FR Document2017-15753

The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

Federal Register, Volume 82 Issue 143 (Thursday, July 27, 2017)
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Pages 34990-34991]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15753]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-027 and 52-028; NRC-2008-0441]


South Carolina Electric & Gas Company, South Carolina Public 
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, 
Inspections, Tests, Analyses, and Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has determined 
that the inspections, tests, and analyses have been successfully 
completed, and that the specified acceptance criteria are met for the 
Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

DATES: The determination of the successful completion of inspections, 
tests, and analyses for VCSNS Units 2 and 3 is effective July 27, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Licensee Notification of Completion of ITAAC

    South Carolina Electric & Gas (SCE&G), on behalf of itself and the 
South Carolina Public Service

[[Page 34991]]

Authority, (both hereafter called the licensee) has submitted 
inspections, tests, analyses, and acceptance criteria (ITAAC) closure 
notifications (ICNs) under Sec.  52.99(c)(1) of title 10 of the Code of 
Federal Regulations (10 CFR), informing the NRC that the licensee has 
successfully performed the required inspections, tests, and analyses, 
and that the acceptance criteria are met for:

VCSNS, Unit 2 ITAAC
    2.1.02.08d.vii (38), 2.2.01.06d.i (105), 2.5.02.07b (535), 
2.5.02.07e (538), 3.2.00.01a (739), 3.2.00.01b (740), and 3.2.00.01c.i 
(741)
VCSNS, Unit 3 ITAAC
    2.2.01.06d.i (105), 2.5.02.07b (535), 2.5.02.07e (538), 3.2.00.01a 
(739), 3.2.00.01b (740), and 3.2.00.01c.i (741)

    The ITAAC for VCSNS, Unit 2 are in Appendix C of the VCSNS, Unit 2 
combined license (ADAMS Accession No. ML14100A092). The ITAAC for 
VCSNS, Unit 3 are in Appendix C of VCSNS, Unit 3 combined license 
(ADAMS Accession No. ML14100A101).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the NRC staff receives new information that 
suggests the NRC staff's determination on any of these ITAAC is 
incorrect, then the NRC staff will determine whether to reopen that 
ITAAC (including withdrawing the NRC staff's determination on that 
ITAAC). The NRC staff's determination will be used to support a 
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of 
construction that all acceptance criteria in the combined license are 
met. The ITAAC closure process is not finalized for these ITAAC until 
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future 
updates to the status of these ITAAC will be reflected on the NRC's Web 
site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the NRC staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027

    A complete list of the review status for VCSNS, Unit 2 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum2-icnsr.pdf.

Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028

    A complete list of the review status for VCSNS, Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum3-icnsr.pdf.

    Dated at Rockville, Maryland, this 18th day of July 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-15753 Filed 7-26-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                  34990                          Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices

                                                  three primary drivers of the Share                       adjustment and opportunity for                        ACTION: Determination of the successful
                                                  Insurance Fund’s performance.                            comment. In soliciting comment, NCUA                  completion of inspections, tests, and
                                                    • A 4 basis point decline in the value                 will issue a report including data                    analyses.
                                                  of the Share Insurance Fund’s claim on                   supporting the proposal.
                                                  the corporate credit union asset                           The Board’s main objectives in setting              SUMMARY:   The U.S. Nuclear Regulatory
                                                  management estates.                                      the normal operating level are to:                    Commission (NRC) has determined that
                                                    • A 2 basis point decline in the equity                  • Retain public confidence in federal               the inspections, tests, and analyses have
                                                  ratio expected to occur prior to when                    share insurance,                                      been successfully completed, and that
                                                  the remaining NGNs begin to mature in                      • Prevent impairment of the one                     the specified acceptance criteria are met
                                                  2020 and remaining exposure to the                       percent contributed capital deposit, and              for the Virgil C. Summer Nuclear
                                                  Legacy Assets can begin to be reduced.                     • Ensure the Share Insurance Fund                   Station (VCSNS), Units 2 and 3.
                                                  This helps ensure the 4 basis points of                  can withstand a moderate recession                    DATES: The determination of the
                                                  additional equity to account for the                     without the equity ratio declining below              successful completion of inspections,
                                                  potential decline in value of the claims                 1.20 percent over a five-year period.                 tests, and analyses for VCSNS Units 2
                                                  on the asset management estates is                                                                             and 3 is effective July 27, 2017.
                                                  maintained in the Share Insurance Fund                   V. Request for Comment
                                                                                                                                                                 ADDRESSES: Please refer to Docket ID
                                                  until Legacy Assets can be sold.52                         The Board seeks comments on the                     NRC–2008–0441 when contacting the
                                                    Therefore, the Board proposes to set                   proposed closure of the Stabilization                 NRC about the availability of
                                                  the normal operating level at 1.39                       Fund in 2017 and the related approach                 information regarding this document.
                                                  percent. Based on the yearend equity                     for setting the normal operating level of             You may obtain publicly-available
                                                  ratio projections of 1.45 percent to 1.47                the Share Insurance Fund. Commenters                  information related to this document
                                                  percent from Table 3, this would result                  are also encouraged to discuss any other              using any of the following methods:
                                                  in an estimated initial Share Insurance                  relevant issues they believe the Board                   • Federal Rulemaking Web site: Go to
                                                  Fund distribution of 6 to 8 basis points                 should consider with respect to this                  http://www.regulations.gov and search
                                                  (approximately $600 to $800 million)                     matter. In particular, the Board is                   for Docket ID NRC–2008–0441. Address
                                                  paid in 2018.53                                          interested in comments on whether to:                 questions about NRC dockets to Carol
                                                  Policy for Setting the Normal Operating                    • Close the Stabilization Fund in                   Gallagher; telephone: 301–415–3463;
                                                  Level                                                    2017, close it at some future date, or                email: Carol.Gallagher@nrc.gov. For
                                                                                                           wait until it is currently scheduled to               technical questions, contact the
                                                    The Board retains the authority to                     close in 2021.                                        individual listed in the FOR FURTHER
                                                  reassess and set the normal operating                      • Set the normal operating level                    INFORMATION CONTACT section of this
                                                  level periodically, in particular when                   based on the Share Insurance Fund’s                   document.
                                                  there are changes in the risks to the                    ability to withstand a moderate                          • NRC’s Agencywide Documents
                                                  Share Insurance Fund’s equity ratio,                     recession. Or, should the Share                       Access and Management System
                                                  such as maturity of the NGNs. Based on                   Insurance Fund be able to withstand a                 (ADAMS): You may obtain publicly-
                                                  the approach discussed above, the                        severe recession.                                     available documents online in the
                                                  Board proposes to replace its current                      • Base the approach to setting the                  ADAMS Public Documents collection at
                                                  policy for setting the normal operating                  normal operating level on preventing                  http://www.nrc.gov/reading-rm/
                                                  level with the following.54                              the equity ratio from declining below                 adams.html. To begin the search, select
                                                    Periodically, NCUA will review the                     1.20 percent, or some other higher                    ‘‘ADAMS Public Documents’’ and then
                                                  equity needs of the Share Insurance                      minimum level.                                        select ‘‘Begin Web-based ADAMS
                                                  Fund and provide this analysis to                          Commenters are encouraged to                        Search.’’ For problems with ADAMS,
                                                  stakeholders. Board action is only                       provide the specific basis for their                  please contact the NRC’s Public
                                                  necessary when this review determines                    comments and, to the extent feasible,                 Document Room (PDR) reference staff at
                                                  that a change in the normal operating                    documentation to support any                          1–800–397–4209, 301–415–4737, or by
                                                  level is warranted. Any change to the                    recommendations.                                      email to pdr.resource@nrc.gov. The
                                                  normal operating level of more than 1                                                                          ADAMS accession number for each
                                                  basis point shall be made only after a                     By the National Credit Union
                                                                                                           Administration Board on July 20, 2017.                document referenced (if it is available in
                                                  public announcement of the proposed                                                                            ADAMS) is provided the first time that
                                                                                                           Gerard S. Poliquin,
                                                    52 The Board must consider retaining this equity       Secretary of the Board.                               it is mentioned in this document.
                                                  now, because as the equity ratio declines, the Board
                                                                                                                                                                    • NRC’s PDR: You may examine and
                                                                                                           [FR Doc. 2017–15686 Filed 7–26–17; 8:45 am]
                                                  would be unable to replenish the equity through                                                                purchase copies of public documents at
                                                                                                           BILLING CODE 7535–01–P
                                                  premium assessments as long as the equity ratio                                                                the NRC’s PDR, Room O1–F21, One
                                                  remains above 1.30 percent, per the Act. 12 U.S.C.                                                             White Flint North, 11555 Rockville
                                                  1782(c)(2)(B).
                                                    53 The 4 basis points of equity included for
                                                                                                                                                                 Pike, Rockville, Maryland 20852.
                                                                                                           NUCLEAR REGULATORY
                                                  covering losses on the Share Insurance Fund’s                                                                  FOR FURTHER INFORMATION CONTACT:
                                                                                                           COMMISSION
                                                  claims against the corporate asset management                                                                  Billy Gleaves, Office of New Reactors,
                                                  estates, along with any recognition permitted on the     [Docket Nos. 52–027 and 52–028; NRC–                  U.S. Nuclear Regulatory Commission,
                                                  outstanding balance of the $1 billion U.S. Central       2008–0441]
                                                  capital note (an estimated range of 2 to 5 basis                                                               Washington, DC 20555–0001; telephone:
                                                  points of equity), may be available for a future                                                               301–415–5848; email: Bill.Gleaves@
                                                  Share Insurance Fund distribution—provided it is         South Carolina Electric & Gas                         nrc.gov.
mstockstill on DSK30JT082PROD with NOTICES




                                                  not consumed by an increase in future legacy asset       Company, South Carolina Public
                                                  losses from an economic downturn or other losses         Service Authority; Virgil C. Summer                   SUPPLEMENTARY INFORMATION:
                                                  and factors affecting the equity ratio. Future           Nuclear Station, Units 2 and 3,
                                                  distributions also depend on any subsequent                                                                    I. Licensee Notification of Completion
                                                  changes the Board might make to the normal               Inspections, Tests, Analyses, and                     of ITAAC
                                                  operating level.                                         Acceptance Criteria
                                                    54 The current policy was approved at the                                                                      South Carolina Electric & Gas
                                                  December 3, 2007 NCUA Board meeting open to the          AGENCY:Nuclear Regulatory                             (SCE&G), on behalf of itself and the
                                                  public.                                                  Commission.                                           South Carolina Public Service


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1


                                                                                 Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices                                           34991

                                                  Authority, (both hereafter called the                    reopen that ITAAC (including                          NUCLEAR REGULATORY
                                                  licensee) has submitted inspections,                     withdrawing the NRC staff’s                           COMMISSION
                                                  tests, analyses, and acceptance criteria                 determination on that ITAAC). The NRC
                                                                                                                                                                 [Docket Nos. 50–413 and 50–414; NRC–
                                                  (ITAAC) closure notifications (ICNs)                     staff’s determination will be used to                 2017–0104]
                                                  under § 52.99(c)(1) of title 10 of the                   support a subsequent finding, pursuant
                                                  Code of Federal Regulations (10 CFR),                    to 10 CFR 52.103(g), at the end of                    Duke Energy Carolinas, LLC; Catawba
                                                  informing the NRC that the licensee has                  construction that all acceptance criteria             Nuclear Station, Units 1 and 2
                                                  successfully performed the required                      in the combined license are met. The
                                                  inspections, tests, and analyses, and that               ITAAC closure process is not finalized                AGENCY:  Nuclear Regulatory
                                                  the acceptance criteria are met for:                                                                           Commission.
                                                                                                           for these ITAAC until the NRC makes an
                                                  VCSNS, Unit 2 ITAAC                                      affirmative finding under 10 CFR                      ACTION: License amendment application;
                                                     2.1.02.08d.vii (38), 2.2.01.06d.i (105),              52.103(g). Any future updates to the                  withdrawal by applicant.
                                                       2.5.02.07b (535), 2.5.02.07e (538),                 status of these ITAAC will be reflected
                                                       3.2.00.01a (739), 3.2.00.01b (740),                                                                       SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                           on the NRC’s Web site at http://                      Commission (NRC) has granted the
                                                       and 3.2.00.01c.i (741)
                                                                                                           www.nrc.gov/reactors/new-reactors/                    request of Duke Energy Carolinas, LLC
                                                  VCSNS, Unit 3 ITAAC
                                                     2.2.01.06d.i (105), 2.5.02.07b (535),                 oversight/itaac.html.                                 (Duke Energy) to withdraw its
                                                       2.5.02.07e (538), 3.2.00.01a (739),                    This notice fulfills the NRC staff’s               application dated December 15, 2016,
                                                       3.2.00.01b (740), and 3.2.00.01c.i                  obligations under 10 CFR 52.99(e)(1) to               for proposed amendments to Renewed
                                                       (741)                                               publish a notice in the Federal Register              Facility Operating License Nos. NPF–35
                                                                                                           of the NRC staff’s determination of the               and NPF–52. In that submitted, Duke
                                                    The ITAAC for VCSNS, Unit 2 are in                                                                           Energy proposed to adopt multiple
                                                  Appendix C of the VCSNS, Unit 2                          successful completion of inspections,
                                                                                                           tests and analyses.                                   Technical Specifications Task Force
                                                  combined license (ADAMS Accession                                                                              (TSTF) Travelers that would have
                                                  No. ML14100A092). The ITAAC for                          Virgil C. Summer Nuclear Station Unit                 modified Technical Specification (TS)
                                                  VCSNS, Unit 3 are in Appendix C of                       2, Docket No. 5200027                                 3.4.12, ‘‘Low Temperature Overpressure
                                                  VCSNS, Unit 3 combined license                                                                                 Protection (LTOP) System,’’ to increase
                                                  (ADAMS Accession No. ML14100A101).                         A complete list of the review status                the time allowed for swapping charging
                                                  II. NRC Staff Determination of                           for VCSNS, Unit 2 ITAAC, including the                pumps to one hour. The portion related
                                                  Completion of ITAAC                                      submission date and ADAMS Accession                   to TSTF–285–A, Revision 1, ‘‘Charging
                                                                                                           Number for each ICN received, the                     Pump Swap LTOP Allowance,’’ is being
                                                    The NRC staff has determined that the                  ADAMS Accession Number for each
                                                  specified inspections, tests, and                                                                              withdrawn.
                                                                                                           VEF, and the ADAMS Accession                          DATES: July 27, 2017.
                                                  analyses have been successfully
                                                                                                           Numbers for the inspection reports
                                                  completed, and that the specified                                                                              ADDRESSES: Please refer to Docket ID
                                                                                                           associated with these specific ITAAC,
                                                  acceptance criteria are met. The                                                                               NRC–2017–0104 when contacting the
                                                                                                           can be found on the NRC’s Web site at                 NRC about the availability of
                                                  documentation of the NRC staff’s
                                                  determination is in the ITAAC Closure                    http://www.nrc.gov/reactors/new-                      information regarding this document.
                                                  Verification Evaluation Form (VEF) for                   reactors/new-licensing-files/sum2-                    You may obtain publicly-available
                                                  each ITAAC. The VEF is a form that                       icnsr.pdf.                                            information related to this document
                                                  represents the NRC staff’s structured                    Virgil C. Summer Nuclear Station Unit                 using any of the following methods:
                                                  process for reviewing ICNs. Each ICN                     3, Docket No. 5200028                                    • Federal Rulemaking Web site: Go to
                                                  presents a narrative description of how                                                                        http://www.regulations.gov and search
                                                  the ITAAC was completed. The NRC’s                         A complete list of the review status                for Docket ID NRC–2017–0104. Address
                                                  ICN review process involves a                            for VCSNS, Unit 3 ITAAC, including the                questions about NRC dockets to Carol
                                                  determination on whether, among other                    submission date and ADAMS Accession                   Gallagher; telephone: 301–415–3463;
                                                  things: (1) Each ICN provides sufficient                 Number for each ICN received, the                     email: Carol.Gallagher@nrc.gov. For
                                                  information, including a summary of the                  ADAMS Accession Number for each                       technical questions, contact the
                                                  methodology used to perform the                          VEF, and the ADAMS Accession                          individual listed in the FOR FURTHER
                                                  ITAAC, to demonstrate that the                           Numbers for the inspection reports                    INFORMATION CONTACT section of this
                                                  inspections, tests, and analyses have                    associated with these specific ITAAC,                 document.
                                                  been successfully completed; (2) each                    can be found on the NRC’s Web site at                    • NRC’s Agencywide Documents
                                                  ICN provides sufficient information to                   http://www.nrc.gov/reactors/new-                      Access and Management System
                                                  demonstrate that the acceptance criteria                                                                       (ADAMS): You may obtain publicly-
                                                                                                           reactors/new-licensing-files/sum3-
                                                  of the ITAAC are met; and (3) any NRC                                                                          available documents online in the
                                                                                                           icnsr.pdf.
                                                  inspections for the ITAAC have been                                                                            ADAMS Public Documents collection at
                                                  completed and any ITAAC findings                           Dated at Rockville, Maryland, this 18th day         http://www.nrc.gov/reading-rm/
                                                  associated with that ITAAC have been                     of July 2017.                                         adams.html. To begin the search, select
                                                  closed.                                                    For the Nuclear Regulatory Commission.              ‘‘ADAMS Public Documents’’ and then
                                                    The NRC staff’s determination of the                   Jennifer Dixon-Herrity,                               select ‘‘Begin Web-based ADAMS
                                                  successful completion of these ITAAC is                  Chief, Licensing Branch 4, Division of New            Search.’’ For problems with ADAMS,
                                                  based on information available at this                                                                         please contact the NRC’s Public
mstockstill on DSK30JT082PROD with NOTICES




                                                                                                           Reactor Licensing, Office of New Reactors.
                                                  time and is subject to the licensee’s                    [FR Doc. 2017–15753 Filed 7–26–17; 8:45 am]
                                                                                                                                                                 Document Room (PDR) reference staff at
                                                  ability to maintain the condition that                                                                         1–800–397–4209, 301–415–4737, or by
                                                                                                           BILLING CODE 7590–01–P
                                                  the acceptance criteria are met. If the                                                                        email to pdr.resource@nrc.gov. The
                                                  NRC staff receives new information that                                                                        ADAMS accession number for each
                                                  suggests the NRC staff’s determination                                                                         document referenced (if it is available in
                                                  on any of these ITAAC is incorrect, then                                                                       ADAMS) is provided the first time that
                                                  the NRC staff will determine whether to                                                                        it is mentioned in this document.


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1



Document Created: 2017-07-27 02:07:16
Document Modified: 2017-07-27 02:07:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe determination of the successful completion of inspections, tests, and analyses for VCSNS Units 2 and 3 is effective July 27, 2017.
ContactBilly Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 34990 