82_FR_35135 82 FR 34992 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria

82 FR 34992 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 143 (July 27, 2017)

Page Range34992-34993
FR Document2017-15754

The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

Federal Register, Volume 82 Issue 143 (Thursday, July 27, 2017)
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Pages 34992-34993]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15754]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and 
Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has determined 
that the inspections, tests, and analyses have been successfully 
completed, and that the specified acceptance criteria are met for the 
Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

DATES: The determination of the successful completion of inspections, 
tests, and analyses for VEGP, Units 3 and 4 is effective July 27, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Licensee Notification of Completion of ITAAC

    Southern Nuclear Operating Company, Inc. (SNC), Georgia Power 
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG 
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton, 
Georgia, (hereafter called the licensee) has submitted inspections, 
tests, analyses, and acceptance criteria (ITAAC) closure notifications 
(ICNs) under Sec.  52.99(c)(1) of title 10 of the Code of Federal 
Regulations (10 CFR), informing the NRC that the licensee has 
successfully performed the required inspections, tests, and analyses, 
and that the acceptance criteria are met for:

VEGP, Unit 3 ITAAC
    2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.2.01.06d.i (105), 2.2.03.09b 
(204), 2.3.05.02.ii (341), 2.5.02.07b (535), and 3.2.00.01c.i (741)
VEGP, Unit 4 ITAAC
    2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.2.01.06d.i (105), 2.2.03.09b 
(204), 2.3.05.02.ii (341), 2.5.02.07b (535), and 3.2.00.01c.i (741)

    The ITAAC for VEGP, Unit 3 are in Appendix C of the VEGP, Unit 3 
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP, 
Unit 4 are in Appendix C of VEGP, Unit 4 combined license (ADAMS 
Accession No. ML14100A135).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the NRC staff receives new information that 
suggests the NRC staff's determination on any of these ITAAC is 
incorrect, then the NRC staff will determine whether to reopen that 
ITAAC (including

[[Page 34993]]

withdrawing the NRC staff's determination on that ITAAC). The NRC 
staff's determination will be used to support a subsequent finding, 
pursuant to 10 CFR 52.103(g), at the end of construction that all 
acceptance criteria in the combined license are met. The ITAAC closure 
process is not finalized for these ITAAC until the NRC makes an 
affirmative finding under 10 CFR 52.103(g). Any future updates to the 
status of these ITAAC will be reflected on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the NRC staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Vogtle Electric Generating Plant Unit 3, Docket No. 5200025

    A complete list of the review status for VEGP, Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.

Vogtle Electric Generating Plant Unit 4, Docket No. 5200026

    A complete list of the review status for VEGP Unit 4 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.

    Dated at Rockville, Maryland, this 18th day of July 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-15754 Filed 7-26-17; 8:45 am]
BILLING CODE 7590-01-P



                                                  34992                          Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices

                                                    • NRC’s PDR: You may examine and                       SUMMARY:   The U.S. Nuclear Regulatory                has submitted inspections, tests,
                                                  purchase copies of public documents at                   Commission (NRC) has determined that                  analyses, and acceptance criteria
                                                  the NRC’s PDR, Room O1–F21, One                          the inspections, tests, and analyses have             (ITAAC) closure notifications (ICNs)
                                                  White Flint North, 11555 Rockville                       been successfully completed, and that                 under § 52.99(c)(1) of title 10 of the
                                                  Pike, Rockville, Maryland 20852.                         the specified acceptance criteria are met             Code of Federal Regulations (10 CFR),
                                                  FOR FURTHER INFORMATION CONTACT:                         for the Vogtle Electric Generating Plant              informing the NRC that the licensee has
                                                  Michael Mahoney, Office of Nuclear                       (VEGP), Units 3 and 4.                                successfully performed the required
                                                  Reactor Regulation, U.S. Nuclear                         DATES: The determination of the                       inspections, tests, and analyses, and that
                                                  Regulatory Commission, Washington DC                     successful completion of inspections,                 the acceptance criteria are met for:
                                                  20555–0001; telephone 301–415–3857,                      tests, and analyses for VEGP, Units 3                 VEGP, Unit 3 ITAAC
                                                  email: Michael.Mahoney@nrc.gov.                          and 4 is effective July 27, 2017.                        2.1.01.06.ii (7), 2.1.03.09a.i (81),
                                                  SUPPLEMENTARY INFORMATION: The NRC                       ADDRESSES: Please refer to Docket ID                       2.2.01.06d.i (105), 2.2.03.09b (204),
                                                  has granted the request of Duke Energy                   NRC–2008–0252 when contacting the                          2.3.05.02.ii (341), 2.5.02.07b (535),
                                                  Carolinas, LLC (the licensee) to                         NRC about the availability of                              and 3.2.00.01c.i (741)
                                                  withdraw its application dated                           information regarding this document.                  VEGP, Unit 4 ITAAC
                                                  December 15, 2016 (ADAMS Accession                       You may obtain publicly-available                        2.1.01.06.ii (7), 2.1.03.09a.i (81),
                                                  No. ML16350A422), for proposed                           information related to this document                       2.2.01.06d.i (105), 2.2.03.09b (204),
                                                  amendments to Renewed Facility                           using any of the following methods:                        2.3.05.02.ii (341), 2.5.02.07b (535),
                                                  Operating License No. NPF–35 and                            • Federal Rulemaking Web site: Go to                    and 3.2.00.01c.i (741)
                                                  NPF–52 for the Catawba Nuclear                           http://www.regulations.gov and search                    The ITAAC for VEGP, Unit 3 are in
                                                  Station, Unit Nos. 1 and 2, located in                   for Docket ID NRC–2008–0252. Address                  Appendix C of the VEGP, Unit 3
                                                  York County, South Carolina.                             questions about NRC dockets to Carol                  combined license (ADAMS Accession
                                                    The submittal dated December 15,                       Gallagher; telephone: 301–415–3463;                   No. ML14100A106). The ITAAC for
                                                  2016, proposed to adopt multiple                         email: Carol.Gallagher@nrc.gov. For                   VEGP, Unit 4 are in Appendix C of
                                                  Technical Specifications Task Force                      technical questions, contact the                      VEGP, Unit 4 combined license
                                                  (TSTF) Travelers that would have                         individual listed in the FOR FURTHER                  (ADAMS Accession No. ML14100A135).
                                                                                                           INFORMATION CONTACT section of this
                                                  modified Technical Specification (TS)                                                                          II. NRC Staff Determination of
                                                  3.4.12, ‘‘Low Temperature Overpressure                   document.
                                                                                                              • NRC’s Agencywide Documents                       Completion of ITAAC
                                                  Protection (LTOP) System,’’ to increase
                                                                                                           Access and Management System                            The NRC staff has determined that the
                                                  the time allowed for swapping charging
                                                                                                           (ADAMS): You may obtain publicly-                     specified inspections, tests, and
                                                  pumps to one hour. The portion related
                                                                                                           available documents online in the                     analyses have been successfully
                                                  to TSTF–285–A, Revision 1, ‘‘Charging
                                                                                                           ADAMS Public Documents collection at                  completed, and that the specified
                                                  Pump Swap LTOP Allowance,’’ is being
                                                                                                           http://www.nrc.gov/reading-rm/                        acceptance criteria are met. The
                                                  withdrawn. The licensee’s application
                                                                                                           adams.html. To begin the search, select               documentation of the NRC staff’s
                                                  was noticed previously in the Federal
                                                                                                           ‘‘ADAMS Public Documents’’ and then                   determination is in the ITAAC Closure
                                                  Register on April 25, 2017 (82 FR
                                                                                                           select ‘‘Begin Web-based ADAMS                        Verification Evaluation Form (VEF) for
                                                  19099). The licensee provided a request
                                                                                                           Search.’’ For problems with ADAMS,                    each ITAAC. The VEF is a form that
                                                  to withdraw the application by letter
                                                                                                           please contact the NRC’s Public                       represents the NRC staff’s structured
                                                  dated on June 29, 2017 (ADAMS
                                                                                                           Document Room (PDR) reference staff at                process for reviewing ICNs. Each ICN
                                                  Accession No. ML17180A154).
                                                                                                           1–800–397–4209, 301–415–4737, or by                   presents a narrative description of how
                                                     Dated at Rockville, Maryland, this 19th day           email to pdr.resource@nrc.gov. The                    the ITAAC was completed. The NRC’s
                                                  of July 2017.                                            ADAMS accession number for each                       ICN review process involves a
                                                     For the Nuclear Regulatory Commission.                document referenced (if it is available in            determination on whether, among other
                                                  Michael Mahoney,                                         ADAMS) is provided the first time that                things: (1) each ICN provides sufficient
                                                  Project Manager, Plant Licensing Branch II–              it is mentioned in this document.                     information, including a summary of the
                                                  1, Division of Operating Reactor Licensing,                 • NRC’s PDR: You may examine and                   methodology used to perform the
                                                  Office of Nuclear Reactor Regulation.                    purchase copies of public documents at                ITAAC, to demonstrate that the
                                                  [FR Doc. 2017–15758 Filed 7–26–17; 8:45 am]              the NRC’s PDR, Room O1–F21, One                       inspections, tests, and analyses have
                                                  BILLING CODE 7590–01–P                                   White Flint North, 11555 Rockville                    been successfully completed; (2) each
                                                                                                           Pike, Rockville, Maryland 20852.                      ICN provides sufficient information to
                                                                                                           FOR FURTHER INFORMATION CONTACT:                      demonstrate that the acceptance criteria
                                                  NUCLEAR REGULATORY                                       Chandu Patel, Office of New Reactors,                 of the ITAAC are met; and (3) any NRC
                                                  COMMISSION                                               U.S. Nuclear Regulatory Commission,                   inspections for the ITAAC have been
                                                                                                           Washington, DC 20555–0001; telephone:                 completed and any ITAAC findings
                                                  [Docket Nos. 52–025 and 52–026; NRC–                     301–415–3025; email: Chandu.Patel@                    associated with that ITAAC have been
                                                  2008–0252]                                               nrc.gov.                                              closed.
                                                                                                           SUPPLEMENTARY INFORMATION:                              The NRC staff’s determination of the
                                                  Southern Nuclear Operating Company,                                                                            successful completion of these ITAAC is
                                                  Inc., Vogtle Electric Generating Plant,                  I. Licensee Notification of Completion                based on information available at this
                                                  Units 3 and 4; Inspections, Tests,                       of ITAAC                                              time and is subject to the licensee’s
mstockstill on DSK30JT082PROD with NOTICES




                                                  Analyses, and Acceptance Criteria                           Southern Nuclear Operating                         ability to maintain the condition that
                                                  AGENCY:  Nuclear Regulatory                              Company, Inc. (SNC), Georgia Power                    the acceptance criteria are met. If the
                                                  Commission.                                              Company, Oglethorpe Power                             NRC staff receives new information that
                                                                                                           Corporation, MEAG Power SPVM, LLC.,                   suggests the NRC staff’s determination
                                                  ACTION: Determination of the successful
                                                                                                           MEAG Power SPVJ, LLC., MEAG Power                     on any of these ITAAC is incorrect, then
                                                  completion of inspections, tests, and
                                                                                                           SPVP, LLC., and the City of Dalton,                   the NRC staff will determine whether to
                                                  analyses.
                                                                                                           Georgia, (hereafter called the licensee)              reopen that ITAAC (including


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1


                                                                                 Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices                                           34993

                                                  withdrawing the NRC staff’s                              NUCLEAR REGULATORY                                    0001; telephone: 301–415–6606, email:
                                                  determination on that ITAAC). The NRC                    COMMISSION                                            Joel.Wiebe@nrc.gov.
                                                  staff’s determination will be used to                                                                          SUPPLEMENTARY INFORMATION: On
                                                                                                           [Docket Nos. 50–454, 50–455, 50–456, 50–
                                                  support a subsequent finding, pursuant                   457; NRC–2017–0167]                                   February 8, 2017, the petitioner
                                                  to 10 CFR 52.103(g), at the end of                                                                             requested that the NRC take action with
                                                  construction that all acceptance criteria                Exelon Generation Company, LLC;                       regard to Braidwood Station, Units 1
                                                  in the combined license are met. The                     Braidwood Station, Units 1 and 2, and                 and 2, and Byron Station, Unit Nos. 1
                                                  ITAAC closure process is not finalized                   Byron Station, Unit Nos. 1 and 2                      and 2 (ADAMS Accession No.
                                                  for these ITAAC until the NRC makes an                                                                         ML17061A127). The petitioner
                                                                                                           AGENCY:  Nuclear Regulatory                           requested: (1) Issue a violation under
                                                  affirmative finding under 10 CFR
                                                                                                           Commission.                                           part 50 of title 10 of the Code of Federal
                                                  52.103(g). Any future updates to the
                                                                                                           ACTION: 10 CFR 2.206 request; receipt.                Regulations (10 CFR), appendix B,
                                                  status of these ITAAC will be reflected
                                                  on the NRC’s Web site at http://                                                                               Criterion III, Design Control for
                                                                                                           SUMMARY:   The U.S. Nuclear Regulatory
                                                  www.nrc.gov/reactors/new-reactors/                                                                             deficiencies in the analysis of record
                                                                                                           Commission (NRC) is giving notice that
                                                  oversight/itaac.html.                                                                                          (AOR) for the main steam isolation
                                                                                                           by petition dated February 8, 2017,
                                                                                                                                                                 valve (MSIV) room pressurization
                                                     This notice fulfills the NRC staff’s                  Barry Quigley (the petitioner) has
                                                                                                                                                                 following a high energy line break
                                                  obligations under 10 CFR 52.99(e)(1) to                  requested that the NRC take action with
                                                                                                                                                                 (HELB), (2) Issue a violation under 10
                                                  publish a notice in the Federal Register                 regard to Braidwood Station, Units 1
                                                                                                                                                                 CFR part 50, appendix B, Criterion XVI,
                                                  of the NRC staff’s determination of the                  and 2, and Byron Station, Unit Nos. 1
                                                                                                                                                                 Corrective Action, for failure to update
                                                  successful completion of inspections,                    and 2. The petitioner’s requests are
                                                                                                                                                                 the AOR in a timely manner, (3) Require
                                                  tests and analyses.                                      included in the SUPPLEMENTARY
                                                                                                                                                                 Exelon (the licensee) to show that the
                                                                                                           INFORMATION section of this document.
                                                                                                                                                                 consequences of the secondary missiles
                                                  Vogtle Electric Generating Plant Unit 3,                 DATES: July 27, 2017.                                 resulting from MSIV room
                                                  Docket No. 5200025                                       ADDRESSES: Please refer to Docket ID                  pressurization do not have adverse
                                                    A complete list of the review status                   NRC–2017–0167 when contacting the                     consequences, (4) Issue a demand for
                                                  for VEGP, Unit 3 ITAAC, including the                    NRC about the availability of                         information under 10 CFR 2.204,
                                                  submission date and ADAMS Accession                      information regarding this document.                  ‘‘Demand for information,’’ to compare
                                                                                                           You may obtain publicly-available                     and contrast the behavior of Exelon
                                                  Number for each ICN received, the
                                                                                                           information related to this document                  management described in the petition
                                                  ADAMS Accession Number for each
                                                                                                           using any of the following methods:                   with the NRC’s policy statement on the
                                                  VEF, and the ADAMS Accession                                • Federal Rulemaking Web site: Go to               attributes of a safety-conscious work
                                                  Numbers for the inspection reports                       http://www.regulations.gov and search                 environment, and (5) Use Exelon’s
                                                  associated with these specific ITAAC,                    for Docket ID NRC–2017–0167. Address                  response to number 4, above, on which
                                                  can be found on the NRC’s Web site at                    questions about NRC dockets to Carol                  to determine whether to issue a
                                                  http://www.nrc.gov/reactors/new-                         Gallagher; telephone: 301–415–3463;                   ‘‘chilling effects’’ letter.
                                                  reactors/new-licensing-files/vog3-                       email: Carol.Gallagher@nrc.gov. For                      As the basis for this request, the
                                                  icnsr.pdf.                                               technical questions, contact the                      petitioner states that: (1) Break
                                                  Vogtle Electric Generating Plant Unit 4,                 individual listed in the FOR FURTHER                  enthalpies used in the MSIV room
                                                                                                           INFORMATION CONTACT section of this                   pressurization AOR are actually the
                                                  Docket No. 5200026
                                                                                                           document.                                             thermodynamic internal energy of the
                                                    A complete list of the review status                      • NRC’s Agencywide Documents                       steam, not the enthalpy. Since in the
                                                  for VEGP Unit 4 ITAAC, including the                     Access and Management System                          range of interest, the internal energy is
                                                  submission date and ADAMS Accession                      (ADAMS): You may obtain publicly-                     about 13 percent less than the enthalpy,
                                                  Number for each ICN received, the                        available documents online in the                     the energy flow to the areas of concern
                                                  ADAMS Accession Number for each                          ADAMS Public Documents collection at                  is non-conservative. Steam flow from
                                                  VEF, and the ADAMS Accession                             http://www.nrc.gov/reading-rm/                        secondary piping is neglected; (2)
                                                  Numbers for the inspection reports                       adams.html. To begin the search, select               Corrective actions to resolve an issue in
                                                                                                           ‘‘ADAMS Public Documents’’ and then                   the AOR are long overdue (8 years) and
                                                  associated with these specific ITAAC,
                                                                                                           select ‘‘Begin Web-based ADAMS                        improperly tracked; (3) A proposed
                                                  can be found on the NRC’s Web site at
                                                                                                           Search.’’ For problems with ADAMS,                    revision to the AOR shows that the
                                                  http://www.nrc.gov/reactors/new-
                                                                                                           please contact the NRC’s Public                       MSIV room roof slabs will be ejected by
                                                  reactors/new-licensing-files/vog4-                       Document Room (PDR) reference staff at                the high pressures in the MSIV rooms
                                                  icnsr.pdf.                                               1–800–397–4209, 301–415–4737, or by                   becoming potential missiles; and (4)
                                                    Dated at Rockville, Maryland, this 18th day            email to pdr.resource@nrc.gov. The                    Management dismissed information in
                                                  of July 2017.                                            ADAMS accession number for each                       the Updated Final Safety Evaluation
                                                    For the Nuclear Regulatory Commission.                 document referenced (if it is available in            Report (UFSAR) that supported the
                                                  Jennifer Dixon-Herrity,                                  ADAMS) is provided the first time that                concerns about the AOR as ‘‘excessive
                                                                                                           it is mentioned in this document.                     detail’’ and directed personnel to
                                                  Chief, Licensing Branch 4, Division of New
                                                                                                              • NRC’s PDR: You may examine and                   remove the information. Management
                                                  Reactor Licensing, Office of New Reactors.
                                                                                                           purchase copies of public documents at                dismissed UFSAR internal
mstockstill on DSK30JT082PROD with NOTICES




                                                  [FR Doc. 2017–15754 Filed 7–26–17; 8:45 am]
                                                                                                           the NRC’s PDR, Room O1–F21, One                       inconsistency related to the ‘‘Break
                                                  BILLING CODE 7590–01–P                                   White Flint North, 11555 Rockville                    Exclusion Zone’’ without discussion or
                                                                                                           Pike, Rockville, Maryland 20852.                      review and stated that the information
                                                                                                           FOR FURTHER INFORMATION CONTACT: Joel                 supporting the concern could be deleted
                                                                                                           S. Wiebe, Office of Nuclear Reactor                   as an UFSAR cleanup item. Recently,
                                                                                                           Regulation, U.S. Nuclear Regulatory                   there was an operability concern where
                                                                                                           Commission, Washington, DC 20555–                     engineering management maintained a


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00071   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1



Document Created: 2017-07-27 02:07:37
Document Modified: 2017-07-27 02:07:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe determination of the successful completion of inspections, tests, and analyses for VEGP, Units 3 and 4 is effective July 27, 2017.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation82 FR 34992 