82_FR_35031 82 FR 34888 - Airworthiness Directives; The Boeing Company Airplanes

82 FR 34888 - Airworthiness Directives; The Boeing Company Airplanes

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration

Federal Register Volume 82, Issue 143 (July 27, 2017)

Page Range34888-34891
FR Document2017-15554

We propose to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 757-200, -200CB, and -300 series airplanes. This proposed AD was prompted by a report of fatigue cracking found in a certain fuselage frame, which severed the inner chord and web. This proposed AD would require inspecting the fuselage frame for existing repairs, repetitive inspections, and applicable repairs. We are proposing this AD to address the unsafe condition on these products.

Federal Register, Volume 82 Issue 143 (Thursday, July 27, 2017)
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Proposed Rules]
[Pages 34888-34891]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15554]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2017-0711; Directorate Identifier 2017-NM-003-AD]
RIN 2120-AA64


Airworthiness Directives; The Boeing Company Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: We propose to adopt a new airworthiness directive (AD) for 
certain The Boeing Company Model 757-200, -200CB, and -300 series 
airplanes. This proposed AD was prompted by a report of fatigue 
cracking found in a certain fuselage frame, which severed the inner 
chord and web. This proposed AD would require inspecting the fuselage 
frame for existing repairs, repetitive inspections, and applicable 
repairs. We are proposing this AD to address the unsafe condition on 
these products.

DATES: We must receive comments on this proposed AD by September 11, 
2017.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to http://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE., Washington, DC 20590.
     Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    For service information identified in this NPRM, contact Boeing 
Commercial Airplanes, Attention: Contractual & Data Services (C&DS), 
2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740; telephone: 
562-797-1717; Internet: https://www.myboeingfleet.com. You may view 
this referenced service information at

[[Page 34889]]

the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, 
WA. For information on the availability of this material at the FAA, 
call 425-227-1221. It is also available on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2017-
0711.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2017-
0711; or in person at the Docket Management Facility between 9 a.m. and 
5 p.m., Monday through Friday, except Federal holidays. The AD docket 
contains this NPRM, the regulatory evaluation, any comments received, 
and other information. The street address for the Docket Office (phone: 
800-647-5527) is in the ADDRESSES section. Comments will be available 
in the AD docket shortly after receipt.

FOR FURTHER INFORMATION CONTACT: Chandra Ramdoss, Aerospace Engineer, 
Airframe Branch, ANM-120L, FAA, Los Angeles Aircraft Certification 
Office (ACO), 3960 Paramount Boulevard, Lakewood, CA 90712-4137; phone: 
562-627-5239; fax: 562-627-5210; email: [email protected].

SUPPLEMENTARY INFORMATION: 

Comments Invited

    We invite you to send any written relevant data, views, or 
arguments about this proposal. Send your comments to an address listed 
under the ADDRESSES section. Include ``Docket No. FAA-2017-0711; 
Directorate Identifier 2017-NM-001-AD'' at the beginning of your 
comments. We specifically invite comments on the overall regulatory, 
economic, environmental, and energy aspects of this NPRM. We will 
consider all comments received by the closing date and may amend this 
NPRM because of those comments.
    We will post all comments we receive, without change, to http://www.regulations.gov, including any personal information you provide. We 
will also post a report summarizing each substantive verbal contact we 
receive about this NPRM.

Discussion

    We have received a report of a crack in the fuselage frame at 
station (STA) 1640, at stringer (S) 14-R, adjacent to door stop number 
5. The inner chord and web of the STA 1640 fuselage frame had been 
severed after developing a crack. Analysis revealed that the crack was 
caused by fatigue due to flight loads and pressurization of the 
fuselage. Cracking of the fuselage frame, if not detected and 
corrected, could result in reduced structural integrity of the 
airplane.

Related Service Information Under 1 CFR Part 51

    We reviewed Boeing Alert Service Bulletin 757-53A0108, dated 
November 14, 2016. The service information describes procedures for an 
inspection of the fuselage frame for existing frame repairs, repetitive 
high frequency eddy current and low frequency eddy current inspections 
for cracking in specified areas with no existing frame repair, and 
repair of any cracking.
    We also reviewed Aviation Partners Boeing (APB) Alert Service 
Bulletin AP757-53-001, Revision 1, dated June 21, 2017. The service 
information provides compliance times for accomplishing the procedures 
identified in Boeing Alert Service Bulletin 757-53A0108, dated November 
14, 2016; for airplanes on which APB blended or scimitar blended 
winglets are installed.
    This service information is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

FAA's Determination

    We are proposing this AD because we evaluated all the relevant 
information and determined the unsafe condition described previously is 
likely to exist or develop in other products of the same type design.

Proposed AD Requirements

    This proposed AD would require accomplishment of the actions 
identified as ``RC'' (required for compliance) in the Accomplishment 
Instructions of Boeing Alert Service Bulletin 757-53A0108, dated 
November 14, 2016, described previously, except for differences between 
this proposed AD and the service information that are identified in the 
regulatory text of this proposed AD.
    For information on the procedures and compliance times, see this 
Boeing service information at http://www.regulations.gov by searching 
for and locating Docket No. FAA-2017-0711, except for airplanes on 
which blended or scimitar blended winglets are installed in accordance 
with Supplemental Type Certificate ST01518SE, which have different 
repetitive compliance times as specified in APB Alert Service Bulletin 
AP757-53-001, Revision 1, dated June 21, 2017.
    For airplanes on which blended or scimitar blended winglets are 
installed in accordance with Supplemental Type Certificate ST01518SE, 
the repetitive compliance times have a range, depending on airplane 
configuration. The earliest repetitive interval is 1,950 flight cycles; 
the latest repetitive interval is 8,600 flight cycles.

Costs of Compliance

    We estimate that this proposed AD affects 606 airplanes of U.S. 
registry. We estimate the following costs to comply with this proposed 
AD:

                                                 Estimated Costs
----------------------------------------------------------------------------------------------------------------
                                                                           Cost per
            Action                    Labor cost          Parts cost        product      Cost on U.S. operators
----------------------------------------------------------------------------------------------------------------
Inspect for existing frame      1 work-hour x $85 per               $0             $85  $51,510.
 repairs.                        hour = $85.
Repetitive high and low         48 work-hours x $85                  0           4,080  $2,439,840 per
 frequency inspections for       per hour = $4,080 per                                   inspection cycle.
 Groups 1 through 3 airplanes    inspection cycle.
 (598 airplanes).
Repetitive high and low         26 work-hours x $85                  0           2,210  $17,680 per inspection
 frequency inspections for       per hour = $2,210 per                                   cycle.
 Groups 4 and 5 airplanes (8     inspection cycle.
 airplanes).
----------------------------------------------------------------------------------------------------------------

    We have received no definitive data that would enable us to provide 
cost estimates for the on-condition repair specified in this proposed 
AD.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue

[[Page 34890]]

rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    We are issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979),
    (3) Will not affect intrastate aviation in Alaska, and
    (4) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive (AD):

The Boeing Company: Docket No. FAA-2017-0711; Directorate Identifier 
2017-NM-003-AD.

(a) Comments Due Date

    We must receive comments by September 11, 2017.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to The Boeing Company Model 757-200, -200CB, and 
-300 series airplanes, certificated in any category, as identified 
in Boeing Alert Service Bulletin 757-53A0108, dated November 14, 
2016.

(d) Subject

    Air Transport Association (ATA) of America Code 53; Fuselage.

(e) Unsafe Condition

    This AD was prompted by a report of fatigue cracking found in 
the fuselage frame at station (STA) 1640, which severed the inner 
chord and web. We are issuing this AD to detect and correct cracking 
of the fuselage frame at STA 1640, which could result in reduced 
structural integrity of the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Actions Required for Compliance

    (1) For all airplanes except those identified in paragraph 
(g)(2) of this AD: Do all applicable actions identified as ``RC'' 
(required for compliance) in, and in accordance with, the 
Accomplishment Instructions of Boeing Alert Service Bulletin 757-
53A0108, dated November 14, 2016; except as provided by paragraph 
(h)(1) of this AD. Do the actions at the applicable times specified 
in paragraph 1.E., ``Compliance,'' of Boeing Alert Service 757-
53A0108, dated November 14, 2016, except as provided by paragraph 
(h)(2) of this AD.
    (2) For airplanes on which blended or scimitar blended winglets 
are installed in accordance with Supplemental Type Certificate 
ST01518SE: Do all applicable actions identified as ``RC'' (required 
for compliance) in, and in accordance with, the Accomplishment 
Instructions of APB Alert Service Bulletin AP757-53-001, Revision 1, 
dated June 21, 2017; and Boeing Alert Service Bulletin 757-53A0108, 
dated November 14, 2016; except as provided by paragraph (h)(1) of 
this AD. Do the actions at the applicable times specified in 
paragraph 1.E., ``Compliance,'' of Aviation Partners Boeing (APB) 
Alert Service Bulletin AP757-53-001, Revision 1, dated June 21, 
2017, except as provided by paragraph (h)(2) of this AD.

(h) Exceptions to Service Information Specifications

    (1) Where Boeing Alert Service Bulletin 757-53A0108, dated 
November 14, 2016, specifies contacting Boeing for instructions, and 
specifies that action as RC: This AD requires using a method 
approved in accordance with the procedures specified in paragraph 
(i) of this AD.
    (2) Where Boeing Alert Service Bulletin 757-53A0108, dated 
November 14, 2016, and APB Alert Service Bulletin AP757-53-001, 
Revision 1, dated June 21, 2017, use the phrase ``after the original 
issue of this service bulletin'' for determining compliance, this AD 
requires compliance within the specified compliance time after the 
effective date of this AD.

(i) Alternative Methods of Compliance (AMOCs)

    (1) The Manager, Los Angeles Aircraft Certification Office 
(ACO), FAA, has the authority to approve AMOCs for this AD, if 
requested using the procedures found in 14 CFR 39.19. In accordance 
with 14 CFR 39.19, send your request to your principal inspector or 
local Flight Standards District Office, as appropriate. If sending 
information directly to the manager of the ACO, send it to the 
attention of the person identified in paragraph (j)(1) of this AD. 
Information may be emailed to [email protected].
    (2) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office.
    (3) An AMOC that provides an acceptable level of safety may be 
used for any repair, modification, or alteration required by this AD 
if it is approved by the Boeing Commercial Airplanes Organization 
Designation Authorization (ODA) that has been authorized by the 
Manager, Los Angeles ACO, to make those findings. To be approved, 
the repair method, modification deviation, or alteration deviation 
must meet the certification basis of the airplane, and the approval 
must specifically refer to this AD.
    (4) Except as required by paragraph (h)(1) of this AD: For 
service information that contains steps that are labeled as RC, the 
provisions of paragraphs (i)(4)(i) and (i)(4)(ii) of this AD apply.
    (i) The steps labeled as RC, including substeps under an RC step 
and any figures identified in an RC step, must be done to comply 
with the AD. If a step or substep is labeled ``RC Exempt,'' then the 
RC requirement is removed from that step or substep. An AMOC is 
required for any deviations to RC steps, including substeps and 
identified figures.
    (ii) Steps not labeled as RC may be deviated from using accepted 
methods in accordance with the operator's maintenance or inspection 
program without obtaining approval of an AMOC, provided the RC 
steps, including substeps and identified figures, can still be done 
as specified, and the airplane can be put back in an airworthy 
condition.

(j) Related Information

    (1) For more information about this AD, contact Chandra Ramdoss, 
Aerospace Engineer, Airframe Branch, ANM-120L, FAA, Los Angeles ACO, 
3960 Paramount Boulevard, Lakewood, CA 90712-4137;

[[Page 34891]]

phone: 562-627-5239; fax: 562-627-5210; email: 
[email protected].
    (2) For service information identified in this AD, contact 
Boeing Commercial Airplanes, Attention: Contractual & Data Services 
(C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740; 
telephone: 562-797-1717; Internet: https://www.myboeingfleet.com. 
You may view this referenced service information at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. 
For information on the availability of this material at the FAA, 
call 425-227-1221.

    Issued in Renton, Washington, on July 18, 2017.
Victor Wicklund,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2017-15554 Filed 7-26-17; 8:45 am]
BILLING CODE 4910-13-P



                                                    34888                      Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Proposed Rules

                                                    inspection for damage (including cracking) of                  (1) Alternative Methods of Compliance               Issued in Renton, Washington, on July 18,
                                                    the upper wing skin and top stringer joints                  (AMOCs): The Manager, International                 2017.
                                                    at rib 18 on both wings, do all applicable                   Branch, ANM–116, FAA, has the authority to          Victor Wicklund,
                                                    corrective actions, and do the applicable                    approve AMOCs for this AD, if requested             Acting Manager, Transport Airplane
                                                    modification, including related investigative                using the procedures found in 14 CFR 39.19.         Directorate, Aircraft Certification Service.
                                                    and corrective actions, in accordance with                   In accordance with 14 CFR 39.19, send your
                                                                                                                                                                     [FR Doc. 2017–15558 Filed 7–26–17; 8:45 am]
                                                    the Accomplishment Instructions of Airbus                    request to your principal inspector or local
                                                    Service Bulletin A300–57–6118, Revision 01,                                                                      BILLING CODE 4910–13–P
                                                                                                                 Flight Standards District Office, as
                                                    dated January 31, 2017, except as required by                appropriate. If sending information directly
                                                    paragraph (i) of this AD. Do all applicable                  to the manager of the International Branch,
                                                    modifications, related investigative actions,                send it to the attention of the person              DEPARTMENT OF TRANSPORTATION
                                                    and corrective actions before further flight.                identified in paragraph (l)(2) of this AD.
                                                       (1) For Group 1, LR airplanes: Inspect at                 Information may be emailed to: 9-ANM-116-           Federal Aviation Administration
                                                    the time specified in paragraph (h)(1)(i) or                 AMOC-REQUESTS@faa.gov. Before using
                                                    (h)(1)(ii) of this AD, whichever occurs later.               any approved AMOC, notify your appropriate          14 CFR Part 39
                                                       (i) Before exceeding 32,500 flight cycles or              principal inspector, or lacking a principal
                                                    70,300 flight hours, whichever occurs first                                                                      [Docket No. FAA–2017–0711; Directorate
                                                                                                                 inspector, the manager of the local flight          Identifier 2017–NM–003–AD]
                                                    since first flight of the airplane.                          standards district office/certificate holding
                                                       (ii) Within 700 flight cycles, 1,500 flight               district office.                                    RIN 2120–AA64
                                                    hours, or 12 months, whichever occurs first                    (2) Contacting the Manufacturer: For any
                                                    after the effective date of this AD.                                                                             Airworthiness Directives; The Boeing
                                                                                                                 requirement in this AD to obtain corrective
                                                       (2) For Group 1, SR airplanes: Inspect at                                                                     Company Airplanes
                                                                                                                 actions from a manufacturer, the action must
                                                    the time specified in paragraphs (h)(2)(i) or
                                                                                                                 be accomplished using a method approved
                                                    (h)(2)(ii) of this AD, whichever occurs later.
                                                                                                                 by the Manager, International Branch, ANM–
                                                                                                                                                                     AGENCY: Federal Aviation
                                                       (i) Before exceeding 35,100 flight cycles or                                                                  Administration (FAA), DOT.
                                                                                                                 116, Transport Airplane Directorate, FAA; or
                                                    52,600 flight hours, whichever occurs first
                                                                                                                 the European Aviation Safety Agency                 ACTION: Notice of proposed rulemaking
                                                    since the first flight of the airplane.
                                                       (ii) Within 700 flight cycles or 1,000 flight             (EASA); or Airbus’s EASA Design                     (NPRM).
                                                    hours, or 12 months, whichever occurs first                  Organization Approval (DOA). If approved by
                                                                                                                 the DOA, the approval must include the              SUMMARY:   We propose to adopt a new
                                                    after the effective date of this AD.
                                                       (3) For Group 2, LR airplanes: Inspect                    DOA-authorized signature.                           airworthiness directive (AD) for certain
                                                    before exceeding 35,000 flight cycles or                       (3) Required for Compliance (RC): If any          The Boeing Company Model 757–200,
                                                    75,700 flight hours, whichever occurs first                  service information contains procedures or          –200CB, and –300 series airplanes. This
                                                    since the first flight of the airplane.                      tests that are identified as RC, those              proposed AD was prompted by a report
                                                       (4) For Group 2, SR airplanes: Inspect                    procedures and tests must be done to comply         of fatigue cracking found in a certain
                                                    before exceeding 37,800 flight cycles or                     with this AD; any procedures or tests that are      fuselage frame, which severed the inner
                                                    56,700 flight hours, whichever occurs first                  not identified as RC are recommended. Those         chord and web. This proposed AD
                                                    since the first flight of the airplane.                      procedures and tests that are not identified
                                                                                                                                                                     would require inspecting the fuselage
                                                                                                                 as RC may be deviated from using accepted
                                                                                                                 methods in accordance with the operator’s           frame for existing repairs, repetitive
                                                      TABLE 1 TO PARAGRAPH (h) OF THIS                           maintenance or inspection program without           inspections, and applicable repairs. We
                                                       AD—COMPLIANCE TIME LOWER                                  obtaining approval of an AMOC, provided             are proposing this AD to address the
                                                       THRESHOLDS                                                the procedures and tests identified as RC can       unsafe condition on these products.
                                                                                                                 be done and the airplane can be put back in         DATES: We must receive comments on
                                                                     Compliance time flight cycles (FC) or       an airworthy condition. Any substitutions or
                                                     Applicable       flight hours (FH), whichever occurs                                                            this proposed AD by September 11,
                                                     airplanes                                                   changes to procedures or tests identified as
                                                                      first since first flight of the airplane                                                       2017.
                                                                                                                 RC require approval of an AMOC.
                                                    Group 1, LR      Not before exceeding     30,900 FC or                                                           ADDRESSES:   You may send comments,
                                                                       66,700 FH.                                (l) Related Information                             using the procedures found in 14 CFR
                                                    Group 1, SR      Not before exceeding     28,700 FC or          (1) Refer to Mandatory Continuing                11.43 and 11.45, by any of the following
                                                                       43,000 FH.                                Airworthiness Information (MCAI) EASA
                                                    Group 2, LR      Not before exceeding     28,600 FC or                                                           methods:
                                                                       61,700 FH.
                                                                                                                 Airworthiness Directive 2017–0023, dated              • Federal eRulemaking Portal: Go to
                                                    Group 2, SR      Not before exceeding     34,400 FC or       February 10, 2017, for related information.         http://www.regulations.gov. Follow the
                                                                       51,600 FH.                                This MCAI may be found in the AD docket             instructions for submitting comments.
                                                                                                                 on the Internet at http://www.regulations.gov
                                                                                                                                                                       • Fax: 202–493–2251.
                                                                                                                 by searching for and locating Docket No.
                                                    (i) Service Information Exception
                                                                                                                 FAA–2017–0710.
                                                                                                                                                                       • Mail: U.S. Department of
                                                       Where Airbus Service Bulletin A300–57–                                                                        Transportation, Docket Operations, M–
                                                                                                                    (2) For more information about this AD,
                                                    6118, Revision 01, dated January 31, 2017,                                                                       30, West Building Ground Floor, Room
                                                                                                                 contact Dan Rodina, Aerospace Engineer,
                                                    specifies to contact Airbus for appropriate                                                                      W12–140, 1200 New Jersey Avenue SE.,
                                                                                                                 International Branch, ANM–116, Transport
                                                    action, and specifies that action as ‘‘RC’’                                                                      Washington, DC 20590.
                                                                                                                 Airplane Directorate, FAA, 1601 Lind
                                                    (Required for Compliance): Before further
                                                    flight, accomplish corrective actions in
                                                                                                                 Avenue SW., Renton, WA 98057–3356;                    • Hand Delivery: Deliver to Mail
                                                    accordance with the procedures specified in                  telephone 425–227–2125; fax 425–227–1149.           address above between 9 a.m. and 5
                                                    paragraph (k)(2) of this AD.                                    (3) For service information identified in        p.m., Monday through Friday, except
                                                                                                                 this AD, contact Airbus SAS, Airworthiness          Federal holidays.
                                                    (j) Credit for Previous Actions                              Office—EAW, 1 Rond Point Maurice                      For service information identified in
mstockstill on DSK30JT082PROD with PROPOSALS




                                                       This paragraph provides credit for actions                Bellonte, 31707 Blagnac Cedex, France;              this NPRM, contact Boeing Commercial
                                                    required by paragraph (h) of this AD, if those               telephone +33 5 61 93 36 96; fax +33 5 61
                                                                                                                                                                     Airplanes, Attention: Contractual & Data
                                                    actions were performed before the effective                  93 44 51; email account.airworth-eas@
                                                                                                                 airbus.com; Internet http://www.airbus.com.
                                                                                                                                                                     Services (C&DS), 2600 Westminster
                                                    date of this AD using Airbus Service Bulletin
                                                                                                                 You may view this service information at the        Blvd., MC 110–SK57, Seal Beach, CA
                                                    A300–57–6118, dated June 30, 2015.
                                                                                                                 FAA, Transport Airplane Directorate, 1601           90740; telephone: 562–797–1717;
                                                    (k) Other FAA AD Provisions                                  Lind Avenue SW., Renton, WA. For                    Internet: https://
                                                      The following provisions also apply to this                information on the availability of this             www.myboeingfleet.com. You may view
                                                    AD:                                                          material at the FAA, call 425–227–1221.             this referenced service information at


                                               VerDate Sep<11>2014    17:09 Jul 26, 2017    Jkt 241001   PO 00000   Frm 00005   Fmt 4702   Sfmt 4702   E:\FR\FM\27JYP1.SGM   27JYP1


                                                                             Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Proposed Rules                                                   34889

                                                    the FAA, Transport Airplane                                We will post all comments we                          FAA’s Determination
                                                    Directorate, 1601 Lind Avenue SW.,                       receive, without change, to http://
                                                    Renton, WA. For information on the                       www.regulations.gov, including any                        We are proposing this AD because we
                                                    availability of this material at the FAA,                personal information you provide. We                    evaluated all the relevant information
                                                    call 425–227–1221. It is also available                  will also post a report summarizing each                and determined the unsafe condition
                                                    on the Internet at http://                               substantive verbal contact we receive                   described previously is likely to exist or
                                                    www.regulations.gov by searching for                     about this NPRM.                                        develop in other products of the same
                                                    and locating Docket No. FAA–2017–                                                                                type design.
                                                    0711.                                                    Discussion
                                                                                                                                                                     Proposed AD Requirements
                                                    Examining the AD Docket                                    We have received a report of a crack
                                                                                                             in the fuselage frame at station (STA)                     This proposed AD would require
                                                      You may examine the AD docket on                       1640, at stringer (S) 14–R, adjacent to                 accomplishment of the actions
                                                    the Internet at http://                                  door stop number 5. The inner chord                     identified as ‘‘RC’’ (required for
                                                    www.regulations.gov by searching for                     and web of the STA 1640 fuselage frame                  compliance) in the Accomplishment
                                                    and locating Docket No. FAA–2017–                        had been severed after developing a                     Instructions of Boeing Alert Service
                                                    0711; or in person at the Docket                         crack. Analysis revealed that the crack                 Bulletin 757–53A0108, dated November
                                                    Management Facility between 9 a.m.                       was caused by fatigue due to flight loads
                                                    and 5 p.m., Monday through Friday,                                                                               14, 2016, described previously, except
                                                                                                             and pressurization of the fuselage.                     for differences between this proposed
                                                    except Federal holidays. The AD docket                   Cracking of the fuselage frame, if not
                                                    contains this NPRM, the regulatory                                                                               AD and the service information that are
                                                                                                             detected and corrected, could result in                 identified in the regulatory text of this
                                                    evaluation, any comments received, and                   reduced structural integrity of the
                                                    other information. The street address for                                                                        proposed AD.
                                                                                                             airplane.
                                                    the Docket Office (phone: 800–647–                                                                                  For information on the procedures
                                                    5527) is in the ADDRESSES section.                       Related Service Information Under 1                     and compliance times, see this Boeing
                                                    Comments will be available in the AD                     CFR Part 51                                             service information at http://
                                                    docket shortly after receipt.                                                                                    www.regulations.gov by searching for
                                                                                                               We reviewed Boeing Alert Service
                                                    FOR FURTHER INFORMATION CONTACT:                                                                                 and locating Docket No. FAA–2017–
                                                                                                             Bulletin 757–53A0108, dated November
                                                    Chandra Ramdoss, Aerospace Engineer,                                                                             0711, except for airplanes on which
                                                                                                             14, 2016. The service information
                                                    Airframe Branch, ANM–120L, FAA, Los                                                                              blended or scimitar blended winglets
                                                                                                             describes procedures for an inspection
                                                    Angeles Aircraft Certification Office                                                                            are installed in accordance with
                                                                                                             of the fuselage frame for existing frame
                                                    (ACO), 3960 Paramount Boulevard,                                                                                 Supplemental Type Certificate
                                                                                                             repairs, repetitive high frequency eddy
                                                    Lakewood, CA 90712–4137; phone:                                                                                  ST01518SE, which have different
                                                                                                             current and low frequency eddy current
                                                    562–627–5239; fax: 562–627–5210;                                                                                 repetitive compliance times as specified
                                                                                                             inspections for cracking in specified
                                                    email: chandraduth.ramdoss@faa.gov.                                                                              in APB Alert Service Bulletin AP757–
                                                                                                             areas with no existing frame repair, and
                                                    SUPPLEMENTARY INFORMATION:
                                                                                                             repair of any cracking.                                 53–001, Revision 1, dated June 21, 2017.
                                                    Comments Invited                                           We also reviewed Aviation Partners                       For airplanes on which blended or
                                                                                                             Boeing (APB) Alert Service Bulletin                     scimitar blended winglets are installed
                                                      We invite you to send any written
                                                    relevant data, views, or arguments about                 AP757–53–001, Revision 1, dated June                    in accordance with Supplemental Type
                                                    this proposal. Send your comments to                     21, 2017. The service information                       Certificate ST01518SE, the repetitive
                                                    an address listed under the ADDRESSES                    provides compliance times for                           compliance times have a range,
                                                    section. Include ‘‘Docket No. FAA–                       accomplishing the procedures identified                 depending on airplane configuration.
                                                    2017–0711; Directorate Identifier 2017–                  in Boeing Alert Service Bulletin 757–                   The earliest repetitive interval is 1,950
                                                    NM–001–AD’’ at the beginning of your                     53A0108, dated November 14, 2016; for                   flight cycles; the latest repetitive
                                                    comments. We specifically invite                         airplanes on which APB blended or                       interval is 8,600 flight cycles.
                                                    comments on the overall regulatory,                      scimitar blended winglets are installed.                Costs of Compliance
                                                    economic, environmental, and energy                        This service information is reasonably
                                                    aspects of this NPRM. We will consider                   available because the interested parties                   We estimate that this proposed AD
                                                    all comments received by the closing                     have access to it through their normal                  affects 606 airplanes of U.S. registry. We
                                                    date and may amend this NPRM                             course of business or by the means                      estimate the following costs to comply
                                                    because of those comments.                               identified in the ADDRESSES section.                    with this proposed AD:

                                                                                                                          ESTIMATED COSTS
                                                                                                                                                                                      Cost per        Cost on U.S.
                                                                         Action                                               Labor cost                        Parts cost            product          operators

                                                    Inspect for existing frame repairs ...............   1 work-hour × $85 per hour = $85 .............                      $0              $85   $51,510.
                                                    Repetitive high and low frequency inspec-            48 work-hours × $85 per hour = $4,080                                0            4,080   $2,439,840 per in-
                                                      tions for Groups 1 through 3 airplanes               per inspection cycle.                                                                     spection cycle.
                                                      (598 airplanes).
                                                    Repetitive high and low frequency inspec-            26 work-hours × $85 per hour = $2,210                                0            2,210   $17,680 per in-
mstockstill on DSK30JT082PROD with PROPOSALS




                                                      tions for Groups 4 and 5 airplanes (8 air-           per inspection cycle.                                                                     spection cycle.
                                                      planes).



                                                      We have received no definitive data                    estimates for the on-condition repair                   Authority for This Rulemaking
                                                    that would enable us to provide cost                     specified in this proposed AD.
                                                                                                                                                                       Title 49 of the United States Code
                                                                                                                                                                     specifies the FAA’s authority to issue


                                               VerDate Sep<11>2014   17:09 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00006    Fmt 4702    Sfmt 4702   E:\FR\FM\27JYP1.SGM   27JYP1


                                                    34890                    Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Proposed Rules

                                                    rules on aviation safety. Subtitle I,                    § 39.13   [Amended]                                   specifies contacting Boeing for instructions,
                                                    section 106, describes the authority of                  ■ 2. The FAA amends § 39.13 by adding                 and specifies that action as RC: This AD
                                                    the FAA Administrator. Subtitle VII:                     the following new airworthiness                       requires using a method approved in
                                                                                                                                                                   accordance with the procedures specified in
                                                    Aviation Programs, describes in more                     directive (AD):
                                                                                                                                                                   paragraph (i) of this AD.
                                                    detail the scope of the Agency’s                         The Boeing Company: Docket No. FAA–                     (2) Where Boeing Alert Service Bulletin
                                                    authority.                                                   2017–0711; Directorate Identifier 2017–           757–53A0108, dated November 14, 2016, and
                                                       We are issuing this rulemaking under                      NM–003–AD.                                        APB Alert Service Bulletin AP757–53–001,
                                                    the authority described in Subtitle VII,                 (a) Comments Due Date                                 Revision 1, dated June 21, 2017, use the
                                                    Part A, Subpart III, Section 44701:                                                                            phrase ‘‘after the original issue of this service
                                                                                                               We must receive comments by September               bulletin’’ for determining compliance, this
                                                    ‘‘General requirements.’’ Under that                     11, 2017.                                             AD requires compliance within the specified
                                                    section, Congress charges the FAA with                                                                         compliance time after the effective date of
                                                    promoting safe flight of civil aircraft in               (b) Affected ADs
                                                                                                                                                                   this AD.
                                                    air commerce by prescribing regulations                    None.
                                                    for practices, methods, and procedures                                                                         (i) Alternative Methods of Compliance
                                                                                                             (c) Applicability
                                                    the Administrator finds necessary for                                                                          (AMOCs)
                                                                                                                This AD applies to The Boeing Company
                                                    safety in air commerce. This regulation                                                                           (1) The Manager, Los Angeles Aircraft
                                                                                                             Model 757–200, –200CB, and –300 series
                                                    is within the scope of that authority                    airplanes, certificated in any category, as           Certification Office (ACO), FAA, has the
                                                    because it addresses an unsafe condition                 identified in Boeing Alert Service Bulletin           authority to approve AMOCs for this AD, if
                                                                                                             757–53A0108, dated November 14, 2016.                 requested using the procedures found in 14
                                                    that is likely to exist or develop on                                                                          CFR 39.19. In accordance with 14 CFR 39.19,
                                                    products identified in this rulemaking                   (d) Subject                                           send your request to your principal inspector
                                                    action.                                                    Air Transport Association (ATA) of                  or local Flight Standards District Office, as
                                                    Regulatory Findings                                      America Code 53; Fuselage.                            appropriate. If sending information directly
                                                                                                                                                                   to the manager of the ACO, send it to the
                                                                                                             (e) Unsafe Condition                                  attention of the person identified in
                                                      We determined that this proposed AD
                                                    would not have federalism implications                      This AD was prompted by a report of                paragraph (j)(1) of this AD. Information may
                                                                                                             fatigue cracking found in the fuselage frame          be emailed to 9-ANM-LAACO-AMOC-
                                                    under Executive Order 13132. This
                                                                                                             at station (STA) 1640, which severed the              Requests@faa.gov.
                                                    proposed AD would not have a                             inner chord and web. We are issuing this AD              (2) Before using any approved AMOC,
                                                    substantial direct effect on the States, on              to detect and correct cracking of the fuselage        notify your appropriate principal inspector,
                                                    the relationship between the national                    frame at STA 1640, which could result in              or lacking a principal inspector, the manager
                                                    Government and the States, or on the                     reduced structural integrity of the airplane.         of the local flight standards district office/
                                                    distribution of power and                                (f) Compliance
                                                                                                                                                                   certificate holding district office.
                                                    responsibilities among the various                                                                                (3) An AMOC that provides an acceptable
                                                                                                                Comply with this AD within the                     level of safety may be used for any repair,
                                                    levels of government.                                    compliance times specified, unless already            modification, or alteration required by this
                                                      For the reasons discussed above, I                     done.                                                 AD if it is approved by the Boeing
                                                    certify this proposed regulation:                        (g) Actions Required for Compliance                   Commercial Airplanes Organization
                                                      (1) Is not a ‘‘significant regulatory                                                                        Designation Authorization (ODA) that has
                                                                                                                (1) For all airplanes except those identified      been authorized by the Manager, Los Angeles
                                                    action’’ under Executive Order 12866,                    in paragraph (g)(2) of this AD: Do all
                                                                                                                                                                   ACO, to make those findings. To be
                                                      (2) Is not a ‘‘significant rule’’ under                applicable actions identified as ‘‘RC’’
                                                                                                                                                                   approved, the repair method, modification
                                                    the DOT Regulatory Policies and                          (required for compliance) in, and in
                                                                                                                                                                   deviation, or alteration deviation must meet
                                                    Procedures (44 FR 11034, February 26,                    accordance with, the Accomplishment
                                                                                                                                                                   the certification basis of the airplane, and the
                                                                                                             Instructions of Boeing Alert Service Bulletin
                                                    1979),                                                   757–53A0108, dated November 14, 2016;                 approval must specifically refer to this AD.
                                                      (3) Will not affect intrastate aviation                except as provided by paragraph (h)(1) of this           (4) Except as required by paragraph (h)(1)
                                                                                                             AD. Do the actions at the applicable times            of this AD: For service information that
                                                    in Alaska, and                                                                                                 contains steps that are labeled as RC, the
                                                                                                             specified in paragraph 1.E., ‘‘Compliance,’’ of
                                                      (4) Will not have a significant                        Boeing Alert Service 757–53A0108, dated               provisions of paragraphs (i)(4)(i) and (i)(4)(ii)
                                                    economic impact, positive or negative,                   November 14, 2016, except as provided by              of this AD apply.
                                                    on a substantial number of small entities                paragraph (h)(2) of this AD.                             (i) The steps labeled as RC, including
                                                    under the criteria of the Regulatory                        (2) For airplanes on which blended or              substeps under an RC step and any figures
                                                    Flexibility Act.                                         scimitar blended winglets are installed in            identified in an RC step, must be done to
                                                                                                             accordance with Supplemental Type                     comply with the AD. If a step or substep is
                                                    List of Subjects in 14 CFR Part 39                       Certificate ST01518SE: Do all applicable              labeled ‘‘RC Exempt,’’ then the RC
                                                                                                             actions identified as ‘‘RC’’ (required for            requirement is removed from that step or
                                                      Air transportation, Aircraft, Aviation                 compliance) in, and in accordance with, the           substep. An AMOC is required for any
                                                    safety, Incorporation by reference,                      Accomplishment Instructions of APB Alert              deviations to RC steps, including substeps
                                                    Safety.                                                  Service Bulletin AP757–53–001, Revision 1,            and identified figures.
                                                                                                             dated June 21, 2017; and Boeing Alert                    (ii) Steps not labeled as RC may be
                                                    The Proposed Amendment                                   Service Bulletin 757–53A0108, dated                   deviated from using accepted methods in
                                                                                                             November 14, 2016; except as provided by              accordance with the operator’s maintenance
                                                      Accordingly, under the authority                                                                             or inspection program without obtaining
                                                                                                             paragraph (h)(1) of this AD. Do the actions at
                                                    delegated to me by the Administrator,                    the applicable times specified in paragraph           approval of an AMOC, provided the RC steps,
                                                    the FAA proposes to amend 14 CFR part                    1.E., ‘‘Compliance,’’ of Aviation Partners            including substeps and identified figures, can
mstockstill on DSK30JT082PROD with PROPOSALS




                                                    39 as follows:                                           Boeing (APB) Alert Service Bulletin AP757–            still be done as specified, and the airplane
                                                                                                             53–001, Revision 1, dated June 21, 2017,              can be put back in an airworthy condition.
                                                    PART 39—AIRWORTHINESS                                    except as provided by paragraph (h)(2) of this
                                                                                                                                                                   (j) Related Information
                                                    DIRECTIVES                                               AD.
                                                                                                                                                                      (1) For more information about this AD,
                                                                                                             (h) Exceptions to Service Information                 contact Chandra Ramdoss, Aerospace
                                                    ■ 1. The authority citation for part 39                  Specifications                                        Engineer, Airframe Branch, ANM–120L,
                                                    continues to read as follows:                              (1) Where Boeing Alert Service Bulletin             FAA, Los Angeles ACO, 3960 Paramount
                                                        Authority: 49 U.S.C. 106(g), 40113, 44701.           757–53A0108, dated November 14, 2016,                 Boulevard, Lakewood, CA 90712–4137;



                                               VerDate Sep<11>2014   17:09 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00007   Fmt 4702   Sfmt 4702   E:\FR\FM\27JYP1.SGM   27JYP1


                                                                             Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Proposed Rules                                               34891

                                                    phone: 562–627–5239; fax: 562–627–5210;                  ADDRESSES:   You may send comments,                   economic, environmental, and energy
                                                    email: chandraduth.ramdoss@faa.gov.                      using the procedures found in 14 CFR                  aspects of this proposed AD. We will
                                                       (2) For service information identified in             11.43 and 11.45, by any of the following              consider all comments received by the
                                                    this AD, contact Boeing Commercial
                                                                                                             methods:                                              closing date and may amend this
                                                    Airplanes, Attention: Contractual & Data
                                                    Services (C&DS), 2600 Westminster Blvd.,                   • Federal eRulemaking Portal: Go to                 proposed AD based on those comments.
                                                    MC 110–SK57, Seal Beach, CA 90740;                       http://www.regulations.gov. Follow the                  We will post all comments we
                                                    telephone: 562–797–1717; Internet: https://              instructions for submitting comments.                 receive, without change, to http://
                                                    www.myboeingfleet.com. You may view this                   • Fax: 202–493–2251.                                www.regulations.gov, including any
                                                    referenced service information at the FAA,                 • Mail: U.S. Department of                          personal information you provide. We
                                                    Transport Airplane Directorate, 1601 Lind                Transportation, Docket Operations, M–                 will also post a report summarizing each
                                                    Avenue SW., Renton, WA. For information                                                                        substantive verbal contact we receive
                                                                                                             30, West Building Ground Floor, Room
                                                    on the availability of this material at the                                                                    about this proposed AD.
                                                    FAA, call 425–227–1221.                                  W12–140, 1200 New Jersey Avenue SE.,
                                                                                                             Washington, DC 20590.                                 Discussion
                                                      Issued in Renton, Washington, on July 18,                • Hand Delivery: Deliver to Mail
                                                    2017.                                                                                                             On September 28, 2016, we issued AD
                                                                                                             address above between 9 a.m. and 5
                                                    Victor Wicklund,
                                                                                                             p.m., Monday through Friday, except                   2016–20–11, Amendment 39–18677 (81
                                                    Acting Manager, Transport Airplane                       Federal holidays.                                     FR 85837, November 29, 2016) (‘‘AD
                                                    Directorate, Aircraft Certification Service.
                                                                                                               For service information identified in               2016–20–11’’), for certain Airbus Model
                                                    [FR Doc. 2017–15554 Filed 7–26–17; 8:45 am]              this NPRM, contact Airbus SAS,                        A300–600 series airplanes; and Airbus
                                                    BILLING CODE 4910–13–P                                   Airworthiness Office—EAW, 1 Rond                      Model A310 series airplanes. AD 2016–
                                                                                                             Point Maurice Bellonte, 31707 Blagnac                 20–11 was prompted by reports of
                                                                                                             Cedex, France; telephone +33 5 61 93 36               fatigue cracks on the cargo door sill
                                                    DEPARTMENT OF TRANSPORTATION                                                                                   beam, lock fitting, and torsion box plate.
                                                                                                             96; fax +33 5 61 93 44 51; email
                                                                                                                                                                   AD 2016–20–11 requires repetitive
                                                    Federal Aviation Administration                          account.airworth-eas@airbus.com;
                                                                                                                                                                   ultrasonic and detailed inspections of
                                                                                                             Internet http://www.airbus.com. You
                                                                                                                                                                   the external area of the aft cargo door
                                                    14 CFR Part 39                                           may view this referenced service
                                                                                                                                                                   sill beam for cracking, repetitive high
                                                                                                             information at the FAA, Transport
                                                    [Docket No. FAA–2017–0708; Directorate                                                                         frequency eddy current (HFEC)
                                                                                                             Airplane Directorate, 1601 Lind Avenue
                                                    Identifier 2017–NM–035–AD]                                                                                     inspections for fatigue cracking of the
                                                                                                             SW., Renton, WA. For information on
                                                                                                                                                                   cargo door sill beam, lock fitting, and
                                                    RIN 2120–AA64                                            the availability of this material at the
                                                                                                                                                                   torsion box plate, and repair if
                                                                                                             FAA, call 425–227–1221.
                                                    Airworthiness Directives; Airbus                                                                               necessary. We issued AD 2016–20–11 to
                                                    Airplanes                                                Examining the AD Docket                               detect and correct fatigue cracking of the
                                                                                                                                                                   cargo door sill beam, lock fitting, and
                                                                                                                You may examine the AD docket on
                                                    AGENCY: Federal Aviation                                                                                       torsion box plate, which could result in
                                                    Administration (FAA), DOT.                               the Internet at http://
                                                                                                                                                                   the loss of the door locking function and
                                                                                                             www.regulations.gov by searching for
                                                    ACTION: Notice of proposed rulemaking                                                                          subsequently, loss of the cargo door in
                                                                                                             and locating Docket No. FAA–2017–
                                                    (NPRM).                                                                                                        flight and rapid decompression.
                                                                                                             0708; or in person at the Docket                         Since we issued AD 2016–20–11,
                                                    SUMMARY:   We propose to supersede                       Management Facility between 9 a.m.                    Airbus has developed a reinforcement
                                                    Airworthiness Directive (AD) AD 2016–                    and 5 p.m., Monday through Friday,                    modification of the aft cargo door sill
                                                    20–11, for certain Airbus Model A300                     except Federal holidays. The AD docket                beam area, which constitutes
                                                    B4–600, B4–600R, and F4–600R series                      contains this proposed AD, the                        terminating action for the repetitive
                                                    airplanes, and Model A300 C4–605R                        regulatory evaluation, any comments                   inspections. We have determined the
                                                    Variant F airplanes (collectively called                 received, and other information. The                  reinforcement of the aft cargo door sill
                                                    Model A300–600 series airplanes); and                    street address for the Docket Operations              beam area is necessary to address the
                                                    Airbus Model A310 series airplanes. AD                   office (telephone 800–647–5527) is in                 unsafe condition.
                                                    2016–20–11 requires repetitive                           the ADDRESSES section. Comments will                     The European Aviation Safety Agency
                                                    inspections of the external area of the aft              be available in the AD docket shortly                 (EASA), which is the Technical Agent
                                                    cargo door sill beam for cracking,                       after receipt.                                        for the Member States of the European
                                                    repetitive inspections for fatigue                       FOR FURTHER INFORMATION CONTACT: Dan                  Union, has issued EASA AD 2017–0048,
                                                    cracking of the cargo door sill beam,                    Rodina, Aerospace Engineer,                           dated March 15, 2017; corrected April
                                                    lock fitting, and torsion box plate, and                 International Branch, ANM–116,                        20, 2017 (referred to after this as the
                                                    repair if necessary. Since we issued AD                  Transport Airplane Directorate, FAA,                  Mandatory Continuing Airworthiness
                                                    2016–20–11, we have determined that                      1601 Lind Avenue SW., Renton, WA                      Information, or ‘‘the MCAI’’), to correct
                                                    reinforcement of the aft cargo door sill                 98057–3356; telephone 425–227–2125;                   an unsafe condition for certain Airbus
                                                    beam area is necessary to address the                    fax 425–227–1149.                                     Model A300–600 series airplanes; and
                                                    unsafe condition, which constitutes                      SUPPLEMENTARY INFORMATION:                            Airbus Model A310 series airplanes.
                                                    terminating action for the repetitive                                                                          The MCAI states:
                                                    inspections. This proposed AD would                      Comments Invited
                                                                                                                                                                     In the frame of the widespread fatigue
                                                    retain the inspections for cracking, and                   We invite you to send any written                   damage (WFD) compliance study and after an
mstockstill on DSK30JT082PROD with PROPOSALS




                                                    repair if necessary; and require                         relevant data, views, or arguments about              in-service occurrence, the area of the aft
                                                    reinforcement of the aft cargo door sill                 this proposal. Send your comments to                  cargo door sill beam and adjacent structure
                                                    beam area. We are proposing this AD to                   an address listed under the ADDRESSES                 was identified as sensitive to the fatigue
                                                    address the unsafe condition on these                    section. Include ‘‘Docket No. FAA–                    loads.
                                                    products.                                                                                                        This condition, if not detected and
                                                                                                             2017–0708; Directorate Identifier 2017–               corrected, could lead to failure of multiple
                                                    DATES: We must receive comments on                       NM–035–AD’’ at the beginning of your                  lock fittings, possibly resulting in loss of the
                                                    this proposed AD by September 11,                        comments. We specifically invite                      cargo door in flight and consequent explosive
                                                    2017.                                                    comments on the overall regulatory,                   decompression of the aeroplane.



                                               VerDate Sep<11>2014   17:09 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00008   Fmt 4702   Sfmt 4702   E:\FR\FM\27JYP1.SGM   27JYP1



Document Created: 2017-07-27 02:06:55
Document Modified: 2017-07-27 02:06:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionNotice of proposed rulemaking (NPRM).
DatesWe must receive comments on this proposed AD by September 11, 2017.
ContactChandra Ramdoss, Aerospace Engineer, Airframe Branch, ANM-120L, FAA, Los Angeles Aircraft Certification Office (ACO), 3960 Paramount Boulevard, Lakewood, CA 90712-4137; phone: 562-627-5239; fax: 562-627-5210; email: [email protected]
FR Citation82 FR 34888 
RIN Number2120-AA64
CFR AssociatedAir Transportation; Aircraft; Aviation Safety; Incorporation by Reference and Safety

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR