before they are                       information about eligibility or the
                                                                                                         program, the applicant is encouraged to               Washington, DC 20420, Telephone (202)
                                                eligible for FTA funding.                                                                                      461–6044. (This is not a toll free
                                                                                                         contact FTA directly, rather than
                                                f. Standard Assurances                                   through intermediaries or third parties,              number.) A copy of the Council’s
                                                                                                         with questions. FTA staff may also                    charter and list of the current
                                                   The applicant assures that it will                                                                          membership can be obtained by
                                                comply with all applicable federal                       conduct briefings on the discretionary
                                                                                                         grants selection and award process upon               contacting Mrs. Cooper or by accessing
                                                statutes, regulations, executive orders,                                                                       the Web site: https://www.va.gov/
                                                directives, FTA circulars, and other                     request.
                                                                                                                                                               ADVISORY/NRAC.asp
                                                federal administrative requirements in                   Matthew J. Welbes,
                                                carrying out any project supported by                                                                          SUPPLEMENTARY INFORMATION: The
                                                                                                         Executive Director.                                   Council advises the Secretary and the
                                                the FTA grant. The applicant
                                                                                                         [FR Doc. 2017–15043 Filed 7–17–17; 8:45 am]           USH on all matters related to the
                                                acknowledges that it is under a
                                                continuing obligation to comply with                     BILLING CODE P                                        research and development program, and
                                                the terms and conditions of the grant                                                                          conducts analyses and develops reports
                                                agreement issued for its project with                                                                          or other materials as necessary. In order
                                                FTA. The applicant understands that                      DEPARTMENT OF VETERANS                                to avoid duplication of effort, the
                                                Federal laws, regulations, policies, and                 AFFAIRS                                               Council is encouraged to review
                                                administrative practices might be                                                                              deliberations of other committees or
                                                                                                         Solicitation of Nominations for                       entities, and may incorporate or
                                                modified from time to time and may
                                                                                                         Appointment to the National Research                  otherwise use the results of
                                                affect the implementation of the project.
                                                                                                         Advisory Council                                      deliberations of such entities. As a part
                                                The applicant agrees that the most
                                                recent Federal requirements will apply                                                                         of its function, the Council may accept
                                                                                                         ACTION:   Notice.
                                                to the project, unless FTA issues a                                                                            for consideration suggestions for
                                                written determination otherwise. The                     SUMMARY:   The Department of Veterans                 research and development from
                                                applicant must submit the Certifications                 Affairs (VA) is seeking nominations of                Congress, VA and non-VA scientists,
                                                                                                         qualified candidates to be considered                 Veterans and their representatives, and
sradovich on DSK3GMQ082PROD with NOTICES




                                                and Assurances before receiving a grant
                                                if it does not have current certifications               for membership on the National                        the general public.
                                                on file.                                                 Research Advisory Council (Council).                     The Council meets at least four times
                                                                                                         The Council provides advice to the                    annually, which may include a site visit
                                                g. Reporting                                             Secretary of Veterans Affairs (Secretary)             to a VA field location. In accordance
                                                   Post-award reporting requirements                     and the Under Secretary for Health                    with Federal Travel Regulation,
                                                include the electronic submission of                     (USH), and makes recommendations on                   members will receive travel expense
                                                Federal Financial Reports and Milestone                  the nature and scope of research and                  reimbursement and per diem for any


                                           VerDate Sep<11>2014   17:47 Jul 17, 2017   Jkt 241001   PO 00000   Frm 00145   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1



Document Created: 2018-10-24 11:25:44
Document Modified: 2018-10-24 11:25:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of funding opportunity (NOFO).
DatesComplete proposals must be submitted electronically through the GRANTS.GOV ``APPLY'' function by 11:59 p.m. on August 25, 2017. Prospective applicants should initiate the process by registering on the GRANTS.GOV Web site promptly to ensure completion of the application process before the submission deadline. Instructions for applying can be found on FTA's Web site at http://transit.dot.gov/ howtoapply and in the ``FIND'' module of GRANTS.GOV. The GRANTS.GOV funding opportunity ID is FTA-2017-004-TPM-Bus. Mail and fax submissions will not be accepted.
ContactMark Bathrick, FTA Office of Program Management, 202-366-9955, or [email protected]
FR Citation82 FR 32924 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR