82_FR_33239 82 FR 33102 - Commission Information Collection Activities (FERC-510, FERC-520, FERC-561, and FERC-583); Comment Request

82 FR 33102 - Commission Information Collection Activities (FERC-510, FERC-520, FERC-561, and FERC-583); Comment Request

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 137 (July 19, 2017)

Page Range33102-33105
FR Document2017-15089

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection [FERC-510 (Application for Surrender of a Hydropower License), FERC-520 (Application for Authority to Hold Interlocking Directorate Positions), FERC-561 (Annual Report of Interlocking Positions), and FERC-583 (Annual Kilowatt Generating Report (Annual Charges))] to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (82 FR 16191, 4/3/2017) requesting public comments. The Commission received no comments on the FERC-510, the FERC-520, the FERC-561, or the FERC- 583 and is making this notation in its submittal to OMB.

Federal Register, Volume 82 Issue 137 (Wednesday, July 19, 2017)
[Federal Register Volume 82, Number 137 (Wednesday, July 19, 2017)]
[Notices]
[Pages 33102-33105]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15089]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC17-9-000]


Commission Information Collection Activities (FERC-510, FERC-520, 
FERC-561, and FERC-583); Comment Request

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection [FERC-510 (Application 
for Surrender of a Hydropower License), FERC-520 (Application for 
Authority to Hold Interlocking Directorate Positions), FERC-561 (Annual 
Report of Interlocking Positions), and FERC-583 (Annual Kilowatt 
Generating Report (Annual Charges))] to the Office of Management and 
Budget (OMB) for review of the information collection requirements. Any 
interested person may file comments directly with OMB and should 
address a copy of those comments to the Commission as explained below. 
The Commission previously issued a Notice in the Federal Register (82 
FR 16191, 4/3/2017) requesting public comments. The Commission received 
no comments on the FERC-510, the FERC-520, the FERC-561, or the FERC-
583 and is making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by August 18, 
2017.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0068 (FERC-510), 1902-0083 (FERC-520), 1902-0099 (FERC-561), or 
1902-0136 (FERC-583) should be sent via email to the Office of 
Information and Regulatory Affairs: [email protected]. Attention: 
Federal Energy Regulatory Commission Desk Officer. The Desk Officer may 
also be reached via telephone at 202-395-4718.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC17-9-000, by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION:

[[Page 33103]]

    Type of Request: Three-year extension of the information collection 
requirements for all collections described below with no changes to the 
current reporting requirements. Please note that each collection is 
distinct from the next.
    Comments: Comments are invited on: (1) Whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC-510 [Application for Surrender of a Hydropower License]

    OMB Control No.: 1902-0068.
    Abstract: The information collected under the requirements of FERC-
510 is used by the Commission to implement the statutory provisions of 
sections 4(e), 6 and 13 of the Federal Power Act (FPA) (16 U.S.C. 
797(e), 799 and 806). Section 4(e) gives the Commission authority to 
issue licenses for the purposes of constructing, operating and 
maintaining dams, water conduits, reservoirs, powerhouses, transmission 
lines or other power project works necessary or convenient for 
developing and improving navigation, transmission and utilization of 
power using bodies of water over which Congress has jurisdiction. 
Section 6 gives the Commission the authority to prescribe the 
conditions of licenses including the revocation or surrender of the 
license. Section 13 defines the Commission's authority to delegate time 
periods for when a license must be terminated if project construction 
has not begun. Surrender of a license may be desired by a licensee when 
a licensed project is retired or not constructed or natural 
catastrophes have damaged or destroyed the project facilities.
    FERC-510 is the application for the surrender of a hydropower 
license. The information is used by Commission staff to determine the 
broad impact of such surrender. The Commission will issue a notice 
soliciting comments from the public and other agencies and conduct a 
careful review of the application before issuing an order for Surrender 
of a License. The order is the result of an analysis of the information 
produced (i.e., dam safety, public safety, and environmental concerns, 
etc.), which is examined to determine whether any conditions must be 
satisfied before granting the surrender. The order implements the 
existing regulations and is inclusive for surrender of all types of 
hydropower licenses issued by FERC and its predecessor, the Federal 
Power Commission. The Commission implements these mandatory filing 
requirements in the Code of Federal Regulations (CFR) under 18 CFR 6.1-
6.4.
    Type of Respondent: Private or Municipal Hydropower Licensees.
    Estimate of Annual Burden \1\: The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:
---------------------------------------------------------------------------

    \1\ Burden is the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. For additional 
information, refer to Title 5 Code of Federal Regulations 1320.3.
    \2\ The Commission staff thinks that the average respondent for 
this collection is similarly situated to the Commission, in terms of 
salary plus benefits. Based upon FERC's 2017 annual average of 
$158,754 (for salary plus benefits), the average hourly cost is 
$76.50/hour.

                                                    FERC-510
                               [Application for surrender of a hydropower license]
----------------------------------------------------------------------------------------------------------------
                    Annual number of                       Average burden      Total annual
    Number of        responses per     Total number of     and  cost per     burden hours and       Cost per
   respondents         respondent         responses           response      total annual cost    respondent ($)
(1)                             (2)    (1) * (2) = (3)                (4)    (3) * (4) = (5)          (5) / (1)
----------------------------------------------------------------------------------------------------------------
              14                  1                 14   80 hrs.; 3 $6,120       1,120 hrs.;             $6,120
                                                                                     $85,680
----------------------------------------------------------------------------------------------------------------

FERC-520 [Application for Authority To Hold Interlocking Directorate 
Positions]

    OMB Control No.: 1902-0083.
    Abstract: The Federal Power Act (FPA), as amended by the Public 
Utility Regulatory Policies Act of 1978 (PURPA), mandates federal 
oversight and approval of certain electric corporate activities to 
ensure that neither public nor private interests are adversely 
affected. Accordingly, the FPA proscribes related information filing 
requirements to achieve this goal. Such filing requirements are found 
in the Code of Federal Regulations (CFR), specifically in 18 CFR part 
45, and serve as the basis for FERC-520.
---------------------------------------------------------------------------

    \3\ Based on additional information, we are revising the 
estimated average burden per response to 80 hours (rather than 10 
hours). The reporting requirements have not changed.
---------------------------------------------------------------------------

    FERC-520 is divided into two types of applications: Full and 
informational. The full application, as specified in 18 CFR 45.8, 
implements the FPA requirement under section 305(b) that it is unlawful 
for any person to concurrently hold the positions of officer or 
director of more than one public utility; or a public utility and a 
financial institution that is authorized to underwrite or participate 
in the marketing of public utility securities; or a public utility and 
an electrical equipment supplier to that public utility, unless 
authorized by order of the Commission. In order to obtain 
authorization, an applicant must demonstrate that neither public nor 
private interests will be adversely affected by the holding of the 
position. The full application provides the Commission with information 
about any interlocking position for which the applicant seeks 
authorization including, but not limited to, a description of duties 
and the estimated time devoted to the position.
    An informational application, specified in 18 CFR 45.9, allows an 
applicant to receive automatic authorization for an interlocked 
position upon receipt of the filing by the Commission. The 
informational application applies only to those individuals who seek 
authorization as: (1) An officer or director of two or more

[[Page 33104]]

public utilities where the same holding company owns, directly or 
indirectly, that percentage of each utility's stock (of whatever class 
or classes) which is required by each utility's by-laws to elect 
directors; (2) an officer or director of two public utilities, if one 
utility is owned, wholly or in part, by the other and, as its primary 
business, owns or operates transmission or generation facilities to 
provide transmission service or electric power for sale to its owners; 
or (3) an officer or director of more than one public utility, if such 
person is already authorized under part 45 to hold different positions 
as officer or director of those utilities where the interlock involves 
affiliated public utilities.
    Pursuant to 18 CFR 45.5, in the event that an applicant resigns or 
withdraws from Commission-authorized interlocked positions or is not 
re-elected or re-appointed to such interlocked positions, the 
Commission requires that the applicant submit a notice of change within 
30 days from the date of the change.
    Type of Respondents: Individuals who plan to concurrently become 
officers or directors of public utilities and of certain other covered 
entities must request authorization to hold such interlocking positions 
by submitting a FERC-520.
    Estimate of Annual Burden \1\: The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                                                        FERC-520
                                         [Application for authority to hold interlocking directorate positions]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number                                              Total annual  burden      Cost per
                                          Number of     of responses    Total number    Average burden and cost    hours (Total Annual      respondent
                                         respondents   per respondent   of responses         per response                 Cost)                 ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Full.................................              16               1              16  50 hrs.; $3,825.........  800 hrs.; $61,200......          $3,825
Informational........................             500               1             500  8 hrs.; $612............  4,000 hrs.; $306,000...            $612
Notice of Change.....................             200               1             200  0.25 hrs.; $19.13.......  50 hrs.; $3,825........          $19.13
                                      ------------------------------------------------------------------------------------------------------------------
    Total............................  ..............  ..............  ..............  ........................  4,850 hrs.; $371,025...  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-561 [Annual Report of Interlocking Positions]

    OMB Control No.: 1902-0099
    Abstract: The FERC Form 561 responds to the FPA requirements for 
annual reporting of similar types of positions which public utility 
officers and directors hold with financial institutions, insurance 
companies, utility equipment and fuel providers, and with any of an 
electric utility's 20 largest purchasers of electric energy (i.e., the 
20 entities with high expenditures of electricity). The FPA 
specifically defines most of the information elements in the Form 561 
including the information that must be filed, the required filers, the 
directive to make the information available to the public, and the 
filing deadline.
    The Commission uses the information required by 18 CFR 131.31 and 
collected by the Form 561 to implement the FPA requirement that those 
who are authorized to hold interlocked directorates annually disclose 
all the interlocked positions held within the prior year. The Form 561 
data identifies persons holding interlocking positions between public 
utilities and other entities, allows the Commission to review these 
interlocking positions, and allows identification of possible conflicts 
of interest.
    Type of Respondents: Public utility officers and directors holding 
financial positions, insurance companies, security underwriters, 
electrical equipment suppliers, fuel provider, and any entity which is 
controlled by these.
    Estimate of Annual Burden \1\: The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                                                      FERC Form 561
                                                        [Annual report of interlocking positions]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                            Annual number
          Number of respondents              of responses   Total number of   Average burden and cost per    Total annual burden hours       Cost per
                                            per respondent     responses               response                and total annual cost      respondent ($)
(1)                                                   (2)   (1) * (2) = (3)  (4).........................  (3) * (4) = (5).............       (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
2,700....................................               1            2,700   0.25 hrs.; $19.13...........  675.00 hrs.; $51,637.50.....          $19.13
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-583 [Annual Kilowatt Generating Report (Annual Charges)]

    OMB Control No.: 1902-0136.
    Abstract: The FERC-583 is used by the Commission to implement the 
statutory provisions of section 10(e) of the Federal Power Act (FPA) 
(16 U.S.C. 803(e)), which requires the Commission to collect annual 
charges from hydropower licensees for, among other things, the cost of 
administering part I of the FPA and for the use of United States dams. 
In addition, section 3401 of the Omnibus Budget Reconciliation Act of 
1986 (OBRA) authorizes the Commission to ``assess and collect fees and 
annual charges in any fiscal year in amounts equal to all of the costs 
incurred by the Commission in that fiscal year.'' The information is 
collected annually and used to determine the amounts of the annual 
charges to be assessed licensees for reimbursable government 
administrative costs and for the use of government dams. The Commission 
implements these filing requirements in the Code of

[[Page 33105]]

Federal Regulations (CFR) under 18 CFR part 11.1 through 11.8.\4\
---------------------------------------------------------------------------

    \4\ As discussed in 18 CFR part 11, selected federal agencies 
(such as the United States Fish and Wildlife Service and the 
National Marine Fisheries Service) submit annual reports to the 
Commission on their federal costs in administering part I of the 
Federal Power Act. The filing requirements imposed on those federal 
agencies are not collected for general statistical purposes and are 
not a collection of information as defined by 5 CFR 1320.3(c)(3). 
(The form and additional information on the information provided by 
those agencies is posted at https://www.ferc.gov/docs-filing/forms.asp#ofa.)
---------------------------------------------------------------------------

    Type of Respondent: FERC-regulated private and public hydropower 
licensees.
    Estimate of Annual Burden\1\: The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                   FERC-583, Annual Kilowatt Generating Report
                                                [Annual charges]
----------------------------------------------------------------------------------------------------------------
                    Annual number of                       Average burden      Total annual
    Number of        responses per     Total number of     and  cost per     burden hours and       Cost per
  respondents\5\       respondent         responses           response      total annual cost    respondent ($)
(1)                             (2)    (1) * (2) = (3)                (4)    (3) * (4) = (5)          (5) / (1)
----------------------------------------------------------------------------------------------------------------
             520                  1                520       2 hrs.; $153        1,040 hrs.;               $153
                                                                                     $79,560
----------------------------------------------------------------------------------------------------------------


    Dated: July 12, 2017.
---------------------------------------------------------------------------

    \5\ Based on data from Fiscal Year 2016, there were 520 project, 
owned by 242 FERC-regulted private and public licensees. Many of the 
licensees owned multiple projects.
---------------------------------------------------------------------------

Kimberly D. Bose,
Secretary.
[FR Doc. 2017-15089 Filed 7-18-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                    33102                        Federal Register / Vol. 82, No. 137 / Wednesday, July 19, 2017 / Notices

                                                    First Street NE., Washington, DC 20426.                     n. Comments, Protests, or Motions to               (Application for Authority to Hold
                                                    The first page of any filing should                      Intervene: Anyone may submit                          Interlocking Directorate Positions),
                                                    include docket number P–2197–117.                        comments, a protest, or a motion to                   FERC–561 (Annual Report of
                                                    Comments emailed to Commission staff                     intervene in accordance with the                      Interlocking Positions), and FERC–583
                                                    are not considered part of the                           requirements of Rules of Practice and                 (Annual Kilowatt Generating Report
                                                    Commission record.                                       Procedure, 18 CFR 385.210, .211, .214,                (Annual Charges))] to the Office of
                                                       The Commission’s Rules of Practice                    respectively. In determining the                      Management and Budget (OMB) for
                                                    and Procedure require all intervenors                    appropriate action to take, the                       review of the information collection
                                                    filing documents with the Commission                     Commission will consider all protests or              requirements. Any interested person
                                                    to serve a copy of that document on                      other comments filed, but only those                  may file comments directly with OMB
                                                    each person whose name appears on the                    who file a motion to intervene in                     and should address a copy of those
                                                    official service list for the project.                   accordance with the Commission’s                      comments to the Commission as
                                                    Further, if an intervenor files comments                 Rules may become a party to the                       explained below. The Commission
                                                    or documents with the Commission                         proceeding. Any comments, protests, or                previously issued a Notice in the
                                                    relating to the merits of an issue that                  motions to intervene must be received                 Federal Register (82 FR 16191, 4/3/
                                                    may affect the responsibilities of a                     on or before the specified comment date               2017) requesting public comments. The
                                                    particular resource agency, they must                    for the particular application.                       Commission received no comments on
                                                    also serve a copy of the document on                        o. Filing and Service of Documents:                the FERC–510, the FERC–520, the
                                                    that resource agency.                                    Any filing must (1) bear in all capital               FERC–561, or the FERC–583 and is
                                                       k. Description of Request: The                        letters the title COMMENTS, PROTEST,                  making this notation in its submittal to
                                                    licensee filed for Commission approval                   or MOTION TO INTERVENE as                             OMB.
                                                    revised appendices to its approved                       applicable; (2) set forth in the heading              DATES: Comments on the collection of
                                                    shoreline management plan pursuant to                    the name of the applicant and the                     information are due by August 18, 2017.
                                                    Article 407 of the license. The revised                  project number of the application to
                                                                                                                                                                   ADDRESSES: Comments filed with OMB,
                                                    appendices (i.e., Appendix E—                            which the filing responds; (3) furnish
                                                                                                                                                                   identified by the OMB Control No.
                                                    Specifications for Private Recreation                    the name, address, and telephone
                                                                                                                                                                   1902–0068 (FERC–510), 1902–0083
                                                    Facilities, Appendix F—Subdivision                       number of the person commenting,
                                                                                                                                                                   (FERC–520), 1902–0099 (FERC–561), or
                                                    Access Approval Procedures, and                          protesting or intervening; and (4)
                                                                                                                                                                   1902–0136 (FERC–583) should be sent
                                                    Appendix G—Shoreline Stewardship                         otherwise comply with the requirements
                                                                                                                                                                   via email to the Office of Information
                                                    Policy) were filed during the re-                        of 18 CFR 385.2001 through 385.2005.
                                                                                                                                                                   and Regulatory Affairs: oira_
                                                    licensing process, discussed in                          All comments, motions to intervene, or
                                                                                                                                                                   submission@omb.gov. Attention:
                                                    Commission staff’s Final Environmental                   protests must set forth their evidentiary
                                                                                                                                                                   Federal Energy Regulatory Commission
                                                    Impact Statement for the project, but not                basis. Any filing made by an intervenor
                                                                                                                                                                   Desk Officer. The Desk Officer may also
                                                    approved under the new license. The                      must be accompanied by proof of
                                                                                                                                                                   be reached via telephone at 202–395–
                                                    revised appendices would increase                        service on all persons listed in the
                                                                                                                                                                   4718.
                                                    flexibility in dock design, allow                        service list prepared by the Commission
                                                                                                             in this proceeding, in accordance with                   A copy of the comments should also
                                                    additional lands adjacent to the project
                                                                                                             18 CFR 385.2010.                                      be sent to the Commission, in Docket
                                                    to pursue dock permits, make changes
                                                                                                                                                                   No. IC17–9–000, by either of the
                                                    to vegetation removal procedures, etc.                     Dated: July 12, 2017.                               following methods:
                                                       l. Locations of the Application: A                    Kimberly D. Bose,                                        • eFiling at Commission’s Web site:
                                                    copy of the application is available for                 Secretary.                                            http://www.ferc.gov/docs-filing/
                                                    inspection and reproduction at the
                                                                                                             [FR Doc. 2017–15090 Filed 7–18–17; 8:45 am]           efiling.asp.
                                                    Commission’s Public Reference Room,
                                                                                                             BILLING CODE 6717–01–P                                   • Mail/Hand Delivery/Courier:
                                                    located at 888 First Street NE., Room
                                                                                                                                                                   Federal Energy Regulatory Commission,
                                                    2A, Washington, DC 20426, or by calling
                                                                                                                                                                   Secretary of the Commission, 888 First
                                                    (202) 502–8371. This filing may also be                  DEPARTMENT OF ENERGY                                  Street NE., Washington, DC 20426.
                                                    viewed on the Commission’s Web site at
                                                                                                                                                                      Instructions: All submissions must be
                                                    http://www.ferc.gov using the                            Federal Energy Regulatory                             formatted and filed in accordance with
                                                    ‘‘eLibrary’’ link. Enter the docket                      Commission                                            submission guidelines at: http://
                                                    number excluding the last three digits in
                                                                                                             [Docket No. IC17–9–000]                               www.ferc.gov/help/submission-
                                                    the docket number field to access the
                                                                                                                                                                   guide.asp. For user assistance contact
                                                    document. You may also register online
                                                                                                             Commission Information Collection                     FERC Online Support by email at
                                                    at http://www.ferc.gov/docs-filing/
                                                                                                             Activities (FERC–510, FERC–520,                       ferconlinesupport@ferc.gov, or by phone
                                                    esubscription.asp to be notified via
                                                                                                             FERC–561, and FERC–583); Comment                      at: (866) 208–3676 (toll-free), or (202)
                                                    email of new filings and issuances
                                                                                                             Request                                               502–8659 for TTY.
                                                    related to this or other pending projects.
                                                    For assistance, call 1–866–208–3676 or                                                                            Docket: Users interested in receiving
                                                                                                             AGENCY:  Federal Energy Regulatory                    automatic notification of activity in this
                                                    email FERCOnlineSupport@ferc.gov, for                    Commission.
                                                    TTY, call (202) 502–8659. A copy is also                                                                       docket or in viewing/downloading
                                                                                                             ACTION: Comment request.                              comments and issuances in this docket
                                                    available for inspection and
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    reproduction at the address in item (h)                                                                        may do so at http://www.ferc.gov/docs-
                                                                                                             SUMMARY:  In compliance with the
                                                    above. Agencies may obtain copies of                                                                           filing/docs-filing.asp.
                                                                                                             requirements of the Paperwork
                                                    the application directly from the                        Reduction Act of 1995, the Federal                    FOR FURTHER INFORMATION CONTACT:
                                                    applicant.                                               Energy Regulatory Commission                          Ellen Brown may be reached by email
                                                       m. Individuals desiring to be included                (Commission or FERC) is submitting its                at DataClearance@FERC.gov, by
                                                    on the Commission’s mailing list should                  information collection [FERC–510                      telephone at (202) 502–8663, and by fax
                                                    so indicate by writing to the Secretary                  (Application for Surrender of a                       at (202) 273–0873.
                                                    of the Commission.                                       Hydropower License), FERC–520                         SUPPLEMENTARY INFORMATION:



                                               VerDate Sep<11>2014   18:49 Jul 18, 2017   Jkt 241001   PO 00000   Frm 00063   Fmt 4703   Sfmt 4703   E:\FR\FM\19JYN1.SGM   19JYN1


                                                                                 Federal Register / Vol. 82, No. 137 / Wednesday, July 19, 2017 / Notices                                                     33103

                                                      Type of Request: Three-year extension                  used by the Commission to implement                    to determine the broad impact of such
                                                    of the information collection                            the statutory provisions of sections 4(e),             surrender. The Commission will issue a
                                                    requirements for all collections                         6 and 13 of the Federal Power Act (FPA)                notice soliciting comments from the
                                                    described below with no changes to the                   (16 U.S.C. 797(e), 799 and 806). Section               public and other agencies and conduct
                                                    current reporting requirements. Please                   4(e) gives the Commission authority to                 a careful review of the application
                                                    note that each collection is distinct from               issue licenses for the purposes of                     before issuing an order for Surrender of
                                                    the next.                                                constructing, operating and maintaining                a License. The order is the result of an
                                                      Comments: Comments are invited on:                     dams, water conduits, reservoirs,                      analysis of the information produced
                                                    (1) Whether the collections of                           powerhouses, transmission lines or                     (i.e., dam safety, public safety, and
                                                    information are necessary for the proper                 other power project works necessary or                 environmental concerns, etc.), which is
                                                    performance of the functions of the                      convenient for developing and
                                                    Commission, including whether the                                                                               examined to determine whether any
                                                                                                             improving navigation, transmission and                 conditions must be satisfied before
                                                    information will have practical utility;                 utilization of power using bodies of
                                                    (2) the accuracy of the agency’s                                                                                granting the surrender. The order
                                                                                                             water over which Congress has                          implements the existing regulations and
                                                    estimates of the burden and cost of the                  jurisdiction. Section 6 gives the
                                                    collections of information, including the                                                                       is inclusive for surrender of all types of
                                                                                                             Commission the authority to prescribe
                                                    validity of the methodology and                                                                                 hydropower licenses issued by FERC
                                                                                                             the conditions of licenses including the
                                                    assumptions used; (3) ways to enhance                                                                           and its predecessor, the Federal Power
                                                                                                             revocation or surrender of the license.
                                                    the quality, utility and clarity of the                                                                         Commission. The Commission
                                                                                                             Section 13 defines the Commission’s
                                                    information collections; and (4) ways to                 authority to delegate time periods for                 implements these mandatory filing
                                                    minimize the burden of the collections                   when a license must be terminated if                   requirements in the Code of Federal
                                                    of information on those who are to                       project construction has not begun.                    Regulations (CFR) under 18 CFR 6.1–
                                                    respond, including the use of automated                  Surrender of a license may be desired by               6.4.
                                                    collection techniques or other forms of                  a licensee when a licensed project is                     Type of Respondent: Private or
                                                    information technology.                                  retired or not constructed or natural                  Municipal Hydropower Licensees.
                                                    FERC–510 [Application for Surrender                      catastrophes have damaged or destroyed                    Estimate of Annual Burden 1: The
                                                    of a Hydropower License]                                 the project facilities.                                Commission estimates the total annual
                                                      OMB Control No.: 1902–0068.                               FERC–510 is the application for the                 burden and cost 2 for this information
                                                      Abstract: The information collected                    surrender of a hydropower license. The                 collection as follows:
                                                    under the requirements of FERC–510 is                    information is used by Commission staff

                                                                                                                                FERC–510
                                                                                                           [Application for surrender of a hydropower license]

                                                                                  Annual number of                                                                       Total annual                 Cost per
                                                          Number of                                               Total number            Average burden and
                                                                                   responses per                                                                      burden hours and               respondent
                                                         respondents                                              of responses             cost per response
                                                                                     respondent                                                                        total annual cost                 ($)

                                                               (1)                          (2)                   (1) * (2) = (3)                    (4)                   (3) * (4) = (5)             (5) ÷ (1)

                                                               14                            1                          14                  80 hrs.; 3 $6,120        1,120 hrs.; $85,680               $6,120



                                                    FERC–520 [Application for Authority                         FERC–520 is divided into two types of               affected by the holding of the position.
                                                    To Hold Interlocking Directorate                         applications: Full and informational.                  The full application provides the
                                                    Positions]                                               The full application, as specified in 18               Commission with information about any
                                                                                                             CFR 45.8, implements the FPA                           interlocking position for which the
                                                       OMB Control No.: 1902–0083.                           requirement under section 305(b) that it               applicant seeks authorization including,
                                                       Abstract: The Federal Power Act                       is unlawful for any person to                          but not limited to, a description of
                                                    (FPA), as amended by the Public Utility                  concurrently hold the positions of                     duties and the estimated time devoted
                                                    Regulatory Policies Act of 1978                          officer or director of more than one                   to the position.
                                                    (PURPA), mandates federal oversight                      public utility; or a public utility and a                 An informational application,
                                                    and approval of certain electric                         financial institution that is authorized to            specified in 18 CFR 45.9, allows an
                                                    corporate activities to ensure that                      underwrite or participate in the                       applicant to receive automatic
                                                    neither public nor private interests are                 marketing of public utility securities; or             authorization for an interlocked position
                                                    adversely affected. Accordingly, the                     a public utility and an electrical                     upon receipt of the filing by the
                                                    FPA proscribes related information                       equipment supplier to that public                      Commission. The informational
                                                    filing requirements to achieve this goal.                utility, unless authorized by order of the             application applies only to those
                                                    Such filing requirements are found in                    Commission. In order to obtain                         individuals who seek authorization as:
                                                    the Code of Federal Regulations (CFR),
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                             authorization, an applicant must                       (1) An officer or director of two or more
                                                    specifically in 18 CFR part 45, and serve                demonstrate that neither public nor
                                                    as the basis for FERC–520.                               private interests will be adversely
                                                      1 Burden is the total time, effort, or financial         2 The Commission staff thinks that the average         3 Based on additional information, we are revising

                                                    resources expended by persons to generate,               respondent for this collection is similarly situated   the estimated average burden per response to 80
                                                    maintain, retain, or disclose or provide information     to the Commission, in terms of salary plus benefits.   hours (rather than 10 hours). The reporting
                                                    to or for a Federal agency. For additional               Based upon FERC’s 2017 annual average of               requirements have not changed.
                                                    information, refer to Title 5 Code of Federal            $158,754 (for salary plus benefits), the average
                                                    Regulations 1320.3.                                      hourly cost is $76.50/hour.



                                               VerDate Sep<11>2014   20:46 Jul 18, 2017   Jkt 241001   PO 00000   Frm 00064   Fmt 4703   Sfmt 4703   E:\FR\FM\19JYN1.SGM     19JYN1


                                                    33104                                   Federal Register / Vol. 82, No. 137 / Wednesday, July 19, 2017 / Notices

                                                    public utilities where the same holding                                     one public utility, if such person is                                        within 30 days from the date of the
                                                    company owns, directly or indirectly,                                       already authorized under part 45 to hold                                     change.
                                                    that percentage of each utility’s stock (of                                 different positions as officer or director                                     Type of Respondents: Individuals
                                                    whatever class or classes) which is                                         of those utilities where the interlock                                       who plan to concurrently become
                                                    required by each utility’s by-laws to                                       involves affiliated public utilities.                                        officers or directors of public utilities
                                                    elect directors; (2) an officer or director                                                                                                              and of certain other covered entities
                                                                                                                                  Pursuant to 18 CFR 45.5, in the event
                                                    of two public utilities, if one utility is                                                                                                               must request authorization to hold such
                                                                                                                                that an applicant resigns or withdraws
                                                    owned, wholly or in part, by the other                                                                                                                   interlocking positions by submitting a
                                                    and, as its primary business, owns or                                       from Commission-authorized                                                   FERC–520.
                                                    operates transmission or generation                                         interlocked positions or is not re-elected                                     Estimate of Annual Burden 1: The
                                                    facilities to provide transmission service                                  or re-appointed to such interlocked                                          Commission estimates the total annual
                                                    or electric power for sale to its owners;                                   positions, the Commission requires that                                      burden and cost 2 for this information
                                                    or (3) an officer or director of more than                                  the applicant submit a notice of change                                      collection as follows:

                                                                                                                                                         FERC–520
                                                                                                                 [Application for authority to hold interlocking directorate positions]

                                                                                                                            Annual                                                                                          Total annual                Cost per
                                                                                              Number of                    number of                Total number               Average burden and                           burden hours               respondent
                                                                                             respondents                responses per               of responses                cost per response                        (Total Annual Cost)               ($)
                                                                                                                          respondent

                                                                                                     (1)                         (2)                (1) * (2) = (3)                          (4)                            (3) * (4) = (5)               (5) ÷ (1)

                                                    Full ................................                      16                            1                        16      50 hrs.; $3,825 ............            800 hrs.; $61,200 ........                 $3,825
                                                    Informational .................                           500                            1                       500      8 hrs.; $612 .................          4,000 hrs.; $306,000 ...                    $612
                                                    Notice of Change .........                                200                            1                       200      0.25 hrs.; $19.13 .........             50 hrs.; $3,825 ............               $19.13

                                                          Total ......................      ........................    ........................   ........................   .....................................   4,850 hrs.; $371,025 ...       ........................



                                                    FERC–561 [Annual Report of                                                  specifically defines most of the                                             between public utilities and other
                                                    Interlocking Positions]                                                     information elements in the Form 561                                         entities, allows the Commission to
                                                                                                                                including the information that must be                                       review these interlocking positions, and
                                                       OMB Control No.: 1902–0099                                               filed, the required filers, the directive to                                 allows identification of possible
                                                       Abstract: The FERC Form 561                                              make the information available to the                                        conflicts of interest.
                                                    responds to the FPA requirements for                                        public, and the filing deadline.                                                Type of Respondents: Public utility
                                                    annual reporting of similar types of                                           The Commission uses the information                                       officers and directors holding financial
                                                    positions which public utility officers                                     required by 18 CFR 131.31 and collected                                      positions, insurance companies,
                                                    and directors hold with financial                                           by the Form 561 to implement the FPA                                         security underwriters, electrical
                                                    institutions, insurance companies,                                          requirement that those who are                                               equipment suppliers, fuel provider, and
                                                    utility equipment and fuel providers,                                       authorized to hold interlocked                                               any entity which is controlled by these.
                                                    and with any of an electric utility’s 20                                    directorates annually disclose all the                                          Estimate of Annual Burden 1: The
                                                    largest purchasers of electric energy                                       interlocked positions held within the                                        Commission estimates the total annual
                                                    (i.e., the 20 entities with high                                            prior year. The Form 561 data identifies                                     burden and cost 2 for this information
                                                    expenditures of electricity). The FPA                                       persons holding interlocking positions                                       collection as follows:

                                                                                                                                                FERC FORM 561
                                                                                                                                       [Annual report of interlocking positions]

                                                                                       Annual                                                               Average                                                 Total annual                        Cost per
                                                         Number of                    number of                Total number                             burden and cost                                          burden hours and                      respondent
                                                        respondents                responses per               of responses                              per response                                             total annual cost                        ($)
                                                                                     respondent

                                                               (1)                          (2)                (1) * (2) = (3)                                     (4)                                                (3) * (4) = (5)                     (5) ÷ (1)

                                                    2,700 ...................                1                         2,700             0.25 hrs.; $19.13 ............................            675.00 hrs.; $51,637.50 .................               $19.13



                                                    FERC–583 [Annual Kilowatt Generating                                        things, the cost of administering part I                                     collected annually and used to
                                                    Report (Annual Charges)]                                                    of the FPA and for the use of United                                         determine the amounts of the annual
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                                                States dams. In addition, section 3401 of                                    charges to be assessed licensees for
                                                      OMB Control No.: 1902–0136.
                                                                                                                                the Omnibus Budget Reconciliation Act                                        reimbursable government administrative
                                                      Abstract: The FERC–583 is used by                                         of 1986 (OBRA) authorizes the                                                costs and for the use of government
                                                    the Commission to implement the                                             Commission to ‘‘assess and collect fees                                      dams. The Commission implements
                                                    statutory provisions of section 10(e) of                                    and annual charges in any fiscal year in                                     these filing requirements in the Code of
                                                    the Federal Power Act (FPA) (16 U.S.C.                                      amounts equal to all of the costs
                                                    803(e)), which requires the Commission
                                                                                                                                incurred by the Commission in that
                                                    to collect annual charges from
                                                                                                                                fiscal year.’’ The information is
                                                    hydropower licensees for, among other


                                               VerDate Sep<11>2014         18:49 Jul 18, 2017       Jkt 241001         PO 00000        Frm 00065      Fmt 4703        Sfmt 4703      E:\FR\FM\19JYN1.SGM               19JYN1


                                                                                  Federal Register / Vol. 82, No. 137 / Wednesday, July 19, 2017 / Notices                                                    33105

                                                    Federal Regulations (CFR) under 18 CFR                      Type of Respondent: FERC-regulated                   Estimate of Annual Burden1: The
                                                    part 11.1 through 11.8.4                                 private and public hydropower                         Commission estimates the total annual
                                                                                                             licensees.                                            burden and cost 2 for this information
                                                                                                                                                                   collection as follows:

                                                                                                   FERC–583, ANNUAL KILOWATT GENERATING REPORT
                                                                                                                              [Annual charges]

                                                                                   Annual number of                                                                     Total annual                 Cost per
                                                          Number of                                               Total number            Average burden and
                                                                                    responses per                                                                    burden hours and               respondent
                                                         respondents5                                             of responses             cost per response
                                                                                      respondent                                                                      total annual cost                 ($)

                                                               (1)                          (2)                   (1) * (2) = (3)                    (4)                   (3) * (4) = (5)           (5) ÷ (1)

                                                              520                            1                         520                     2 hrs.; $153          1,040 hrs.; $79,560               $153


                                                      Dated: July 12, 2017.                                  interventions in lieu of paper, using the             ENVIRONMENTAL PROTECTION
                                                    Kimberly D. Bose,                                        FERC Online links at http://                          AGENCY
                                                    Secretary.                                               www.ferc.gov. To facilitate electronic
                                                    [FR Doc. 2017–15089 Filed 7–18–17; 8:45 am]              service, persons with Internet access                 [FRL–9964–90–OA]
                                                    BILLING CODE 6717–01–P                                   who will eFile a document and/or be
                                                                                                             listed as a contact for an intervenor                 Environmental Laboratory Advisory
                                                                                                             must create and validate an                           Board; Notice of Charter Renewal
                                                    DEPARTMENT OF ENERGY                                     eRegistration account using the
                                                                                                             eRegistration link. Select the eFiling                AGENCY: Environmental Protection
                                                    Federal Energy Regulatory
                                                                                                             link to log on and submit the                         Agency (EPA).
                                                    Commission
                                                                                                             intervention or protests.
                                                    [Docket No. ER17–2084–000]                                                                                     ACTION:      Notice of charter renewal.
                                                                                                               Persons unable to file electronically
                                                    Great Bay Solar 1, LLC; Supplemental                     should submit an original and 5 copies                  Notice is hereby given that the
                                                    Notice That Initial Market-Based Rate                    of the intervention or protest to the                 Environmental Protection Agency (EPA)
                                                    Filing Includes Request for Blanket                      Federal Energy Regulatory Commission,                 has determined that, in accordance with
                                                    Section 204 Authorization                                888 First Street NE., Washington, DC                  the provisions of the Federal Advisory
                                                                                                             20426.                                                Committee Act (FACA), 5 U.S.C. App. 2,
                                                      This is a supplemental notice in the
                                                    above-referenced proceeding of Great                        The filings in the above-referenced                the Environmental Laboratory Advisory
                                                    Bay Solar 1, LLC’s application for                       proceeding are accessible in the                      Board (ELAB) is in the public interest
                                                    market-based rate authority, with an                     Commission’s eLibrary system by                       and is necessary in connection with the
                                                    accompanying rate tariff, noting that                    clicking on the appropriate link in the               performance of EPA’s duties.
                                                    such application includes a request for                  above list. They are also available for               Accordingly, ELAB will be renewed for
                                                    blanket authorization, under 18 CFR                      electronic review in the Commission’s                 an additional two-year period. The
                                                    part 34, of future issuances of securities               Public Reference Room in Washington,                  purpose of the ELAB is to provide
                                                    and assumptions of liability.                            DC. There is an eSubscription link on                 advice and recommendations to the
                                                      Any person desiring to intervene or to                 the Web site that enables subscribers to              Administrator of EPA on issues
                                                    protest should file with the Federal                     receive email notification when a                     associated with enhancing EPA’s
                                                    Energy Regulatory Commission, 888                        document is added to a subscribed                     measurement programs and the systems
                                                    First Street NE., Washington, DC 20426,                  docket(s). For assistance with any FERC               and standards of environmental
                                                    in accordance with Rules 211 and 214                     Online service, please email                          accreditation. Inquiries may be directed
                                                    of the Commission’s Rules of Practice                    FERCOnlineSupport@ferc.gov. or call                   to Lara P. Phelps, Senior Advisor, U.S.
                                                    and Procedure (18 CFR 385.211 and                        (866) 208–3676 (toll free). For TTY, call             Environmental Protection Agency,
                                                    385.214). Anyone filing a motion to                      (202) 502–8659.                                       Office of the Science Advisor, 109 T W
                                                    intervene or protest must serve a copy
                                                                                                               Dated: July 13, 2017.                               Alexander Drive (E243–05), Research
                                                    of that document on the Applicant.
                                                      Notice is hereby given that the                        Nathaniel J. Davis, Sr.,
                                                                                                                                                                   Triangle Park, NC 27709 or by email:
                                                    deadline for filing protests with regard                                                                       phelps.lara@epa.gov.
                                                                                                             Deputy Secretary.
                                                    to the applicant’s request for blanket                   [FR Doc. 2017–15095 Filed 7–18–17; 8:45 am]             Dated: July 12, 2017.
                                                    authorization, under 18 CFR part 34, of                  BILLING CODE 6717–01–P                                Robert J. Kavlock,
                                                    future issuances of securities and                                                                             EPA Science Advisor.
                                                    assumptions of liability, is August 2,
                                                                                                                                                                   [FR Doc. 2017–14825 Filed 7–18–17; 8:45 am]
                                                    2017.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                                                                                   BILLING CODE 6560–50–P
                                                      The Commission encourages
                                                    electronic submission of protests and
                                                      4 As discussed in 18 CFR part 11, selected federal     imposed on those federal agencies are not collected   posted at https://www.ferc.gov/docs-filing/
                                                    agencies (such as the United States Fish and             for general statistical purposes and are not a        forms.asp#ofa.)
                                                    Wildlife Service and the National Marine Fisheries       collection of information as defined by 5 CFR           5 Based on data from Fiscal Year 2016, there were

                                                    Service) submit annual reports to the Commission         1320.3(c)(3). (The form and additional information    520 project, owned by 242 FERC-regulted private
                                                    on their federal costs in administering part I of the    on the information provided by those agencies is      and public licensees. Many of the licensees owned
                                                    Federal Power Act. The filing requirements                                                                     multiple projects.



                                               VerDate Sep<11>2014   20:46 Jul 18, 2017   Jkt 241001   PO 00000   Frm 00066   Fmt 4703   Sfmt 4703   E:\FR\FM\19JYN1.SGM     19JYN1



Document Created: 2017-07-19 06:17:11
Document Modified: 2017-07-19 06:17:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by August 18, 2017.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation82 FR 33102 