82 FR 34990 - South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 143 (July 27, 2017)

Page Range34990-34991
FR Document2017-15753

The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

Federal Register, Volume 82 Issue 143 (Thursday, July 27, 2017)
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Pages 34990-34991]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15753]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, 
Inspections, Tests, Analyses, and Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has determined 
that the inspections, tests, and analyses have been successfully 
completed, and that the specified acceptance criteria are met for the 
Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

DATES: The determination of the successful completion of inspections, 
tests, and analyses for VCSNS Units 2 and 3 is effective July 27, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Licensee Notification of Completion of ITAAC

    South Carolina Electric & Gas (SCE&G), on behalf of itself and the 
South Carolina Public Service

[[Page 34991]]

Authority, (both hereafter called the licensee) has submitted 
inspections, tests, analyses, and acceptance criteria (ITAAC) closure 
notifications (ICNs) under Sec.  52.99(c)(1) of title 10 of the Code of 
Federal Regulations (10 CFR), informing the NRC that the licensee has 
successfully performed the required inspections, tests, and analyses, 
and that the acceptance criteria are met for:

VCSNS, Unit 2 ITAAC
    2.1.02.08d.vii (38), 2.2.01.06d.i (105), 2.5.02.07b (535), 
2.5.02.07e (538), 3.2.00.01a (739), 3.2.00.01b (740), and 3.2.00.01c.i 
(741)
VCSNS, Unit 3 ITAAC
    2.2.01.06d.i (105), 2.5.02.07b (535), 2.5.02.07e (538), 3.2.00.01a 
(739), 3.2.00.01b (740), and 3.2.00.01c.i (741)

    The ITAAC for VCSNS, Unit 2 are in Appendix C of the VCSNS, Unit 2 
combined license (ADAMS Accession No. ML14100A092). The ITAAC for 
VCSNS, Unit 3 are in Appendix C of VCSNS, Unit 3 combined license 
(ADAMS Accession No. ML14100A101).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the NRC staff receives new information that 
suggests the NRC staff's determination on any of these ITAAC is 
incorrect, then the NRC staff will determine whether to reopen that 
ITAAC (including withdrawing the NRC staff's determination on that 
ITAAC). The NRC staff's determination will be used to support a 
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of 
construction that all acceptance criteria in the combined license are 
met. The ITAAC closure process is not finalized for these ITAAC until 
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future 
updates to the status of these ITAAC will be reflected on the NRC's Web 
site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the NRC staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027

    A complete list of the review status for VCSNS, Unit 2 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum2-icnsr.pdf.

Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028

    A complete list of the review status for VCSNS, Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum3-icnsr.pdf.

    Dated at Rockville, Maryland, this 18th day of July 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-15753 Filed 7-26-17; 8:45 am]
 BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe determination of the successful completion of inspections, tests, and analyses for VCSNS Units 2 and 3 is effective July 27, 2017.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 34990 