82_FR_35195 82 FR 35052 - Petition for Waiver of Compliance

82 FR 35052 - Petition for Waiver of Compliance

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration

Federal Register Volume 82, Issue 143 (July 27, 2017)

Page Range35052-35053
FR Document2017-15790

Federal Register, Volume 82 Issue 143 (Thursday, July 27, 2017)
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Pages 35052-35053]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-15790]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket Number FRA-2017-0059]


Petition for Waiver of Compliance

    Under part 211 of Title 49 of the Code of Federal Regulations 
(CFR), this provides the public notice that on June 27, 2017 the San 
Bernardino Railroad Historical Society Inc. (SBRHS) petitioned the 
Federal Railroad Administration (FRA) for a waiver of compliance from 
certain provisions of the Federal railroad safety regulations contained 
at 49 CFR part 230, Steam Locomotive Inspection and Maintenance 
Standards. FRA assigned the petition docket number FRA-2017-0059.
    SBRHS maintains and operates No. 3751, a 4-8-4 ``Northern'' type 
steam locomotive built by the Baldwin Locomotive Works in 1927 for the 
Atchison, Topeka & Santa Fe Railroad. SBRHS requests relief from 
performing the 1472 service day inspection (SDI), for No. 3751, as it 
pertains to the inspection of the boiler every 15 calendar years or 
1472 service days under 49 CFR 230.17--One thousand four hundred 
seventy-two (1472) service day inspection. SBRHS is requesting an 
additional 139 calendar days before performing a 1472 SDI. The previous 
SDI was performed on August 14, 2002. Granting relief will allow No. 
3751 an

[[Page 35053]]

SDI period of 15 calendar years and 139 calendar days while not 
exceeding 1472 service days.
    SBRHS sporadically operates No. 3751 for display in the Los Angeles 
area as well as excursions to San Diego and San Bernardino, CA and 
Williams, AZ. SBRHS's justification for requesting relief is that No. 
3751 has only operated for a total of 141 service days within the 15-
calendar year period. SBRHS anticipates approximately 10 additional 
service days for the locomotive during the requested time extension.
    A copy of the petition, as well as any written communications 
concerning the petition, is available for review online at 
www.regulations.gov and in person at the Department of Transportation's 
Docket Operations Facility, 1200 New Jersey Ave. SE., W12-140, 
Washington, DC 20590. The Docket Operations Facility is open from 9 
a.m. to 5 p.m., Monday through Friday, except Federal Holidays.
    Interested parties are invited to participate in these proceedings 
by submitting written views, data, or comments. FRA does not anticipate 
scheduling a public hearing in connection with these proceedings since 
the facts do not appear to warrant a hearing. If any interested parties 
desire an opportunity for oral comment, they should notify FRA, in 
writing, before the end of the comment period and specify the basis for 
their request.
    All communications concerning these proceedings should identify the 
appropriate docket number and may be submitted by any of the following 
methods:
     Web site: http://www.regulations.gov. Follow the online 
instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: Docket Operations Facility, U.S. Department of 
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC 
20590.
     Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140, 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal Holidays.
    Communications received by September 11, 2017 will be considered by 
FRA before final action is taken. Comments received after that date 
will be considered if practicable.
    Anyone can search the electronic form of any written communications 
and comments received into any of our dockets by the name of the 
individual submitting the comment (or signing the document, if 
submitted on behalf of an association, business, labor union, etc.). In 
accordance with 5 U.S.C. 553(c), DOT solicits comments from the public 
to better inform its processes. DOT posts these comments, without edit, 
including any personal information the commenter provides, to 
www.regulations.gov, as described in the system of records notice (DOT/
ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/privacy. See also https://www.regulations.gov/privacyNotice for the 
privacy notice of regulations.gov.

    Issued in Washington, DC.
Robert C. Lauby,
Associate Administrator for Railroad Safety, Chief Safety Officer.
[FR Doc. 2017-15790 Filed 7-26-17; 8:45 am]
 BILLING CODE 4910-06-P



                                                  35052                          Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices

                                                  resulted in a lower level of safety than                 states that of those railroads, 5 safely              by FRA before final action is taken.
                                                  was maintained before it was granted; or                 transport more hazmat than GDLK.                      Comments received after that date will
                                                  (3) continuation of the exemption would                  GDLK conducts ultrasonic rail and                     be considered as far as practicable.
                                                  not be consistent with the goals and                     geometry testing twice per year over the                Anyone can search the electronic
                                                  objectives of 49 U.S.C. 31136 and 31315.                 entire railroad. GDLK operates to the                 form of any written communications
                                                    If the exemption is still effective at the             north of subject trackage from milepost               and comments received into any of our
                                                  end of the two year period, the person                   33 to milepost 102.3 a mix of TWC and                 dockets by the name of the individual
                                                  may apply to FMCSA for a renewal                         yard limits (YL). There are two manual                submitting the comment (or signing the
                                                  under procedures in effect at that time.                 interlockings on the north section of                 document, if submitted on behalf of an
                                                    Issued on: July 19, 2017.                              track using TWC as an acceptable                      association, business, labor union, etc.).
                                                                                                           method of operation. TWC is the                       In accordance with 5 U.S.C. 553(c), DOT
                                                  Larry W. Minor,
                                                                                                           method of operation used by all                       solicits comments from the public to
                                                  Associate Administrator for Policy.                      dispatched Watco railroads, including                 better inform its processes. DOT posts
                                                  [FR Doc. 2017–15839 Filed 7–26–17; 8:45 am]              parts of the GDLK. Watco states that the              these comments, without edit, including
                                                  BILLING CODE 4910–EX–P                                   discontinuance of the TCS section and                 any personal information the
                                                                                                           converting it to TWC maintains the                    commenter provides, to
                                                                                                           consistency of dispatching and                        www.regulations.gov, as described in
                                                  DEPARTMENT OF TRANSPORTATION                             standardization of training for the                   the system of records notice (DOT/ALL–
                                                                                                           GDLK, and will provide a higher level                 14 FDMS), which can be reviewed at
                                                  Federal Railroad Administration
                                                                                                           of safety through simplified operations               https://www.transportation.gov/privacy.
                                                  [Docket Number FRA–2016–0058]                            by having one method of controlled                    See also https://www.regulations.gov/
                                                                                                           operation rather than the two it has                  privacyNotice for the privacy notice of
                                                  Notice of Application for Approval of                    now. Watco further states that this                   regulations.gov.
                                                  Discontinuance or Modification of a                      consistency and standardization of
                                                  Railroad Signal System                                   dispatching and training will enhance                 Robert C. Lauby,
                                                                                                           the safety of GDLK operations.                        Associate Administrator for Railroad Safety,
                                                     Under part 235 of Title 49 of the Code                                                                      Chief Safety Officer.
                                                  of Federal Regulations (CFR) and 49                         A copy of the petition, as well as any
                                                                                                           written communications concerning the                 [FR Doc. 2017–15789 Filed 7–26–17; 8:45 am]
                                                  U.S.C. 20502(a), this provides the public
                                                  notice that on June 30, 2017, Watco                      petition, is available for review online at           BILLING CODE 4910–06–P

                                                  Companies LLC (Watco) petitioned the                     www.regulatons.gov and in person at the
                                                  Federal Railroad Administration (FRA)                    U.S. Department of Transportation’s
                                                                                                           Docket Operations Facility, 1200 New                  DEPARTMENT OF TRANSPORTATION
                                                  seeking reconsideration of a decision
                                                  regarding the discontinuance or                          Jersey Avenue SE., W12–140,
                                                                                                           Washington, DC 20590. The Docket                      Federal Railroad Administration
                                                  modification of a signal system. FRA
                                                  assigned the petition Docket Number                      Operations Facility is open from 9 a.m.               [Docket Number FRA–2017–0059]
                                                  FRA–2016–0058.                                           to 5 p.m., Monday through Friday,
                                                                                                           except Federal Holidays.                              Petition for Waiver of Compliance
                                                     Applicant: Watco Companies LLC,
                                                                                                              Interested parties are invited to
                                                  Anthony Cox, VP of Engineering, 315 E.                                                                           Under part 211 of Title 49 of the Code
                                                                                                           participate in these proceedings by
                                                  3rd St., Pittsburg, KS 66762.                                                                                  of Federal Regulations (CFR), this
                                                                                                           submitting written views, data, or
                                                     Watco is the owner-operator of the                                                                          provides the public notice that on June
                                                                                                           comments. FRA does not anticipate
                                                  Grand Elk Railroad LLC (GDLK), which                                                                           27, 2017 the San Bernardino Railroad
                                                                                                           scheduling a public hearing in
                                                  operates on track that is currently leased                                                                     Historical Society Inc. (SBRHS)
                                                                                                           connection with these proceedings since
                                                  from Norfolk Southern Railway                                                                                  petitioned the Federal Railroad
                                                                                                           the facts do not appear to warrant a
                                                  Company (NS). Watco requests                                                                                   Administration (FRA) for a waiver of
                                                                                                           hearing. If any interested parties desire
                                                  reconsideration under 49 CFR 235.13(a)                                                                         compliance from certain provisions of
                                                                                                           an opportunity for oral comment, they
                                                  of FRA’s denial of its application to                                                                          the Federal railroad safety regulations
                                                                                                           should notify FRA, in writing, before
                                                  discontinue and remove the traffic                                                                             contained at 49 CFR part 230, Steam
                                                                                                           the end of the comment period and
                                                  control system (TCS) from mile post                                                                            Locomotive Inspection and
                                                                                                           specify the basis for their request.
                                                  (MP) 33.00 at Park, in Grand Rapids, MI                     All communications concerning these                Maintenance Standards. FRA assigned
                                                  to MP 1.4 at the end of GDLK, in                         proceedings should identify the                       the petition docket number FRA–2017–
                                                  Elkhart, IN. FRA issued its decision                     appropriate docket number and may be                  0059.
                                                  letter denying the application on                        submitted by any of the following                       SBRHS maintains and operates No.
                                                  November 29, 2016, and issued a second                   methods:                                              3751, a 4–8–4 ‘‘Northern’’ type steam
                                                  letter to clarify the basis of its decision                 • Web site: http://                                locomotive built by the Baldwin
                                                  on January 10, 2017.                                     www.regulations.gov. Follow the online                Locomotive Works in 1927 for the
                                                     Based on new facts and new evidence,                  instructions for submitting comments.                 Atchison, Topeka & Santa Fe Railroad.
                                                  Watco is seeking reconsideration of its                     • Fax: 202–493–2251.                               SBRHS requests relief from performing
                                                  application on behalf of GDLK. Watco                        • Mail: Docket Operations Facility,                the 1472 service day inspection (SDI),
                                                  asserts that FRA’s Railroad Safety Board                 U.S. Department of Transportation, 1200               for No. 3751, as it pertains to the
                                                  (Board) based its denial on erroneous                    New Jersey Avenue SE., W12–140,                       inspection of the boiler every 15
                                                  information. Watco believes the                          Washington, DC 20590.                                 calendar years or 1472 service days
mstockstill on DSK30JT082PROD with NOTICES




                                                  hazardous materials (hazmat)                                • Hand Delivery: 1200 New Jersey                   under 49 CFR 230.17—One thousand
                                                  information provided in the field report                 Avenue, SE., Room W12–140,                            four hundred seventy-two (1472) service
                                                  considered by the Board was out of date                  Washington, DC 20590, between 9 a.m.                  day inspection. SBRHS is requesting an
                                                  or incorrect.                                            and 5 p.m., Monday through Friday,                    additional 139 calendar days before
                                                     Watco owns and operates 20 railroads                  except Federal Holidays.                              performing a 1472 SDI. The previous
                                                  on 3570 miles of main line that is track                    Communications received by                         SDI was performed on August 14, 2002.
                                                  warrant controlled (TWC) and Watco                       September 11, 2017 will be considered                 Granting relief will allow No. 3751 an


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00130   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1


                                                                                 Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices                                          35053

                                                  SDI period of 15 calendar years and 139                  better inform its processes. DOT posts                previously arranged place of safety
                                                  calendar days while not exceeding 1472                   these comments, without edit, including               designated as a ‘‘clearance area’’ that
                                                  service days.                                            any personal information the                          may be slightly less than four feet from
                                                    SBRHS sporadically operates No.                        commenter provides, to                                the near running rail but, due to track
                                                  3751 for display in the Los Angeles area                 www.regulations.gov, as described in                  and station structure configurations,
                                                  as well as excursions to San Diego and                   the system of records notice (DOT/ALL–                provide a safe haven from the risk of
                                                  San Bernardino, CA and Williams, AZ.                     14 FDMS), which can be reviewed at                    being struck by moving trains or on-
                                                  SBRHS’s justification for requesting                     https://www.transportation.gov/privacy.               track equipment.
                                                  relief is that No. 3751 has only operated                See also https://www.regulations.gov/                    Amtrak’s waiver request states that it
                                                  for a total of 141 service days within the               privacyNotice for the privacy notice of               faces operational problems complying
                                                  15-calendar year period. SBRHS                           regulations.gov.                                      with new provisions in 49 CFR
                                                  anticipates approximately 10 additional                                                                        214.329(a), effective April 1, 2017,
                                                                                                             Issued in Washington, DC.
                                                  service days for the locomotive during                                                                         while operating an average of
                                                                                                           Robert C. Lauby,                                      approximately 1,100 weekday, and 700
                                                  the requested time extension.
                                                    A copy of the petition, as well as any                 Associate Administrator for Railroad Safety,          weekend departures and arrivals. Penn
                                                                                                           Chief Safety Officer.                                 Station has 21 tracks fed by seven
                                                  written communications concerning the
                                                  petition, is available for review online at              [FR Doc. 2017–15790 Filed 7–26–17; 8:45 am]           tunnels (the two Hudson River Tunnels,
                                                  www.regulations.gov and in person at                     BILLING CODE 4910–06–P                                the four East River Tunnels, and the
                                                  the Department of Transportation’s                                                                             single Empire Connection tunnel). It is
                                                  Docket Operations Facility, 1200 New                                                                           at the center of the Northeast Corridor
                                                  Jersey Ave. SE., W12–140, Washington,                    DEPARTMENT OF TRANSPORTATION                          as well as the main intercity railroad
                                                  DC 20590. The Docket Operations                                                                                station in New York City. Intercity
                                                                                                           Federal Railroad Administration
                                                  Facility is open from 9 a.m. to 5 p.m.,                                                                        trains are operated by Amtrak, which
                                                  Monday through Friday, except Federal                    [Docket Number FRA–2017–0061]                         owns the station, while commuter rail
                                                  Holidays.                                                                                                      services are operated by the Long Island
                                                    Interested parties are invited to                      Petition for Waiver of Compliance                     Rail Road and New Jersey Transit. In its
                                                  participate in these proceedings by                                                                            waiver request, Amtrak also states that,
                                                                                                              Under Part 211 of Title 49 of the Code
                                                  submitting written views, data, or                                                                             prior to the new rule, Amtrak roadway
                                                                                                           of Federal Regulations (CFR), this                    workers using train approach warning
                                                  comments. FRA does not anticipate                        provides the public notice that on June
                                                  scheduling a public hearing in                                                                                 as a method of protection in Penn
                                                                                                           28, 2017 the National Railroad                        Station would clear to another track as
                                                  connection with these proceedings since                  Passenger Corporation (Amtrak)
                                                  the facts do not appear to warrant a                                                                           their place of safety when the
                                                                                                           petitioned the Federal Railroad                       Watchman/Lookout provided a warning
                                                  hearing. If any interested parties desire                Administration (FRA) for a waiver of
                                                  an opportunity for oral comment, they                                                                          of an impending movement on the track
                                                                                                           compliance from certain provisions of                 which they occupied or fouled. In
                                                  should notify FRA, in writing, before                    the Federal railroad safety regulations in
                                                  the end of the comment period and                                                                              addition, Amtrak’s waiver request states
                                                                                                           49 CFR part 214. FRA assigned the                     that the revised rule now prohibits
                                                  specify the basis for their request.                     petition docket number FRA–2017–
                                                    All communications concerning these                                                                          making the place of safety another track
                                                                                                           0061.                                                 unless working limits are established on
                                                  proceedings should identify the
                                                                                                              Amtrak is requesting relief from the               that track and movement authority is
                                                  appropriate docket number and may be
                                                                                                           definition of ‘‘fouling a track’’ found at            withheld or not authorized by the
                                                  submitted by any of the following
                                                                                                           49 CFR 214.7 at certain locations within              roadway worker-in-charge. Finally, the
                                                  methods:
                                                    • Web site: http://                                    Amtrak’s New York Penn Station. The                   waiver request states that the additional
                                                  www.regulations.gov. Follow the online                   waiver is sought for the express purpose              constraints and disruption of
                                                  instructions for submitting comments.                    of increasing the number of areas                     movement, and subsequent delays to
                                                    • Fax: 202–493–2251.                                   considered a ‘‘place of safety’’ under                trains and passengers required to
                                                    • Mail: Docket Operations Facility,                    214.329 to improve the safety and                     establish working limits, could be
                                                  U.S. Department of Transportation, 1200                  efficiency of roadway maintenance                     significantly offset if Amtrak could
                                                  New Jersey Avenue SE., W12–140,                          procedures at that location. Safety will              utilize existing places of refuge that do
                                                  Washington, DC 20590.                                    be improved by reducing the distance                  not meet the requirements of the
                                                    • Hand Delivery: 1200 New Jersey                       roadway workers must move and                         regulation.
                                                  Avenue SE., Room W12–140,                                lessening the number of live tracks they                 Amtrak explains in its request that
                                                  Washington, DC 20590, between 9 a.m.                     may have to cross to reach a place of                 New York Penn Station was built
                                                  and 5 p.m., Monday through Friday,                       safety upon receiving warning of an                   between 1901 and 1910, and is entirely
                                                  except Federal Holidays.                                 approaching train. Efficiency of                      underground. As such, Amtrak asserts
                                                    Communications received by                             roadway maintenance procedures will                   the architecture and track configurations
                                                  September 11, 2017 will be considered                    be improved by increasing the number                  within the station area provide several
                                                  by FRA before final action is taken.                     of clearing locations, thereby reducing               locations where it is physically
                                                  Comments received after that date will                   time spent moving to and from places of               impossible to be struck by moving
                                                  be considered if practicable.                            safety.                                               equipment despite being within four
                                                    Anyone can search the electronic                          The area under consideration in New                feet of the near rail. Amtrak believes
                                                  form of any written communications                       York Penn Station lies between the                    these areas provide the same level of
mstockstill on DSK30JT082PROD with NOTICES




                                                  and comments received into any of our                    Hudson River and Empire Connection                    safety as a tunnel niche without the
                                                  dockets by the name of the individual                    tunnels to the west and the East River                restrictions of a confined space. Amtrak
                                                  submitting the comment (or signing the                   tunnels to the east when certain                      explains that except for the use of
                                                  document, if submitted on behalf of an                   conditions, identified below, are met. If             tunnel niches and clearing bays
                                                  association, business, labor union, etc.).               approved, when train approach warning                 provided for in 49 CFR 214.317(d), the
                                                  In accordance with 5 U.S.C. 553(c), DOT                  is used as the method of protection,                  214.7 definition of ‘‘fouling a track’’
                                                  solicits comments from the public to                     roadway workers may move to a                         prevents the use of other infrastructure


                                             VerDate Sep<11>2014   19:17 Jul 26, 2017   Jkt 241001   PO 00000   Frm 00131   Fmt 4703   Sfmt 4703   E:\FR\FM\27JYN1.SGM   27JYN1



Document Created: 2017-07-27 02:07:24
Document Modified: 2017-07-27 02:07:24
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 35052 