82_FR_35667 82 FR 35522 - Notice of Public Hearing and Business Meeting August 16 and September 14, 2017

82 FR 35522 - Notice of Public Hearing and Business Meeting August 16 and September 14, 2017

DELAWARE RIVER BASIN COMMISSION

Federal Register Volume 82, Issue 145 (July 31, 2017)

Page Range35522-35523
FR Document2017-16041

Federal Register, Volume 82 Issue 145 (Monday, July 31, 2017)
[Federal Register Volume 82, Number 145 (Monday, July 31, 2017)]
[Notices]
[Pages 35522-35523]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-16041]


=======================================================================
-----------------------------------------------------------------------

DELAWARE RIVER BASIN COMMISSION


Notice of Public Hearing and Business Meeting August 16 and 
September 14, 2017

    Notice is hereby given that the Delaware River Basin Commission 
will hold a public hearing on Wednesday, August 16, 2017 at the 
Washington Crossing Historic Park Visitor Center, 1112 River Road, 
Washington Crossing, Pennsylvania. A business meeting will be held the 
following month on Wednesday, September 13, 2017 at the Linksz 
Pavilion, Bucks County Community College, 275 Swamp Road, Newtown, 
Pennsylvania. The hearing and meeting are open to the public.
    Public Hearing. The public hearing on August 16, 2017 will begin at 
1:30 p.m. Hearing items will include draft dockets for withdrawals, 
discharges, and other water-related projects subject to the 
Commission's review.
    The list of projects scheduled for hearing, including project 
descriptions, will be posted on the Commission's Web site, 
www.drbc.net, in a long form of this notice at least ten days before 
the hearing date. Any draft resolutions scheduled for hearing also will 
be posted at www.drbc.net ten or more days prior to the hearing.
    Written comments on matters scheduled for hearing on August 16 will 
be accepted through 5:00 p.m. on August 21. Time permitting, an 
opportunity for Open Public Comment will be provided upon the 
conclusion of Commission business at the September 13 Business Meeting; 
in accordance with recent format changes, this opportunity will not be 
offered upon completion of the Public Hearing.
    The public is advised to check the Commission's Web site 
periodically prior to the hearing date, as items scheduled for hearing 
may be postponed if additional time is deemed necessary to complete the 
Commission's review, and items may be added up to ten days prior to the 
hearing date. In reviewing docket descriptions, the public is also 
asked to be aware that project details commonly change in the course of 
the Commission's review, which is ongoing.
    Public Meeting. The public business meeting on September 13, 2017 
will begin at 10:30 a.m. and will include: Adoption of the Minutes of 
the Commission's June 14, 2017 Business Meeting, announcements of 
upcoming meetings and events, a report on hydrologic conditions, 
reports by the Executive Director and the Commission's General Counsel, 
and consideration of any items for which a hearing has been completed 
or is not required. The latter are expected to include resolutions: (1) 
Authorizing the Executive Director to enter into an agreement with the 
Wildlands Conservancy for project services associated with dam removals 
to be performed as mitigation for natural resource damages associated 
with the 2005 ash slurry spill from the PPL Martins Creek Steam 
Electric Station in Lower Mount Bethel Township, Pa.; (2) authorizing 
the Executive Director to establish a purchasing card (``P-Card'') 
system for making electronic payments

[[Page 35523]]

for certain Commission expenses; and (3) providing for replacement of 
the 1970's-era HVAC system at the Commission's West Trenton office 
building. After all scheduled business has been completed and as time 
allows, the Business Meeting will also include up to one hour of Open 
Public Comment.
    There will be no opportunity for additional public comment for the 
record at the September 13 Business Meeting on items for which a 
hearing was completed on August 16 or a previous date. Commission 
consideration on September 13 of items for which the public hearing is 
closed may result in approval of the item (by docket or resolution) as 
proposed, approval with changes, denial, or deferral. When the 
Commissioners defer an action, they may announce an additional period 
for written comment on the item, with or without an additional hearing 
date, or they may take additional time to consider the input they have 
already received without requesting further public input. Any deferred 
items will be considered for action at a public meeting of the 
Commission on a future date.
    Advance Sign-Up for Oral Comment. Individuals who wish to comment 
on the record during the public hearing on August 16 or to address the 
Commissioners informally during the Open Public Comment portion of the 
meeting on September 13 as time allows, are asked to sign-up in advance 
through EventBrite, the online registration process recently introduced 
by the Commission. Links to EventBrite for the Public Hearing and the 
Business Meeting are available at drbc.net. For assistance, please 
contact Ms. Paula Schmitt of the Commission staff, at 
[email protected].
    Addresses for Written Comment. Written comment on items scheduled 
for hearing may be made through SmartComment, the web-based comment 
system recently introduced by the Commission, a link to which is posted 
at drbc.net. Although use of SmartComment is strongly preferred, 
comments may also be delivered by hand at the public hearing; or by 
hand, U.S. Mail or private carrier to Commission Secretary, P.O. Box 
7360, 25 Cosey Road, West Trenton, NJ 08628. For assistance, please 
contact Paula Schmitt at [email protected].
    Accommodations for Special Needs. Individuals in need of an 
accommodation as provided for in the Americans with Disabilities Act 
who wish to attend the informational meeting, conference session or 
hearings should contact the Commission Secretary directly at 609-883-
9500 ext. 203 or through the Telecommunications Relay Services (TRS) at 
711, to discuss how we can accommodate your needs.
    Additional Information, Contacts. Additional public records 
relating to hearing items may be examined at the Commission's offices 
by appointment by contacting Carol Adamovic, 609-883-9500, ext. 249. 
For other questions concerning hearing items, please contact Judith 
Scharite, Project Review Section assistant at 609-883-9500, ext. 216.

    Dated: July 25, 2017.
Pamela M. Bush,
Commission Secretary and Assistant General Counsel.
[FR Doc. 2017-16041 Filed 7-28-17; 8:45 am]
 BILLING CODE 6360-01-P



                                                35522                                 Federal Register / Vol. 82, No. 145 / Monday, July 31, 2017 / Notices

                                                 MAXIMUM PER DIEM RATES FOR OFFICIAL TRAVEL IN ALASKA, HAWAII, THE COMMONWEALTHS OF PUERTO RICO AND THE
                                                    NORTHERN ISLANDS AND POSSESSIONS OF THE UNITED STATES BY FEDERAL GOVERNMENT CIVILIAN EMPLOYEES—
                                                    Continued
                                                                                                                                            Maximum                   Meals and               Maximum per
                                                                                     Locality                                                lodging                  incidentals                           Effective date
                                                                                                                                                                                               diem rate
                                                                                                                                             amount                       rate

                                                                                                                                               (A)             +          (B)           =         (C)

                                                        12/01–05/31 .................................................................          195                        88                     283         12/01/2015
                                                   LUQUILLO:
                                                        01/01–12/31 .................................................................          139                        92                     231         10/01/2012
                                                   MAYAGUEZ:
                                                        01/01–12/31 .................................................................          109                       112                     221         09/01/2010
                                                   PONCE:
                                                        01/01–12/31 .................................................................          149                        89                     238         09/01/2012
                                                   RIO GRANDE:
                                                        01/01–12/31 .................................................................          169                       123                     292         06/01/2012
                                                   SABANA SECA [INCL ALL MILITARY]:
                                                        06/01–11/30 .................................................................          167                        88                     255         12/01/2015
                                                        12/01–05/31 .................................................................          195                        88                     283         12/01/2015
                                                   SAN JUAN & NAV RES STA:
                                                        12/01–05/31 .................................................................          195                        88                     283         12/01/2015
                                                        06/01–11/30 .................................................................          167                        88                     255         12/01/2015
                                                   VIEQUES:
                                                        01/01–12/31 .................................................................          175                        95                     270         03/01/2012
                                                VIRGIN ISLANDS (U.S.):
                                                   ST. CROIX:
                                                        04/15–12/14 .................................................................          247                       110                     357         06/01/2015
                                                        12/15–04/14 .................................................................          299                       116                     415         06/01/2015
                                                   ST. JOHN:
                                                        05/01–12/03 .................................................................          170                       107                     277         08/01/2015
                                                        12/04–04/30 .................................................................          230                       113                     343         08/01/2015
                                                   ST. THOMAS:
                                                        04/15–12/15 .................................................................          249                       110                     359         03/01/2017
                                                        12/16–04/14 .................................................................          339                       110                     449         03/01/2017
                                                WAKE ISLAND:
                                                   WAKE ISLAND:
                                                        01/01–12/31 .................................................................          129                        70                     199         07/01/2016



                                                [FR Doc. 2017–16043 Filed 7–28–17; 8:45 am]                          The list of projects scheduled for                         asked to be aware that project details
                                                BILLING CODE 5001–06–P                                            hearing, including project descriptions,                      commonly change in the course of the
                                                                                                                  will be posted on the Commission’s                            Commission’s review, which is ongoing.
                                                                                                                  Web site, www.drbc.net, in a long form                          Public Meeting. The public business
                                                DELAWARE RIVER BASIN                                              of this notice at least ten days before the                   meeting on September 13, 2017 will
                                                COMMISSION                                                        hearing date. Any draft resolutions                           begin at 10:30 a.m. and will include:
                                                                                                                  scheduled for hearing also will be                            Adoption of the Minutes of the
                                                Notice of Public Hearing and Business                             posted at www.drbc.net ten or more                            Commission’s June 14, 2017 Business
                                                Meeting August 16 and September 14,                               days prior to the hearing.                                    Meeting, announcements of upcoming
                                                2017                                                                 Written comments on matters                                meetings and events, a report on
                                                  Notice is hereby given that the                                 scheduled for hearing on August 16 will                       hydrologic conditions, reports by the
                                                Delaware River Basin Commission will                              be accepted through 5:00 p.m. on                              Executive Director and the
                                                hold a public hearing on Wednesday,                               August 21. Time permitting, an                                Commission’s General Counsel, and
                                                August 16, 2017 at the Washington                                 opportunity for Open Public Comment                           consideration of any items for which a
                                                Crossing Historic Park Visitor Center,                            will be provided upon the conclusion of                       hearing has been completed or is not
                                                1112 River Road, Washington Crossing,                             Commission business at the September                          required. The latter are expected to
                                                Pennsylvania. A business meeting will                             13 Business Meeting; in accordance                            include resolutions: (1) Authorizing the
                                                be held the following month on                                    with recent format changes, this                              Executive Director to enter into an
                                                Wednesday, September 13, 2017 at the                              opportunity will not be offered upon                          agreement with the Wildlands
                                                Linksz Pavilion, Bucks County                                     completion of the Public Hearing.                             Conservancy for project services
                                                Community College, 275 Swamp Road,                                   The public is advised to check the                         associated with dam removals to be
                                                                                                                  Commission’s Web site periodically                            performed as mitigation for natural
sradovich on DSKBCFCHB2PROD with NOTICES




                                                Newtown, Pennsylvania. The hearing
                                                and meeting are open to the public.                               prior to the hearing date, as items                           resource damages associated with the
                                                  Public Hearing. The public hearing on                           scheduled for hearing may be postponed                        2005 ash slurry spill from the PPL
                                                August 16, 2017 will begin at 1:30 p.m.                           if additional time is deemed necessary                        Martins Creek Steam Electric Station in
                                                Hearing items will include draft dockets                          to complete the Commission’s review,                          Lower Mount Bethel Township, Pa.; (2)
                                                for withdrawals, discharges, and other                            and items may be added up to ten days                         authorizing the Executive Director to
                                                water-related projects subject to the                             prior to the hearing date. In reviewing                       establish a purchasing card (‘‘P-Card’’)
                                                Commission’s review.                                              docket descriptions, the public is also                       system for making electronic payments


                                           VerDate Sep<11>2014      17:38 Jul 28, 2017     Jkt 241001     PO 00000     Frm 00016        Fmt 4703   Sfmt 4703   E:\FR\FM\31JYN1.SGM   31JYN1


                                                                                Federal Register / Vol. 82, No. 145 / Monday, July 31, 2017 / Notices                                                  35523

                                                for certain Commission expenses; and                     Secretary directly at 609–883–9500 ext.               Email: guzman.henry@epa.gov
                                                (3) providing for replacement of the                     203 or through the Telecommunications                 Telephone: 212–637–3166.
                                                1970’s-era HVAC system at the                            Relay Services (TRS) at 711, to discuss               SUPPLEMENTARY INFORMATION: The
                                                Commission’s West Trenton office                         how we can accommodate your needs.                    Settling Party agrees to pay EPA
                                                building. After all scheduled business                     Additional Information, Contacts.                   $261,000.00 in reimbursement of EPA’s
                                                has been completed and as time allows,                   Additional public records relating to                 past response costs paid at or in
                                                the Business Meeting will also include                   hearing items may be examined at the                  connection with the Site.
                                                up to one hour of Open Public                            Commission’s offices by appointment by                   The settlement includes a covenant by
                                                Comment.                                                 contacting Carol Adamovic, 609–883–                   EPA not to sue or to take administrative
                                                   There will be no opportunity for                      9500, ext. 249. For other questions                   action against the Settling Party
                                                additional public comment for the                        concerning hearing items, please contact              pursuant to Section 107(a) of CERCLA,
                                                record at the September 13 Business                      Judith Scharite, Project Review Section               42 U.S.C. 9607(a), with regard to the
                                                Meeting on items for which a hearing                     assistant at 609–883–9500, ext. 216.                  response costs related to the work at the
                                                was completed on August 16 or a                                                                                Site enumerated in the settlement
                                                                                                           Dated: July 25, 2017.
                                                previous date. Commission                                                                                      agreement. For thirty (30) days
                                                consideration on September 13 of items                   Pamela M. Bush,
                                                                                                         Commission Secretary and Assistant General            following the date of publication of this
                                                for which the public hearing is closed                                                                         notice, EPA will receive written
                                                may result in approval of the item (by                   Counsel.
                                                                                                         [FR Doc. 2017–16041 Filed 7–28–17; 8:45 am]           comments relating to the settlement.
                                                docket or resolution) as proposed,                                                                             EPA will consider all comments
                                                approval with changes, denial, or                        BILLING CODE 6360–01–P
                                                                                                                                                               received and may modify or withdraw
                                                deferral. When the Commissioners defer
                                                                                                                                                               its consent to the settlement if
                                                an action, they may announce an
                                                                                                                                                               comments received disclose facts or
                                                additional period for written comment                    ENVIRONMENTAL PROTECTION
                                                                                                                                                               considerations that indicate that the
                                                on the item, with or without an                          AGENCY
                                                                                                                                                               proposed settlement is inappropriate,
                                                additional hearing date, or they may                     [FRL–9964–99–Region 2]                                improper, or inadequate. EPA’s
                                                take additional time to consider the
                                                                                                                                                               response to any comments received will
                                                input they have already received                         Proposed CERCLA Cost Recovery                         be available for public inspection at
                                                without requesting further public input.                 Settlement for the Computer Circuits                  EPA Region 2, 290 Broadway, New
                                                Any deferred items will be considered                    Superfund Site, Hauppauge, Suffolk
                                                for action at a public meeting of the                                                                          York, New York 10007–1866.
                                                                                                         County, New York
                                                Commission on a future date.                                                                                     Dated: July 5, 2017.
                                                   Advance Sign-Up for Oral Comment.                     AGENCY: Environmental Protection                      John Prince,
                                                Individuals who wish to comment on                       Agency (EPA).                                         Acting Director, Emergency and Remedial
                                                the record during the public hearing on                  ACTION: Notice; request for public                    Response Division, U.S. Environmental
                                                August 16 or to address the                              comment.                                              Protection Agency, Region 2.
                                                Commissioners informally during the                                                                            [FR Doc. 2017–16069 Filed 7–28–17; 8:45 am]
                                                Open Public Comment portion of the                       SUMMARY:    In accordance with the                    BILLING CODE 6560–50–P
                                                meeting on September 13 as time                          Comprehensive Environmental
                                                allows, are asked to sign-up in advance                  Response, Compensation, and Liability
                                                through EventBrite, the online                           Act of 1980, as amended (‘‘CERCLA’’),                 FEDERAL DEPOSIT INSURANCE
                                                registration process recently introduced                 notice is hereby given by the U.S.                    CORPORATION
                                                by the Commission. Links to EventBrite                   Environmental Protection Agency
                                                for the Public Hearing and the Business                  (‘‘EPA’’), Region 2, of a proposed cost               Notice to All Interested Parties of the
                                                Meeting are available at drbc.net. For                   recovery settlement agreement pursuant                Termination of the Receivership of
                                                assistance, please contact Ms. Paula                     to CERCLA, with 145 Marcus Blvd., Inc.                10381—LandMark Bank of Florida
                                                Schmitt of the Commission staff, at                      (‘‘Settling Party’’) for the Computer                 Sarasota, Florida
                                                paula.schmitt@drbc.nj.gov.                               Circuits Superfund Site (‘‘Site’’), located
                                                   Addresses for Written Comment.                        in Hauppauge, Suffolk County, New                        Notice is hereby given that the Federal
                                                Written comment on items scheduled                       York.                                                 Deposit Insurance Corporation (FDIC) as
                                                for hearing may be made through                                                                                Receiver for LandMark Bank of Florida,
                                                                                                         DATES: Comments must be submitted on                  Sarasota, Florida (‘‘the Receiver’’)
                                                SmartComment, the web-based
                                                                                                         or before August 30, 2017.                            intends to terminate its receivership for
                                                comment system recently introduced by
                                                the Commission, a link to which is                       ADDRESSES: The proposed settlement is                 said institution. The FDIC was
                                                posted at drbc.net. Although use of                      available for public inspection at EPA                appointed Receiver of LandMark Bank
                                                SmartComment is strongly preferred,                      Region 2 offices at 290 Broadway, New                 of Florida, Sarasota, Florida on July 22,
                                                comments may also be delivered by                        York, New York 10007–1866. Comments                   2011. The liquidation of the
                                                hand at the public hearing; or by hand,                  should reference the Computer Circuits                receivership assets has been completed.
                                                U.S. Mail or private carrier to                          Superfund Site, Hauppauge, Suffolk                    To the extent permitted by available
                                                Commission Secretary, P.O. Box 7360,                     County, New York, Index No. II–                       funds and in accordance with law, the
                                                25 Cosey Road, West Trenton, NJ 08628.                   CERCLA–02–2017–2017. To request a                     Receiver will be making a final dividend
                                                For assistance, please contact Paula                     copy of the proposed settlement                       payment to proven creditors.
                                                                                                         agreement, please contact the EPA                        Based upon the foregoing, the
sradovich on DSKBCFCHB2PROD with NOTICES




                                                Schmitt at paula.schmitt@drbc.nj.gov.
                                                   Accommodations for Special Needs.                     employee identified below.                            Receiver has determined that the
                                                Individuals in need of an                                FOR FURTHER INFORMATION CONTACT:                      continued existence of the receivership
                                                accommodation as provided for in the                     Henry Guzman, Attorney, Office of                     will serve no useful purpose.
                                                Americans with Disabilities Act who                      Regional Counsel, New York/Caribbean                  Consequently, notice is given that the
                                                wish to attend the informational                         Superfund Branch, U.S. Environmental                  receivership shall be terminated, to be
                                                meeting, conference session or hearings                  Protection Agency, 290 Broadway, 17th                 effective no sooner than thirty days after
                                                should contact the Commission                            Floor, New York, NY 10007–1866.                       the date of this notice. If any person


                                           VerDate Sep<11>2014   17:38 Jul 28, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\31JYN1.SGM   31JYN1



Document Created: 2017-07-29 00:21:50
Document Modified: 2017-07-29 00:21:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 35522 

2025 Federal Register | Disclaimer | Privacy Policy